Records from 2016 to 2026. Most recent: inspection, 17 July 2026.
Documentation record
Registered dimensions (L × B × D)36.0 ft × 12.0 ft × 5.3 ft
Registered tonnagegross 15 / net 12
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPEREGRINE MARINE · ANCHORAGE, AK, UNITED STATES · built 1994
Hull materialAluminum
PropulsionDiesel Outdrive
Hull shapeShip
Hull configurationMonohull
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 August 2025 · expires 31 August 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it15 - Simplified, Gross Ton
12 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
17 July 2026
Type not recorded
No type recorded · Station Valdez · USCG Arctic District (CGD-A) · Activity 8444377
29 May 2026
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8354127
2 April 2026
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8344241
17 September 2025
Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8207550
1 May 2025
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8127069
5 March 2025
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8089020
28 May 2024
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7921922
3 October 2023
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7806375
2 June 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7710143
20 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7458348
4 October 2021
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7328828
21 May 2021
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7202788
24 June 2020
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7012757
17 September 2019
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6815092
23 May 2019
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6698448
23 May 2018
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6421904
18 September 2017
Drydock Exam
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6269668
22 May 2017
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6162981
20 May 2016
COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5879559
10 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 5873642
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 May 2026
Resolved
At each initial and subsequent inspection the firefighting equipment of all vessels shall be inspected and all deficiencies shall be corrected. CO2 Extinguisher for engine compartments did not have evidence or paperwork on its last hydrostatic test.
46 CFR 176.25-25
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2026
Resolved 2 June 2026
Resolution: Provided the CO2 extinguisher on board servicing and hydrostatic testing records from Taylor Fire. The extinguisher was last serviced in March 2026 and most recently hydrostatic tested in February 2025.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 May 2026
Resolved
Means provided for pumping bilges shall be tested by operation. Audible and visual alarms for the 02 engine compartment submersible bilge pumps did not function. 46 CFR 176.25-10
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2026
Resolved 2 June 2026
Resolution: Starboard engine bilge float switch was replaced and retested. Port engine bilge float switch and pump were replaced. Both pumps now properly operate, sound an audible alarm at the operating station, and illuminate a visual indicator.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 23 May 2018
Resolved
Replace plastic and non standard fuel tank vent piping hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2018
Resolved 2 June 2018