Inspection history · 50
22 April 2009
Periodic Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3459074
23 April 2008
Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3190501
1 May 2007
Administrative Inspection
Administrative · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2919989
29 January 2007
Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Hull Examination · COI Inspection
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2863950
25 November 2006
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2841200
9 February 2006
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 2582390
23 January 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2571551
21 April 2005
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2339844
12 April 2005
Periodic Inspection · MTSA Verification
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2332359
4 February 2004
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 2000518
4 February 2003
Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1739714
28 March 2002
Deficiency Check · Periodic Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1598886
15 January 2002
Internal Structural Exam · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1478539
7 February 2001
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1369997
8 May 2000
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 816929
1 March 2000
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 818376
2 February 2000
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1401178
10 February 1999
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1458600
11 February 1998
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1430507
11 March 1997
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1106906
26 February 1997
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1383450
15 October 1996
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1402334
23 October 1995
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 886081
7 December 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 668642
26 October 1994
Deficiency Check · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431438
13 September 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 143325
13 September 1994
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465798
12 September 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 10430
7 February 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 668638
18 January 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 162921
14 December 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1407239
1 December 1992
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 833971
5 March 1992
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1010237
20 December 1990
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1225269
13 December 1990
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 928618
28 March 1990
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1228365
19 March 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1229725
5 March 1990
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1220386
7 February 1990
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1222581
21 December 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1034211
16 June 1988
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 889453
31 March 1988
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1304064
15 March 1988
MARPOL Annex II Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1337687
8 March 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 512834
30 March 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1329674
13 January 1987
Hull Examination · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1009170
5 December 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992810
26 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1287057
13 December 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278649
9 October 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271535
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 9 February 2006
Resolved
Restencil oil service only on all faded transfer hoses.
Action required: 705 - Other - as specified
Due 16 February 2006
Resolved 10 February 2006
Resolution: meet requirement of 835.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 9 February 2006
Resolved
Tank barge was operating on a expired COI.
Action required: 705 - Other - as specified
Due 9 February 2006
Resolved 16 February 2006
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 12 April 2005
Resolved
replace all 1.5 inch lube oil and slop oil hoses
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2005
Resolution: Slop oil hoses replaced.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 12 April 2005
Resolved
replace temperature guage on port center lube oil tank
Condition: Damaged By Earlier Event
Due 12 May 2005
Resolved 21 April 2005
Resolution: Replaced temperature guage on port center lube oil tank.
Pollution Prevention/Response › Response Equipment
Issued 28 March 2002
Resolved
In accordance with 33 CFR 155.215, provide on board all of the required Discharge Removal Equipment. LEGACY COMPONENT DESC: Protective Clothing
Condition: Improper/Lack of Maintenance
Due 5 April 2002
Resolved 29 March 2002
Resolution: All of the required equipment was verified as being on board the vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 28 March 2002
Resolved
Provide for review, a test affidavit for the annual hydrostatic test of the cargo pump's relief valve and cargo line pressure gauge. LEGACY COMPONENT DESC: Relief Valve
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2002
Resolution: The test affidavit was provided for review. The seat and the spring were renewed.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 28 March 2002
Resolved
Provide on all six cargo hoses on board, the correct date of the last hydrostatic test. Transfer hose test affidavits indicate the hoses were tested on 1/11/2002. LEGACY COMPONENT DESC: Transfer Hose
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2002
Resolution: All of the cargo transfer hoses were correctly marked.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 28 March 2002
Resolved
Provide and install a 30 x 30 mesh flame screen to replace the 20 x 20 mesh screen in way of the gooseneck vent on the the #2 starbard lube oil tank. LEGACY COMPONENT DESC: Flame Screens
Condition: Placed in Improper Service
Due 5 April 2002
Resolved 29 March 2002
Resolution: A 30 x 30 mesh flame screen was provided and installed.
Documentation › Markings/Placards
Issued 28 March 2002
Resolved
In accordance with 33 CFR 155.450, provide and post a Discharge of Oil Prohibited placard. LEGACY COMPONENT DESC: Oil Discharge Placard
Condition: Unknown
Due 5 April 2002
Resolved 29 March 2002
Resolution: A placard was provided and posted.
Construction/Loadline › Hull
Issued 22 February 2002
Resolved
Provide hull gauging and analysis per 46 CFR 31.10-21a.
Due 23 April 2002
Resolved 3 April 2002
Deck/Cargo
Issued 7 February 2001
Resolved
Cargo transfer hose kinked.
Condition: Unknown
Due 10 February 2001
Resolved 10 February 2001
Deck/Cargo
Issued 7 February 2001
Resolved
Gasket material missing on 3" of coaming.
Condition: Unknown
Due 10 February 2001
Resolved 10 February 2001
Deck/Cargo
Issued 7 February 2001
Resolved
Flame screen wrong size on stern tank ullage opening.
Condition: Unknown
Due 10 February 2001
Resolved 10 February 2001
Deck/Cargo
Issued 7 February 2001
Resolved
Emergency shutdown cable worn at cargo pump engine.
Condition: Unknown
Due 10 February 2001
Resolved 10 February 2001
Navigation
Issued 2 February 2000
Resolved
NAVIGATIONAL LIGHT SCREENS FOR P/S/CENTER LIGHTS FADED AND NEED REPAINTING.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Electrical
Issued 2 February 2000
Resolved
PRIME MOVER ENGINE'S BATTERY CABLE CHAFED ON KNIFE EDGE OF ENGINE MOUNT EXPOSING BARE WIRES.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Electrical
Issued 2 February 2000
Resolved
WIRING FOR GAUGE ON PRIME MOVER ENGINE HAD ONE WIRE NUT CONNECTOR AND SLIGHT CHAFING.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Construction/Loadline
Issued 2 February 2000
Resolved
DOGS ON FWD VOID HATCH WRONG SIZE; AFT VOID HATCH HAD ONE DOG INOPERABLE.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Engineering
Issued 2 February 2000
Resolved
MISSING GUARD/BLANKET ON GENERATOR EXHAUST MANIFOLD.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Engineering
Issued 2 February 2000
Resolved
GENERATOR MISSING REMOTE SHUTDOWN.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Engineering
Issued 2 February 2000
Resolved
PRIME MOVER ENGINE BATTERY BOX MISSING VENT PLUG ON COVER.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Navigation
Issued 2 February 2000
Resolved
WIRING ON P/S/TOW LIGHTS CRACKED AND WORN. STBD LIGHT LENS CRACKED AND MISSING BULB. PORT LIGHT MISSING GASKET ON COVER.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Deck/Cargo
Issued 2 February 2000
Resolved
P/S LUBE OIL TRANSFER HOSES TESTED BUT NOT MARKED.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Deck/Cargo
Issued 2 February 2000
Resolved
FLAME SCREENS ON 1-6 LUBE OIL DECK TANKS DIRTY.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Documentation
Issued 26 February 1997
Resolved
VESSEL OWNERS ARE REQUIRED TO SUBMIT TO THIS OFFICE A COMPLETED 30 YEAR MIDBODY SURVEY ANALYSIS.
Condition: Unknown
Due 26 February 1997
Resolved 26 February 1997
Deck/Cargo
Issued 26 October 1994
Resolved
Replace or prove oil transfer hose assemblies, used on vessel meets all requirements of 33CFR 154.500 and 33CFR 155.800 & 155.820.
Condition: Unknown
Due 26 November 1994
Resolved 9 November 1994
Construction/Loadline
Issued 13 September 1994
Resolved
IMMEDIATELY REMOVE ALL CARGO FROM THE VESSEL, GAS FREE VESSEL FOR REPAIR & CG INSPECTION OF #1 STBD CARGO TANK SIDE SHELL PLATING FRACTURE AND REPAIR.VSL SHALL NOT BE RELOADED OR CONDUCT ANY FUELING OPS UNTIL REPAIRS & TESTING ARE MADE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 September 1994
Resolved 25 October 1994
Construction/Loadline
Issued 13 December 1990
Resolved
REMOVE OR REPAIR PADEYE, STARBOARD SIDE, #6 FROM BOW.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Navigation
Issued 13 December 1990
Resolved
REPAIR FLASHING RUNNING LIGHT (AMBER)
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Electrical
Issued 13 December 1990
Resolved
PROVIDE RECEPTACLE COVER FOR FLASHING LIGHT ELECTRIC BOX.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Construction/Loadline
Issued 13 December 1990
Resolved
REPAIR FRACTURE AT END OF RUB BAR, STARBOARD SIDE AT THE STERN.
Condition: Unknown
Due 13 December 1990
Resolved 13 December 1990
Electrical
Issued 7 February 1990
Resolved
REPAIR CABLES TO BOOM MOTOR CONTROLLERS.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Electrical
Issued 7 February 1990
Resolved
PROVIDE PROPER BATTERY TRAYS FOR CARGO PUMP PRIME MOVER.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Construction/Loadline
Issued 7 February 1990
Resolved
PERMANENTYLY REPAIR 4" HOLE IN BOW RAKE ON STARBOARD SIDE HEADLOG AT DECK KNUCKLE.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Navigation
Issued 7 February 1990
Resolved
PROVIDE PROPER BULBS FOR NAVIGATION LIGHTS.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Electrical
Issued 7 February 1990
Resolved
PROVIDE CERTIFICATION OF, OR INSTALL EXPLOSION PROOF ELECTRICAL EQUIPMENT FOR ALL WIRING, MOTORS, CONTROL BOXES, JUNCTION BOXES, ETC. WITHIN 10' OF ANY CARGO OPENING.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Deck/Cargo
Issued 7 February 1990
Resolved
PROVIDE EVIDENCE OF CARGO TANK INTERNAL EXAMINATIONS FOR ALL CARGO DECK TANKS, OR GAS FREE ALL CARGO DECK TANKS AND PRESENT TO MARINE INSPECTOR.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Deck/Cargo
Issued 7 February 1990
Resolved
REMOVE/REPAIR INOPERABLE BARREL PUMP.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Deck/Cargo
Issued 7 February 1990
Resolved
MAKE REACH RODS VAPOR TIGHT.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Electrical
Issued 31 March 1988
Resolved
PROVIDE OVERSPEED TRIP ON GENERATOR PRIME MOVER. DEMONSTRATE PROPER OPERATION IN THE RPRESCENCE OF A COAST GUARD MARINE INSPECTOR NOT LATER THAN 29APR88.
Condition: Unknown
Due 31 March 1988
Resolved 31 March 1988
Deck/Cargo
Issued 13 January 1987
Resolved
HYDRO ALL CARGO HOSES AND PIPING SYSTEMS 46 CFR 35.35-7, 33 CFR 156.170.
Condition: Unknown
Due 13 January 1987
Resolved 13 January 1987
Electrical
Issued 13 January 1987
Resolved
PROVIDE PROPER ELECTRIC JUNCTION BOX PENTATRATION FOR WINCH CONTROLS.
Condition: Unknown
Due 13 January 1987
Resolved 13 January 1987