Records in 2001. Most recent: inspection, 27 February 2001.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Deck/Cargo
Issued 27 February 2001
No resolution recorded
Steam piping for heating cargo was corroded and had several temporary patches on various pipes.SOLAS 74 CHP.II-1 REG 26.1.
Condition: Unknown
Due 13 March 2001 — due date passed with no resolution recorded
Electrical
Issued 19 February 2001
Resolved
ENGINE ROOM HAS NUMEROUS DEAD END WIRES. (SOLAS 74A REG. II-1/45.1.3)_x001C_ REMOVE ALL DEAD END WIRING BY 19MAR01_x001C_
Condition: Unknown
Due 19 March 2001
Resolved 20 February 2001
Accommodation/Occupational Safety
Issued 19 February 2001
No resolution recorded
BOTH OF THE VESSEL'S GANG WAYS WERE DESTROYED OR REMOVED IN STORM VESSEL ENCOUNTERED DURING TRANSIT. (ILLC 66 ANNEX I/15)_x001C_ PORTABLE GANGWAY ONBOARD CLASS ISSUED COC FOR PERMANENT REPAIRS TO BOTH GANGWAYS TO BE CARRIED OUT NLT COMPLIANCE DATE.
Condition: Unknown
Due 31 May 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 19 February 2001
No resolution recorded
NUMEROUS DECK EQUIPMENT AND STRUCTURES DESTROYED DURING STORM VESSEL ENCOUNTERED DURING TRANSIT. (SOLAS 74A REG. I/11)_x001C_ PROVIDE CLASS REPORT VERIFYING REPAIRS OF DESTROYED ITEMS. CLASS ISSUED COC'S TO BE CARRIED OUT NLT COMPLIANCE DATE._x001C_
Condition: Unknown
Due 31 May 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 19 February 2001
Resolved
INERT GAS OXYGEN ANALYZER DOES NOT MATCH ANALYZER LISTED IN IGS MANUAL.(SOLAS 74A REG. II-2/62.21)_x001C_ PROVIDE CLASS APPROVAL FOR THE CURRENT ANALYZER AND ITS INSTALLATION PRIOR TO DEPARTURE._x001C_
Condition: Unknown
Due 19 February 2001
Resolved 20 February 2001
Documentation
Issued 19 February 2001
No resolution recorded
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 19 March 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 19 February 2001
Resolved
INERT GAS SCRUBBER HAS CRACK ON BOTTOM AFT CENTER GAS INLET SIDE. (SOLAS 74A II-2/62)_x001C_ PERMANENTLY REPAIR TO SATISFACTION OF CLASS PRIOR TO DEPARTURE. _x001C_
Condition: Unknown
Due 19 February 2001
Resolved 23 February 2001
Deck/Cargo
Issued 19 February 2001
Resolved
VESSEL'S EMERGENCY LIGHTERING EQUIPMENT NOT LABELED AND MISSING BOLTS AND GASKETS. (33 CFR 157.410)_x001C_ PROVIDE EMERGENCY LIGHTERING EQUIPMENT IAW 33 CFR 157.410._x001C_
Condition: Unknown
Due 23 February 2001
Resolved 28 February 2001
Documentation
Issued 19 February 2001
Resolved
VESSEL IS NOT IN COMPLIANCE WITH THEIR GARBAGE MANAGEMENT PLAN. (MARPOL 73/78 ANNEX V)_x001C_ PROVE COMPLIANCE WITH MANAGEMENT PLAN BY NEXT US PORT._x001C_
Condition: Unknown
Due 23 February 2001
Resolved 28 February 2001
Deck/Cargo
Issued 19 February 2001
Resolved
VESSEL'S OVERFILL ALARM IS INOPERATIVE. (33 CFR 155.480)_x001C_ VESSEL PROHIBITED FROM LOADING OILS IN US WATERS UNTIL IT CAN DEMONSTRATE PROPER OPERATION AND INSTALLATION IAW 33 CFR 155.480._x001C_
Condition: Unknown
Due 23 February 2001
Resolved 28 February 2001
Electrical
Issued 19 February 2001
Resolved
NO.3 GENERATOR LUBE OIL COOLER OUTLET PIPE CRACKED AND LEAKING EXCESSIVELY.(SOLAS 74A REG. II-1/26)_x001C_ PERMANENTLY REPAIR TO SATISFACTION OF CLASS PRIOR TO MOVEMENT._x001C_
Condition: Unknown
Due 19 February 2001
Resolved 20 February 2001
Deck/Cargo
Issued 19 February 2001
No resolution recorded
CONTAINMENT FOR MARPOL LINE HOLED AND WASTED. (33 CFR 155.310)_x001C_ PERMANENTLY REPAIR CONTAINMENT._x001C_
Condition: Unknown
Due 19 March 2001 — due date passed with no resolution recorded
Engineering
Issued 19 February 2001
No resolution recorded
MAIN ENGINE PISTON COOLING WATER COOLER HAS LEAKING TEMPORARY PATCH ON S/W SIDE. (SOLAS 74A REG.I/11)_x001C_ TEMPORARY REPAIR FIXED AND CLASS ISSUED COC FOR PERMANENT REPAIR TO BE CARRIED OUT NLT COMPLIANCE DATE._x001C_
Condition: Unknown
Due 31 May 2001 — due date passed with no resolution recorded
Engineering
Issued 19 February 2001
No resolution recorded
MAIN ENGINE AFTER COOLER PIPING HAS LEAKING TEMPORARY PATCH ON AFT PORT SIDE OF ENGINE. (SOLAS 74A REG. I/11)_x001C_ TEMPORARY REPAIR FIXED AND CLASS ISSUED COC FOR PERMANENT REPAIR TO BE CARRIED OUT NLT COMPLIANCE DATE.
Condition: Unknown
Due 31 May 2001 — due date passed with no resolution recorded
Engineering
Issued 19 February 2001
Resolved
MAIN ENGINE NO'S. 4 & 5 F/O INJECTION PUMPS INLET VALVES LEAKING. (SOLAS 74A REG. I/11)_x001C_ PERMANENTLY REPAIR TO SATISFACTION OF CLASS PRIOR TO DEPARTURE._x001C_
Condition: Unknown
Due 19 February 2001
Resolved 20 February 2001