Records from 1985 to 1987. Most recent: inspection, 4 March 1987.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Navigation
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TEST OF MAIN STEERING SYSTEM AND STATIONS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Navigation
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TEST OF RADAR AND PLOTTING FACILITIES PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Navigation
Issued 30 July 1985
Resolved
TEST ALL NAVIGATIONAL LIGHTS AND SIGNALS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Construction/Loadline
Issued 30 July 1985
Resolved
TEST CONTROLS OF WATERTIGHT DOORS IN SUBDIVISION BULKHEADS PRIOR TO PLACINGVESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
TEST ALL VALVES AND CONTROLS OF OVERBOARD DISCHARGE, BILGE AND SCUPPER VALVES PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Documentation
Issued 30 July 1985
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Navigation
Issued 30 July 1985
Resolved
REPAIR RUDDER ANGLE INDICATOR ON BRIDGE PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
RENEW GASKETS AND CLEAN KNIFE EDGES ON ALL SUBDIVISION WATERTIGHT DOORS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Lifesaving
Issued 30 July 1985
Resolved
RERNEW TOPPING LIFT WIRE ON STARBOARD BOAT DAVIT PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Navigation
Issued 30 July 1985
Resolved
OBTAIN COPY OF INLAND NAVIGATION RULES TO BE KEPT ON BRIDGE PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
CONDUCT EMERGENCY DRILLS AS REQUIRED INCLUDING BOAT AND FIRE DRILLS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Fire Fighting
Issued 30 July 1985
Resolved
CONDUCT ANNUAL TESTING OF SEMI-PORTABLE AND HAND PORTABLE FIRE EXTINGUISHERS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Construction/Loadline
Issued 30 July 1985
Resolved
DRYDOCK VESSEL TO CONDUCT PERIODIC DRYDOCK EXAMINATION PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Engineering
Issued 30 July 1985
Resolved
OPEN WATERSIDE, FIRESIDE AND INSPECTION PLATES OF FORWARD AND AFT MAIN PRO-PULSION BOILERS FOR INSPECTION AND EXAMINATION BY A COAST GUARD MARINE INSPECTOR PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Engineering
Issued 30 July 1985
Resolved
SET AND SEAL FORWARD AND AFT MAIN BOILER DRUM AND SUPERHEATER SAFETY VALVESIN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Engineering
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TESTS OF FEED WATER SYSTEM PUMPS, STOP & CHECK VALVES, WATER HEATERS, REGULATORS AND GREASE EXTRACTORS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Engineering
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TESTS OF FUEL OIL TRANSFER AND SERVICE PUMPS' REMOTE SHUTOFF VALVES, RELIEF AND BYPASSED VALVES PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
OPEN ALL PRESSURE VESSEL FOR INTERNAL EXAMINATION. IF VESSELS CANNOT BE OPENED FOR EXAMINATION, A HYDROSTATIC TEST OF 1-1/2 TIMES THE MAWP WILL BE CONDUCTED PRIOR TO VESSEL OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Electrical
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TESTS OF SHIP SERVICE GENERATOR OVERSPEED TRIP AND REVERSE POWER RELAY PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Electrical
Issued 30 July 1985
Resolved
TEST ELECTRICAL SWITCHBOARDS INCLUDING EMERGENCY AUTOMATIC BUS TRANSFER ANDGROUND DETECTORS PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Electrical
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TEST OF EMERGENCY GENERATOR LOAD ON THE LINE PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
TEST ALL INTERNAL COMMUNICATION AND CONTROL SYSTEM PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Lifesaving
Issued 30 July 1985
Resolved
PROVIDE SIXTY TWO(62) TYPE I LIFE PRESERVERS WITH RETROFLECTIVE TAPES PRIORTO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Lifesaving
Issued 30 July 1985
Resolved
PROVIDE SIX(6) RING LIFE BUOYS WITH AT LEAST 90 FT LINE ATTACHED TO EACH BUOY PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Fire Fighting
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL AND PRESSURE TEST OF FIRE MAIN SYSTEM, STATIONS AND FIRE HOSES PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Fire Fighting
Issued 30 July 1985
Resolved
CONDUCT OPERATIONAL TESTS OF STEAM AND CARBON DIOXIDE FIXED FIRE EXTINGUISHING SYSTEM PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JULY87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Unknown
Issued 30 July 1985
Resolved
TEST GENERAL ALARM SYSTEM PRIOR TO PLACING VESSEL IN OPERATION BUT NOT LATER THAN 30JUL87.
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985