Records from 1996 to 2012. Most recent: inspection, 8 June 2012.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Lifesaving
Issued 3 February 1998
Resolved
RECHARGE SPARE OBA BOTTLE FOR FIREMANS SUIT ON MAIN DECK.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Deck/Cargo
Issued 3 February 1998
Resolved
INSTALL PLUGS ON DRAINS FOR OIL TANKS BY SCR ROOM.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Construction/Loadline
Issued 3 February 1998
Resolved
INSTALL PROPER GASKETS IN WTD'S IN MACHINERY SPACES. _x001C_ _x001C_
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Lifesaving
Issued 3 February 1998
Resolved
REPAIR EYEWASH STATION IN THE DRILL FLOOR.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Construction/Loadline
Issued 3 February 1998
Resolved
CLOSE OPEN STUFFING TUBES IN MUD PIT BULKHEADS.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Lifesaving
Issued 3 February 1998
No resolution recorded
CONDUCT AIR QUALITY TEST ON BREATHING AIR IN BOTH LIFEBOATS.
Condition: Unknown
Due 11 March 1998 — due date passed with no resolution recorded
Lifesaving
Issued 3 February 1998
Resolved
PROCURE SURVIVAL LIGHTS FOR ALL LIFE PRESERVERS AS NEEDED.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Documentation
Issued 3 February 1998
No resolution recorded
PROVIDE ABS APPROVED COPY OF FIRE CONTROL PLAN TO OUR OFFICE.
Condition: Unknown
Due 30 April 1998 — due date passed with no resolution recorded
Electrical
Issued 3 February 1998
Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAY ON #3 GENERATOR.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Electrical
Issued 3 February 1998
Resolved
PROVE PROPER OPERATION OF LOW L/O SHUTDOWN ON ALL GENERATORS_x001C_ _x001C_ _x001C_ .
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Lifesaving
Issued 3 February 1998
Resolved
PROVE OPERATION OF ALARM PANEL IN SCR ROOM.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Electrical
Issued 3 February 1998
Resolved
LABEL EMERGENCY LIGHTS IN EDG ROOM_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Electrical
Issued 3 February 1998
Resolved
PROVE PROPER OPERATION OF EDG INCLUDING SHUTDOWNS.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Unknown
Issued 31 January 1997
Resolved
ADD NECK, ARM AND LEG SPLINTS TO HOSPITAL SUPPLIES.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Fire Fighting
Issued 31 January 1997
Resolved
INSTALL FIRE STATIONS #16 AND #17 ON DRILL FLOOR IN ACCORDANCE WITH APPROVED FIRE CONTROL AND SAFETY PLAN OR GAIN APPROVAL OF RIG MODIFICATION FROM CLASSIFICATION SOCIETY.
Condition: Unknown
Due 31 January 1997
Resolved 31 January 1997
Lifesaving
Issued 31 January 1997
Resolved
MAKE REPAIRS, MODIFICATIONS AND CHANGES IN POLICY TO COMPLY WITH REVISIONS TO 46 CFR 107-109.
Condition: Unknown
Due 31 January 1997
Resolved 31 January 1997
Documentation
Issued 31 January 1997
Resolved
PROVIDE COPY OF SAFE MANNING CERTIFICATE.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Electrical
Issued 31 January 1997
Resolved
MAKE DOORS TO MUD PITS GAS-TIGHT.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Accommodation/Occupational Safety
Issued 31 January 1997
Resolved
INSTALL CLAMPS ON POTABLE WATER PIPING. INSTALL 100 PSI RELIEF VALVE ON POTABLE WATER TANK.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Electrical
Issued 31 January 1997
Resolved
REPAIR LOW LUBE OIL SENSING UNITS ON GENERATOR PRIME MOVERS.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Engineering
Issued 31 January 1997
Resolved
INSTALL RIGID FUEL LINE BETWEEN EMERGENCY GENERATOR AND SERVICE TANK.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Construction/Loadline
Issued 31 January 1997
Resolved
MAKE REPAIRS TO WATERTIGHT DOORS.
Condition: Unknown
Due 13 February 1997
Resolved 13 February 1997
Electrical
Issued 31 January 1997
Resolved
PERFORM TEST OF TOTAL RIG SHUT-DOWN.
Condition: Unknown
Due 31 January 1997
Resolved 31 January 1997
Documentation
Issued 7 February 1996
Resolved
PROVIDE COPY OF ABS HULL SURVEY STATUS REPORT.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Fire Fighting
Issued 7 February 1996
Resolved
INSTALL VENT CLOSURE ON PAINT LOCKER VENT.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Lifesaving
Issued 7 February 1996
Resolved
INSTALL VISUAL GENERAL ALARM ON DRILL FLOOR.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Electrical
Issued 7 February 1996
Resolved
INSTALL PERMANENTLY MOUNTED BATTERY CHARGER FOR EMERGENCY GENERATOR STARTING BATTERIES.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Lifesaving
Issued 7 February 1996
Resolved
PRIOR TO DRILLING, COMPLETE INSTALLATION OF PRESSURE GAUGE IN AIR LINE TO DRILLER'S CONSOLE AND TO TOP DRIVE DC CONTACTOR PANEL.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Electrical
Issued 7 February 1996
Resolved
UPON INSTALLATION OF NEW EXCITOR IN #2 GENERATOR SET, PROVE PROPER OPERATIONS OF FOLLOWING TRIPS: LOW LUBE OIL, OVERSPEED, AND REVERSE POWER RELAY.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Electrical
Issued 7 February 1996
Resolved
BLANK EMPTY SLOTS ON DISTRIBUTION PANELS #1 AND #2 TO EMERGENCY GENERATOR SWITCHBOARD.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Accommodation/Occupational Safety
Issued 7 February 1996
Resolved
PROVIDE PROPER VENTILATION FOR ALL BATTERY STORAGE BOXES.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Electrical
Issued 7 February 1996
Resolved
PRIOR TO DRILLING, COMPLETE INSTALLATION OF UPPER LEVEL SHALE SHAKER GAS DETECTOR.
Condition: Unknown
Due 11 February 1996
Resolved 4 April 1996
Lifesaving
Issued 7 February 1996
Resolved
RENEW OR END-FOR-END ALL LIFE CAPSULE DAVIT FALLS.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Fire Fighting
Issued 7 February 1996
Resolved
ONCE ON LOCATION, FLUSH FIREMAIN SYSTEM OF ALL DEBRIS.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Electrical
Issued 7 February 1996
Resolved
PRIOR TO DRILLING, PROVE PROPER OPERATIONS OF REVERSE POWER RELAY TRIP FOR #1 GENERATOR SET.
Condition: Unknown
Due 11 February 1996
Resolved 4 April 1996
Documentation
Issued 7 February 1996
Resolved
PROVIDE COPY OF PRESSURE VESSEL INSPECTION REPORT AND RELIEF VALVE TEST REPORT PERFORMED BY ABS.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996
Construction/Loadline
Issued 7 February 1996
Resolved
REPAINT DRAFT MARKS AND HOMEPORT IN COLOR CONTRASTING WITH THE HULL.
Condition: Unknown
Due 7 February 1996
Resolved 7 February 1996