Records from 1985 to 2008. Most recent: inspection, 20 November 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 20 November 2008
Resolved
Prior to any work, submit repair plans and procedures IAW NVIC 7-95 to USCG for review. At a minimum, include materials, manufacturing processes, and equipment. Any calculations performed to determine scantlings, dimensions, sizes, etc. should be included.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew the area around the 2nd and 3rd frame (port and starboard side), in the foc'sle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew deck frame 4 on portside (forward bulkhead of sleeping quarters) in foc’sle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 20 November 2008
Resolved
Replace top step in foc’sle.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew vessel’s deck as necessary. Prior to beginning work, provide detailed plan outlying areas which will be replaced and make vessel available for verification by marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Hull › Bottom Plating
Issued 20 November 2008
Resolved
Crop and renew floor at base of galley steps.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Hull › Side Shell
Issued 20 November 2008
Resolved
Crop and renew 3 bulwark futtocks in midships aft port cabin.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew framing IWO scupper area in galley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Hull › Side Shell
Issued 20 November 2008
Resolved
Provide caulking in between seams to planking on starboard side in galley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew deck joist IWO countertop in galley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew "carline" framing alongside countertop in galley (2 places).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Construction/Loadline › Structures › Deck Plating
Issued 20 November 2008
Resolved
Crop and renew dark framing on starboard side in galley / lazzarette space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Stability › Weathertight Integrity › General
Issued 20 November 2008
Resolved
Make both engineroom door entrances weathertight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 20 November 2008
Resolved
Replace engine coolant line hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Engineering › Fuel Oil Service System › Tank
Issued 20 November 2008
Resolved
Properly label emergency fuel shut off location.
Action required: 705 - Other - as specified
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 20 November 2008
Resolved
Clean out bilge of mud material in foc’sle.
Action required: 705 - Other - as specified
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Navigation › Piloting/Steering › Magnetic Compass
Issued 20 November 2008
Resolved
Provide magnetic compass for inspection.
Action required: 705 - Other - as specified
Resolved 21 June 2011
Resolution: June 21, 2011 This activity was reopened to clear long standing, overdue deficiency(ies) **VESSEL WAS DELETED FROM SERVICE" //s// [name withheld], Sector New York, Civilian Marine Inspector, [email withheld], [phone withheld]
Communications › Alarms/Indicators › Bilge Alarm
Issued 27 May 2004
Resolved
Prove proper operation of bilge visual high level alarm at operating station.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 May 2004
Resolved 8 June 2004
Construction/Loadline › Structures › Superstructure
Issued 27 May 2004
Resolved
Make proper repairs to galley overhead - fwd stbd corner skylight.
Due 27 June 2004
Resolved 30 June 2004
Resolution: Skylight removed.
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 27 May 2004
Resolved
Provide proof of apprroved weak link on life float.
Due 27 June 2004
Resolved 30 June 2004
Resolution: Metal tagged with CG approval 46 CFR 160.073
Construction/Loadline › Structures › End Bulkhead
Issued 27 May 2004
Resolved
Make permanent and proper repairs to corner (external) stantion on galley. (Galley cabin corner aft stbd.) LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Due 27 June 2004
Resolved 30 June 2004
Resolution: Proper repairs made by C\R.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 May 2004
Resolved
Make permanent and proper repairs to galley cabin aft bulkhead - between corner and #1 inboard stantion at overhead.
Condition: Improper/Lack of Maintenance
Due 27 June 2004
Resolved 30 June 2004
Resolution: Proper repairs made by wood puddy.
Engineering › Non-conventional Propulsion/Steering › Base (cycloidal)
Issued 27 May 2004
Resolved
Make proper repairs to stay sail at the clew.
Due 27 June 2004
Resolved 30 June 2004
Resolution: Repairs sat.
Communications › Alarms/Indicators
Issued 29 April 2004
Resolved
Prove proper operation of bilge high level alarms. LEGACY COMPONENT DESC: Bilge Alarm
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 April 2004
Resolved 27 May 2004
Resolution: Bilge alarm audio SAT- issued CG-85 #NY10 for visual alarm. Also Prior to Carrying passengers.
Documentation › Manifests/Lists
Issued 29 April 2004
Resolved
Properly post emergency instructions. LEGACY COMPONENT DESC: Muster List/Emergency Instructions
Due 12 May 2004
Resolved 27 May 2004
Resolution: In galley cabin.
Lifesaving › Hand Flares
Issued 29 April 2004
Resolved
Provide the proper number/kind of flares.
Action required: 701 - Prior to carriage of passengers/cargo
Due 12 May 2004
Resolved 27 May 2004
Resolution: Provided 3 orange flares. (Already had 3 red flares.)
Construction/Loadline › Structures
Issued 29 April 2004
Resolved
Make sails and rigging available for inspection. LEGACY COMPONENT DESC: Superstructure
Due 12 May 2004
Resolved 27 May 2004
Resolution: Available.
Lifesaving › Buoyant Apparatus
Issued 29 April 2004
Resolved
Make proper repairs to life float paddles and pendant/life lines.
Due 12 May 2004
Resolved 27 May 2004
Resolution: Replaced paddles and tied up life lines.
Accommodation/Occupational Safety › Medical/First Aid
Issued 29 April 2004
Resolved
Provide USCG approved first aid kit or equiv. contents.
Due 12 May 2004
Resolved 27 May 2004
Resolution: Obtained new first aid kit, and had supplimental items on hand to meet requirements.
Engineering › Fuel Oil Service System
Issued 29 April 2004
Resolved
Make proper repairs to fuel & MSD tank vents with 30x30 mesh screen. LEGACY COMPONENT DESC: Vent Pipe
Due 12 May 2004
Resolved 27 May 2004
Construction/Loadline › Hull
Issued 29 April 2004
Resolved
Make permanent and proper repairs to main deckon p & s side ivo galley space (aft).
Due 12 May 2004
Resolved 27 May 2004
Resolution: Small patches were put in place.
Construction/Loadline › Hull
Issued 29 April 2004
Resolved
Make permanent and proper repairs to decking at base of the ladder (rear) in port side aft cabin.
Due 12 May 2004
Resolved 27 May 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew decking on stbd. side of Sampson Post (to good wood). LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 29 April 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew decking on port side (#2 & #3) above frame #2 deck. LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 27 May 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew stbd #4 deck plank from king plank IWO bow midship aft cabin. LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 29 April 2004
Engineering › Bilge Water Management System
Issued 25 February 2004
Resolved
Remove or repair pvc pipe from stbd antique bilge pump. LEGACY COMPONENT DESC: Piping
Due 29 April 2004
Resolved 27 May 2004
Resolution: Repaired PVC piping. Piping AUX and not needed.
Stability › Weathertight Integrity
Issued 25 February 2004
Resolved
Replace two craked windows in Galley.
Due 29 April 2004
Resolved 29 April 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew deck plank #2 from Carlin (stbd side) above middle of seat in galley. LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 27 May 2004
Resolution: Repaired and covered with epoxy.
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew stbd overhead long. #1 from outboard (aft) in galley.
Due 29 April 2004
Resolved 27 May 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew stbd galley ceiling/ aft bulhead IWO stbd overhead long #1 from outboard (aft) in galley
Due 29 April 2004
Resolved 27 May 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Report skylight frame to good wood in galley.
Due 29 April 2004
Resolved 29 April 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Renew stbd overhead long. IWO galley entrance (hatch rail).
Due 29 April 2004
Resolved 29 April 2004
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
C/R deck plank #4 from outboard stbd covering board under life jacket box. LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 27 May 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 25 February 2004
Resolved
Secure stbd stern corner railing post and 1 fwd of it. LEGACY COMPONENT DESC: Deck Rail
Due 29 April 2004
Resolved 27 May 2004
Resolution: All railing posts were firmly secured.
Construction/Loadline › Structures
Issued 25 February 2004
Resolved
Repair two areas on stbd covering board. LEGACY COMPONENT DESC: Deck Plating
Due 29 April 2004
Resolved 29 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 25 February 2004
Resolved
Repair port side stern top rail. LEGACY COMPONENT DESC: Deck Rail
Due 29 April 2004
Resolved 29 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 25 February 2004
Resolved
Secure hand rail port side near ice box (#2&3 fwd midships). LEGACY COMPONENT DESC: Deck Rail
Due 29 April 2004
Resolved 29 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 25 February 2004
Resolved
Repair hand rail port side (#5 fwd midships). LEGACY COMPONENT DESC: Deck Rail
Due 29 April 2004
Resolved 29 April 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 25 February 2004
Resolved
Repair base board on hand rail port side (#1 aft midships). LEGACY COMPONENT DESC: Deck Rail
Due 29 April 2004
Resolved 29 April 2004
Navigation
Issued 15 August 2002
Resolved
Update charts, light list and NAV pubs.
Due 29 August 2002
Resolved 10 October 2002
Resolution: Updated charts, light list and NAV pubs.
Accommodation/Occupational Safety
Issued 15 August 2002
Resolved
Supply supervisory drug training info
Due 29 August 2002
Resolved 27 September 2002
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Electrical
Issued 15 August 2002
Resolved
Remove INOP guage panel IWO aft galley bulkhead
Due 29 August 2002
Resolved 10 October 2002
Resolution: Guage panel removed.
Accommodation/Occupational Safety
Issued 15 August 2002
Resolved
Make paint supply locker debris free
Due 29 August 2002
Resolved 10 October 2002
Resolution: Space cleared.
Construction/Loadline › Hull › Hull Plating
Issued 5 June 2002
Resolved
Find source of water intrusion IWO stem & keel & permanently repair.
Due 19 June 2002
Resolved 20 June 2002
Resolution: No water observed during underway exam. Repair necessary above the waterline. Caulking reefed out and re-caulked.
Construction/Loadline › Hull › Hull Plating
Issued 5 June 2002
Resolved
Find source of water intrusion approximately athwart ships of keel between #1 & #2 frames in port forward midship cabin.
Due 10 June 2002
Resolved 12 June 2002
Resolution: Observed no water during underway exam. Repaired with underwater epoxy.
Construction/Loadline › Hull
Issued 4 June 2002
Resolved
Find source of water intrusion IWO centerline beneath galley countertop & permanently repair. LEGACY COMPONENT DESC: Keel
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 5 June 2002
Resolution: No water intrusion observed. Repaired with underwater epoxy.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
Bay 1 - C/R #2 & #12 decking in forecastle port side cabin. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
Bay 2 - C/R #8 & #11 decking in forecastle port side cabin. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R #3 & #4 decking in port midship forward cabin. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 12 June 2002
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R #9 decking to standing overhead in port midship forward cabin. LEGACY COMPONENT DESC: Overhead decking
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R aft lower bunk supports in stbd midship forward cabin.
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R #1 decking in stbd midship forward cabin. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Stability › Weathertight Integrity
Issued 29 April 2002
Resolved
Make stbd midship aft cabin hatch weathertight.
Due 12 July 2002
Resolved 16 July 2002
Resolution: Stbd Midship aft cabin is now watertight.
Construction/Loadline › Hull › Transverse Frame
Issued 29 April 2002
Resolved
C/R #1 aft futtock & #2 forward futtock in port midship aft cabin (approximately 1 foot in length, each).
Due 30 November 2003
Resolved 25 February 2004
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R #1 decking in stbd engine room access. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R galley overhead decking IWO skylight. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Electrical › Lighting (service)
Issued 29 April 2002
Resolved
Renew black wire to foremast masthead light (cracked). LEGACY COMPONENT DESC: Conductor
Due 12 July 2002
Resolved 16 July 2002
Resolution: Black wire renewed.
Construction/Loadline › Structures
Issued 29 April 2002
Resolved
C/R decking IWO fwd corner of lifejacket box, stbd side. LEGACY COMPONENT DESC: Deck Plating
Due 12 July 2002
Resolved 16 July 2002
Resolution: Examined repair - all sat.
Construction/Loadline › Hull
Issued 29 April 2002
Resolved
Refasten black plank below port aft cleat.
Due 12 July 2002
Resolved 16 July 2002
Resolution: Plank refastened with new butt block - all sat.
Accommodation/Occupational Safety › Medical/First Aid
Issued 5 November 2001
Resolved
Provide First Aid Kit IAW 46 CFR 160.041 LEGACY COMPONENT DESC: Medicine Chest
Condition: Improper/Lack of Maintenance
Due 7 December 2001
Resolved 18 December 2001
Stability › Weathertight Integrity
Issued 5 November 2001
Resolved
Install positive shut-off valve for overboard discharge for submersible pump in engine room. Install valve at hull penetration LEGACY COMPONENT DESC: Positive Shut valve
Condition: Improper Installation
Due 7 December 2001
Resolved 18 December 2001
Lifesaving
Issued 11 October 2000
Resolved
Provide floating water light for the buoyant apparatus that meets 46CFR180.175(f)(4) and approved under 46CFR160.010.
Condition: Unknown
Due 11 October 2000
Resolved 11 October 2000
Documentation
Issued 11 October 2000
Resolved
Provide company policy for drug program.
Condition: Unknown
Due 11 October 2000
Resolved 11 October 2000
Lifesaving
Issued 11 October 2000
Resolved
Make repairs to life float net and grab lines.
Condition: Unknown
Due 11 October 2000
Resolved 11 October 2000
Lifesaving
Issued 11 October 2000
Resolved
Remove charcoal grill from vessel.
Condition: Unknown
Due 11 October 2000
Resolved 11 October 2000
Lifesaving
Issued 11 October 2000
Resolved
Provide retroreflective tape for rescue boat.
Condition: Unknown
Due 11 October 2000
Resolved 11 October 2000
Electrical
Issued 11 August 1999
Resolved
EMPTY LIGHT FIXTURE, REPLACE BULB AND PROVE PROPER OPERATION.
Condition: Unknown
Due 12 August 1999
Resolved 12 August 1999
Electrical
Issued 11 August 1999
Resolved
REPLACE WIRE TO PORT SIDE READING LIGHT IN GALLEY SPACE.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Deck/Cargo
Issued 11 August 1999
Resolved
MAKE PERMANENT AND PROPER REPAIRS TO LOOSE ANCHOR WINDLASS MOUNT, MISSING BOLTS ON PORT SIDE.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Engineering
Issued 11 August 1999
Resolved
REPLACE OR MAKE PERMANENT & PROPER REPAIRS TO FORESAIL.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Engineering
Issued 11 August 1999
Resolved
REPLACE RUBBER HOSE ON FUEL LINE IN ACCORDANCE WITH 46CFR182.20-40 OF "OLD"T OR 46CFR182455 OF "NEW" T.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Lifesaving
Issued 11 August 1999
Resolved
PROVIDE TYPE II RETRO REFLECTIVE TAPE ON LIFE RING AND 60FT OF UV RESISTANTLINE.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Construction/Loadline
Issued 11 August 1999
Resolved
REPLACE NON-METALIC PIPING ON BILGE SYSTEM IN ACCORDANCE WITH 46CFR56.60- 25(B) AND SAE J-1942
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Documentation
Issued 11 August 1999
Resolved
PROVIDED COPY OF UP TO DATE RADIO TELEPHONEY CERTFICATE
Condition: Unknown
Due 26 August 1999
Resolved 26 August 1999
Accommodation/Occupational Safety
Issued 11 August 1999
Resolved
REWEW FWD LIFE LINE USING PROPER FASTENERS AND EXTEND THE LIFE LINE FWD TO PAST THE ANCHOR WINDLASS.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Construction/Loadline
Issued 11 August 1999
Resolved
REPLACE ALL EXISTING DEAD EYE W/EXCEPTION OF 2 LOCATED ON BOTTOM PORT.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Lifesaving
Issued 11 August 1999
Resolved
6 LIFE JACKETS ARE IN NEED OF REPAIR/REPLACEMENT. REDUCE NUMBER OF_x001C_ PASSENGERS BY 6 UNTIL PFD ON PROPERLY REPAIRED OR REPLACED.
Condition: Unknown
Due 26 August 1999
Resolved 26 August 1999
Navigation
Issued 11 August 1999
Resolved
MAKE PERMANENT AND PROPER REPAIRS TO RUDDER WORM GEAR MOUNTS WHICH ARE LOSEAND OUT OF ALINEMENT.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Lifesaving
Issued 11 August 1999
Resolved
REPLACE PAINTER ON LIFE FLOAT W/ UV RESISTANT, BOUYANT LINE, PROVIDE 12 PENNETS AND LOOSEN GRAB LINES.
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Fire Fighting
Issued 22 January 1999
Resolved
Submit plans for review and approval for the installation of a fixed fire fighting system in the machinery spaces iaw 46CFR181.115(b) and 46CFR181.400.
Condition: Unknown
Due 22 January 1999
Resolved 12 August 1999
Fire Fighting
Issued 22 January 1999
Resolved
Install a fixed fire fighting system in the machinery spaces iaw USCG approved plans.
Condition: Unknown
Due 12 August 1999
Resolved 12 August 1999
Fire Fighting
Issued 22 January 1999
Resolved
Vessel is not to be operated with passengers for hire after 11Mar99 until the above requirements have been cleared to the satisfaction of an attending USCG marine inspector.
Condition: Unknown
Due 12 August 1999
Resolved 12 August 1999
Construction/Loadline
Issued 3 November 1998
Resolved
Provide bilge high level alarms in accordance with 46CFR182.530
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Construction/Loadline
Issued 3 November 1998
Resolved
Renew inboard deck plank at port side of main deck next to galley companionway.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Construction/Loadline
Issued 3 November 1998
Resolved
Renew short plank at centerline of starboard aft bit on main deck aft.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Engineering
Issued 3 November 1998
Resolved
Renew first flexible of main diesel engine exhaust riser.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Fire Fighting
Issued 3 November 1998
Resolved
Replace non-metalic (PVC) piping on fire main, with proper piping in accordance with 46CFR182.700 & 710
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Fire Fighting
Issued 3 November 1998
Resolved
Provide fixed fire extinguishing and detections systems in accordance with 46CFR181.400._x001C_ Prior to installation, plans must be approved by Officer in Charge, Marine Inspections.
Condition: Unknown
Due 3 November 1998
Resolved 3 November 1998
Construction/Loadline
Issued 1 September 1998
Resolved
Repair or refasten hull planking to frames stbd side fwd IWO mast stay.
Condition: Unknown
Due 1 September 1998
Resolved 1 September 1998
Lifesaving
Issued 1 September 1998
Resolved
Remove two charcoal grills from vessel. This is a repeat violation from 1997.
Condition: Unknown
Due 1 September 1998
Resolved 1 September 1998
Construction/Loadline
Issued 8 December 1997
Resolved
PORTSIDE AFT ON AFT DECKHOUSE, CORNER POST ROTTED. RENEW AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
GALLEY/AFT DECKHOUSE TOP ROTTED, CROP AND RENEW AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Navigation
Issued 8 December 1997
Resolved
WOODEN PROTECTIVE COVERING/TOP ROTTED AND DETERIORATED, RENEW TOP TO ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Navigation
Issued 8 December 1997
Resolved
TIGHTEN AND DOUBLE NUT STEERING BOLTS FOR THE MOUNTINGS FOR THE "DOUBLE DIAMOND" STEERING MECHANISM.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
ENTRANCE TO AFT DECK HOUSE, RENEW DRY ROTTED AS ORIGINAL._x001C_
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
PROPERLY SPLICE LIFELINE ON PORT SIDE.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
FORWARD DECKHOUSE TOP ROTTED, RENEW AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Electrical
Issued 8 December 1997
Resolved
PROVIDE WATERPROOF JUNCTION BOX IN GALLEY/STEERING SPACE.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
DECK PLANKING AFT OF FORWARD MAST ROTTED, RENEW AS ORIGINAL,
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
PORT AND STBD MID-DECK DECK PLANKING ROTTED IN VARIOUS LOCATIONS. DECK COMPLETELY PENETRATED IN AT LEAST ONE AREA. RENEW ROTTED DECK AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
PREPARE ALL BLOCKS AND RUNNING GEAR FOR INSPECTION.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
MIDSHIP CABIN TOP ROTTED, REPLACE AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Construction/Loadline
Issued 8 December 1997
Resolved
FORE PEAK CABIN TOP ROTTED, RENEW AS ORIGINAL.
Condition: Unknown
Due 8 December 1997
Resolved 8 December 1997
Electrical
Issued 6 August 1997
Resolved
INSTALL A COVER ON THE SEWAGE CONTROLLER IN THE ENGINEROOM.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
REPAIR LEAK ON SEACHEST VALVE HANDLE.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Electrical
Issued 6 August 1997
Resolved
INSTALL LAMP GUARDS ON ALL LIGHT FIXTURES.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Engineering
Issued 6 August 1997
Resolved
RENEW FUEL OIL STORAGE TANK.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Engineering
Issued 6 August 1997
Resolved
REPLACE FUEL OIL SUPPLY LINE FROM TANK TO THE FUEL FILTER.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Navigation
Issued 6 August 1997
Resolved
PROVIDE AN ANCHOR BALL DAYSHAPE.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
RENEW PORT SIDE DECK BEAMS UNDER PORT SIDE LIFE JACKET LOCKER.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
CAULK PORT SIDE HULL PLANKING NEAR BOW.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Navigation
Issued 6 August 1997
Resolved
PERMANENTLY AFFIX STERN LIGHT TO VESSEL.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Engineering
Issued 6 August 1997
Resolved
DOUBLE CLAMP HOSE ON PORT SIDE OF ENGINEROOM FOR THE MAIN ENGINE COOLING WATER SUPPLY.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Documentation
Issued 6 August 1997
Resolved
PROVIDE A VALID MASTERS LICENSE.
Condition: Unknown
Due 21 August 1997
Resolved 27 August 1997
Lifesaving
Issued 6 August 1997
Resolved
PROVIDE A BUOYANT APPARATUS THAT CAN CARRY UP TO 30 % OF TOTAL AUTHORIZED PERSONNEL.
Condition: Unknown
Due 21 August 1997
Resolved 29 August 1997
Lifesaving
Issued 6 August 1997
Resolved
PROVIDE A DARK COLORED SYNTHETIC LINE APPROX 3-6 FT IN LENTGH WITH A CORROSION RESISTANT CLIP AND ATTACH IT TO THE LIFE RING.
Condition: Unknown
Due 21 August 1997
Resolved 29 August 1997
Lifesaving
Issued 6 August 1997
Resolved
PROVIDE A 60 FT LENGTH OF A DARK COLORED SYTHETIC LINE FOR THE LIFE RING.
Condition: Unknown
Due 21 August 1997
Resolved 29 August 1997
Lifesaving
Issued 6 August 1997
Resolved
PROVIDE LIFEJACKET DONNING INSTRUCTIONS AND POST.
Condition: Unknown
Due 21 August 1997
Resolved 29 August 1997
Lifesaving
Issued 6 August 1997
Resolved
LABEL ALL LIFE JACKET STORAGE AREAS WITH QUANTITY AND SIZE LIFE JACKETS ie;25 ADULT, 5 CHIDREN LIFEJACKETS.
Condition: Unknown
Due 21 August 1997
Resolved 29 August 1997
Deck/Cargo
Issued 6 August 1997
Resolved
REPLACE WOOD BLOCK UNDER CATSPAW ON STBD SIDE.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Engineering
Issued 6 August 1997
Resolved
INSTALL A MACHINERY GUARD COVERING THE BILGE PUMP PULLEY.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
REPAIR STBD PLANKING ON STBD SIDE BY COMPT #2 NEAR DECK COAMING.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
REPAIR HOLE IN DECK ON STBD SIDE UNDER LIFE JACKET LOCKER.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Construction/Loadline
Issued 6 August 1997
Resolved
REPAIR ROTTED COAMINGS ON DECK HOUSES.
Condition: Unknown
Due 21 August 1997
Resolved 4 September 1997
Lifesaving
Issued 9 August 1996
Resolved
LABEL STOWAGE OF LEFE PRESERVERS INDICATING THE NUMBER AT THAT LOCATION ANDWHETHER THEY ARE ADULT OR CHILD.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Lifesaving
Issued 9 August 1996
Resolved
REPLACE EXISTING WATERLIGHT LANYARD FOR RING BUOY WITH A 3-6 FT LANYARD WITH A QUICK DISCONNECT CLIP.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Lifesaving
Issued 9 August 1996
Resolved
PROVIDE EMERGENCY BROADCAST PLACARD IN ACCORDANCE WITH 46 CFR 184.510
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Unknown
Issued 9 August 1996
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Lifesaving
Issued 9 August 1996
Resolved
PROVIDE BRIGHTLY COLORED CASE MARKED: "DISTRESS SIGNALS"
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Lifesaving
Issued 9 August 1996
Resolved
RENEW THREE EXPIRED DISTRESS SIGNALS(ORANGE SMOKE)
Condition: Unknown
Due 19 August 1996
Resolved 23 August 1996
Engineering
Issued 4 June 1996
Resolved
SUBMIT REPAIR PROPOSAL FOR REPAIR OF FORESAIL BOOM AND EFFECT APPROVED REPAIRS PRIOR TO OPERATION.
Condition: Unknown
Due 2 August 1996
Resolved 5 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR GALLEY CABIN ROOF TOP.
Condition: Unknown
Due 2 August 1996
Resolved 13 August 1996
Engineering
Issued 4 June 1996
Resolved
REPLACE CUTLESS BEARING.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Navigation
Issued 4 June 1996
Resolved
REPAIR RUDDER PINTLE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
SCRAPE OUT AND TREAT 5th PLANK DOWN, 2 FEET AFT OF FORWARD MAST CHAIN PLATES, STBD SIDE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
SUBMIT REPAIR PROPOSAL FOR ROTTED 4th AND 5th PLANKS DOWN 5 FEET AFT OF FORWARD MAST CHAIN PLATES.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANK ENDS AROUND FORWARD MAST.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
CHEMICALLY TREAT ALL PLANK ENDS ABUTTING STEM ON PORT AND STBD SIDES.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
SUBMIT PROPOSAL FOR REPAIR OF 11th PLANK DOWN, 4 FEET FORWARD OF FORWARD MAST CHAIN PLATES, STBD SIDE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
SUBMIT PROPOSAL FOR REPAIR OF ROT ON BOTTOM MOST PLANK ON TRANSOM.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
MAKE AVAILABLE FOR INSPECTION ALL THRU HULL VALVES.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR OUTERMOST DECK PLANK ON MAIN DECK ABUTTING COVERING BOARD BETWEEN FRAMES 11-13 ON PORT SIDE, PRIOR TO OPERATION.
Condition: Unknown
Due 2 August 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR HONEYMOON CABIN HATCH TOP PRIOR TO OPERATION.
Condition: Unknown
Due 2 August 1996
Resolved 5 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR FOCS'L CABIN TOP, STBD SIDE, PRIOR TO OPERATION.
Condition: Unknown
Due 2 August 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996
Resolved
REINSTALL MISSING EYELETS AND HOOKS ON ALL LADDERS LEADING BELOW DECKS PRIOR TO OPERATION.
Condition: Unknown
Due 2 August 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANKS ABUTTING STEM BOTH PORT AND STBD SIDE UNDER BOW SPRIT.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
SUBMIT REPAIR PROPOSAL FOR REPAIR OF ROTTED ENDS OF 8th AND 9th PLANKS DOWN, ABUTTING GRAVING PIECE ON PORT SIDE BELOW FORWARD MAST CHAIN PLATES.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR COAMING (12") BETWEEN WINDOW PORTS ON MIDSHIP CABIN, STBD SIDE, AND REPAIR HATCH RAIL SAME AREA.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MIDSHIP CABIN OVERHEAD PLANKS, PORT AND STBD SIDE.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANKS OUTBOARD OF ANTIQUE BILGE PUMP STBD SIDE FWD, AND REPAIR PVC ELBOW BELOW BILGE PUMP.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR #1 FRAME HEAD UNDER CAP RAIL, PORTSIDE, BOW.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANKS PORTSIDE AFT, APPROX. AMIDSHIPS OF GALLEY.
Condition: Unknown
Due 2 August 1996
Resolved 13 August 1996
Lifesaving
Issued 4 June 1996
Resolved
REPAIR TAFF RAIL PORT QUARTER.
Condition: Unknown
Due 2 August 1996
Resolved 13 August 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANKING ABUTTING #1 FRAME STBD SIDE, BOW.
Condition: Unknown
Due 2 August 1996
Resolved 13 August 1996
Construction/Loadline
Issued 4 June 1996
Resolved
CLEAR LAZARETTE FOR VISUAL INSPECTION.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
OOPS, I SHOULDN'T HAVE GONE TO #30!
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR MAIN DECK PLANKING ABUTTING SAMSON POST FORWARD OF AND UNDER BOW SPRIT.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Construction/Loadline
Issued 4 June 1996
Resolved
REPAIR #1 FRAME HEAD UNDER CAP RAIL STBD SIDE, BOW.
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Lifesaving
Issued 4 June 1996
Resolved
REPAIR CAP RAIL PORT SIDE, FORWARD (BOW)
Condition: Unknown
Due 4 June 1996
Resolved 4 June 1996
Engineering
Issued 4 June 1996
Resolved
REPAIR PITTING ON PROPELLER.
Condition: Unknown
Due 15 December 1996
Resolved 4 June 1996
Accommodation/Occupational Safety
Issued 18 August 1994
Resolved
PROPERLY SECURE UPPER LIFELINE AROUND STERN.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Lifesaving
Issued 18 August 1994
Resolved
VSL IS RESTRICTED TO NMT ONE MILE FROM LAND WHEN CARRYING PASSENGERS UNTIL GRAB LINE ON THE LIFE FLOAT IS REPLACED IN KIND, OR THE 7 PERSON SKIFF IS BROUGHT ABOARD.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Electrical
Issued 18 August 1994
Resolved
MAKE PROPER AND PERMANENT CORRECTIONS IN NAV LIGHT WIRING.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Accommodation/Occupational Safety
Issued 18 August 1994
Resolved
PERMANENTLY SECURE #2 L/L POST ON PORT SIDE TO DECK.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Accommodation/Occupational Safety
Issued 18 August 1994
Resolved
REPAIR AS ORIGINAL #2 L/L POST ON STBD SIDE.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Lifesaving
Issued 18 August 1994
Resolved
PROPERLY MARK 7 PERSON SKIFF WITH VSL NAME AND CAPACITY.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Lifesaving
Issued 18 August 1994
Resolved
VESSEL SHALL NOT CARRY PASSENGERS UNTI LIFE LINES ON PORT AND STBD SIDES ARE REPLACED WITH SUITABLE MATERIAL.
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994
Construction/Loadline
Issued 18 August 1994
Resolved
RECAULK DECK SEAM IN FWD PEAK CABIN OVERHEAD.
Condition: Unknown
Due 18 August 1994
Resolved 18 August 1994
Engineering
Issued 18 August 1994
Resolved
PROVE PROPER REPAIR TO MDE FUEL PIPING AT 2 LEAKING FITTINGS.
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994
Lifesaving
Issued 10 August 1993
Resolved
PROVIDE EVIDENCE OF ENROLLMENT IN A SUITABLE CHEMICAL TESTING PROGRAM TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR/INVESTIGATOR. EVIDENCE OF COMPLIANCE MAY BE PROVIDED BY TELEFAX TO MIONY NO LATER THAN 20AUG93.
Condition: Unknown
Due 20 August 1993
Resolved 20 August 1993
Engineering
Issued 17 May 1985
Resolved
PROVIDE FOR VENTILATION OF THE MACHINERY SPACE IN ACCORDANCE WITH 46 CFR 182.20-45.
Condition: Unknown
Due 17 May 1985
Resolved 17 May 1985
Engineering
Issued 17 May 1985
Resolved
ALLOWED TO GET UNDERWAY ON SAIL ONLY UNTIL ALL ABOVE 835'S ARE CLEARED AND NOT LATER THAN 24 AUGUST 1984.
Condition: Unknown
Due 17 May 1985
Resolved 17 May 1985
Engineering
Issued 17 May 1985
Resolved
PROVE SATISFACTORY OPERATION OF NEWLY INSTALLED MACHINERY SYSTEMS IN ACCOR-DANCE WITH MIO NY PLAN REVIEW GUIDELINES AS PER MIO NY LETTER DATED 1 AUGUST 1984, FILE NO. 16710/RICHARD ROBBINS, SR.
Condition: Unknown
Due 17 May 1985
Resolved 17 May 1985