Inspection history · 90
26 January 2010
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3697483
13 May 2009
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3473866
21 November 2008
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3367201
24 October 2008
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3350866
18 July 2008
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3270402
7 July 2008
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3260155
13 June 2008
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3236017
7 June 2008
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3234188
15 April 2008
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3184575
7 April 2008
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3178838
28 August 2007
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3040709
27 March 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2895779
27 March 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2896014
26 March 2007
Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2909033
7 August 2006
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2738464
14 March 2006
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2621311
29 December 2005
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2557524
21 December 2005
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2554735
21 April 2005
Examination of Repairs · Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2334739
21 April 2005
Annual Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2362609
18 April 2005
MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2336567
13 April 2005
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2333295
18 June 2004
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2106687
2 June 2004
COI Inspection · Internal Structural Exam
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2062403
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1996280
29 May 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1804488
29 January 2003
Periodic Inspection · Administrative Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1744160
20 November 2002
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1708343
31 January 2002
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1491618
14 June 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 42896
24 April 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1068444
28 March 2000
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1048338
20 May 1999
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 795119
13 May 1998
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 791119
20 May 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1419776
16 July 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1089675
10 July 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1088686
31 May 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367768
12 November 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 201438
12 November 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 765661
23 October 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 109326
7 September 1995
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1189461
11 August 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1434287
21 June 1994
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 859437
15 February 1994
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 853310
31 August 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1135113
18 March 1993
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 529292
24 February 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1401671
14 September 1992
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 951888
1 September 1992
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 444528
11 June 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957637
20 May 1992
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 948674
28 April 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 961760
17 October 1991
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 525653
11 July 1991
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 462932
24 April 1991
COI Inspection · Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1241995
11 January 1991
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 456714
14 December 1990
Deficiency Check
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1219254
23 October 1990
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 495103
17 October 1990
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 451447
29 August 1990
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 915158
12 July 1990
Re-Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 901004
20 March 1990
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 533552
11 August 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 476682
11 May 1989
COI Inspection · Hull Examination · Examination of Repairs
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 895810
21 March 1989
Damage Survey · Permit to Proceed
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1210227
19 March 1989
Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1201176
20 February 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1040733
8 February 1989
Re-Inspection
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1032308
14 July 1988
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 487180
13 April 1988
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1341799
23 March 1988
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 989172
17 November 1987
COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1027749
24 September 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 532692
22 April 1987
Deficiency Check
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1313616
12 March 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 482496
11 March 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 527915
11 February 1987
Re-Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1318430
22 August 1986
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 487028
9 April 1986
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 453504
25 November 1985
COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1298112
10 October 1985
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 537193
10 October 1985
Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 987571
11 July 1985
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 441508
27 June 1985
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 522838
9 April 1985
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 540590
4 March 1985
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 527927
23 January 1985
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 519625
5 November 1984
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1283752
12 November 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966154
Deck/Cargo › Cargo Stowage › General
Issued 21 November 2008
No resolution recorded
The vessel has a weeping leak at a wasted 6" master suction valve reach rod collar penetration of the deck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 November 2008 — due date passed with no resolution recorded
Deck/Cargo › Cargo Stowage › General
Issued 7 July 2008
Resolved
The KIRBY 13008B has a pinhole on the #3 cargo tank top that is temporarily repaired with epoxy.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 July 2008
Resolved 18 July 2008
Resolution: C/R 1''6" x 4'' insert on top of raised trunk inway of 8" ullage, 2" sounding tube, strapping table, and 8" stick gauge stub at lap. Air test sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 7 June 2008
Resolved
Small hole in deep well stripping pipe located next to the deep well pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2008
Resolution: A new deep well stripping pipe manifold was installed and air tested.
Deck/Cargo › Cargo Stowage › General
Issued 7 April 2008
Resolved
The vessel has a 4" x 1/8" fracture to a weld on the cargo tank top of #2 cargo tank.
Action required: 705 - Other - as specified
Due 8 April 2008
Resolved 15 April 2008
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of a 4" gouge and weld fracture to the #2 cargo tank top.
Construction/Loadline › Hull › Bottom Plating
Issued 27 March 2007
Resolved
Make permanent repairs to 2" x 1/8" fracture in way of the #1 stbd wing void.
Due 29 April 2007
Resolved 27 March 2007
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of 24"x6''-6"x3/8" insert in the way of the #1 starboard wing tank.
Stability › Unintentional Flooding › General
Issued 21 December 2005
Resolved
Vessel may transit to and offload cargo to a facility in the Port Of Houston. Prior to reloading cargo make permanent repairs to the fractures in the sideshell of void #3 Port, approx 6" at the 5 ft draft and the Port Bow Rake knuckle, approx. 8". Barge may not depart the Sector Houston/Galveston OCMI Zone without additional approval
Due 20 January 2006
Resolved 29 December 2005
Resolution: Witnessed satisfactory repair to damage in the #3 port wing void.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 13 April 2005
Resolved
Located in #3 cargo tank top, there was a small hole about 1/4" in dia, with a temporary patch that was not holding.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 April 2005
Resolved 21 April 2005
Resolution: Received gauge report. Witnessed satisfactory inserts of all low areas.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 14 November 2002
Resolved
Cargo VCS piping wasted.
Action required: 705 - Other - as specified
Due 30 November 2002
Resolved 15 November 2002
Resolution: Conducted repair check and air test renewed above deck vapor piping, all sat.
Deck/Cargo
Issued 31 May 1996
Resolved
Make the vapor control piping available for USCG inspection.
Condition: Unknown
Due 31 May 1996
Resolved 31 May 1996
Deck/Cargo
Issued 31 May 1996
Resolved
Repair the bent hand wheel on the port forward winch.
Condition: Unknown
Due 31 May 1996
Resolved 31 May 1996
Deck/Cargo
Issued 31 May 1996
Resolved
The stern void gooseneck vent is wasted and needs to be replaced.
Condition: Unknown
Due 31 May 1996
Resolved 31 May 1996
Deck/Cargo
Issued 31 May 1996
Resolved
Test the high level alarms in the presense of a USCG inspector.
Condition: Unknown
Due 31 May 1996
Resolved 31 May 1996
Deck/Cargo
Issued 31 May 1996
Resolved
Prior to carrying any cargo containing 0.5% benzene or more affix a benzenewarning sign.
Condition: Unknown
Due 31 May 1996
Resolved 31 May 1996
Deck/Cargo
Issued 11 August 1995
Resolved
MAKE VAPOR LINE GAS FREE AND OPEN FOR C.G. INSPECTION FOR POLYMERIZING CARGO BUILD UP.
Condition: Unknown
Due 11 August 1995
Resolved 11 August 1995
Deck/Cargo
Issued 14 September 1992
Resolved
PRIOR TO USE OF THE CLOSED GAUGING SYSTEM, MAKE THE SYSTEM AVAILABLE FOR USCG TESTING/INSPECTION IN ACCORDANCE WITH THE USCG/MSC APPROVED PLAN.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Deck/Cargo
Issued 14 September 1992
Resolved
PRIOR TO USE OF THE VAPOR RECOVERY SYSTEM (VRS), MAKE THE SYSTEM AVAILABLE FOR USCG TESTING/INSPECTION IN ACCORDANCE WITH THE USCG/MSC APPROVED PLAN.
Condition: Unknown
Due 14 September 1992
Resolved 14 September 1992
Construction/Loadline
Issued 20 May 1992
Resolved
MAKE REPAIRS IN WAY OF THE BARGES STERN LOG WHERE TWO FRACTURES HAVE DEVELOPED IN THE PLATING MATERIAL, (FRACTURES WERE MARKED OUT WITH SPRAY PAINT). REPAIRS ARE TO BE COMPLETED BY NO LATER THAN 30 JUNE 1992.
Condition: Unknown
Due 20 May 1992
Resolved 20 May 1992
Deck/Cargo
Issued 24 April 1991
Resolved
Empty discharge containment under the port and starboard manifolds to provide the capacity required by 33CFR155.310(a)(1)(iv) prior to next cargoloading.
Condition: Unknown
Due 24 April 1991
Resolved 24 April 1991
Construction/Loadline
Issued 24 April 1991
Resolved
Replace gaskets on the hatch covers to t#1 stbd, #2 stbd, #3 stbd and #1 port wing voids as required by 46CFR172.050(b) prior to the next cargo loading.
Condition: Unknown
Due 24 April 1991
Resolved 24 April 1991
Construction/Loadline
Issued 24 April 1991
Resolved
Reattach captive chain to the hatch cover at #2 port wing void prior to thenext cargo loading.
Condition: Unknown
Due 24 April 1991
Resolved 24 April 1991
Deck/Cargo
Issued 14 December 1990
Resolved
PRIOR TO USE OF THE CLOSED GAUGING SYSTEM, MAKE THE SYSTEM AVAILABLE FOR USCG TESTING/INSPECTION IN ACCORDANCE WITH THE USCG-MSC APPROVED PLAN.
Condition: Unknown
Due 14 December 1990
Resolved 14 December 1990
Deck/Cargo
Issued 14 December 1990
Resolved
PRIOR TO USE OF THE VAPOR RECOVERY SYSTEM, MAKE THE SYSTEM AVAILABLE FOR USCG TESTING/INSPECTION IN ACCORDANCE WITH THE USCG-MSC APPROVED PLAN.
Condition: Unknown
Due 14 December 1990
Resolved 14 December 1990
Construction/Loadline
Issued 12 July 1990
Resolved
PERMANENTLY REPAIR 12" VERTICAL FRACTURE AT TOP OF PORT AFT FORMED CORNER.
Condition: Unknown
Due 12 July 1990
Resolved 12 July 1990
Construction/Loadline
Issued 12 July 1990
Resolved
PERMANENTLY REPAIR 18" DECK KNUCKLE FRACTURE AT STERN ON STBD SIDE.
Condition: Unknown
Due 12 July 1990
Resolved 12 July 1990
Construction/Loadline
Issued 20 February 1989
Resolved
MAKE PERMANENT REPAIRS THE DAMAGED PORTSIDE #1 CARGO TANK TOP PRIOR TO LOADING THE NEXT CARGO BUT NO LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 20 February 1989
Resolved 20 February 1989
Construction/Loadline
Issued 20 February 1989
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGED #1 AND #2 PORT WING VOIDS PRIOR TO LOADING NEXT CARGO BUT NO LATER THEN COMPLIANCE DATE.
Condition: Unknown
Due 20 February 1989
Resolved 20 February 1989
Construction/Loadline
Issued 11 February 1987
Resolved
PERMANENTLY REPAIR 24" DECK KNUCKLE FRACTURE IN WAY OF PORT STERN CORNER AT NEXT GAS-FREE AVAILABILITY BUT NOT LATER THAN 30 NOV 87.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987
Electrical
Issued 11 February 1987
Resolved
PERMANENTLY REPAIR THE ELECTRICAL BOX STAND ON THE CENTERLINE AT THE BOW, AT NEXT GAS-FREE AVAILABILITY BUT NOT LATER THAN 30 NOV 87.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987
Construction/Loadline
Issued 10 October 1985
Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN UPPER RIGHT CORNER OF BOW VOID IN HEAD LOG AREA. REPAIRS TO BE COMPLETED PRIOR TO 11/11/85
Condition: Unknown
Due 10 October 1985
Resolved 10 October 1985