MAURY USCG vessel records Sign in
← All vessels

HOCKING

HOCKING is a 1968 research vessel. The Coast Guard has recorded 71 inspections since 1985, most recently in July 2025, along with 98 deficiencies.

Records from 1985 to 2025. Most recent: inspection, 10 July 2025.

Built
1968
Last inspected
10 July 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
—
Maury page id
psix-41156

Inspections, by type

…with no type recorded5
Years with a record 37 calendar years (1985–2025)
The 71 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Research Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it55 - Regulatory (Subpart C or D), Net Ton
74 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 71

10 July 2025 Annual Inspection · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8160456
16 July 2024 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7959354
15 May 2024 Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7912716
6 December 2023 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7835836
19 July 2023 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7746457
13 July 2022 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7504899
6 December 2021 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7362942
19 July 2021 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7260680
10 August 2020 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7028896
15 July 2020 Administrative Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7007878
10 September 2019 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6808104
9 October 2018 Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6553905
27 August 2018 Drydock Extension
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6524413
16 August 2018 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6513688
9 November 2017 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6304010
28 August 2017 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6253665
3 November 2016 Hull Examination · Deficiency Check · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6034389
28 July 2016 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5956858
19 July 2016 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5948142
27 June 2016 Drydock Extension
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5921470
5 August 2015 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5206743
22 July 2015 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5192148
24 July 2012 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4387888
20 July 2011 Deficiency Check · COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4087951
7 August 2008 Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3291449
24 September 2007 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3064685
8 August 2006 COI Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2740129
1 August 2006 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2734051
15 August 2005 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2463566
9 September 2004 MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2190914
27 October 2003 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1936637
2 September 2003 Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1894290
19 August 2003 Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1875755
17 September 2002 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1676493
5 August 2002 Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1656688
27 November 2001 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1072092
6 August 2001 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1461422
10 August 2000 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1376289
8 February 2000 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1046508
13 December 1999 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1471398
10 November 1999 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1361206
20 July 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1423232
25 September 1998 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 798845
12 August 1998 COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1131661
18 May 1998 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 793376
16 December 1997 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 780526
20 November 1997 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1461002
25 September 1997 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1116078
14 August 1996 Re-Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1089391
1 September 1995 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 876506
11 August 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 877767
13 September 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1179849
31 August 1994 Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 869401
10 August 1994 MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 869727
4 August 1993 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 845423
11 August 1992 Deficiency Check · Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 951602
28 August 1991 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249943
12 August 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249942
9 August 1990 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 913183
26 February 1990 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1233446
16 February 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 930099
11 August 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 890979
17 February 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 892557
22 August 1988 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1198712
11 August 1988 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1038594
29 October 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1326644
21 July 1987 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1328248
12 September 1986 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1308004
11 August 1986 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 985230
13 January 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 992582
4 September 1985 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1295135

Deficiency record · 98

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 July 2025 Resolved
In the inspection of hulls, boilers, and machinery of vessels, the standards established by the American Bureau of Shipping, see part 90, subpart 90.35 of this chapter, respecting material and inspection of hulls, boilers, and machinery, and the certificate of classification referring thereto, except where otherwise provided for by the rules and regulations in this subchapter, subchapter E (Load Lines), subchapter F (Marine Engineering), subchapter J (Electrical Engineering). Boiler inspection is overdue. 46CFR91.15
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2025
Resolved 30 July 2025
Resolution: Conducted inspection and tested all safeties, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 10 July 2025 Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter. Engine Room emergency lighting is inadequate. 46 CFR 90.25-1
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2025
Resolved 13 March 2026
Resolution: New lighting fixtures installed
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 19 July 2021 Resolved
The keeper nut on the anchor swivel is at the end of the threads, tighten up the nut as discussed.
Action required: 10 - Deficiency Rectified
Resolved 19 July 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 July 2021 Resolved
The pressure switch for the CO2 is not operating properly, demonstrate proper operation.
Action required: 10 - Deficiency Rectified
Resolved 19 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 19 July 2021 Resolved
Provide the proper signage for operation (46 CFR 95.15-10(h) of the CO2 system and warnings (46 CFR 97.37-11)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2021
Resolved 19 July 2021
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 July 2020 Resolved
Refs: 46 CFR 91.25-20 / NFPA 10 CO2 bottles were not weighed by Sea Safety at annual servicing IAW 46 CFR and NFPA 10. Vessel must prove the bottles are in compliance with annual servicing requirements of all applicable regulations. Ambient temp and liquid level indicator accepted no longer accepted. **BOTTLES MUST BE WEIGHED AT COI IN 2021**
Action required: 10 - Deficiency Rectified
Due 15 July 2020
Resolved 15 July 2020
Resolution: Alternative means of determining serviceability accepted.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 July 2020 Resolved
46 CFR 95.05-1 / Sub H Galley smoke detector expired. Independent device was installed in 2000; sensor life cycle 10 years. Detector expired 2010. Must replace.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 21 July 2020
Resolution: Replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 July 2020 Resolved
46 CFR 91.25-35 / Sub F Port-side engine shift cable severely chaffed. Must replace.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2020
Resolved 27 July 2020
Resolution: Replaced
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 July 2016 Resolved
Rubber hose on the S/W OVBD for the STBD main needs to be replaced. Prior to going back in service after upcoming dry-dock.
Action required: 705 - Other - as specified
Resolved 28 July 2016
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 July 2016 Resolved
Replace the S/W hoses on both mains from the strainer to the pump inlet. Prior to going back in service after upcoming dry-dock.
Action required: 705 - Other - as specified
Resolved 28 July 2016
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Emergency shutdown
Issued 19 July 2016 Resolved
Prove proper operation of the low L/O alarm for the STBD main.
Action required: 705 - Other - as specified
Due 2 August 2016
Resolved 19 July 2016
Resolution: (Cleared on site)
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 19 July 2016 Resolved
The relief valve on the boiler did not relieve at the proper PSI. Need to prove proper operation of the relieving device. Prior to going back in service after upcoming dry-dock.
Action required: 705 - Other - as specified
Resolved 28 July 2016
Engineering › Pressure Vessel › Pressure Gauge
Issued 19 July 2016 Resolved
Perform hydro test on the boiler. Prior to going back in service after upcoming dry-dock.
Action required: 705 - Other - as specified
Resolved 28 July 2016
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 22 July 2015 Resolved
Crew were not able to prove operation of over speed trip for starboard generator. CG-835 issued to prove proper operation of starboard generators over speed trip to the satisfaction of attending Marine Inspector
Action required: 705 - Other - as specified
Due 5 August 2015
Resolved 5 August 2015
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 24 July 2012 Resolved
Prior tooperating heating boiler and or placing it service CG Marine Inspector must inspect the system. Additionally hydro test the system at 1.25 times MAWP.
Action required: 705 - Other - as specified
Resolved 24 September 2012
Resolution: Inspection of boiler was done using applicable parts of 46 CFR subpart 61 and manufactures recommended procedures. Boiler has been placed back into service.
Engineering › Bilge Water Management System › Pump
Issued 20 July 2011 Resolved
Demonstrate proper operation of bilge pump system both electric and engine driven pump prior to conducting operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 August 2011
Resolution: Both bilge pumps were repared and found to be in satisfactory operation.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 20 July 2011 Resolved
Demonstrate proper operation of heat sensor for fixed CO2 System prior to conducting operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 August 2011
Resolution: reviewed report from [name withheld] attesting to proper operation of heat sensors.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 20 July 2011 Resolved
Starboard generator alarm panel in the pilothouse not operating properly.
Action required: 705 - Other - as specified
Due 5 August 2011
Resolved 2 August 2011
Resolution: gererator alarm panel operating properly.
Construction/Loadline › Structures › Door
Issued 7 August 2008 Resolved
Replace cracked window IWO port side pilot house door.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 September 2008
Resolved 27 August 2008
Fire Fighting › Ventilation Systems › Fans
Issued 15 August 2005 Resolved
Make repairs to automatic shut down for E/R exhaust blowers. Blowers do not shut down when CO2 system is actuated.
Action required: 705 - Other - as specified
Due 15 August 2005
Resolved 15 August 2005
Engineering › Sea-water System (primary cooling)
Issued 2 September 2003 Resolved
Make available for CG inspection all sea valves (6) and sea chests. LEGACY COMPONENT DESC: Valve
Due 5 September 2003
Resolved 3 September 2003
Engineering › Sea-water System (primary cooling)
Issued 2 September 2003 Resolved
Replace port and starboard MDE sea suction valves. LEGACY COMPONENT DESC: Valve
Action required: 705 - Other - as specified
Due 17 September 2003
Resolved 9 September 2003
Construction/Loadline › Hull
Issued 2 September 2003 Resolved
Make available for CG inspection all interior hull plating. LEGACY COMPONENT DESC: Hull Plating
Due 5 September 2003
Resolved 3 September 2003
Engineering › Shafting/Propeller Arrangements
Issued 2 September 2003 Resolved
Replace port aft cutlass bearing. LEGACY COMPONENT DESC: Bearing
Due 17 September 2003
Resolved 9 September 2003
Engineering › Shafting/Propeller Arrangements
Issued 2 September 2003 Resolved
Repair/replace port propeller due to fracture. LEGACY COMPONENT DESC: Propeller (fixed pitch)
Due 5 September 2003
Resolved 3 September 2003
Resolution: New propeller installed.
Engineering › Shafting/Propeller Arrangements
Issued 2 September 2003 Resolved
Draw both shafts and make available for CG inspection. LEGACY COMPONENT DESC: Propeller Shaft
Action required: 705 - Other - as specified
Due 17 September 2003
Resolved 9 September 2003
Engineering › Steering Gear System
Issued 2 September 2003 Resolved
Make permanent repairs to P/S rudder stops. LEGACY COMPONENT DESC: Rudder
Due 17 September 2003
Resolved 9 September 2003
Engineering › Bilge Water Management System
Issued 2 September 2003 Resolved
Hard pipe all connections for bilge eductor system. LEGACY COMPONENT DESC: Piping
Due 17 September 2003
Resolved 15 September 2003
Fire Fighting › Means of Escape
Issued 2 September 2003 Resolved
Make permanent repairs to hairline crack in both emergency escape hatches and properly adjust handles.
Due 17 September 2003
Resolved 15 September 2003
Construction/Loadline › Structures
Issued 2 September 2003 Resolved
Install watertight packing to cables (2) on forward E/R bulkhead. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 17 September 2003
Resolved 9 September 2003
Construction/Loadline › Structures
Issued 2 September 2003 Resolved
Replace gaskets to WTD's for E/R and FWD berthing. LEGACY COMPONENT DESC: Door
Due 17 October 2003
Resolved 27 October 2003
Resolution: Owner replaced gaskets with new.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 19 August 2003 Resolved
CO2 25 sec time delay tested and discharged at 20 sec. Replace or prove proper operation of time delay prior to operating. Vessel to provide ACTNY inspection certificate from servicing tech attesting to proper operation. LEGACY COMPONENT DESC: Operating Controls
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2003
Resolution: Received fax copy of servicing tech showing replacement and sat testing of time delay.
Navigation › Collision/Grounding Avoidance
Issued 19 August 2003 Resolved
Sternlight top cap broke during operations. Issued requirement to replace. Witnessed sat operation of light and requisition of new light. LEGACY COMPONENT DESC: Navigation Lights
Due 19 September 2003
Resolved 15 September 2003
Communications › Radio Communications
Issued 19 August 2003 Resolved
EPIRB sent in to manufacturer for battery replacement and repair of strobe light. Issued requirement to install prior to operating in Oceans or Coastwise trade route. LEGACY COMPONENT DESC: EPIRB
Action required: 705 - Other - as specified
Due 19 September 2003
Resolved 26 August 2003
Resolution: Received fax from vsl master (Tim) stating that EPIRB was re-installed this date.
Lifesaving › Rocket Parachute Flares
Issued 5 August 2002 Resolved
Provide 12 Rocket Parachut flares IAW 46 CFR sub W
Action required: 705 - Other - as specified
Due 26 August 2002
Resolved 5 August 2002
Communications › Radio Communications
Issued 5 August 2002 Resolved
Provide current hydrostatic release LEGACY COMPONENT DESC: EPIRB
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 September 2002
Resolved 29 August 2002
Resolution: hydrostatic release provided
Lifesaving › Immersion Suits
Issued 5 August 2002 Resolved
Provide #30 immersion suits
Action required: 705 - Other - as specified
Due 5 September 2002
Resolved 29 August 2002
Resolution: When operating on near coastal waters outside LBS route, vessel will carry the number of immersion suits required to be on board.
Lifesaving › Lifejacket/PFD (General)
Issued 5 August 2002 Resolved
Repair/replace retroreflective material and lights for identified lifejackets LEGACY COMPONENT DESC: Retroreflective Material
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 September 2002
Resolved 29 August 2002
Resolution: lights replace and retro replace on identified lifejackets
Deck/Cargo › Mooring/Anchoring
Issued 5 August 2002 Resolved
Secure anchor LEGACY COMPONENT DESC: Anchor
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 September 2002
Resolved 29 August 2002
Resolution: anchor secured
Lifesaving
Issued 6 August 2001 Resolved
VESSEL IS REQUIRED TO HAVE (15) MAN L/R ONBOARD, CURRENTLY A (10) MAN LOANER IS INSTALLED. VESSEL IS LIMITED TO 22 PERSONS UNTIL REPLACED.
Condition: Unknown
Due 17 August 2001
Resolved 6 September 2001
Lifesaving
Issued 6 August 2001 Resolved
VESSEL IS LIMITED TO 22 PERSONS UNTIL ADULT LIFEJACKETS ARE REPLACED OR REPAIRED.
Condition: Unknown
Due 17 August 2001
Resolved 6 September 2001
Lifesaving
Issued 6 August 2001 Resolved
REPLACE BROKEN PADDLES FOR LIFE FLOAT.
Condition: Unknown
Due 17 August 2001
Resolved 6 September 2001
Lifesaving
Issued 6 August 2001 Resolved
PROVIDE ONBOARD LIFESAVING REQUIREMENTS OF 46CFR 199.180.
Condition: Unknown
Due 17 October 2001
Resolved 6 September 2001
Electrical
Issued 6 August 2001 Resolved
REPAIR LIGHTING FIXTURE IN ENGINEROOM.
Condition: Unknown
Due 17 August 2001
Resolved 6 September 2001
Navigation
Issued 6 August 2001 Resolved
STEERING GEAR IS RESISTANT FROM SIDE TO SIDE WITH A HUNTING MOTION WITH MOTOR, MAKE REPAIRS TO SYSTEM.
Condition: Unknown
Due 17 August 2001
Resolved 6 September 2001
Accommodation/Occupational Safety
Issued 10 November 1999 Resolved
SUBMIT PLAN FOR FOR FORWARD RAILS TO COAST GUARD PLAN REVIEW AND EXTEND RAIL HEIGHT ON FORWARD RAILS TO 39.5 INCHES AS DISCUSSED.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Electrical
Issued 10 November 1999 Resolved
Provide marine type/grade alternator on port generator.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Lifesaving
Issued 10 November 1999 Resolved
Replace expired hydrostatic release mechanism on EPIRB.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Electrical
Issued 10 November 1999 Resolved
Extend rubber matting in front of gererator switchboard to a reasonable length.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Documentation
Issued 10 November 1999 Resolved
Provide Waste Management Plan iaw 33 CFR 151.57.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Navigation
Issued 10 November 1999 Resolved
Replace port running light canister.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Lifesaving
Issued 10 November 1999 Resolved
Provide new retroreflective tape (Type II) and line (dark in color or UV resistant: 46 CFR 180.175) for the lifefloats.
Condition: Unknown
Due 10 November 1999
Resolved 10 November 1999
Lifesaving
Issued 12 August 1998 Resolved
Install 30x30 mesh screen for port fuel tank.
Condition: Unknown
Due 28 September 1998
Resolved 28 September 1998
Engineering
Issued 12 August 1998 Resolved
Weld cracks in port engine muffler.
Condition: Unknown
Due 28 September 1998
Resolved 28 September 1998
Electrical
Issued 12 August 1998 Resolved
Provide method to verify generator overspeed trip and overspeed trip setting.
Condition: Unknown
Due 19 August 1998
Resolved 19 August 1998
Navigation
Issued 12 August 1998 Resolved
Verfy proper steering hydraulic operation and lubricate pivit point._x001C_ (No Sail)
Condition: Unknown
Due 19 August 1998
Resolved 19 August 1998
Construction/Loadline
Issued 12 August 1998 Resolved
Renew gasket port side engine room escape.
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Construction/Loadline
Issued 12 August 1998 Resolved
Repair or replace sea chest guards.
Condition: Unknown
Due 19 August 1998
Resolved 19 August 1998
Fire Fighting
Issued 25 September 1997 Resolved
DOUBLE CLAMP ALL HOSES FOR THE FIRE MAIN SYSTEM PIPING IN THE ENGINEROOM.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Engineering
Issued 25 September 1997 Resolved
DOUBLE CLAMP THE RAW WATER HOSE OVBD DISCHARGE FOR THE STBD MDE.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE A RESCUE PLATFORM FOR RETRIEVING A PERSON THAT HAS FALLEN OVBD.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Unknown
Issued 25 September 1997 Resolved
PROVIDE PROOF THAT VESSEL AND CREW BELONG TO A DRUG CONSORTIUM.
Condition: Unknown
Due 10 October 1997
Resolved 1 October 1997
Unknown
Issued 25 September 1997 Resolved
PROVIDE COPIES OF 46 SUBCHAPTER T PART 166-199 AND 47 CFR PART 80 TO END.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE SIX ADULT LIFE JACKETS WITH LIGHTS.
Condition: Unknown
Due 10 October 1997
Resolved 29 September 1997
Fire Fighting
Issued 25 September 1997 Resolved
WIRE THE ENGINEROOM EXHAUST FAN SO THAT IT SECURES WHEN THE CO2 SYSTEM IS ACTIVATED.
Condition: Unknown
Due 10 October 1997
Resolved 29 September 1997
Lifesaving
Issued 25 September 1997 Resolved
REPAIR THE VESSEL'S EPRIB, THE LIGHT DID NOT ACTIVATE WHEN PLACED IN THE TEST POSITION.
Condition: Unknown
Due 10 October 1997
Resolved 29 September 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE AND INSTALL A COAST GUARD APPROVED WEAK LINK FOR THE VESSEL'S LIFERAFT.
Condition: Unknown
Due 10 October 1997
Resolved 29 September 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE ONE PADDLE AND PLACE IN THE VESSEL'S BA.
Condition: Unknown
Due 10 October 1997
Resolved 29 September 1997
Documentation
Issued 25 September 1997 Resolved
PROVIDE AND POST A LETTER OF STABILITY FOR THE VESSEL.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Unknown
Issued 25 September 1997 Resolved
PROVIDE A PLUG OR CAP OFF HOLE THROUGH FWD BLKHD IN E/R AT CENTERLINE TO MAKE WATERTIGHT.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Unknown
Issued 25 September 1997 Resolved
MOUNT MICROWAVE OVEN SECURELY TO COUNTERTOP, OR REMOVE IT FROM VESSEL.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Navigation
Issued 25 September 1997 Resolved
PROVIDE AND POST NEAR RADIO, EMERGENCY OPERATING INSTRUCTION.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE AND POST INSTRUCTIONS FOR DONNING LIFE JACKETS.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Electrical
Issued 25 September 1997 Resolved
INSTALL GLOBES OVER LIGHT FIXTURES IN THE ENGINEROOM.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Electrical
Issued 25 September 1997 Resolved
LABEL BATTERY CHARGER DISCONNECT SWITCHES IN ENGINEROOM.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Electrical
Issued 25 September 1997 Resolved
REMOVE DEAD ENDED WIRES NEAR BOTH THE PORT AND STBD GENERATORS.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Electrical
Issued 25 September 1997 Resolved
PROVIDE A SWITCH HANDLE AND INSTALL ON SHORE POWER DISCONNECT SWITCH ON SWITCHBOARD IN ENGINEROOM.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Engineering
Issued 25 September 1997 Resolved
DOUBLE NUT OR COTTER PIN THE CLUTCH AND THROTTLE CONTROLS FOR BOTH MDE'S.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Electrical
Issued 25 September 1997 Resolved
MAKE EMERGENCY LIGHTING THROUGHOUT THE VESSEL ACTIVATE AUTOMATICALLY UPON LOSS OF NORMAL ELECTRICAL POWER.
Condition: Unknown
Due 10 October 1997
Resolved 10 October 1997
Electrical
Issued 25 September 1997 Resolved
PROVIDE ELECTRICAL GRADE SAFETY MATTING AND PLACE NEAR SWITCHBOARD IN ENGINEROOM.
Condition: Unknown
Due 10 October 1997
Resolved 30 September 1997
Electrical
Issued 11 August 1995 Resolved
PROVE PROPER OPERATION OF THE EMERGENCY LIGHTING TO THE SATISFACTION OF THEATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 11 August 1995
Resolved 11 August 1995
Lifesaving
Issued 11 August 1995 Resolved
REPLACE HYDROSTATIC RELEASE UNIT ATTACHED TO THE EPIRB.
Condition: Unknown
Due 11 August 1995
Resolved 11 August 1995
Engineering
Issued 13 September 1994 Resolved
REPAIR LEAKING PORT GENERATOR EXHAUST SYSTEM IN LAZARETTE.
Condition: Unknown
Due 13 September 1994
Resolved 13 September 1994
Construction/Loadline
Issued 31 August 1994 Resolved
REPLACE BILGE ALARMS IN THE FWD PEAK, FUEL COMPT, & LAZARETTE.
Condition: Unknown
Due 31 August 1994
Resolved 31 August 1994
Engineering
Issued 31 August 1994 Resolved
REPLACE FLEXIBLE HOSES ON BOTH DIESEL TANK FILLS VENTS AND SOUNDING TUBES WITH SUITABLE FLEXIBLE TUBING.
Condition: Unknown
Due 31 August 1994
Resolved 31 August 1994
Engineering
Issued 10 August 1994 Resolved
INSTALL EXHAUST LAGGING ON STBD MDE EXHAUST SYSTEM. (01) 2 FT SECTION BEFORE WATER INJECTION. (01) 1 FT SECTION BEFORE SECOND 90 DEGREE ELBOW AFTER ENGINE LEFT BANK.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Engineering
Issued 10 August 1994 Resolved
FABRICATE AND INSTALL GUARD ON FWD CRANKSHAFT AUXILIARY DRIVE FULLY AND STEERING PUMP BELTS, STBD MDE
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Accommodation/Occupational Safety
Issued 10 August 1994 Resolved
REPAIR FWD BERTHING ESCAPE HATCH SO IT CAN BE OPENED FROM INSIDE COMPT.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Lifesaving
Issued 4 August 1993 Resolved
PROVIDE LIGHTS FOR CHILD LIFE PRESERVERS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. VESSEL IS NOT TO OPERATE WITH CHILDREN ABOARD UNTIL REQUIREMENT IS SATISFIED BUT IN NO CASE LATER THAN 18AUG93.
Condition: Unknown
Due 20 August 1993
Resolved 20 August 1993
Lifesaving
Issued 4 August 1993 Resolved
PROVIDE PROPER CLASS A EPIRB TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. VESSEL IS NOT TO OPERATE ON AN OCEANS ROUTE UNTIL THIS REQUIREMENT IS CLEARED BUT IN NO CASE LATER THAN 18AUG93.
Condition: Unknown
Due 20 August 1993
Resolved 20 August 1993
Lifesaving
Issued 4 August 1993 Resolved
PROVIDE PROPER PYRO DISTRESS SIGNALS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. VESSEL MAY ONLY BE OPERATED DURING DAYLIGHT HOURS UNTIL REQUIREMENT IS CLEARED. IN NO CASE LATER THAN 18AUG93. REQUIREMENT MAY BE CLEARED BY FAX.
Condition: Unknown
Due 20 August 1993
Resolved 20 August 1993
Lifesaving
Issued 11 August 1992 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 21 August 1992
Resolved 27 October 1992
Electrical
Issued 11 August 1992 Resolved
PROVE PROPER OPERATION OF BOTH SHIP'S SERVICE GENERATOR AMPERE METERS TO BECOMPLETED TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 August 1992
Resolved 27 October 1992
Fire Fighting
Issued 11 August 1988 Resolved
PROVE OPERATION AND ABILITY TO DELIVER A EFFECTIVE STREAM FROM ENGINE DRIVEN FIRE PUMP.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Fire Fighting
Issued 11 August 1988 Resolved
CO2 FIRE EXTINGUISHERS ARE PAST DUE FOR HYDROSTATIC TESTING.
Condition: Unknown
Due 11 August 1988
Resolved 11 August 1988
Accommodation/Occupational Safety
Issued 11 August 1986 Resolved
TEST OPERATING CONTROLS AND SAFETY VALVES ON OIL-FIRED PACKAGE HEATING BOILER.
Condition: Unknown
Due 11 August 1986
Resolved 11 August 1986
Accommodation/Occupational Safety
Issued 11 August 1986 Resolved
CONDUCT 1.5 HYDROSTATIC TEST ON STAINLESS STEEL H.W. STORAGE TANK.
Condition: Unknown
Due 11 August 1986
Resolved 11 August 1986
Engineering
Issued 11 August 1986 Resolved
INSTALL RACOR FIRE SHIELDS ON ALL SEVEN (7) RACOR FUEL FILTERS IN ENGINE ROOM.
Condition: Unknown
Due 11 August 1986
Resolved 11 August 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.