Records from 1985 to 2016. Most recent: inspection, 17 August 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 36
17 August 2016
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6070622
3 October 2014
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4998276
15 August 2014
Internal Structural Exam
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 4958408
12 May 2014
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 4885193
28 November 2008
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 4801236
11 August 2004
Type not recorded
No type recorded · Commandant (CG-5P-TI) · Activity 3360556
1 March 1994
Administrative
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1163344
9 February 1994
Hull Examination
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1407264
23 May 1991
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1235686
13 February 1991
Administrative
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 910269
23 October 1990
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1225944
17 October 1990
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1238117
31 May 1990
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 922176
17 May 1990
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1241012
14 November 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 913580
31 July 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1043608
26 June 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 893257
18 May 1989
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1035624
14 April 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1349209
10 February 1989
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1038080
19 May 1988
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1350050
14 April 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1338678
20 November 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1334151
28 October 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1010063
12 August 1987
Deficiency Check
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1029410
21 May 1987
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1025835
5 May 1987
Hull Examination
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1331146
21 April 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1004636
14 January 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1013568
12 January 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1013564
3 November 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1006440
16 October 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1006932
2 October 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1321349
16 September 1986
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1012214
22 May 1986
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1298690
24 May 1985
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 979117
Electrical
Issued 17 May 1990
Resolved
PROVIDE GUARD FOR BELTS AND PULLEYS ON DIESEL GENERATOR.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Construction/Loadline
Issued 17 May 1990
Resolved
INSTALL GUARD OVER COUPLING TO BALLAST PUMP.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Electrical
Issued 17 May 1990
Resolved
PROVIDE GUARD FOR LIGHT OVER WORKBENCH IN BOILER ROOM.
Condition: Unknown
Due 17 May 1990
Resolved 17 May 1990
Lifesaving
Issued 18 May 1989
Resolved
CONDUCT LIFEBOAT DRILLS ON BOTH PORT LIFEBOATS IN THE PRESENTS OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Lifesaving
Issued 18 May 1989
Resolved
PROVIDE 103 ADULT AND 21 CHILD LIFEJACKETS IN ADDITION TO PFD'S ALREADY ON BOARD. VESSEL IS RESTRICTED TO 2523 TOTAL ADULTS AND 664 CHILDREN UNTIL ADDITIONAL PFD'S ARE PROVIDED.
Condition: Unknown
Due 18 May 1989
Resolved 18 May 1989
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-REPAIR DECK UNDER FWD LADDER.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Electrical
Issued 20 November 1987
Resolved
C-DECK-REMOVE OLD CONTROLLER BOX & WIRING.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
B-DECK-REPLACE STRINGER, PORT SIDE,FWD.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-REPLACE APPROX. 5FT OF WOODEN DECK,PORT SIDE, FWD.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-REPLACE KICK BOARD, PORT SIDE AFT.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
C-DECK-INSPECT OVERHEAD AREA, STBD, FWD, REPLACE WOOD IF NECESSARY.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
A-DECK-REPLACE STRINGER, INBD, FWD
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
B-DECK-REPLACE EST. 20 FT OF DECK WOOD, STBD AFT AREA.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
B-DECK-REPLACE STRINGER AFT, PORT SIDE.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
B-DECK-REPLACE KICK BOARD, PORT SIDE, AFT.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Construction/Loadline
Issued 20 November 1987
Resolved
B-DECK-REPLACE CARLINGS, PORT SIDE, AFT.
Condition: Unknown
Due 20 November 1987
Resolved 20 November 1987
Deck/Cargo
Issued 28 October 1987
Resolved
FWD ANCHOR WINDLESS-REPAIR STEAM LINE UNION AND REPLACE 4 FUSIBLE PLUGS
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER-STBD FURNACE- RECALK WRAPPER SEAM, AT HORSE COLLAR.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- PORT FURNACE-RECALK 1 REVIT, WRAPPER SEAM AT HORSE COLLAR.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT MAIN BOILER, EXTERNAL, PORT SIDE. SHELL INSPECTION PLUG LEAKS, REAR
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER- COMBUSTION CHAMBERS- STBD FURNACE- CALK LEAKING T BAR RIVETS , BTM WRAPPER SHEET.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
AFT BOILER- PORT FURNACE- RECALK RIVET, BTM WRAPPER- HORSE COLLAR AND RECALK 2 RIVETS BTM WRAPPER, FLAME SHEET.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- REPAIR STB FLUE CAP CASING.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER-RENEW 1 STAY PORT WRAPPER AND 2 STAYS STBD WRAPPER.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- RECALK 2 REAR HEAD RIVETS.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER-RECALK REAR HEAD SEAM DOUBLER, TURN OF FLANGE
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- RECALK GIRTH SEAM, STBD SIDE.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- RENEW WATER COLUMN NIPPLE AT SHELL
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Engineering
Issued 28 October 1987
Resolved
FWD BOILER- CHECK YARWAY BLOW DOWN VALVE.ALSO REPAIR PIPING.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Electrical
Issued 21 May 1987
Resolved
OBTAIN & INSTALL INSULATION BLANKETS ON NEW A/C GENERATOR EXHAUST PIPE FLANGES.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
CONDUCT SATISFACTORY REPAIRS TO WASTED FRAMES 3 THROUGH 10 FROM FORWARD BULKHEAD STARBOARD SIDE AT CONNECTION TO BALLAST TANK IN SHAFT ALLEY.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
RENEW GASKETS IN ACCESS HATCHES TO BALLAST TANKS.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
4' FORWARD OF STARBOARD SIDE SHELL PLATE RENEWAL REPLACE RIVET AS INDICATED
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
REPAIR BULKHEAD PENETRATION BETWEEN ENGINE ROOM AND SHAFT ALLEY WITH PROPER WATERTIGHT FITTING.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
REPAIR/REPLACE 2 RIVETS NEAR DISHED IN SECTION BY SEACHEST IN ENGINE ROON AS MARKED.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
COMPLETE TK TOP REPAIRS AFTER STEERING.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
CONDUCT SATISFACTORY REPAIRS TO PORT AND STARBOARD FRAMES 6 THROUGH 10 IN WASTED AREAS AT BALLAST TANK CONNECTION.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
GAUGE PITTED PORT SIDE SHELL PLATING AS MARKED ADJACENT TO SEWAGE TANK.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
MAKE READY FOR INSPECTION SHAFT ALLEY, ENGINE ROOM AND BOILER ROOM BALLAST TANKS.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Lifesaving
Issued 21 April 1987
Resolved
PROVIDE 232 ADULT PFDS AND 12 CHILD PFDS PRIOR TO REISSUANCE OF CERTIFICATEOF INSPECTION.
Condition: Unknown
Due 21 April 1987
Resolved 21 April 1987
Construction/Loadline
Issued 16 October 1986
Resolved
RENEW GASKET MATERIAL ON ALL WATERTIGHT DOORS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"A" DECK: STBD FWD GANGWAY: REPLACE ROTTED BEAM OVER GATEWAY.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"A" DECK: PORTSIDE ENGINEERS STATEROOM: RENEW WASTED DECK PLATE TO GOOD METAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"A" DECK: PORTSIDE REC ROOM: RENEW WASTED DECKPLATE TO GOOD METAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"A" DECK: PORTSIDE LADIES HEAD: RENEW GUNWALE AND RAIL TO GOOD METAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: STBD BAR AREA, 1ST BEAM AFT OF STACK CASING: REPAIR ROTTED SECTION OF BEAM.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: FORWARD INTERIOR STAIRWELL TO "B" DECK: SECURE PORTSIDE HANDRAIL
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: PORTSIDE MIDSHIP AREA, OUTBOARD OVERHEAD IN THE VICINITY OF THE AFT END OF THE FORWARD DECKHOUSE: REPLACE 60' SECTION OF DETERIORATED OVERHEAD TO GOOD MATERIAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: PORTSIDE, 15TH STANCION FROM STERN: REPLACE ROTTED OVERHEAD BOARD.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: AFTERMOST STANCION, REPLACE ROTTED STRINGER AND OVERHEAD BOARDS TO GOOD MATERIAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: STBD SIDE OVERHEAD BETWEEN 2ND AND 3RD QUEEN POST FROM STERN: REPLACE ROTTED OVERHEAD BOARDS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: STBD OVERHEAD BETWEEN 15TH AND 18TH STANCIONS FROM STERN: REPLACE ROTTED OVERHEAD AND CAPBOARD.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"B" DECK: STBD SIDE OVERHEAD IN VICINITY OF AFT END OF FWD DECKHOUSE: REPLACE 10' SECTION OF ROTTED OVERHEAD BOARDS TO GOOD MATERIAL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
PORT SIDE BETWEEN STANCIONS #6 AND #12 FROM BOW, REPLACE ROTTED DECKING. "C" DECK
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: STARBOARD SIDE AT FORWARD LIFEBOAT FOUNDATION: REPLACE ROTTED OVERHEAD BOARDS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: REPLACE ROTTED OVERHEAD BOARD PORTSIDE, 6 STANCIONS FROM STERN.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: STARBOARD SIDE IN WAY OF AFTERMOST QUEEN POST: REPLACE 12' SECTION OF ROTTED OVERHEAD.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
REPLACE HANDRAIL ON PORTSIDE STAIRS IN THE VICINITY OF FIRE STATION #4. "C" DECK
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: STARBOARD STAIRWAY IN VICINITY OF FIRE STATION # 5: REPLACE HANDRAIL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: STARBOARD SIDE OVERHEAD BETWEEN STANCIONS 1 AND 5 FROM BOW: REPLACE ROTTED BOARDS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
"C" DECK: FWD STAIRWAY: REPAIR HAND RAIL.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 2 October 1986
Resolved
BOTH BOILERS- REPLACE OR TIGHTEN UP PACKING, MAIN STEAM STOP.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER-REPLACE WATER COLUMN.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER- REPLACE/REPAIR BOTTOM STAY
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
AFT MAIN BOILER-REPLACE STAY BOLTS, TWO BETWEEN COMB. CHAMBER FIVE ROWS UP AND SECOND ROW DOWN.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER-RECALK REVITS NEAR THROUGH STAYS.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- REWELD STAY BOLT, NEAR BOTTOM WRAPPER SHEET.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- REPAIR COLLISION BLOCK PENTRATION HOLE.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- REPLACE STAY BOLTS; 2- BACKHEAD & PORT COMB. CHAMBER, 6-BETWEEN BACKHEAD & STBD COMB. CHAMBER, 1- BETWEEN COMB. CHAMBER FOURTH ROW UP.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- INVESTIGATE/ REPAIR TRIPPED STAY CONNECTIONS BETWEEN BOTH FURNANCES.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
FWD MAIN BOILER- REPLACE THROUGH STAYS , ONE EACH INBOARD OF TRI-STAYS.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
BOTH BOILERS- UPGRADE/PAST THICKNESS SURVEYS
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 2 October 1986
Resolved
BOTH BOILERS- GENERAL REFACTORY REPAIRS.
Condition: Unknown
Due 2 October 1986
Resolved 2 October 1986
Engineering
Issued 24 May 1985
Resolved
AT NEXT REQUIRED BOILER INSPECTION GAGE THE FOLLOWING AREAS: FWD BOILER- (1) PORT AND STBD CUMBUSTION CHAMBERS IN WAY OF FLAME IMPINGEMENT. (2) BACKHEAD. AFT BOILER-(1) LOWER FRONT PORT HEAD (2) BACKHEAD.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985
Fire Fighting
Issued 24 May 1985
Resolved
MODIFY EXISTING FIRE PLAN TO INCLUDE DIAGRAM SHOWING LOCATION OF ALL FIRE FIGHTING EQUIPMENT.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985
Construction/Loadline
Issued 24 May 1985
Resolved
AT NEXT SCHEDULED DRYDOCK MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS AT STBD SIDE SHELL ALONG THE AFT PEAK TANK TOP CONNECTION.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985