DUPLICATE OF CG029703 is a 1989 school ship. The Coast Guard has recorded 37 inspections since 1984, most recently in March 1996, along with 126 deficiencies.

Records from 1984 to 1996. Most recent: inspection, 11 March 1996.

This is an administrative record, not a vessel. The Coast Guard created this MISLE entry and then marked it as superseded — the name itself says which record it points to. It is kept here because it exists in the record and nothing is deleted, but the inspection history of the hull lives under the other entry.
Built
1989
Last inspected
11 March 1996
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
—
Maury page id
psix-41499

Inspections, by type

…with no type recorded12
Years with a record 13 calendar years (1984–1996)
The 37 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 30 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the School Ship class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it12542 - Convention (Subpart B), Gross Ton
13319 - Regulatory (Subpart C or D), Gross Ton
3762 - Convention (Subpart B), Net Ton
7158 - Regulatory (Subpart C or D), Net Ton
16278 - Displacement, Ton
6920 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 37

11 March 1996 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 884591
9 May 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1351110
14 December 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 837939
27 July 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1177852
6 May 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1023669
7 May 1993 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 833466
25 March 1993 Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1142589
1 March 1993 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 840925
8 May 1992 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 948796
3 May 1991 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1217652
16 April 1991 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 907320
12 October 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 923359
18 July 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 906342
16 July 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1218483
1 June 1990 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 903756
4 May 1990 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1230543
27 April 1990 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 917800
12 May 1989 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1043867
5 May 1989 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1352451
25 April 1989 Excursion Permit
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1038130
7 May 1988 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1343063
24 October 1987 Hull Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1017793
23 October 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1017787
11 May 1987 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1024617
2 May 1987 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1008898
2 May 1987 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1330070
9 December 1986 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1022119
2 September 1986 Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1314246
12 May 1986 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1299035
3 May 1986 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 998616
11 October 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 991696
9 September 1985 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1302437
13 May 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 979482
5 May 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1286201
4 May 1985 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 978161
10 October 1984 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 976696
9 October 1984 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1286857

Deficiency record · 126

Construction/Loadline
Issued 9 May 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE WATER TIGHT DOORS IN QUESTION.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Fire Fighting
Issued 9 May 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF FIRE SCREEN DOORS IN QUESTION.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Electrical
Issued 9 May 1995 Resolved
REMOVE DEAD-ENDED ELECTRICAL CABLES FROM THE BATTERY ROOM.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Engineering
Issued 9 May 1995 Resolved
REPLACE AND PROVE PROPER OPERATION OF THE STARBOARD SIDE STEAM DRUM VENT VALVE.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Lifesaving
Issued 9 May 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE #5 LIFE BOAT WINCH BRAKES.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Lifesaving
Issued 9 May 1995 Resolved
CROP AND RENEW THE DAVIT PEDESTAL MOUNTS FOR THE #3 AND #4 LIFE BOATS.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Accommodation/Occupational Safety
Issued 9 May 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE MSD OVERBOARD DISCHARGE VALVE REACH ROD.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Construction/Loadline
Issued 9 May 1995 Resolved
REPAIR AND PROVE PROPER OPERATION OF THE EMERGENCY BILGE PUMP SUCTION REACHROD AND THE #1 PORT ENGINE ROOM BILGE SUCTION REACH ROD.
Condition: Unknown
Due 9 May 1995
Resolved 17 May 1995
Fire Fighting
Issued 6 May 1994 Resolved
SAT. HYDRO-TEST (2) S.C.B.A. BOTTLES IN QUESTION OR REPLACE WITH (2) SAT. SPARE BOTTLES.
Condition: Unknown
Due 6 May 1994
Resolved 24 June 1994
Lifesaving
Issued 6 May 1994 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 6 May 1994
Resolved 22 June 1994
Fire Fighting
Issued 6 May 1994 Resolved
MAKE NECESSARY REPAIRS TO FIRE SCREEN DOORS INQUESTION.
Condition: Unknown
Due 6 May 1994
Resolved 22 June 1994
Lifesaving
Issued 6 May 1994 Resolved
REPLACE/REPAIR (2) RING BUOYS IN QUESTION.
Condition: Unknown
Due 6 May 1994
Resolved 22 June 1994
Lifesaving
Issued 6 May 1994 Resolved
PROVE PROPER OPERATION OF (2) WATERLIGHTS IN QUESTION.
Condition: Unknown
Due 6 May 1994
Resolved 22 June 1994
Fire Fighting
Issued 6 May 1994 Resolved
REPLACE 1 1/2" FIRE HOSE IN QUESTION.
Condition: Unknown
Due 6 May 1994
Resolved 24 June 1994
Fire Fighting
Issued 6 May 1994 Resolved
REPLACE/REPAIR FIRE HELMET FACESHIELD IN QUESTION.
Condition: Unknown
Due 6 May 1994
Resolved 24 June 1994
Documentation
Issued 1 March 1993 Resolved
VESSEL TO " PROCEED DIRECTLY FROM BERTH AT CASTINE, ME. TO BATH IRON WORKS DRYDOCKING FACILITY IN PORTLAND, ME. WITH NO PASSENGERS OR INTERMITTENT STOPS." TO UNDERGO CREDIT HULL EXAM.
Condition: Unknown
Due 10 March 1993
Resolved 10 March 1993
Navigation
Issued 3 May 1991 Resolved
PROVE PROPER OPERATION OF GYRO REPEATER IN AFT STEERING COMPARTMENT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 May 1991
Resolved 3 May 1991
Lifesaving
Issued 3 May 1991 Resolved
PROVE PROPER OPERATION OF STBD EMBARKATION LIGHT FOR #3 LIFEBOAT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 May 1991
Resolved 3 May 1991
Electrical
Issued 3 May 1991 Resolved
PROVE PROPER INSTALLATION OF ELECTRICAL FIXTURES THROUGHOUT THE VESSEL, ESPECIALLY IN STATE ROOMS AND OFFICES. PROPERLY DEAD END CABLES, ELIMINATEJURY RIGS AND ENSURE PROPER SPLICES THROUGHOUT SHIP._x001C_ _x001C_
Condition: Unknown
Due 3 May 1991
Resolved 3 May 1991
Engineering
Issued 3 May 1991 Resolved
PROVIDE MEANS TO INTERNALLY EXAMINE OR HYDRO TEST DIESEL GENERATOR STARTINGPRESSURE VESSEL TO 1 1/2 MAWP. THIS REQUIREMENT IS TO MEET 46 CFR PART 54._x001C_
Condition: Unknown
Due 3 May 1991
Resolved 3 May 1991
Construction/Loadline
Issued 16 July 1990 Resolved
REPAIR VENT AFT/IN WAY OF 1-166-0; THE COVER CANNOT BE DOGGED.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
AFTERMOST VENT DUCT, STARBOARD SIDE; PATCH HOLE IN VENT PIPE AND INSTALL GASKET IN COVER.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
VENT DUCT, STARBOARD SIDE, 3RD FROM STERN: RENEW GASKET IN COVER.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
AFT VENT, AFTERMOST HOUSE: SERVICE DOGS, MAKE COVERS OPERATIONAL, RENEW GASKET. PATCH HOLE IN PORT VENT HOOD, PORTSIDE.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
VENT STARBOARD SIDE, FORWARD OF MAIN HOUSE: FREE UP COVER AND MAKE IT OPERATIONAL AND WEATHERTIGHT.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
FORWARD STARBOARD WINCH CONTROL BOX: DISCONNECT OR DEAD-END LOOSE WIRING; RENEW COAMING AND GASKET TO VENT COVER; PATCH HOLE BELOW VENT.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
FORWARDMOST DECK HOUSE AFT VENT; FREE VENT COVER AND MAKE IT OPERATIONAL AND WEATHER TIGHT.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
DECK VENT, STARBOARD SIDE 2ND FROM BOW; FREE UP VENT COVER AND MAKE IT OPERATIONAL.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
DECK TRUNK TO BOSUN STORES, FORWARD SIDE: PATCH HOLE.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
DECK TRUNK AFT OF FORWARD ANCHOR WINDLASS: REPAIR DOG ON STARBOARD SIDE.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
FORWARDMOST ESCAPE TRUNK: RENEW GASKET TO DECK ACCESS DOOR.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Electrical
Issued 16 July 1990 Resolved
MOORING GEAR LOCKER; DEADEND OR REMOVE LOOSE ELECTRICAL CABLE IN WATERTIGHTDECK AND PLUG ALL ELECTRICAL CABLE PENETRATIONS; DEADEND OR REMOVE LOOSE CABLE IN VENT FAN SUPPLY BOX #1-24-1.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
FORWARD LADDER TRUNK, PORTSIDE; RENEW LOWER WATERTIGHT DOOR FLANGE, WHERE WASTED TO GOOD METAL.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
PORTSIDE FORWARD WINCH CONTROL BOX; CROP & RENEW TO GOOD METAL THE WASTED DOOR, VENT AND VENT DOOR GASKET FLANGE AND DEADEND OR REMOVE LOOSE CABLE.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
CLEAN RUST/SCALE FROM PORT VENT COVER IN VENT FORWARD OF MAIN HOUSE PORT SIDE.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Construction/Loadline
Issued 16 July 1990 Resolved
VENT FAN ROOM #1-59-2; CROP & RENEW TO GOOD METAL THE WATERTIGHT DOOR FLANGE WHERE WASTED AT BOTTOM.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Accommodation/Occupational Safety
Issued 16 July 1990 Resolved
FORWARD RAILING ON FLYING BRIDGE-WELD TOP & MIDDLE RAILINGS WHERE CRACKED AT STANCHION.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Lifesaving
Issued 16 July 1990 Resolved
REPAIR OR REPLACE FORWARD WOODEN STRIKING CHOCK TO #6 LIFEBOAT.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Electrical
Issued 16 July 1990 Resolved
MAKE PERMANENT REPAIR TO ELECTRICAL "RED-HAND BOX IN WAY OF DOOR #WDD 03- 87-1.
Condition: Unknown
Due 16 July 1990
Resolved 16 July 1990
Lifesaving
Issued 4 May 1990 Resolved
ENSURE ALL LIFEBOAT EMBARKATION LIGHTS ARE TRAINABLE.
Condition: Unknown
Due 4 May 1990
Resolved 4 May 1990
Electrical
Issued 4 May 1990 Resolved
PROVIDE COMPLETE AND CORRECT EXPLOSION PROOF FIXTURE FOR LAMP LOCKER.
Condition: Unknown
Due 4 May 1990
Resolved 4 May 1990
Lifesaving
Issued 5 May 1989 Resolved
MAKE REPAIRS TO FAIRLEAD SHEAVES OF #4 LIFEBOAT DAVIT.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Electrical
Issued 5 May 1989 Resolved
CORRECT TURBO GENERATOR L/O ALARM TO GIVE AUDIBLE AND VISUAL ALARM IN EVENTOF LOSS OF OIL PRESSURE.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Engineering
Issued 5 May 1989 Resolved
PROVE PROPER OPERATION OF #1 BOILER FEED PUMP HAND TRIP.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Electrical
Issued 5 May 1989 Resolved
RENEW ELECTRICAL CABLE TO TWO (02) SPOT LIGHTS LOCATED ON FORWARD HOUSE, BOAT DECK WHERE ARMOR IS BROKEN.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Lifesaving
Issued 5 May 1989 Resolved
IN ACCORDANCE WITH 46 CFR 167.833, EXERCISE #4 LIFEBOAT.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Lifesaving
Issued 5 May 1989 Resolved
IN ACCORDANCE WITH 46 CFR 167.35-15 CONDUCT WEIGHT TEST #4 LIFEBOAT.
Condition: Unknown
Due 5 May 1989
Resolved 5 May 1989
Construction/Loadline
Issued 7 May 1988 Resolved
MAKE THE PORT SIDE BUNKERING PORT WATERTIGHT, AND PROOF SAME TO A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 May 1988
Resolved 7 May 1988
Engineering
Issued 7 May 1988 Resolved
THE LUBE OIL PURIFIER PUMP AND BILGE PRIMER PUMP INSTALLATIONS ARE TO BE COMPLETED AND TESTED TO THE SATISFACTION OF THE CHIEF ENGINEER PRIOR TO UTILIZATION.
Condition: Unknown
Due 7 May 1988
Resolved 7 May 1988
Electrical
Issued 7 May 1988 Resolved
THE NON-EXPLOSION PROOF ELECTRICAL FIXTURES INCLUDING THE FUSE AND CIRCUIT BREAKER BOXES, ARE TO BE REMOVED OR REPLACED WITH EXPLOSION PROOF FIXTURES PRIOR TO STOWAGE OF FLAMMABLE LIQUIDS IN THE PAINT LOCKER.
Condition: Unknown
Due 7 May 1988
Resolved 7 May 1988
Electrical
Issued 7 May 1988 Resolved
THE SHORE TIE CONNECTION IS TO BE COMPLETED AND TESTED TO THE SATISFACTION OF THE CHIEF ENGINEER, PRIOR TO UTILIZATION.
Condition: Unknown
Due 7 May 1988
Resolved 7 May 1988
Engineering
Issued 24 October 1987 Resolved
MAKE PERMANENT REPAIRS TO THE #4 STARBOARD REEFER BOX BILGE SUCTION LINE WHERE FITTED WITH A TEMPORARY PATCH.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
HAVE BLANKS FITTED OVER THE CONTROLLERS FOR THE SEWAGE SYSTEM.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
PROVIDE PLANS FOR THE INSTALLATION OF THE SOUND POWERED PHONE SYSTEM THAT IS BEING FITTED OUT TO VARIOUS LOCATIONS IN THE SHAFT ALLEY. UPON COMPLETION OF THIS SYSTEM THE INSTALLATION IS TO BE EXAMINED BY A COAST GUARD MARINE INSPECTION.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
RENEW THE ELECTRICAL WIRE RUNS AND THE ASSOCIATED CABLE RETAINING CLIPS FROM THE LOCAL CONTROL PANELS TO THE #2 DISTILLER CONDENSATE AND TO THE #2 OVERBOARD BRINE PUMP.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
RENEW OR REPAIR THE BILGE AND BALLAST PUMP VACUUM TANK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
UPON COMPLETION OF REFITTING OF THE DIESEL OIL PURIFIER (SOON TO BE LUBE OIL PURIFIER) SYSTEM ALL OF THE ELECTRICAL INSTALLATION & PIPING ARRANGE- MENTS ARE TO BE EXAMINED BY A CG MARINE INSPECTOR. PLAN APPROVAL FOR THIS INSTALLATION IS TO BE OBATINED FROM THE LOCAL CG MARINE INSPECTION OFFICE.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
PROPERLY SEAL THE OPENED WIRE PENETRATIONS LOCATED AT THE TOP OF ELECTRIC POWER PANEL NO. P106 LOCATED AT L-138-1.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REFIT THE DRAIN LINE FOR THE #3 AUXILIARY CONDENSER.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
RENEW THE AFT PEAK DRAIN LINE FLANGE NUTS AT THE FLANGE JOINT LOCATED JUST FORWARD OF THE STERN TUBE PACKING GLAND.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REPAIR THE LIGHT SWITCH/INDICATOR FOR THE LIGHTING CIRCUIT FOR THE OLD ENGINEER'S PAINT LOCKER LOCATED IN THE SHAFT ALLEY.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Fire Fighting
Issued 24 October 1987 Resolved
REFIT THE PIPE SUPPORT BRACKET ASSOCIATED WITH THE AFT DIESEL ENGINE FIRE PUMP ENGINE COOLING WATER LINE.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
DEMONSTRATE OPERATION OF THE MOTOR CONTROLLER PANEL LOCATED OUTBOARD OF THE #1 AND #3 AUXILIARY CIRCULATING PUMPS. THIS CONTROLLER IS USED FOR THE FLOAT PUMPS.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
PROVE THAT THE WATERTIGHT DOOR (6-169-2) FITTED BETWEEN THE SHAFT ALLEY/DIESEL FIRE PUMP BULKHEAD IS WATERTIGHT.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
REFIT THE REACHROD TO THE #7 BILGE LINE VALVE. THE SUBJECT VALVE IS LOCATED IN THE SHAFT ALLEY JUST AFT OF THE OLD ENGINEER'S PAINT LOCKER.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
RENEW PIPING ARRANGEMENT WHERE PATCHED IN WAY OF THE UNION/SHORT NIPPLE/ FLANGE JOINT FOR THE ATMOSPHERIC DRAIN TANK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REFIT THE PUMP RUN LIGHT INDICATORS TO THE CONTROLLER PANELS FOR THE #3 AND#4 SEWAGE PUMPS (5P73).
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
CLEAN OUT THE BILGE STRAINER BOX LOCATED IN THE AFT DIESEL ENGINE FIRE PUMP ROOM.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REPLACE THE PROTECTIVE COVER OVER THE #3 REEFER COMPRESSOR ELECTRIC MOTOR WIRING JUNCTION BOX.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REFIT WHERE MISSING THE LIGHTING FIXTURE GUARDS AND GLOBES THROUGHOUT THE VESSEL.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
PROPERLY FIT THE ELECTRIC WIRE PENETRATION INTO THE STUFFING BOX WHERE FITTED TO THE TOP OF THE #6 LIFEBOAT CONTROLLER.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Unknown
Issued 24 October 1987 Resolved
HAVE HYDROSTATICALLY TESTED THE CO2 BOTTLES THAT ARE IN SERVICE IN THE AFT DIESEL ENGINE FIRE PUMP ROOM. THE LAST HYDRO TEST STAMP DATES READ OCT67.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Lifesaving
Issued 24 October 1987 Resolved
LIFERING STATION BRACKETS ARE TO BE REBUILT WHERE BROKEN ON WEATHER DECKS.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REPLACE THE ELECTRIC WIRE KICK PIPES/STUFFING TUBES WHERE WASTED ON THE 02 DECK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REBUILD WHERE WASTED THE ELECTRICAL CABLE RUN SUPPORT RACKS AND ASSOCIATED WIRE RETAINER CLIPS ON THE 02 DECK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Fire Fighting
Issued 24 October 1987 Resolved
REPAIR OR RENEW THE FIREHOSE SUPPORT RACK AT STATION FS02-127-1.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REPLACE WHERE MISSING THE ELECTRICAL CONTROLLER COVER SECURING CLIPS AND PINS AT ALL OF THE LIFEBOAT STATIONS.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
RENEW THE HINGE SUPPORT CLIPS AND THE DOOR GASKET FOR THE DOOR FOR THE VENTILATION MACHINERY SPACE LOCATED ON THE 02 DECK INBOARD OF THE #3 LIFEBOAT STATION.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REBUILD ALL EXPOSED DECK SUPPORTING/MOUNTING BRACKETS FOR THE LIGHTING FIXTURES, PHONE RECEPTICLES AND SWITCH BOXES WHERE WASTED OR BROKEN AWAY.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
REPAIR OR RENEW THE FOLLOWING BULWARK STAYS: 1) SIXTH STAY FORWARD OF THE NUMBER 2 LIFEBOAT; 2) FIRST STAY FROWARD OF THE NUMBER 1 LIFEBOAT.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
REPLACE WHERE WASTED AROUND THE DECK DRAIN STRAINERS ON THE CARGO DECK IN THE #2 LOWER HOLD (MSD SPACE) IN THE AREA OF THE PORT AND STARBOARD SIDE ATTHE AFT BULKHEAD.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
CLEAN OUT ALL BILGE SUCTION BOXES LOCATED IN THE CARGO HOLDS.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
RENEW OR REPAIR THE HOLED VENT RISER PIPE LOCATED INBOARD OF THE NUMBER THREE LIFEBOAT ON THE 02 DECK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
REPAIR WHERE HOLED THE SUPERSTRUCTURE LOCATED INBOARD OF THE #5 LIFEBOAT STATION ON THE 02 DECK.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
CLEAN, INSPECT AND REPAIR WHERE WASTED THE SIDESHELL FRAMING MEMBERS THAT ARE LOCATED ON THE PORT AND STARBORD SIDE OF THE LOWER NUMBER 2 HOLD JUST FORWARD OF THE AFT BULKHEAD.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
DEMONSTRATE THE WEATHERTIGHTNESS OF THE #2 FORWARD CARGO HATCHWAY COVER AS REQUIRED BY 46 CFR 42.15-30. UNTIL THIS REQUIREMENT IS MET A TARPAULIN STYLE COVER IS TO BE FITTED OVER THE METAL HATCH COVER.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Construction/Loadline
Issued 24 October 1987 Resolved
DEMONSTRATE THE WATERTIGHTNESS OF THE VESSEL'S SIDEPORT ACCESSES THAT ARE LOCATED BELOW THE FREEBOARD DECK AS REQUIRED BY 46 CFR 42.15-55.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Accommodation/Occupational Safety
Issued 24 October 1987 Resolved
FREE UP THE RUBBISH CHUTES SECURING DOGS.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Accommodation/Occupational Safety
Issued 24 October 1987 Resolved
REMOVE FROM THE VESSEL ALL NON-ESSENTIAL MATERIAL AND DEBRIS WHICH HAS COLLECTED IN THE NUMBER 7 HOLDS TWEEN AND LOWER DECK & BROOM SWEEP CLEAN.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REMOVE THE DEAD ENDED ELECTRICAL WIRING THAT WAS USED FOR THE #1 (7P33) TUBE NEST DRAIN PUMP. THE SUBJECT WIRING IS PRESENTLY HANGING UNDER THE CONTROLLER FOR THE #1 DISTILLER CONDENSATOR PUMP.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
DEMONSTRATE THE OPERATION OF THE BILGE AND BALLAST PRIMING PUMP.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
RENEW WHERE RED HAND PATCHED THE BILGE LINE LOCATED ABOVE THE #2 HOLD BILGE SUCTION BOX ON THE PORT SIDE JUST FORWARD OF THE AFTER BULKHEAD.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Engineering
Issued 24 October 1987 Resolved
REPAIR OR REPLACE THE BILGE LEVEL ALARM FLOAT SYSTEM LOCATED OUTBOARD OF THE #3 DISTILLER CIRCULATING PUMP.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REFIT COVER ON THE MOUNTED ELECTRICAL JUNCTION BOX THAT IS INSIDE AND ABOVETHE VENTILATION MACHINERY SPACE DOOR LOCATED ON THE 02 DECK INBOARD OF THE #3 LIFEBOAT STATION.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
FIT WITH ELECTRICIANS PUTTY THE WIRE PENETRATION FOR THE JUNCTION BOX L-18-B3 LIGHTING CIRCUIT LOCATED ABOVE THE PORT ANCHOR WINCH CONTROLLER ON BULKHEAD NO. 11. DEAD ENDED ELECTRICAL WIRING ON THIS AREA IS TO BE REMOVED.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Accommodation/Occupational Safety
Issued 24 October 1987 Resolved
REPLACE THE PIPE DRAIN BRACKETS FOR THE EVAPORATORS 1ST EFFECT TUBE NEST DRAIN TO BILGE LINE.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REPAIR OR RENEW THE ELECTRIC CONTROLLER BOX AND COVER, ALONG WITH SUPPORTING ANGLE BRACES, FOR THE #3 LIFEBOAT STATION.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
REMOVE FROM THE AFT BRIG THE DEADENDED ELECTRICAL WIRES WHERE HANGING DOWN FROM THE OVERHEAD ABOVE THE DOOR AND PROPERLY SEAL WIRE PENETRATION STUFFING BOXES.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
RENEW THE ELECTRICAL WIRING PROTECTION COVER FOR THE LEADS TO THE SHAFT ALLEY FIRE PUMP MOTOR. ALSO RENEW WHERE WASTED AWAY THE ELECTRICAL WIRE RETAINING CLIPS BETWEEN THE FIRE PUMP MOTOR AND ASSOCIATED LOCAL CONTROL PANEL.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 24 October 1987 Resolved
PROPERLY DEAD END THE EXPOSED ELECTRICAL WIRING FOR THE SOLENOID STYLE LINECONTROL VALVES FOR THE THAW ROOM/MEAT ROOM REFRIGERATION SYSTEMS. COVERS ARE TO BE FITTED OVER THE ASSOCIATED THERMOSTAT CONTROLS. THESE CONTROLS ARE LOCATED IN THE SHAFT ALLEY BETWEEN FRAMES 146/147 AND 150/151.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Fire Fighting
Issued 24 October 1987 Resolved
RENEW WHERE MISSING THE BRACKETS THAT ARE USED TO SUPPORT THE SHAFT ALLEY FIRE PUMP PIPING. SUBJECT BRACKETS ARE MISSING FROM BETWEEN THE STRAINERS TO THE FIRST 90 DEGREE ELBOW.
Condition: Unknown
Due 24 October 1987
Resolved 24 October 1987
Electrical
Issued 2 May 1987 Resolved
COMPLETE THE WIRING OF THE SEWAGE TREATMENT PLANT CONTROL PANEL, ENSURING THAT ALL OPENINGS IN THE PANEL ARE UTILIZED OR COVERED OVER, AND THAT ALL WIRE CABLE IS EQUIPPED WITH STUFFING TUBES OR OTHER DEVICE TO PREVENT CHAFING AT THE POINT WERE THEY PENETRATE THE CONTROL BOX.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Electrical
Issued 2 May 1987 Resolved
REWIRE THE POWER SUPPLY TO THE WELDER ON 2 DECK INTO THE PANEL AT 2-165-1, ENSURING THAT STUFFING TUBES ARE USED AT BOTH THE BULKHEAD AND PANEL BOX PENETRATIONS AND THAT WIRE CABLE IS PROPERLY SECURED TO OVERHEAD AND BULKHEADS.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Construction/Loadline
Issued 2 May 1987 Resolved
ISSUED WORK LIST WITH 50 ITEMS.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Engineering
Issued 2 May 1987 Resolved
DEMONSTRATE THE PROPER OPERATION OF THE #3 BOILER FEED PUMP OVERSPEED TRIP BY MANUALLY TRIPPING IT, IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Construction/Loadline
Issued 2 May 1987 Resolved
REPLACE THE TWO BROKEN DOGS AT THE AFTER STARBOARD SIDE OF THE #6 HOLD HATCH COVER.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Construction/Loadline
Issued 2 May 1987 Resolved
GOUGE AND WELD THE CRACK IN THE #6 HOLD HATCH COVER AT THE FORWARD END OF THE PORT SIDE SEAM.
Condition: Unknown
Due 2 May 1987
Resolved 2 May 1987
Fire Fighting
Issued 3 May 1986 Resolved
REPAIR LEAKING VALVES AT FIRE STATIONS 4-29-0, 6-93-1, 01-129-2 AND 3-57-2.
Condition: Unknown
Due 3 May 1986
Resolved 3 May 1986
Lifesaving
Issued 3 May 1986 Resolved
IN ACCORDANCE WITH 46 CFR 167.35-15 LIFEBOATS #2 AND #4 ARE TO BE LOADED TO ALLOWED CAPACITY AND LOWERED INTO WATER IN PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 3 May 1986
Resolved 3 May 1986
Navigation
Issued 3 May 1986 Resolved
IN ACCORDANCE WITH 33 CFR 164.35(K) PROVIDE A SIMPLE BLOCK DIAGRAM SHOWING CHANGE OVER FOR REMOTE STEERING GEAR CONTROL SYSTEM.
Condition: Unknown
Due 3 May 1986
Resolved 3 May 1986
Fire Fighting
Issued 3 May 1986 Resolved
REPAIR THE INOPERATIVE ALARM BELLS ON THE STARBOARD SIDE OF "A" DECK AND INTROOP GALLEY ON "B" DECK
Condition: Unknown
Due 3 May 1986
Resolved 3 May 1986
Navigation
Issued 3 May 1986 Resolved
IN ACCORDANCE WITH 33 CFR 164.35(G) 1 THRU 7 POST MANUEVERING INFORMATION ON THE BRIDGE
Condition: Unknown
Due 3 May 1986
Resolved 3 May 1986
Engineering
Issued 4 May 1985 Resolved
MAKE PROPER REPAIRS OR REPLACE SUPERHEATER SAFETY VALVE ON PORT BOILER. CONTACT COGNIZANT OCMI FOR TESTING AND SEALING OF SUPERHEATER VALVE. THIS REQUIREMENT SHALL BE CORRECTED PRIOR TO DEPARTURE FROM NORFOLK, VA. AND PRIOR TO 15 MAY 1985.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Electrical
Issued 4 May 1985 Resolved
REFASTEN DECKLIGHT TO BULKHEAD AT # 4 BOAT ON BOAT DECK.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Lifesaving
Issued 4 May 1985 Resolved
REPLACE PUBLIC ADDRESS SPEAKER AT # 8 LIFEBOAT ON BOAT DECK.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Construction/Loadline
Issued 4 May 1985 Resolved
REPAIR KNIFEDGE,GASKET, AND DOGS FOR VENTILATION SHAFT CLOSURE ON PORT SIDE TOP OF DECKHOUSE FRAME 61 AT YARD PERIOD, BUT NOT LATER THAN 1 OCT 85.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Electrical
Issued 4 May 1985 Resolved
REMOVE DISCONNECTED WIRING FROM OVERHEAD IN #5 HOLD REEFER AREA.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Navigation
Issued 4 May 1985 Resolved
PROVIDE ONBOARD PRIOR TO DEPARTURE FROM NORFOLK, VA. 1 COPY OF TIDAL CURRENT TABLES FOR EUROPEAN COAST.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Construction/Loadline
Issued 4 May 1985 Resolved
MAKE REPAIRS OR REPLACE DETERIORATED RIVETS IN LOWER #2 HOLD PORT AND STARBOARD SIDE. THIS REQUIREMENT SHALL BE CORRECTED AT NEXT DRYDOCK EXAM.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Construction/Loadline
Issued 4 May 1985 Resolved
REPLACE FOUR BROKEN BOLTS ON HATCH COVERS # 1, 2, AND 6 AT YARD PERIOD BUT NOT LATER THAN 1 OCT 1985.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Construction/Loadline
Issued 4 May 1985 Resolved
OPEN PORT COFFERDAM UNDER REDUCTION GEAR FOR FURTHER EVALUATION OF DETERIORATION OF THE BULKHEAD OF DIESEL OIL TANK, AND KEEL. THIS REQUIREMENT SHALL BER COMPLETED AT NEXT DRYDOCK EXAMINATION.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Fire Fighting
Issued 4 May 1985 Resolved
REPLACE LEAKING VALVES AT FIRE STATIONS 4-45-1, 1,127-2, AND 02-87-1.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Lifesaving
Issued 4 May 1985 Resolved
REPLACE HINGES FOR 1 DOG TO STARBOARD AFT TANK OF NUMBER 3 LIFEBOAT AT NEXTYARD PERIOD.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Lifesaving
Issued 4 May 1985 Resolved
REPLACE HINGES FOR 1 DOG OF FORWARD TANK OF NUMBER 1 LIFEBOAT AT NEXT YARD PERIOD.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Electrical
Issued 4 May 1985 Resolved
REPAIR ELECTRICAL BOX ON FORWARD DAVIT OF #4 LIFEBOAT.
Condition: Unknown
Due 4 May 1985
Resolved 4 May 1985
Engineering
Issued 10 October 1984 Resolved
TEST OVERSPEED ON NUMBER 2 AND 3 COFFIN FEED PUMP AT NEXT ANNUAL INSPECTION
Condition: Unknown
Due 10 October 1984
Resolved 10 October 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.