Inspection history · 44
30 July 2008
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3285299
4 November 2004
MTSA Verification · Deficiency Check · Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2232569
5 December 2003
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1959629
21 November 2003
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1952285
14 November 2003
Annual Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1941363
6 November 2002
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1701827
3 October 2002
Annual Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1682192
3 January 2002
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1478352
3 December 2001
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1423689
9 July 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 656411
6 July 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 212625
6 July 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1447146
17 May 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 758377
20 April 2001
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 195330
6 April 2000
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1466064
4 April 2000
Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1444197
19 May 1997
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1092110
27 December 1996
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1357829
8 November 1995
Hull Examination · Deficiency Check · Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1421035
6 June 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 710986
4 March 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 27793
4 March 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 219394
2 November 1994
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 866728
11 May 1994
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 529889
8 November 1993
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 482259
2 November 1993
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 844828
2 April 1993
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1147084
5 November 1992
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1137529
21 November 1991
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1249208
13 November 1991
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1005871
26 November 1990
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1222591
7 November 1990
COI Inspection · Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1226553
6 November 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 490135
11 January 1990
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 913588
20 November 1989
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 908798
6 November 1989
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1339354
6 November 1989
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1339466
19 May 1989
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1044488
13 December 1988
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 899037
13 December 1988
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1209823
16 October 1987
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1016885
5 November 1986
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1012987
28 October 1985
COI Inspection · Credit Drydock
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1300482
20 August 1985
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1300606
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 November 2004
Resolved
Renew gaskets to all wing tank manhole covers.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 November 2004
Resolved
Properly repair starboard side deck rail. Deck rail welds are fractured at the deck.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 5 November 2004
Resolved
Repair/renew RPM gauge on prime mover (cargo pump).
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Engineering › Generator (propulsion/auxiliary-electric) › Wiring
Issued 5 November 2004
Resolved
Properly repair damaged wire running from generator to alarm.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 November 2004
Resolved
Stencil new hydro test date on cargo header piping.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 November 2004
Resolved
Replace all missing bolts on man hole cover of port new lube oil storage tank.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 December 2004
Deck/Cargo › Holds/Tanks › Ventilation Exhaust Outlet
Issued 5 November 2004
Resolved
Clean or replace flame screen of goose neck on port side lube oil tank.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Bolts
Issued 5 November 2004
Resolved
Properly install missing bolts on Port number 2 fill valve.
Condition: Improper Installation
Due 5 December 2004
Resolved 3 December 2004
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 5 November 2004
Resolved
Properly mark stern with barge name and hailing port.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Documentation › Markings/Placards › Warning Signs
Issued 5 November 2004
Resolved
Replace emergency generator shutdown placard.
Condition: Improper/Lack of Maintenance
Due 5 December 2004
Resolved 3 December 2004
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 5 November 2004
Resolved
Aquire all MSDS for Hazardous cargo carried onboard.
Condition: Improper Installation
Due 5 December 2004
Resolved 3 December 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 14 November 2003
Resolved
Properly mark #1 cargo transfer hose with name of product. LEGACY COMPONENT DESC: Transfer Hose
Condition: Unknown
Due 14 December 2003
Resolved 21 November 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 14 November 2003
Resolved
Properly cycle all cargo transfer valves. LEGACY COMPONENT DESC: Cargo Manifold
Condition: Improper/Lack of Maintenance
Due 14 December 2003
Resolved 21 November 2003
Deck/Cargo › Holds/Tanks
Issued 14 November 2003
Resolved
Replace flame screen on port lube oil tank. LEGACY COMPONENT DESC: Goose neck flame screen
Condition: Improper/Lack of Maintenance
Due 14 December 2003
Resolved 8 December 2003
Deck/Cargo › Holds/Tanks › Ullage
Issued 14 November 2003
Resolved
Properly repair hole in rake void IWA deck plug. LEGACY COMPONENT DESC: Rake Void
Condition: Damaged By Earlier Event
Due 15 April 2005
Resolved 3 December 2004
Engineering › Fuel Oil Service System
Issued 14 November 2003
Resolved
Properly repair fuel line bracket on cargo tank prime mover piping. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Due 14 December 2003
Resolved 8 December 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 14 November 2003
Resolved
Install proper CO2 fire extinguisher bracket. LEGACY COMPONENT DESC: Mounting Bracket
Condition: Design Flaw
Due 14 December 2003
Resolved 21 November 2003
Engineering › Fuel Oil Storage/Transfer System
Issued 14 November 2003
Resolved
Properly install containment bowl and proper plug on diesel filter system on the diesel pump prime mover fuel system. LEGACY COMPONENT DESC: Filter/Strainer
Condition: Improper/Lack of Maintenance
Due 14 December 2003
Resolved 8 December 2003
Engineering › Fuel Oil Service System
Issued 14 November 2003
Resolved
Properly repair fuel leaks on generator. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 November 2003
Resolved 14 November 2003
Operations/Management › Cargo Transfer/Lightering
Issued 3 October 2002
Resolved
Provide a proper piping diagram for the L.C. No. 1 LEGACY COMPONENT DESC: Vessel Transfer Procedures on Hand
Condition: Unknown
Due 4 November 2002
Resolved 6 November 2002
Resolution: Operator provided adquate transfer piping diagram.
Construction/Loadline › Markings
Issued 3 October 2002
Resolved
Renew aft draft marks LEGACY COMPONENT DESC: Draft Marks/Indicating System
Condition: Unknown
Due 4 November 2002
Resolved 21 October 2002
Resolution: Painted draft marks
Deck/Cargo › Holds/Tanks
Issued 3 October 2002
Resolved
Show proper operation of dogs on bow rake hatch. LEGACY COMPONENT DESC: Hatch Cover
Condition: Unknown
Due 4 November 2002
Resolved 3 October 2002
Resolution: Dogs were freed and hatch properly sealed.
Stability › Unintentional Flooding
Issued 3 October 2002
Resolved
Pump out excess water from #1 port void space and arrange for inspection by marine inspector.
Condition: Unknown
Due 4 November 2002
Resolved 3 October 2002
Resolution: Vessel rep pumped out void space and marine inspector viewed space from deck w/no signs of damage, river mud, or leaks found in void space.
Electrical
Issued 3 December 2001
Resolved
Renew fuel return line on generator and double clamp fuel lines.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Construction/Loadline
Issued 3 December 2001
Resolved
Paint draft marks on hull.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Deck/Cargo
Issued 3 December 2001
Resolved
Install bug screen on gooseneck to potable water tank.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Documentation
Issued 3 December 2001
Resolved
Prior to conducting cargo transfer proceedures, ensure vessel response planand transfer proceedures are onboard barge with approval ltr for response plan from Coast Guard. Provide copy of original Certificate of Documentation.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Deck/Cargo
Issued 3 December 2001
Resolved
Replace holed flame screen on port deck fuel oil tank.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Deck/Cargo
Issued 3 December 2001
Resolved
Prior to conducting cargo transfer proceedures, install pressure gauge on carge transfer pump.
Condition: Unknown
Due 3 January 2002
Resolved 3 January 2002
Deck/Cargo
Issued 6 July 2001
Resolved
PROVIDE PROOF OF CARGO SYSTEM HYDROSTATIC TESTING.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 6 July 2001
Resolved
PROVIDE PLANS FOR THE UNAUTHORIZED MODIFICATION TO THE OILY WATER SEPARATOROR RETURN TO THE ORIGINAL CONFIGURATION.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Electrical
Issued 6 July 2001
Resolved
PROVIDE PLANS FOR THE UNAUTHORIZED MODIFICATION TO THE GENERATOR SHORE TIE BOX OR RETURN TO THE ORIGINAL APPROVED CONFIGURATION.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Engineering
Issued 6 July 2001
Resolved
INSTALL A GUARD ON THE PRIME MOVER EXHAUST SYSTEM.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Documentation
Issued 6 July 2001
Resolved
ENSURE THE ORIGINAL COI IS MAINTAINED ONBOARD THE VESSEL.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 6 July 2001
Resolved
PRIOR TO OPERATING OILY WATER SEPARATOR, PROVIDE UNIT WITH STATEMENT FROM THE MANUFACTURING SERVICE REP. STATING THE SYSTEM IS FULLY FUNCTIONAL.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Electrical
Issued 6 July 2001
Resolved
ENSURE PROPER OPERATION THE THE VESSEL'S GENERATOR.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 6 July 2001
Resolved
PROVE PROPER OPERATION OF THE VESSEL'S PRIME MOVER AND CARGO PUMP.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Documentation
Issued 6 July 2001
Resolved
PRIOR TO MAKING ANY REPAIRS OR MODIFICATIONS, SUBMIT PLANS TO THIS OFFICE FOR APPROVAL.
Condition: Unknown
Due 6 July 2001
Resolved 6 July 2001
Deck/Cargo
Issued 27 December 1996
Resolved
REPLACE FLAME SCREEN IWO L/O TANK.
Condition: Unknown
Due 27 January 1997
Resolved 5 March 1997
Documentation
Issued 27 December 1996
Resolved
DO NOT LOAD BARGE UNTIL A SET OF TRANSFER PROCEDURES ARE ON BOARD.
Condition: Unknown
Due 27 January 1997
Resolved 5 March 1997
Deck/Cargo
Issued 27 December 1996
Resolved
PROPERLY BRACKET L/O SERVICE PIPING, STBD SIDE PIPING.
Condition: Unknown
Due 27 January 1997
Resolved 5 March 1997
Deck/Cargo
Issued 27 December 1996
Resolved
PROPERLY LABEL ABOVE DECK L/O STORAGE TANKS.
Condition: Unknown
Due 27 January 1997
Resolved 5 March 1997
Deck/Cargo
Issued 8 November 1995
Resolved
PROPERLY SECURE CARGO PUMP MOUNTING LOCATED AFT OF PRIME MOVER.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
RENEW WELDMENTS IN THE FOLLOWING SPACES; #1 STBD WING VOID - 4 PICK UPS, #2 STBD WING VOID - 2 PICK UPS AND INSERT LOCATED NEXT TO SECOND CAVEL, #3_x001C_STBD WING VOID - 3 PICK UPS, #4 STBD WING VOID - 3 PICK UPS.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
RENEW WELDMENTS IN FOLLOWING SPACES: #1 PORT WING VOID - 1 PICK UP, #2 PORT WING VOID - 2 PICK UPS, #3 PORT WING VOID - 2 PICK UPS.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
RENEW FRACTURED WELDS IN AFT RAKE VOID LOCATED ON PORT SIDE SHELL IN WAY OFINSERT AS MARKED.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Documentation
Issued 8 November 1995
Resolved
PROVIDE GAUGING REPORT TOGETHER WITH SCANTLINGS/TECH DETAILS NO LATER THAN 08 JAN 96. Deficiency extended until 01 Aug 96.
Condition: Unknown
Due 14 November 1995
Resolved 14 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
REWELD FRACTURE IN #2 STBD VOID IN WAY OF FIRST STANCHION AT UPPER MOST LONGITUDINAL.
Condition: Unknown
Due 8 December 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
REPAIR TWO FRACTURES IN PORTSIDE OF AFT RAKE VOID IN WAY OF HEAD LOG AS MARKED.
Condition: Unknown
Due 8 December 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
RENEW/REPAIR FRACTURES LOCATED ON STBD SIDE OF RAKE BOW ALONG FIRST LONGITUDINAL STRENGTH MEMBER AS MARKED.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
REPLACE GASKETS ON HATCHES TO RAKE BOW VOIDS.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
REPAIR FRACTURE TO WELDMENT ON OUTSIDE OF RAKE BOW STBD SIDE NEXT TO FIRST TRANSVERSE WELDMENT.
Condition: Unknown
Due 13 November 1995
Resolved 13 November 1995
Construction/Loadline
Issued 8 November 1995
Resolved
REWELD BOTH SIDES OF PIN HOLE IN #1 STBD VOID IN WAY OF FWD BULKHEAD.
Condition: Unknown
Due 8 December 1995
Resolved 13 November 1995
Fire Fighting
Issued 2 November 1994
Resolved
SERVICE VESSEL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Deck/Cargo
Issued 2 November 1994
Resolved
ADD NRC 1-800 NUMBER TO TRANSFER PROCEDURES, CORRECT MSO STL NOTIFICATION NUMBER.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Deck/Cargo
Issued 5 November 1992
Resolved
REPLACE ALL FLAME SCREENS ON (8) CARGO TANKS, (3) DECK L/O TANKS, AND (1) DIESEL FUEL DECK TANK.
Condition: Unknown
Due 20 November 1992
Resolved 20 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
PUMP BILGE SLOPS FROM FWD RAKE, HAVE RAKE CLEANED AND GAS FREE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Construction/Loadline
Issued 5 November 1992
Resolved
PUMP ALL WING VOIDS OF WATER.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
PROVIDE TEST RESULTS FOR ALL CARGO TRANSFER HOSES.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
IDENTIFY ALL CARGO TRANSFER HOSES TO USE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
CONDUCT PRESSURE TEST ON CARGO PIPE AND RELIEF VALVE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
STOW ALL PORTABLE DECK MACHINERY, EQUIPMENT, AND OIL DRUMS ON PALLETS OR OTHER PROTECTIVE SURFACE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Accommodation/Occupational Safety
Issued 5 November 1992
Resolved
REMOVE ALL TRASH AND JUNK FROM VESSEL.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 5 November 1992
Resolved
HAVE CARGO PUMP DRIVE ENGINE READY FOR OPERATIONAL RUN AND EMERGENCY SHUTDOWN TEST.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 5 November 1992
Resolved
HAVE ALL FIRE EXTINGUISHERS UNDERGO ANNUAL SERVICE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 13 November 1991
Resolved
PROVE TEST OF CARGO HOSE.
Condition: Unknown
Due 13 December 1991
Resolved 25 November 1991
Construction/Loadline
Issued 13 November 1991
Resolved
GOUGE AND WELD FRACTURE IN RUB BAR, STARBOARD SIDE, AT #1 BUTTON
Condition: Unknown
Due 13 December 1991
Resolved 25 November 1991
Deck/Cargo
Issued 13 November 1991
Resolved
MARK CARGO HOSES FOR ITS' USE.
Condition: Unknown
Due 13 December 1991
Resolved 25 November 1991
Construction/Loadline
Issued 13 November 1991
Resolved
REPAIR/REMOVE FRACTURED PAD EYE, STARBOARD SIDE AT #4 CAVEL.
Condition: Unknown
Due 13 December 1991
Resolved 25 November 1991
Construction/Loadline
Issued 13 November 1991
Resolved
REPAINT ALL DRAFT MARKS
Condition: Unknown
Due 13 December 1991
Resolved 25 November 1991
Construction/Loadline
Issued 13 November 1991
Resolved
DEWATER VOIDS #1 AND #3, STARBOARD SIDE TO PROVE WATER TIGHT.
Condition: Unknown
Due 25 November 1991
Resolved 25 November 1991
Deck/Cargo
Issued 7 November 1990
Resolved
PROVE ANNUAL PIPING TEST.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Deck/Cargo
Issued 7 November 1990
Resolved
PROVE ANNUAL CARGO HOSE TESTING. NOT ON ORIGINAL CG-835. NOTIFIED BY PHONE.
Condition: Unknown
Due 7 November 1990
Resolved 7 November 1990
Deck/Cargo
Issued 6 November 1989
Resolved
HYDRO TEST ALL CARGO HOSES.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Navigation
Issued 6 November 1989
Resolved
PROIR TO OPERATION, PROVIDE ON BOARD CG APPROVED NAVIGATION LIGHTS.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Deck/Cargo
Issued 6 November 1989
Resolved
UP-DATE OIL CARGO TANK DIAGRAM TO SHOW NEW ON DECK OIL STORAGE TANKS.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Deck/Cargo
Issued 6 November 1989
Resolved
PRIOR TO NEXT TRANSFER, REPLACE HOSES ON CARGO HEADER PRIMING PUMP.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Deck/Cargo
Issued 6 November 1989
Resolved
REPLACE FLAME SCREENS ON NO. 1 PORT, NO. 4 STBD CARGO TANKS, AND ON DECK LUBE OIL STORAGE TANKS.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Deck/Cargo
Issued 6 November 1989
Resolved
STENCIL OIL SERVICE ON TRANSFER HOSES.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Deck/Cargo
Issued 6 November 1989
Resolved
MOVE WARNING SIGN TO A VISIBLE LOCATION.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Electrical
Issued 6 November 1989
Resolved
SECURE CARGO PUMP ENGINE STARTING BATTERY BOX FROM SHIFTING.
Condition: Unknown
Due 6 November 1989
Resolved 6 November 1989
Construction/Loadline
Issued 13 December 1988
Resolved
RENEW DRAFT MARKS AND VESSEL NAME ON EACH SIDE OF HULL AT BOW WHILE IN NEXT LIGHTERED CONDITION.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988
Deck/Cargo
Issued 13 December 1988
Resolved
RENEW THREE FUEL HOSES ON DIESEL CARGO PUMP ENGINE WITH CG APPROVED HOSES AND MANUFACTURER RECOMMENDED FITTINGS.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988
Deck/Cargo
Issued 13 December 1988
Resolved
RENEW TWO FLAME SCREENS ON CARGO TANK GOOSENECK VENTS FOR #2 PORT C.T. AND THE AFTER PORT VOID GOOSENECK VENT.
Condition: Unknown
Due 13 December 1988
Resolved 13 December 1988