Inspection history · 25
13 November 2020
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7094838
3 December 2019
Deficiency Check · COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6866075
1 November 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6847327
15 October 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6835009
17 July 2019
Deficiency Check · Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6753485
11 April 2019
MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6659815
8 April 2019
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6658292
28 January 2019
Re-Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6615988
15 October 2018
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6561741
24 July 2018
Re-Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6488916
17 April 2018
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6393504
15 February 2018
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6355771
15 November 2017
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6308660
24 October 2017
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6295993
23 October 2017
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6295946
4 October 2017
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6393246
1 September 2017
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6256735
28 July 2017
Administrative Inspection · Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6223453
19 April 2017
MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6128055
26 January 2017
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6080635
24 October 2016
Re-Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6028722
27 July 2016
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5954383
23 March 2016
COI Inspection · MTSA Verification · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5838907
29 January 2016
Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5806179
21 January 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5800952
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 13 November 2020
Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure". Engine room receiver rated for 100 MAWP has a 250 MAWP relief valve. Vessel must put correct 100 MAWP relief valve on the receiver.Fix within 7 days 46 CFR 71.25-35(a), 46 CFR 54.15-10 (a)
Action required: 705 - Other - as specified
Due 26 November 2020
Resolved 1 December 2020
Resolution: Attending MI received picture of safety valves data plate and video of the valve being tested. Test SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 November 2020
Resolved
Each cable installation must meet— Sections 25, except 25.11, of IEEE 45-2002 (incorporated by reference. Wire run over #1 MDE is being supported with a rope. 46 CFR 77.05-1, 46 CFR 111.60-5 (a) (1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 December 2020
Resolved 1 December 2020
Resolution: Attending MI received pictures showing the reinstallation of original cable tray.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 13 November 2020
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use. Elbow leading to the engine room fire plug broke while testing the system. 46 CFR 78.17-80 (a)
Action required: 10 - Deficiency Rectified
Due 19 November 2020
Resolved 19 November 2020
Resolution: Ship’s crew replaced elbow, fire main test conducted satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 November 2020
Resolved
Each inflatable lifesaving appliance must be serviced within twelve (12) months of each subsequent servicing.
IAW COI, vessel is missing eleven (11) IBAs. Pax count is reduced to 375 until IBAs are serviced and returned.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 November 2020
Resolution: Attending MI received maintenance certificates for all installed IBA’s. Certs uploaded to the deficiency documents tab
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 December 2019
Resolved
Engine room receiver rated for 100 MAWP has a 250 MAWP relief valve. Vessel must put correct 100 MAWP relief valve on the receiver.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 28 January 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 December 2019
Resolved
Sprinkler system shall be arranged that the overhead is effectively sprayed and all portions of the deck are covered. Repair/clean out sprinkler nozzle at the Governor's Island end on the starboard side.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 14 January 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 December 2019
Resolved
Electrical Installations on vessels must ensure protection of passengers and crew from electrical hazards. Remove power strip or install permanent means of powering fridge, coffee maker, refrigerated water machine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 28 January 2020
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 December 2019
Resolved
The ASP must be implemented in its entirety. Update security plan to reflect correct personnel and points of contact and vessel schematics where required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 14 January 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 3 December 2019
Resolved
Deck drain track is leaking water into the engine room between the main engines. Find source of leak and submit repair plan for USCG approval.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 28 January 2020
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 December 2019
Resolved
All passenger vessels shall have efficient rails. Hand rail on Governor's Island end, starboard side is unattached from the bulkhead due to a cracked weld.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 28 January 2020
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 December 2019
Resolved
Electrical Installations on vessels must ensure protection of passengers and crew from electrical hazards. Properly end cable on bridge adjacent to flood light controls.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 December 2019
Resolved 28 January 2020
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 11 April 2019
Resolved
Ventilation ducting through out the vessel have excessive amounts of lint which could cause a fire. Clean out ALL ventilation duct work.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 17 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 11 April 2019
Resolved
Under the wheelhouse of the Manhattan End, heating lines/pipes have been replaced with rubber hoses. Replace the hose with original type piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 April 2019
Resolved
There is a open electrical box under the wheelhouse of the Manhattan End, replace the missing cover.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
02 - Structural Conditions › N/A - No Subsystem › Wheelhouse -door -window
Issued 11 April 2019
Resolved
Both doors on the passenger deck leading out need to be able to close so they are weather-tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 11 April 2019
Resolved
There is no record of the last time a weight test was conducted on either rescue boat davit. Conduct a weight test in presence of USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 17 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 11 April 2019
Resolved
The over the side lighting for the rescue boats need to be able to be adjusted, presently they are frozen or loose and not able to be freed of secured in place, demonstrate that both lights can be easily adjusted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 11 April 2019
Resolved
Speaker wire is pulling out for PA on the forward end Manhattan end under wheelhouse. Properly wire PA
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 11 April 2019
Resolved
New Jersey side rescue boat is missing boat-hook, replace missing boat-hook.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 11 April 2019
Resolved
Some of the retro-reflective tape is wasted, replace tape on boat rescue boats using IMO Resolution A.658(16 as a guide for amount and location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 11 April 2019
Resolved
The operating instruction located in way of life rafts reflect a different type of raft. Post instructions that reflect that of a throw over raft.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 11 April 2019
Resolved
Fuel oil day tank appears to be leaking. (This is the second deficiency issued prior was 27 April 2015 Activity 5111450). In the presence of the USCG Marine Inspector conduct a hydro.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
Resolution: Tank was cleaned up and repainted white. No apparent leaks at this time. During next dry-dock tank will need to be pressed up to make more detailed exam/condition of tank.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 11 April 2019
Resolved
Some of the car deck drains are clogged, ensure all deck drains are free and drain. USCG MI to witness that all drains work by use of the car deck fire deluge system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2019
Resolved 29 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2019
Resolved
Conduct hydro on air receiver #1
Action required: 705 - Other - as specified
Due 13 May 2019
Resolved 17 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 April 2019
Resolved
could not conduct overspeed testing on both aux gens
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 May 2019
Resolved 17 July 2019
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 October 2018
Resolved
The frame or support of each size III, IV, and V fire extinguisher required by table 76.50-10(a) must be welded or otherwise permanently attached to a bulkhead or deck. The fire extinguishing bracket on the GI bridge is missing and the fire extinguisher is sitting on the deck. Properly install fire extinguishing bracket.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2018
Resolved 27 November 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 15 October 2018
Resolved
All glass in windows or airports shall be at least 1/4 inch thick. 05 windows on the New Jersey side/Governor's Island end have been shattered due to slip landings. Replace shattered windows.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2018
Resolved 27 November 2018
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 July 2018
Resolved
The main steering gear and rudder stock must be of adequate strength for and capable of steering the vessel at maximum ahead service speed. The vessel experiences a "floating" bow rudder when in transit from Manhattan to Governor's Island. This "floating" rudder causes maneuvering challenges for the vessels conning officer. Provide causal analysis report and repair proposal for bow rudder en route to Governor's Island.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 August 2018
Resolved 15 October 2018
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 18 April 2018
Resolved
1) Bulkheads or decks shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of smoke and flame. In the PA Room, the bulkhead was found with wires passing through without any means to stop smoke and flame. Properly install approved fire stop material.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2018
Resolved 7 June 2018
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 April 2018
Resolved
2) Accommodations provided for officers and crew on all vessels shall be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged, and insulated from undue noise, heat, and odors. In the PA Room, the lighting fixture cover was missing from the overhead light. Properly install approved lighting fixture cover.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2018
Resolved 7 June 2018
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 April 2018
Resolved
3) Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazard. In the PA Room, the panel for the PA system was missing, exposing wires to crew. Properly install panel.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2018
Resolved 7 June 2018
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 15 February 2018
Resolved
1. The #1 SSDG breaker trips when using the #1 firepump. The vessel is to either parallel the #1 and #2 SSDG or use only the #2 SSDG until the #1 SSDG can prove proper operation. In addition, provide procedural guidance addressing the in-operability of the #1 SSDG and the new procedures. These procedures are to be posted on both bridges and engine room until the #1 SSDG has proven proper operation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 April 2018
Resolved 18 April 2018
Fire Fighting › Fire Main › Material
Issued 15 February 2018
Resolved
2. The fire main has a pin hole leak producing one drop every three to five seconds. Submit repair plan with certified welder's documentation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 5 March 2018
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 October 2017
Resolved
Vessel must label all electrical panel's on the bridge and locate the source of power.
Due 24 November 2017
Resolved 5 March 2018
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 24 October 2017
Resolved
Fire ext #13 needs the hose replaced due to cracking
Due 31 October 2017
Resolved 5 March 2018
Electrical › Electric Generation Source (service) › Power Requirement
Issued 23 October 2017
Resolved
Vessel's #2 Gen set will not take an electrical load due to high voltage issue. Vessel must repair and supply a service tech report to the CGMI, prior to passenger operations vessel must prove proper operation in the presants of a CGMI
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 October 2017
Resolution: Engine manufacture on board and fixed the issue, loose wire on voltage regulator.
Engineering › Steering Gear System › Follow-up Assembly
Issued 1 September 2017
Resolved
1. Prove proper operation of pump No. 1 for steering system navigating vessel when en route to Governor's Island. Proper operation is to be proven to attending USCG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 September 2017
Resolved 12 September 2017
Electrical › Electrical Distribution System (emergency) › Switch
Issued 20 April 2017
Resolved
Relay switch was burnt out making emergency power check inop.
Condition: Improper/Lack of Maintenance
Due 25 April 2017
Resolved 25 April 2017
Resolution: Witnessed replacement of the bad emergency power relay, and emergency power operational test, all sat.
Lifesaving › Rescue Boat › Drain Valve
Issued 27 April 2016
Resolved
Examination of the New Jersey side rescue boat found that the boat plug would no stay in place. CG-835 issued to replace/renew boat plug.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 27 July 2016
Documentation › Markings/Placards › Warning Signs
Issued 27 April 2016
Resolved
Vessel had just came out of credit dry-docking and much of the posted instructions, labels restricted area markings have been painted over. CG-835 to replace/renew/label all areas as required.
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 27 July 2016
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 27 April 2016
Resolved
Vehicle deck New Jersey side, Governors Island end there is a space with an electrical panel cover which is loose and numerous extension cords. CG-835 issued to repair cover and remove extension cords.
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 27 July 2016
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 27 April 2016
Resolved
Ran both generators under load, in parallel and tested both generator reverse power relays, both failed to trip, issued CG 835 to prove proper operation of both generator reverse power relays.
Action required: 705 - Other - as specified
Resolved 27 October 2016
Resolution: Relays were replaced and tested satisfactory.