Records from 2006 to 2019. Most recent: inspection, 10 September 2019.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 September 2019
No resolution recorded
Complete credit renewal Certificate of inspection.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 September 2019 — due date passed with no resolution recorded
Construction/Loadline › Hull › Bottom Plating
Issued 16 October 2017
Resolved
Clad weld areas marked, due to pitting of steel place, both port and starboard side.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: All areas were welded, all sat
Construction/Loadline › Hull › Weld
Issued 16 October 2017
Resolved
Repair/re-weld stbd chine weld near frame 40 (Tank Compartment #2 - stbd fuel wing tank)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: Welding completed, all sat.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 16 October 2017
Resolved
Pull both shafts, replace in kind, both shafts are to be condemned due to corrosion.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: Both shafts were replaced in kind.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 16 October 2017
Resolved
Replace both cutlass bearings for each shaft replaced.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: All bearings replaced in kind.
Engineering › Thrusters › Tunnel
Issued 16 October 2017
Resolved
Address pitting corrosion in bow thruster tunnel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: Coated bow thruster tunnel with BALZONA marine adhesive to protect, all sat.
Construction/Loadline › Structures › Superstructure
Issued 16 October 2017
Resolved
Replace stanchion pipes on swim platform, replace all in kind.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 March 2018
Resolution: Replaced all stanchions in kind and relayed fiber glass for section of swim platform.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 16 October 2017
Resolved
Centerline compartment aft of forepeak, re-weld weld on aft bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2017
Resolution: Weld completed, all sat.
Engineering › Bilge Water Management System › Piping
Issued 16 October 2017
Resolved
Repair hole in ballast pipe in Lazarette.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 November 2017
Resolution: Repaired hole, inserted mechanical plug, with threaded fitting, all sat.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 16 October 2017
Resolved
Repair vent pipes for fuel tank on stbd side as original.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 March 2018
Resolution: Repaired vent pipes for fuel tank on stbd side as original.
Construction/Loadline › Hull › Weld
Issued 16 October 2017
Resolved
Re-weld two marked areas on hull for washed out welds, gouge out and re-weld.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 October 2017
Resolution: Welds completed, all sat.