Documentation record
Registered dimensions (L × B × D)64.5 ft × 20.0 ft × 6.0 ft
Registered tonnagegross 51 / net 41
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSEAWAY BOAT CO · LONG BEACH, CA, UNITED STATES · built 1994
Hull materialWood
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portMARINA DEL REY, CA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 13 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it51 - Simplified, Gross Ton
41 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
16 December 2025
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8264817
4 November 2025
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8215225
1 January 2025
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8058962
13 December 2024
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8037329
19 December 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7824665
16 November 2023
Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7826036
31 October 2023
Hull Examination · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7786447
18 March 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7655274
30 January 2023
Plan Review "T" Boat
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7633611
12 December 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7590673
30 October 2021
Deficiency Check · Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7342769
30 October 2021
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7395998
19 October 2021
Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7335217
15 September 2021
COI Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7313206
21 December 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7114502
18 December 2019
Annual Inspection · DAPI Audit
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6866312
29 October 2019
Examination of Repairs · Drydock Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6830076
4 December 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6563364
5 December 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6301749
24 October 2017
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6248394
22 September 2016
DAPI Audit · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6001025
13 January 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5805408
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 19 December 2023
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Epirb Hydrostatic release unit expired by one month.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2024
Resolved 20 December 2023
Resolution: Owner replaced hydrostatic release unit - All Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 19 December 2023
Resolved
Suitable covers, guard, or rails shall be installed in way of all exposed/hazardous places such as gears & Machinery. Guard missing on generator.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2024
Resolved 4 January 2024
Resolution: Guard Installed: All Sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 19 December 2023
Resolved
Provision shall be made by means of plugs, covers, etc to prevent the admission of air into space protected. Vessel has no means of shuting off power ventilation serving engine room from outside space.
46 CFR 177.35-15
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2024
Resolved 20 December 2023
Resolution: Owner installed switch to shut off power ventilation outside space: All Sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 31 October 2023
Resolved
Treat wood decay identified IVO of starboard engine room near vent.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 November 2023
Resolved 29 November 2023
Resolution: Operator applied West Systems to impacted area - All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 31 October 2023
Resolved
Each inflatable life raft, inflatable buoyant apparatus, life float, and buoyant apparatus on the vessel on March 11, 1996, may be used to meet the requirements of this part for these survival craft as long as the survival craft is continued in use on the vessel, and is in good and serviceable condition. MI identified 02 deteriorated buoyant apparatuses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2024
Resolved 10 January 2024
Resolution: Owner installed 22 pax life float: All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 March 2023
Resolved
A propulsion engine control system, including pilothouse control, must be designed so that a loss of power to the control system does not result in an increase in shaft speed or propeller pitch. Vessel installed new engine control system, DVTP/QFAs were provided on board but are not MSC approved for the vessel and did not represent the installed system.
46CFR184.620
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2023
Resolved 28 March 2023
Resolution: Vessel provided DVTP/DFAs from manufacturer specific to vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 December 2022
Resolved
Each survival craft required on a vessel by this part must meet one of the following: For a buoyant apparatus - Approved under approval series 46 CFR 160.010 or other standard specified by the Commandant. The 18-person buoyant apparatus was noted to be deteriorated and shall be repaired to the standard or replaced by a life float. The capacity of total persons on board is reduced to 48.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 17 April 2023
Resolution: Operator provided photos of installed life float with required additional equipment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 December 2022
Resolved
Each lifeline on a ring life buoy must be of at least 60 feet in length. Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length, but not more than 6 feet, securing the waterlight around the body of the ring life buoy. Each floating waterlight on a vessel carrying only one ring buoy must be attached to the lanyard with a corrosion-resistant clip. The length of the lifeline and lanyard were found to be shorter than required, and the
corrosion-resistant clip was found to be inoperable.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 27 December 2022
Resolution: Vessel provided ring buoy with all necessary attachments.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 December 2022
Resolved
Each distribution panel and switchboard must be in as dry a location as practicable, adequately ventilated, and protected from falling debris and dripping or splashing water. The distribution panel in the engine room was found to be missing screws and therefore not protected from dripping or splashing water.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 27 December 2022
Resolution: The distribution panel cover was secured by screws.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 12 December 2022
Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable flame screens or flame arresters. The starboard fuel tank vent pipe is missing flame screen.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 27 December 2022
Resolution: A flame screen was installed on the starboard fuel tank vent pipe.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 12 December 2022
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible, U.S. Coast Pilot or similar publication, and Coast Guard Light List. The vessel did not have current charts, U.S. Coast Pilot, and Coast Guard Light List on board.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 17 March 2023
Resolution: Operator provided updated copies of charts, U.S. Coast Pilot, and Coast Guard Light List.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 12 December 2022
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Emergency instructions were neither mounted at the operating station nor found on board.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 27 December 2022
Resolution: The emergency instructions were made available on board the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 September 2021
Resolved
Each vessel that operates on the high seas, or operates beyond 3 miles from the coastline of the great lakes, must have onboard a FCC type accepted cat 1 406 EPIRB installed to automatically float free and activate. Vessels EPIRB battery is expired. Replace battery or provide a new EPIRB. Vessel is restricted to operations no more than 3 miles from the coastline.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 September 2021
Resolution: Vessel provided new EPIRB and registration.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 15 September 2021
Resolved
Each vessel constructed of material other than wood certificated to operate on a coastwise route in cold water must be provided life floats of an aggregate capacity of 100%. Vessel only has life floats for 66 total persons onboard. Vessel is restricted to 66 total person's onboard.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 2 December 2021
Resolution: Issued COI with reduced passengers
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 4 December 2018
Resolved
PENETRATIONS IN ENG ROOM BULKHEAD WERE FOUND TO NOT BE WATERTIGHT. PROVIDE MEANS TO MAKE PENETRATIONS WATERTIGHT AS INDICATED BY THE MARINE INSPECTOR.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2018
Resolved 14 December 2018
Resolution: Operator provided proof that penetrations in the Engine Room were made watertight; all sat.
Fire Fighting › Fire Hoses › Condition
Issued 5 December 2017
Resolved
Replace/renew fire fighting hose and ensure hose is sufficient strength to with stand maximum fire pump pressure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 December 2017
Resolved 5 December 2017
Resolution: Vessel removed section of deteriated hose and operationally tested satisfactory
Engineering › Bilge Water Management System › Piping
Issued 5 December 2017
Resolved
Permanently attach bilge suction strainer for the port engine room pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 December 2017
Resolved 5 December 2017
Resolution: Vessel permanently attached strainer to bilge piping in the engine room.