Records from 1985 to 2017. Most recent: inspection, 12 July 2017.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 53
12 July 2017
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6221386
9 January 2017
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6067859
14 December 2016
Administrative Inspection · Internal Structural Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6057786
9 October 2015
Internal Structural Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 5739460
7 November 2007
Attraction Vessel Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3094472
7 November 2007
Attraction Vessel Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3094478
19 July 2007
Attraction Vessel Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 3000204
1 June 2007
Attraction Vessel Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2948545
18 September 2006
Attraction Vessel Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2786941
28 September 2005
Deficiency Check
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2502937
2 September 2005
COI Inspection
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 2481898
16 July 2004
Deficiency Check
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2138153
18 June 2004
Attraction Vessel Exam
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 2108865
25 September 2003
Attraction Vessel Exam
Physical examination · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1916151
12 September 2003
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1903483
31 January 2003
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1737837
9 September 2002
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1672797
11 October 2001
Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1437952
29 May 2001
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1444555
1 March 1994
Administrative
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1163345
17 August 1991
Damage Survey
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1245174
8 May 1991
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1230114
24 October 1990
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1227364
31 May 1990
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1233680
17 May 1990
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1240488
14 November 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 909314
17 October 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1238118
31 July 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1044605
19 June 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1197759
18 May 1989
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1343895
14 April 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1042326
10 February 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1038075
3 August 1988
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1035208
19 May 1988
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1043537
18 April 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1033216
5 April 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1302121
14 January 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1320654
20 November 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1337418
28 October 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1006480
12 August 1987
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1029407
22 May 1987
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1026893
20 April 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1003345
7 April 1987
Hull Examination
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1328717
9 February 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1011305
10 November 1986
Administrative
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1321344
16 October 1986
Administrative
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1318767
16 October 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1319843
2 October 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1318919
17 September 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1319765
18 July 1986
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 987075
22 May 1986
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1298688
9 July 1985
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 983749
24 May 1985
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1284868
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 2 September 2005
Resolved
Provide fire fighting diagram with crew duties and provide certification that firemain and portable fire extinguishers have been tested
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Fire fighting diagram is on vessel.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 2 September 2005
Resolved
Provide Certificate of Documentation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Certificate of Documentation is on vessel.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 2 September 2005
Resolved
Provide evacuation plan for injured crew and passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Evacuation plan is on vessel.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 2 September 2005
Resolved
Repair/Repalce water tight hatches to satisfaction of Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Water tight hatches have been repaired.
Construction/Loadline › Structures › Door
Issued 2 September 2005
Resolved
Reinstall plywood over nonsafety glass door main deck port side.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Plywood has been placed over nonsafety glass.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 2 September 2005
Resolved
Conduct satisfactory crew safety drill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Safety crew drill performed satisfactory.
Operations/Management › Drills/Instruction › Fire
Issued 2 September 2005
Resolved
Conduct satisfactory crew safety drill.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Drills were conducted satisfactory.
Fire Fighting › Fire Pumps › Location
Issued 2 September 2005
Resolved
Provide a fire pump capable of supplying adequeate water through a fire hose for each deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Fire pump has been provided.
Fire Fighting › Fixed Fire Detection System › Approval
Issued 2 September 2005
Resolved
Provide a certificate proving heat/smoke detection system works.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Certificate for heat/ smoke detectors.
Documentation › Manifests/Lists › Emergency Checkoff List
Issued 2 September 2005
Resolved
Provide a list of emergency phone numbers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: List of emergency number is on vessel.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 2 September 2005
Resolved
Provide dry dock report from 2001
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Dry dock report on vessel.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 2 September 2005
Resolved
Provide the number of crewman and hours they will work.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: List of crewman and hours is on vessel.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 2 September 2005
Resolved
Provide in writing dates of opertion to include hours of operation, location of vessel, acesss and egress, line diagrams and mooring.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Dates of operation on board vessel.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 September 2005
Resolved
Provide a certified Marine Electrician report for the installation of new electrical wiring in acccordance with new Subchapter J, 46 CFR.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Marine Electrician report is on board vessel.
Engineering › Bilge Water Management System › Not Operational
Issued 2 September 2005
Resolved
Sound bilges each day prior to taking on passengers and after close of business. Bilges to be sounded are both engine spaces and shaft alley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Bilges are being sounded each day.
Lifesaving › Lifeboat › Propulsion Engine
Issued 2 September 2005
Resolved
Provide outboard engine capable of moving rescue boat against Detroit Current.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 September 2005
Resolution: Outboard engine provided and tested.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 18 June 2004
Resolved
Replace all fixed heat detectors with smoke detectors and prove proper operation. Haunted House operations are only permitted if at least 11 additional roving fire watch patrolmen are provided and evenly distributed as follows: two additional on the main deck, four additional on the 0-1 Ballroom Deck, four additional on the 0-2 Hurricane Deck, and one additional on the 0-3 Boat Deck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 July 2004
Resolved 16 July 2004
Resolution: Cleared deficiency and reissued for clarification.
Construction/Loadline › Markings
Issued 9 September 2002
Resolved
Provide proof of load line or an exemption letter. LEGACY COMPONENT DESC: Load Line Mark
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 29 January 2003
Operations/Management › Pollution
Issued 9 September 2002
Resolved
Provide proof of COFR. LEGACY COMPONENT DESC: Control of Discharge of Oil
Condition: Improper/Lack of Maintenance
Due 1 November 2002
Resolved 31 January 2003
Construction/Loadline
Issued 17 May 1990
Resolved
INSTALL NEW GASKET ON WATERTIGHT DOOR BETWEEN ENGINEROOM AND BOILER ROOM.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Electrical
Issued 17 May 1990
Resolved
DEMONSTRATE PROPER OPERATION OF DIESEL GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Electrical
Issued 17 May 1990
Resolved
PROVIDE GUARD FOR STEAM GENERATOR COUPLING.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Lifesaving
Issued 18 May 1989
Resolved
PROVIDE 309 ADULT AND 81 CHILD LIFEJACKETS IN ADDITION TO PFD'S ALREADY ON BOARD VESSEL. VESSEL IS RESTRICTED TO 2180 TOTAL ADULTS AND 523 CHILDRENON BOARD UNTIL LIFEJACKETS PROVIDED.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Electrical
Issued 18 May 1989
Resolved
REPAIR OR REPLACE LIGHTING FIXTURE AND WIRING IN VARIOUS LOCATIONS IN THE CREWS GALLEY AND QUARTERS.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Electrical
Issued 18 May 1989
Resolved
INSTALL COVER BLANKS ON A.C JUNCTION BOXES.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Lifesaving
Issued 18 May 1989
Resolved
EXERCISE BOTH PORT BOATS DURING A LIFEBOAT DRILL IN THE PRESENTS OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Navigation
Issued 18 May 1989
Resolved
PROVE PROPER OPERATION OF NOT UNDER COMMAND LIGHTS.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Engineering
Issued 10 February 1989
Resolved
REPAIR OR REPLACE DEFECTIVE ASBESTOS INSULATION IN FWD STACK HOUSING
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Fire Fighting
Issued 19 May 1988
Resolved
REPAIR OR REPLACE THE FIREMAIN VALVE AT THE STATION ON THE BOAT DECK ON THE PORT SIDE AT THE FORWARD END OF THE VESSEL.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Lifesaving
Issued 19 May 1988
Resolved
REPAIR OR REPLACE THE INTERNAL BOTTOM STRUCTURE TO THE LIFE FLOATS NUMBERED3,4,6,AND 8.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Engineering
Issued 19 May 1988
Resolved
MAKE THE FEEDWATER HEATER AVAILABLE FOR INTERNAL INSPECTION OR A HYDROSTATIC TEST.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
PROPERLY REPAIR AND THEN DEMONSTRATE THE OPERATION OF THE OVERSPEED DEVICE ON THE DIESEL GENERATOR IN THE FIRE ROOM.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Electrical
Issued 19 May 1988
Resolved
REPAIR THE EXIT SIGN ABOVE THE VESTIBULE LEADING TO THE FORWARD CREW'S QUARTERS.
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988
Construction/Loadline
Issued 14 January 1988
Resolved
MAKE PERMANENT REPAIRS IN WAY OF PIN HOLE LEAKS STARBOARD SIDE JUST ABOVE THE AFT PEAK DECK PRIOR TO PLACING VESSEL BACK IN SERVICE. NOTIFY [name withheld] PROCEDURES ARE FINALIZED AND PRIOR TO COMMENCING ANY REPAIRS.
Condition: Unknown
Due 14 January 1988
Resolved 14 January 1988
Construction/Loadline
Issued 20 November 1987
Resolved
D-DECK-GENERAL MAINTENCE ON CABIN DOORS.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
A-DECK-REPLACE FILLER BOARD STRINGER, STBD AFT.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
A-DECK-CHECK DECK REVITS, PORT DECK, FWD. REPAIR IF NEEDED.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
D-DECK-REPAIR FIRE STATION #2 NOSE REEL.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
A-DECK-REPLACE BOUNDING BAR, STANION 6-7 FROM BOW.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-REMOVE WOOD DOUBLER, UNDER AFT LADDER, INSPECT AREA, REPAIR AS NEEDED.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Electrical
Issued 20 November 1987
Resolved
RE-INSTALL COVERS ON ELECTRICAL LIGHTS.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-REPAIR/REPLACE TRUNK STRINGER, AFT.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER- RECALK 1 REVIT ADJACENT TO BLOW DOWN VALVE OPENING.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
PORT BOILER-REPLACE FUSIBLE PLUGS. REPAIR THREADS IF NEED.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- RECALK FEED WATER PADS, POR & STBD.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- RENEW COMPOUND FEED NIPPLE, NEAR REAR HEAD.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- REPAIR MAIN STOP VALVE.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- STBD FURNACE- RENEW FUSIBLE PLUG.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- PORT FURNACE- RECALK HORSE COLLAR SEAM.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- PORT FURNACE- REROLL 2 STAY TUBES.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER-REPAIR LEAKING BLOW DOWN VALVE FLANGE, BACK HEAD AREA.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER-RECALK FEED WATER PADS & SHELL, PORT & STBD.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER- REPLACE FUSIBLE PLUG AND CHECK THREADS. REPAIR THREADS IF NEED.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Electrical
Issued 22 May 1987
Resolved
REINSTALL COVERS ON ALL ELECTRICAL MOTOR CONNECTION BOXS AS NEEDED THROUGHOUT VESSEL.
Condition: Unknown
Due 22 May 1987
Resolved 22 May 1987
Electrical
Issued 22 May 1987
Resolved
INSTALL GUARD ON REEFER SYSTEM
Condition: Unknown
Due 22 May 1987
Resolved 22 May 1987
Lifesaving
Issued 20 April 1987
Resolved
PROVIDE 217 ADDITIONAL ADULT PFDS AND 19 CHILD PFDS PRIOR TO REISSUANCE OF CERTIFICATE.
Condition: Unknown
Due 20 April 1987
Resolved 20 April 1987
Construction/Loadline
Issued 16 October 1986
Resolved
D DECK- 1. STBD SIDE 2ND STANCION FROM STERN, REPLACE BLOCK.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
D DECK 2. STBD SIDE AFT SCUTTLE, REPAIR CANVAS ON DECK.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
C DECK 1. PORTSIDE OVERHEAD BETWEEN #8 AND #1 STANCIONS FROM BOW, OUTBD AREA IN THE VICINTY OF FIRE STATION #8, REPLACE ROTTEN STRINGER AND BOARDS
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
STBD SIDE OVERHEAD BETWEEN 2ND AND 3RD STANCIONS,STERN, REPLACE ROTTED BOARDS ( C DECK 2)
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
STBD SIDE 3RD BOAT DAVIT FOUNDATION,REPLACE BOLTS ON PLATE. (C DECK 4)
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
STARBD SIDE BETWEEN 2ND AND 3RD DAVIT FROM BOW, REPLACE ROTTED BOARDS IN OVERHEAD NEAR LADDER. ( C DECK 5)
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
B-DECK 1. PORTSIDE FWD DOORWAY TO DECKHOUSE, REPLACE ROTTED BOARDS NEAR COLUMN.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
B DECK 2. STERN RAIL, REPLACE ROTTED TIMBER TO GOOD MATERIAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
A DECK 1. PORT AND STBD OVERHEAD AT FIRST STANCION AFT OF STAIRWAYS LEADING TO B DECK, REPLACE ROTTED BOARDS TO GOOD MATERIAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER-RENEW WATER COLUMN NIPPLE.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER-RECALK STAY.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- GENERAL REFACTORY REPAIR.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- RENEW BOTTOM STAY
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- RECALK AUX. FEED VALVE PAD.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- REPAIR COLLISION BLOCKS
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER- REPAIR BI-STAY.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- CLEAN OIL FROM UNDER BOILER AREA.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER-REPLACE WATER COLUMN NIPPLE.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER- REPLACE TRI-COCK NIPPLE.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER- RECALK MAIN FEED PAD.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Documentation
Issued 22 May 1986
Resolved
OBTAIN ON BOARD COPY OF ENGINEERING REGULATIONS
Condition: Unknown
Due 22 May 1986
Resolved 22 May 1986
Engineering
Issued 22 May 1986
Resolved
RENEW, REPAIR OR REPLACE ALL STEAM GAUGES IN BOILER AND ENGINE ROOM.
Condition: Unknown
Due 22 May 1986
Resolved 22 May 1986
Construction/Loadline
Issued 9 July 1985
Resolved
THIS REQ. WAS ORIGINALLY ISSUED ON 30MARCH82. MAKE PERMANENT REPAIRS TO TEMPORARY PATCH REPAIRS TO SHELL PLATE IN FOREPEAK PORTSIDE FORWARD OF COL-LISION BULKHEAD ABOVE ORLOP DECK STIFFENER AT THE NEXT SCHEDULED D/D OR SOONER.
Condition: Unknown
Due 9 July 1985
Resolved 9 July 1985
Construction/Loadline
Issued 9 July 1985
Resolved
THIS REQ. WAS ORIGINALLY ISSUED ON 30MARCH82. MAKE PERMANENT REPAIRS TO TEMPORARY PATCH REPAIRS IN WAY OF DETERORIATED SHELL PLATE STBD SIDE E/R NEAR GENERATOR FLAT AT THE NEXT SCHEDULED D/D OR SOONER.
Condition: Unknown
Due 9 July 1985
Resolved 9 July 1985
Engineering
Issued 24 May 1985
Resolved
AT THE NEXT REQUIRED BOILER INSPECTION AFTER THE 1985 OPERATING SEASON GAGE THE FOLLOWING AREAS: AFT BOILER: BACK HEAD
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985
Unknown
Issued 24 May 1985
Resolved
MODIFY EXISTING FIRE CONTROL PLAN TO INCLUDE A DIAGRAM SHOWING LOCATIONS OFFIREFIGHTING EQUIPMENT.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985