MAURY USCG vessel records Sign in
← All vessels

BELLE OF LOUISVILLE

BELLE OF LOUISVILLE is a 1914 passenger vessel (inspected). The Coast Guard has recorded 196 inspections since 1985, most recently in May 2026, along with 225 deficiencies, 1 operational control and 6 casualty investigations between 2009 and 2025.

Records from 1985 to 2026. Most recent: inspection, 27 May 2026.

Built
1914
Last inspected
27 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WF6270
Flag
UNITED STATES
367199750
Maury page id
psix-41734

Inspections, by type

…with no type recorded44
Years with a record 41 calendar years (1985–2026)
The 196 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)170.7 ft × 46.0 ft × 5.2 ft
Registered tonnagegross 350 / net 350
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTHOMAS M KEES & SONS CO · PITTSBURGH, PA, UNITED STATES · built 1914
Hull materialSteel
PropulsionSteam Reciprocating
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLOUISVILLE, KY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it350 - Regulatory (Subpart C or D), Gross Ton
350 - Regulatory (Subpart C or D), Net Ton
0 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WF6270MMSI 367199750 · active · compulsorily equipped · granted 29 August 2017, expires 17 September 2027
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 196

27 May 2026 Bulk Liquid Transfer Monitor
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8381862
23 March 2026 COI Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8330430
14 October 2025 Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 8253357
20 September 2025 Deficiency Check · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8238728
20 September 2025 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8241049
18 September 2025 Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8238961
18 July 2025 Damage Survey · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8188572
15 April 2025 Deficiency Check · In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8112564
13 March 2025 COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8092479
15 October 2024 Deficiency Check · Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8011844
14 September 2024 Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8003325
16 July 2024 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7954124
29 February 2024 Deficiency Check · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7868860
2 November 2023 Re-Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7818074
27 February 2023 COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7644194
9 November 2022 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7587006
30 August 2022 MTSA Verification · Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7531586
19 July 2022 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7509728
8 June 2022 Bulk Liquid Transfer Monitor
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7471771
11 February 2022 Deficiency Check · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7388728
5 October 2021 Re-Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7314666
6 July 2021 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7246848
7 April 2021 Bulk Liquid Transfer Monitor
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7170419
18 March 2021 COI Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7159074
28 October 2020 Drydock Exam
Physical examination · Commandant (CG-5P-TI) · Activity 7086218
27 October 2020 Internal Structural Exam · Drydock Exam · Hull Examination
Physical examination · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7085414
7 October 2020 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7071507
20 August 2020 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7038143
4 March 2020 COI Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6921107
24 October 2019 Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6841133
8 October 2019 Administrative Inspection · Excursion Permit · Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6802750
31 July 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6760504
17 July 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6752958
8 July 2019 Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6720341
20 March 2019 In-Service Inspection
Physical examination · Commandant (CG-5P-TI) · Activity 6728714
21 February 2019 Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6629747
30 October 2018 Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6571300
19 October 2018 Excursion Permit · Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6565812
17 October 2018 Internal Structural Exam · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6593642
3 October 2018 Re-Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6553713
24 July 2018 Re-Inspection · MTSA Verification · Deficiency Check · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6488888
21 July 2018 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6490139
20 July 2018 Administrative Inspection · In-Service Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6487864
15 May 2018 DAPI Audit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6416667
13 March 2018 Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6379366
17 September 2017 Re-Inspection · Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6270174
13 July 2017 Re-Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6208560
2 June 2017 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6170593
27 February 2017 COI Inspection · MTSA Verification · Deficiency Check · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6096119
28 October 2016 Administrative Inspection · Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6029851
2 August 2016 Damage Survey · Examination of Repairs
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5961825
18 July 2016 Re-Inspection · MTSA Verification · In-Service Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5944936
15 March 2016 DAPI Audit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5834667
14 December 2015 COI Inspection · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5781408
15 October 2015 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5743195
13 October 2015 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5738716
25 August 2015 Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 5226092
18 August 2014 Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4958939
14 August 2014 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4955414
4 March 2014 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4811153
18 July 2012 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4383035
26 June 2012 Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4357364
21 February 2012 COI Inspection · Administrative Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4248189
26 September 2011 Deficiency Check · Re-Inspection · Administrative Inspection · DAPI Audit · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4154180
18 July 2011 Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4087244
26 January 2011 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3933806
23 November 2010 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3897557
19 November 2010 COI Inspection · Internal Structural Exam · MTSA Verification · Hull Examination · DAPI Audit · Deficiency Check · Special · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3894806
10 November 2010 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3921302
4 October 2010 Re-Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3862981
28 September 2010 Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3858988
8 January 2010 In-Service Inspection · COI Inspection · Deficiency Check · Deadweight Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3660881
15 July 2009 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3535722
5 March 2009 Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3428735
14 October 2008 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3344675
25 June 2008 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3247819
6 March 2008 MTSA Verification · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3162380
24 July 2007 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3009037
12 March 2007 COI Inspection · MTSA Verification
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2891193
26 October 2006 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2808595
10 July 2006 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2715765
24 January 2006 Hull Examination · MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2573006
27 September 2005 Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2502411
22 June 2005 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2400626
23 March 2005 MTSA Verification · COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2293547
5 October 2004 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2215975
17 September 2004 Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2198061
23 June 2004 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2116474
22 April 2004 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2049804
26 March 2004 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2031965
24 March 2004 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2071085
27 February 2004 Administrative Inspection
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2014257
9 February 2004 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2003205
17 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1968849
30 November 2003 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2012097
5 November 2003 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1951622
21 October 2003 Quarterly Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2014245
12 August 2003 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1874386
9 July 2003 Deficiency Check · Quarterly Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1841616
26 March 2003 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1775577
13 February 2003 Quarterly Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1744789
10 January 2003 Administrative Inspection
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1728675
27 August 2002 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1667463
24 July 2002 Quarterly Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1651754
9 April 2002 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1602829
8 October 2001 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1073687
2 August 2001 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1464419
25 April 2001 COI Inspection · Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1433847
10 January 2001 Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1057484
19 September 2000 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1054298
22 August 2000 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 821162
8 August 2000 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1052560
3 August 2000 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1451591
29 June 2000 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1417083
29 April 2000 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1466696
1 December 1999 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1388954
12 October 1999 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 810078
8 October 1999 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1196940
31 August 1999 Deficiency Check · Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1432199
9 July 1999 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1092756
28 May 1999 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 808183
28 May 1999 Examination of Repairs · COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1456706
11 March 1999 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 803667
29 October 1998 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1472445
15 September 1998 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 798873
14 August 1998 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 53518
15 July 1998 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1383898
15 June 1998 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 794348
24 April 1998 Examination of Repairs
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 794347
17 April 1998 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1427501
24 August 1997 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 160683
24 August 1997 Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1459349
31 July 1997 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1438623
31 March 1997 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1419728
22 January 1997 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1099697
20 December 1996 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1093760
8 October 1996 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 838189
7 August 1996 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1085009
13 April 1996 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1080981
3 April 1996 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 515372
1 April 1996 Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 881716
30 November 1995 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1079349
9 November 1995 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 871759
9 October 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 142720
9 October 1995 Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1187496
29 September 1995 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 874548
31 August 1995 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 873276
19 August 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 184800
15 August 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 51804
15 August 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 131386
24 July 1995 Deficiency Check · Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 881555
20 April 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1170645
6 April 1995 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 860255
24 February 1995 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 31700
8 December 1994 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 868247
5 October 1994 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1181610
24 August 1994 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1173563
22 June 1994 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1022479
29 April 1994 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 477098
14 April 1994 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 856068
30 September 1993 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 120472
19 August 1993 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 95306
17 August 1993 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1155994
23 July 1993 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1373888
15 June 1993 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 839269
13 May 1993 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 833561
21 April 1993 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1444707
9 April 1993 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1366812
18 November 1992 Re-Inspection · Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1370509
3 August 1992 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1458964
23 July 1992 Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 949809
18 June 1992 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1259463
22 April 1992 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 479973
10 April 1992 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1362621
20 March 1992 Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1391760
29 August 1991 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 534183
27 August 1991 Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1247415
12 June 1991 Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 915542
15 May 1991 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1214528
25 April 1991 Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1240339
5 April 1991 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1216406
30 March 1990 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1234133
19 March 1990 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 912274
17 October 1989 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 888280
12 April 1989 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1205414
4 April 1989 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 469904
31 March 1989 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1338374
19 August 1988 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1037524
9 May 1988 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1039322
31 March 1988 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1341385
1 March 1988 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1039319
12 December 1987 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1004589
1 April 1987 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1020123
6 January 1987 Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1001982
2 April 1986 COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1305623
3 April 1985 Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1287875

Deficiency record · 225

07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 March 2026 Resolved
The branch line valves of all fire extinguishing systems shall be plainly and permanently marked indicating the spaces served. Boiler fire sprinkler distribution line was not labeled.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2026
Resolved 9 April 2026
Resolution: All firefighting lines have been labeled.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 23 March 2026 Resolved
An emergency lighting system must not have a switch. E-Light located in the middle of the engine room Aft of the steam drum is supplied power from an outlet. E-light shall be wired direct or outlet should be a junction box.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2026
Resolved 9 April 2026
Resolution: Outlet was replaced with junction box feeding E-light.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 March 2026 Resolved
Existing structure previously approved will be considered satisfactory so long as it is maintained in good condition. 2 steps leading out of the engine room up to the second deck on the port side have significant wastage, steps are approximately head hight. Crop and renew wasted steel.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2026
Resolved 9 April 2026
Resolution: Stares were cropped and replaced with new steel.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 23 March 2026 Resolved
Main propulsion machinery must be provided with automatic shut-off controls in accordance with part 62 of this sub-chapter. These controls must shut down main propulsion machinery in case of a failure, such as failure of the lubricating-oil supply, that could lead rapidly to complete breakdown, serious damage, or explosion. #1 SSDG high cooling water alarm sensor failed during the testing of the alarm. Replace pre-high temp sensor and retest.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2026
Resolved 9 April 2026
Resolution: Alarm was replaced with new and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 September 2025 Resolved
Weld broke on cam rod
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 23 October 2025
Resolved 23 September 2025
Resolution: Repair welded area, added a sleeve, witnessed NDT and operational check.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 July 2025 Resolved
Vessel POC reported a pin hole leak in feedwater pipe IWO heat exchanger.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2025
Resolution: Replaced damaged pipe section.
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 15 April 2025 Resolved
Each fuel oil tank with at least one side integral to the vessel's hull and located within the hull (“integral fuel oil tank”) is subject to inspection as provided in this section. Each integral fuel oil tank is subject to inspection as provided in this section. Vessel had seeping coming from their F/O tank.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 April 2025
Resolved 18 June 2025
Resolution: Attended vessel at the Fourth Street Warf to meet with [name withheld], from Elliott Bay, along with [name withheld], a representative from Belzona, tested the area, everything tested SAT
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 13 March 2025 Resolved
Remove temporary repairs from live well; Make permanent repairs during upcoming dry-docking 2025.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2025
Resolved 6 January 2026
Resolution: SEE Misle #8253357, Live well was replaced in kind. Test SAT
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 October 2024 Resolved
Prove proper operation of #2 forward generator and alarms and shutdowns. There was a fuel oil leak, unable to test alarms and shutdowns.
Action required: 705 - Other - as specified
Due 22 October 2024
Resolved 16 October 2024
Resolution: Fuel oil leak was fixed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 October 2024 Resolved
Each self-propelled vessel must be provided with a power-driven pump, or pumps connected to the bilge main. STBD Bilge Pump #2, would trip breaker once it hit the third phase.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2024
Resolved 16 October 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 October 2024 Resolved
Each self-propelled vessel must be provided with a power-driven pump, or pumps connected to the bilge main. Port Bilge Pump #1, switch would not energize the pump unit.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 October 2024
Resolved 16 October 2024
Resolution: Replaced relay switch
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 November 2023 Resolved
Found 3 life jackets on the 3rd deck that were no longer in serviceable condition.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 9 November 2023
Resolution: 3 life jackets on the 3rd deck that were replaced
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 2 November 2023 Resolved
No donning placard in the vicinity of forward life jackets on 3rd deck
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 9 November 2023
Resolution: donning placard in the vicinity of forward life jackets on 3rd deck has been replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 November 2023 Resolved
The emergency light on the main deck above the ticket booth was not working when tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 9 November 2023
Resolution: The emergency light on the main deck above the ticket booth was working when re-tested.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 November 2023 Resolved
46CFR 61.01-1(b) Inspections and tests shall ensure that the equipment and associated structure are in satisfactory operating conditions and fit for teh service for which they are intended. Output piping from steam driven fire pump has a leak when energized.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 9 November 2023
Resolution: Output piping from steam driven fire pump was not leaking when re-energized.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 February 2023 Resolved
Markings. Each lifejacket must be marked - (i) In block capital letters with the name of the vessel; and (ii) With Type I retro-reflective material approved under approval series 164.018. The arrangement of the retro-reflective material must meet IMO Resolution A.658(16). Rejected 07 PFDs, replace and properly mark.
Action required: 705 - Other - as specified
Resolved 10 March 2023
Resolution: witnessed replacement of 07 PFDs. All were corrected prior to completion of inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 August 2022 Resolved
General. Clear instructions must be provided on the vessel that detail the actions each person on board should follow in the event of an emergency.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2022
Resolved 10 March 2023
Resolution: Vessel's watch quarter and station bill is posted throughout vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 July 2022 Resolved
Elevator Certificate was out dated, need to post new certificate with the updated information.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2022
Resolved 19 July 2022
Resolution: Valid Certificate was placed on board.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 19 July 2022 Resolved
Light float was in operable, light was not working. Need to fix/or replace float light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2022
Resolved 19 July 2022
Resolution: Light Float was replaced, with a new one. SAT
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 July 2022 Resolved
Emergency instructions. The illustrations and instructions must include information on The method of donning lifejackets. Current one onboard has faded.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2022
Resolved 19 July 2022
Resolution: Emergency instructions were replaced with new ones.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 30 March 2022 Resolved
Prove proper operation of stern searchlight.
Action required: 705 - Other - as specified
Due 1 April 2022
Resolved 31 March 2022
Resolution: Witnessed satisfactory test.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 February 2022 Resolved
Rejected 13 PFDs, replace and properly mark.
Action required: 705 - Other - as specified
Due 30 March 2022
Resolved 30 March 2022
Resolution: witnessed replacement of 13 PFDs, noted 4 needed proper markings. All were corrected prior to completion of inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 5 October 2021 Resolved
Emergency lights on 3rd deck stern and portside engine room were dim when tested. Repair/replace batteries to ensure lights stay energized for twice the time of the vessel's longest voyage.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2021
Resolved 18 November 2021
Resolution: Received email that the batteries for the "E" lights were replaced and the lights operate properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 October 2019 Resolved
Each outlet or junction box must have a cover unless a fixture canopy, switch cover, receptacle cover or other cover is used. The cover on the junction box in the port aft section of the concession stand is broken.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2019
Resolved 24 October 2019
Resolution: The broken junction box cover was replaced with an unbroken cover.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 October 2019 Resolved
Electrical installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. The cover on the aft most ceiling fan in the ballroom is missing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 October 2019
Resolved 24 October 2019
Resolution: The missing cover was put into place to protect passengers.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 October 2019 Resolved
Electrical installations must ensure protection of pax, crew, & the vessel from electrical hazards. The wheelchair lift had wires hanging from the aft framing where an automatic door closure device was removed.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 8 October 2019
Resolved 8 October 2019
Resolution: CHENG repaired before inspection was complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 July 2019 Resolved
Repair or replace and prove proper operation of both forward and aft boiler safety relief valves.
Action required: 30 - Ship detained
Resolved 1 August 2019
Resolution: Two (2) new valves were installed and tested satisfactory.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 8 July 2019 Resolved
Renew all (4) expired eyewash bottles.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2019
Resolved 17 July 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 July 2019 Resolved
Properly label fire axe mounted on aft of pilot house.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 August 2019
Resolved 17 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 March 2019 Resolved
Repair, replace provide manufacturers information jacketwater temperature sensor are within tolorence.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2019
Resolved 17 July 2019
Resolution: New sensor tested satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 October 2018 Resolved
Operator reported the aft generator is in operable due to a failed alternator. No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery or equipment shall be made without the knowledge of the Officer in Charge, Marine Inspections. Conduct repairs to the aft generator to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2018
Resolved 31 October 2018
Resolution: It was identified that the bearing on the alternator was failing. Chief engineer replaced unit and tested in the presence of the MI with satisfactory results.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 July 2018 Resolved
A comprehensive shipboard safety management and contingency plan SSMCP that is tailored to the particular vessel, is easy to use, is understood by vessel management personnel both on board and ashore, is updated regularly; Vessels SSMCP has not been updated since 2004 and does not have current list of immediately available assets and vessel’s crew is unfamiliar with its contents. Vessel management and crew must update manual, contact available assets to ensure assistance agreements are in place or meet the Survival Craft Requirements of 46 CFR 199.201(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2018
Resolved 29 August 2018
Resolution: Received documentation from Captaoin Mark Doty with updates and aid agreements.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 July 2018 Resolved
The approved SSMCP requires an Evacuation Drill to be conducted annually in the presence and to the satisfaction of a Coast Guard Marine Inspector; Vessel was unable to conduct drill due to Mary M. Miller being unable to sail. 46 CFR 199.630(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2018
Resolved 6 August 2018
Resolution: Vessel conduct sat Abandon ship drill.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 July 2018 Resolved
Each Lifebuoy self igniting light had batteries installed improperly.
Action required: 10 - Deficiency Rectified
Due 24 July 2018
Resolved 24 July 2018
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 24 July 2018 Resolved
Each Lifefloat location numbered and marked; vessel has 07 LF which are not marked.
Action required: 10 - Deficiency Rectified
Due 24 July 2018
Resolved 24 July 2018
Resolution: Crew labled LF's
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 July 2018 Resolved
Vessel shall conduct weekly Fire and Abandon Ship Drills w/ all members of the crew; Vessel has been conducting weekly drills but failing to include all crew members.
Action required: 10 - Deficiency Rectified
Due 24 July 2018
Resolved 24 July 2018
Resolution: Crew has been conducting drills but not including every part-time member. CG witnessed sat drills.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 July 2018 Resolved
Copies of the muster list must be posted in conspicuous places throughout the vessel including on the navigating bridge, in the engine room, and in crew accommodation spaces. List must include duties of crew members during Fire, Flooding, MOB and Abandon Ship. Station Bill on fwd port Main deck is faded and unreadable.
Action required: 10 - Deficiency Rectified
Due 24 July 2018
Resolved 24 July 2018
Resolution: All Station Bills were in good condition except the subjest one. Vessel's crew labled the Station Bill.
Lifesaving › Launching Appliances › Winch
Issued 13 April 2018 Resolved
A launching appliance must not depend on any means other than gravity or stored mechanical power independent of the vessel's power supply to launch the survival craft it serves. During inspection of vsl rescue boat the Marine Inspector identified the launching and recovery arrangements winch was electronically powered and could not lower the rescue boat by gravity. Current winch for launching is not approved type. Remove current rescue boat launching devise and install new rescue boat winch in accordance with 46CFR 199.155 to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2018
Resolved 4 May 2018
Resolution: Vessel provided new rescue boat winch.
Lifesaving › Rescue Boat Equipment › Boat-hook/Safety Boat-hook
Issued 13 April 2018 Resolved
Rescue boats on river routs shall be outfitted with equipment in accordance with 46 CFR 199.620(j)table. During inspection the Marine Inspector noted that the rescue boat was missing boat hook, and fire extinguisher. Supply rescue boat with required to the satisfaction of the attending marine inspector.
Action required: 10 - Deficiency Rectified
Due 4 May 2018
Resolved 4 May 2018
Resolution: Vessel updated the rescue boat with appropriate equipment.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 13 April 2018 Resolved
During preparation, launching and recovery, each rescue boat and its launching appliance and the area of water into which it is being launched or recovered must be adequately illuminated by lighting supplied from emergency power source. During inspection of rescue boat the Marine Inspector noted there was not emergency lighting for launching and recovery of the rescue boat. Install emergency lighting for the rescue boat in accordance with 46 CFR 199.150(f)(6) to the satisfaction of the Coast Guard Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2018
Resolved 4 May 2018
Resolution: rescue boat emergency lighting installed.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 28 March 2018 Resolved
Inspections for life saving equipment must have a log for records of inspection. Each rescue boat must be tested and inspected weekly. The rescue boat must be run ahead and astern for not less than three minutes. Vessel representative could not provide the Marine Inspector with records verifying the rescue boat engine is tested weekly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2018
Resolved 29 April 2018
Resolution: Vessel created new rescue boat checksheet for daily and weekly checks
Personnel › Training › Safety Orientation
Issued 28 March 2018 Resolved
Every crew member with emergency duties assigned on the muster list must be familiar with the assigned duties before the voyage begin. Vessel representative could not provide the Marine Inspector with a log or record of new crew members receiving indoctrination training.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2018
Resolved 29 April 2018
Resolution: Vessel provided new crew member indoctrination form that will be implemented immediately.
Personnel › Training › Familiarization Training
Issued 28 March 2018 Resolved
Onboard training in the use of survival systems and fire fighting must be given as soon as possible but no latter than 2 weeks after a crewmemeber joins the vessel.Vessel representative could not provide logs of records of onboard training for new crew.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 April 2018
Resolved 29 April 2018
Resolution: Vessel provided new log record for new crew member training.
Engineering › Steam System (main) › Valve, Relief
Issued 26 March 2018 Resolved
Replace or repair aft boiler safety valve, prove valve operates in accordance with 46 CFR 52.01-120.
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 4 April 2018
Resolution: Aft safety replaced and tested satisfactory.
Electrical › Electric Generation Source (service) › Generator
Issued 17 September 2017 Resolved
Diesel generator dropped off line and began to smoke from the windings indicating a potential fire hazard. Provide diagnostic report from Caterpillar technician prior to operating generator.
Action required: 705 - Other - as specified
Due 17 October 2017
Resolved 6 October 2017
Resolution: Generator was overhauled, tested all alarms and shutdowns, tested generator under load, all satisfactory.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 17 September 2017 Resolved
Remove/ repair/ replace; loose/ rotten flooring forward of both port & stbd dance floor aft stairwells. (Mate stated it is on the winter work list).
Action required: 705 - Other - as specified
Resolved 13 April 2018
Resolution: All repairs completed.
Engineering › Steam System (main) › Piping
Issued 17 September 2017 Resolved
Renew Port steam engine condensate drain and remove water from void; drain is leaking into port fire-pump void.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 October 2017
Resolved 28 September 2017
Resolution: Attended vessel and satifactorily inspected renewed condesate drain piping.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 27 February 2017 Resolved
Replace five rejected pfds.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2017
Resolution: Mate replaced during course of inspection.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 27 February 2017 Resolved
Replce batteries in stbd boiler room latern.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2017
Resolution: Batteries were replaced.
Construction/Loadline › Structures › Deck Plating
Issued 27 February 2017 Resolved
Crop wasted deck under auxiliary feed pump (little lee) to good metal; inform USCG inspector when insert is fit up; complete insert and test to the satisfaction of the attending USCG inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 April 2017
Resolution: Deck cropped to good metal, inserted, and hose tested satisfactory.
Engineering › Steam System (main) › Piping
Issued 27 February 2017 Resolved
Repair exhaust leak on Port steam engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 April 2017
Resolution: Flange tightened.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 27 February 2017 Resolved
Replace aft generator lube oil alarm sensor and prove proper operation.
Action required: 705 - Other - as specified
Resolved 6 April 2017
Resolution: New pressure switch installed and tested satisfactory.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 27 February 2017 Resolved
Provide proof of annual servicie for all fire extinguishers.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 April 2017
Resolution: Third party serviced all portable and semi-portable extinguishers, no report found, checked all extinguishers.
Construction/Loadline › Hull › Bottom Plating
Issued 27 February 2017 Resolved
Conduct Ultra sonic testing on bottom plating under sewage pump and tank in compartment # 13.
Action required: 705 - Other - as specified
Resolved 12 April 2017
Resolution: UTs taken under both sewage tanks and sewage pump, no reading lower than .125.
Personnel › Manning/Qualifications › First Aid Certified Personnel
Issued 13 October 2015 Resolved
Provide proof sufficient number of crew have been certified in First Aid.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2015
Resolved 13 October 2015
Resolution: Copies of First Aid certification kept in ships log were outdated, individual crew members provided copies of certification.
Personnel › Manning/Qualifications › CPR Certified Personnel
Issued 13 October 2015 Resolved
Provide proof a sufficient number of crew members are certified in CPR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2015
Resolved 13 October 2015
Resolution: Copies of CPR certification kept in vessels log book were outdated, individual crew members provided copies of certification.
Operations/Management › Drills/Instruction › Fire
Issued 26 June 2012 Resolved
Ensure crew's ability to properly contain and fight a shipboard fire. With emphasis on safe and effective use of fire fighting equipment.
Action required: 705 - Other - as specified
Due 3 July 2012
Resolved 4 September 2012
Resolution: Item cleared.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 26 June 2012 Resolved
Ensure crew's ability to safely and properly rescue a man overboard. With emphasis on operation of rescue boat.
Action required: 705 - Other - as specified
Due 3 July 2012
Resolved 4 September 2012
Resolution: Item cleared.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 February 2012 Resolved
Replace expired eyewash bottles located in engineroom.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 April 2012
Resolved 2 May 2012
Resolution: Eyewash aft of boiler replaced.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 1 November 2011 Resolved
Replace expired alcohol saliva screening test on board vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2011
Resolved 29 March 2012
Resolution: New alcohol screening test provided.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 26 September 2011 Resolved
Properly mount fire extinguisher in snack bar area prior to taking on passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 September 2011
Resolved 26 September 2011
Resolution: Item corrected during inspection.
Lifesaving › Lifebuoys › Serviceable
Issued 26 September 2011 Resolved
Replace ring life buoy in engineroom starboard side
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2011
Resolved 1 November 2011
Resolution: Item was removed since it was in excess, and will be stored in crew storage barge for use in man overboard drills.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 26 September 2011 Resolved
Replace inoperable ring life buoy light on aft pilothouse deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2011
Resolved 1 November 2011
Resolution: Item cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Marking
Issued 26 September 2011 Resolved
Replace missing record of inspection tags on two portable fire extinguishers located on Texas deck; port side aft and starboard side forward.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 October 2011
Resolved 1 November 2011
Resolution: Item cleared during follow-up inspection
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 September 2011 Resolved
Replace expired items after completing proper inventory of first aid kit in accordance with 46 CFR 160.041-4(b). Include directions for use in each kit in accordance with 46 CFR 160.041-4(c). Replace expired eyewash solution for engine room eyewash station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2011
Resolved 1 November 2011
Resolution: Item cleared during follow-up inspection.
Fire Fighting › Firemans Outfit › Axe
Issued 26 September 2011 Resolved
Properly mount fire axe located in engine room starboard side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2011
Resolved 29 March 2012
Resolution: Item cleared.
Construction/Loadline › Structures › Deck Plating
Issued 17 February 2011 Resolved
Crop to good metal, including removal of two (2) deck drains and properly insert overhead in compartment # 2 between frames 14 & 15,
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 8 April 2011
Construction/Loadline › Hull › Transverse Frame
Issued 17 February 2011 Resolved
Crop and renew floor frames 12 and 14 on port side of compartment # 2.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Bottom Plating
Issued 17 February 2011 Resolved
Crop and renew bottom plate port side aft as marked,
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Bottom Plating
Issued 17 February 2011 Resolved
Crop and renew bottom plate starboard side aft as marked.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 4 April 2011
Stability › Unintentional Flooding › General
Issued 9 February 2011 Resolved
Properly install missing non-return (check) valves where required on all through hull piping.
Action required: 705 - Other - as specified
Resolved 8 April 2011
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 7 February 2011 Resolved
Crop to good metal and properly insert inboard bulkhead aft in compartment # 24.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 23 March 2011
Construction/Loadline › Structures › Deck Plating
Issued 7 February 2011 Resolved
Crop to good metal and properly insert overhead in compartment # 24 approximately six (6) feet forward of bulkhead 111.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Transverse Frame
Issued 28 January 2011 Resolved
Crop and renew wasted floor frames at frames 13, 14 and 15 in #2 void.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Bottom Plating
Issued 28 January 2011 Resolved
Crop to good metal and renew wasted bottom plate forward and aft of frame 16 on starboard side.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Girder
Issued 28 January 2011 Resolved
Crop to good metal and renew overhead girders in # 2 void.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Structures › Transverse Bulkhead
Issued 28 January 2011 Resolved
Crop bulkhead 39 at bottom plate to good metal between # 6 and #12 voids and properly insert.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Hull › Bottom Plating
Issued 28 January 2011 Resolved
Crop wasted bottom plate in # 5 void at/ near bulkhead 16 to good metal and properly insert.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 1 April 2011
Construction/Loadline › Structures › Deck Plating
Issued 28 January 2011 Resolved
Remove epoxy, crop to good metal and properly insert around deck drains in # 11 void.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 23 March 2011
Construction/Loadline › Hull › Bottom Plating
Issued 28 January 2011 Resolved
De-scale compartments 13, 15, 16, 19, 24, 28 and conduct Ultrasonic Testing.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 8 April 2011
Construction/Loadline › Hull › Strut/Cross Tie
Issued 28 January 2011 Resolved
Properly repair loose truss in # 17 void near aft bulkhead.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 4 March 2011
Construction/Loadline › Hull › Bottom Plating
Issued 28 January 2011 Resolved
Remove doubler plate on bottom plate in # 10 void and properly insert.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 4 March 2011
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 28 January 2011 Resolved
Install sea connection for electric fire pump in accordance with 46 CFR 76.10 (h).
Action required: 705 - Other - as specified
Due 18 February 2011
Resolved 23 March 2011
Construction/Loadline › Hull › Bottom Plating
Issued 28 January 2011 Resolved
Remove water/ ice from # 1 void and make available for inspection.
Action required: 705 - Other - as specified
Due 25 March 2011
Resolved 4 March 2011
Engineering › Sea-water System (primary cooling) › Valve
Issued 28 January 2011 Resolved
Remove and clean all through hull fittings and make available for inspection.
Action required: 705 - Other - as specified
Due 18 February 2011
Resolved 4 March 2011
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 28 January 2011 Resolved
Repair leak on Port aft keel cooler and pressure test in accordance with manufacturers instructions.
Action required: 705 - Other - as specified
Due 18 February 2011
Resolved 1 April 2011
Engineering › Steam Boiler (propulsion) › Mount
Issued 19 November 2010 Resolved
Replaced worn starboard boiler aft water gage mounting coupling to the satisfaction of the Chief Engineer and attending USCG Inspector.
Action required: 705 - Other - as specified
Due 13 April 2011
Resolved 13 April 2011
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 19 November 2010 Resolved
Amend oil transfer procedures to include oil transfers (internal and External) that consist of oil slops, tank washings, and other oil contaminated washings in accordance with 33 CFR 155.750 & 33 CFR 155.760.
Action required: 705 - Other - as specified
Due 18 February 2011
Resolved 8 April 2011
Documentation › Logs/Records › Declaration of Inspection
Issued 19 November 2010 Resolved
Complete a declaration of inspection prior to all transfers, to include slops and tank washings.
Action required: 705 - Other - as specified
Due 18 February 2011
Resolved 13 April 2011
Engineering › Steam Boiler (propulsion) › Valve, Relief
Issued 19 November 2010 Resolved
Prove proper operation of boiler and relief valves prior to getting underway with passengers.
Action required: 705 - Other - as specified
Resolved 20 April 2011
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 November 2010 Resolved
Prior to getting underway with passengers complete manoverboard, fire, and abandonship drills.
Action required: 705 - Other - as specified
Resolved 10 May 2011
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 19 November 2010 Resolved
Prior to getting underway with passengers prove proper operation of all navigation equipment and complete sea trials.
Action required: 705 - Other - as specified
Resolved 10 May 2011
Electrical › Lighting (service) › Lighting Fixture
Issued 4 October 2010 Resolved
Replace burned out light bulb in compartment # 20.
Due 4 November 2010
Resolved 28 January 2011
Fire Fighting › Fire Hydrants › Material
Issued 4 October 2010 Resolved
Repair or replace leaking fire main valve at fire station # 4 port side engine room.
Due 4 November 2010
Resolved 10 May 2011
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 4 October 2010 Resolved
Provide proof that the B-V fire extinguisher in the boiler room has been serviced.
Due 4 November 2010
Resolved 10 May 2011
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 8 January 2010 Resolved
Repair/replace "E" light on port side of dance floor aft near stairs.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 14 April 2010
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 8 January 2010 Resolved
Prove proper operation of both diesel generator overspeed trips in accordance 46 CFR 111.12-1(b).
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 14 April 2010
Resolution: Manufacturers representative adjusted both overspeeds to be in accordance with 46 CFR 111.12-1(b).
Engineering › Compressed Air System (control) › Valve
Issued 8 January 2010 Resolved
Prove proper operation of aft air compressor relief valve.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 14 April 2010
Resolution: New relief valve installed and tested satisfactory.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 8 January 2010 Resolved
Adjust electric fire pump pressure in accoedance with manufacturers instructions.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 14 April 2010
Electrical › Electrical Distribution System (service) › Panelboard
Issued 8 January 2010 Resolved
Properly label all motor controllers in accordance with 46 CFR 111.70-3(d).
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 4 May 2010
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 8 January 2010 Resolved
Inland navigation rules of the road missing and/or not present for inspection. Provide a copy of the inland NAVRULES aboard vessel.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 20 April 2010
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 8 January 2010 Resolved
Provide proof of PORT/STBD FWD searchlight operation.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 4 May 2010
Lifesaving › Lifebuoys › Serviceable
Issued 8 January 2010 Resolved
Replace line on ring buoy located aft of pilot house near AC units.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 20 April 2010
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 8 January 2010 Resolved
Ensure first aid kit is fully stocked as per kit stock list
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 4 May 2010
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 8 January 2010 Resolved
Repair or replace reflective material on FIVE lifejackets
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 4 May 2010
Resolution: Vessel removed 199 lifejackets due to passenger count reduction after stability test.
Communications › Alarms/Indicators › General Alarm
Issued 8 January 2010 Resolved
General Alarm signal on port bulkhead in boiler fire room not marked properly.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 20 April 2010
Fire Fighting › Fire Hoses › Connections
Issued 8 January 2010 Resolved
Repair or replace leaking coupling on Port #10 hose.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 14 April 2010
Electrical › Lighting (service) › Lighting Fixture
Issued 8 January 2010 Resolved
Ensure light fixtures installed in machinery spaces are installed with a guard.
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 20 April 2010
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 15 July 2009 Resolved
Replace missing safety pin seals for fire extinguishers at location # 7, and 19.
Action required: 705 - Other - as specified
Due 22 July 2009
Resolved 17 September 2009
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 15 July 2009 Resolved
Replace two (2) over pressured extinguishers on Texas deck.
Due 22 July 2009
Resolved 11 August 2009
Fire Fighting › Nozzles › Condition
Issued 15 July 2009 Resolved
Repair or replace and prove proper operation of fire hose nozzle on fire station # 11.
Action required: 705 - Other - as specified
Due 22 July 2009
Resolved 11 August 2009
Communications › Audible Communications › Bell
Issued 15 July 2009 Resolved
Properly mark all general alarm bells and lights in accordance with 46 CFR 113.25-20(d),
Action required: 705 - Other - as specified
Due 22 July 2009
Resolved 11 August 2009
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 15 July 2009 Resolved
Prove proper operation of "E" light starboard side of dance floor.
Action required: 705 - Other - as specified
Due 22 July 2009
Resolved 11 August 2009
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 15 July 2009 Resolved
Install non-conductive deck covering at electrical switching stations in accordance with 46 CFR 111.30-11.
Action required: 705 - Other - as specified
Due 14 August 2009
Resolved 11 August 2009
Lifesaving › Lifebuoys › Serviceable
Issued 15 July 2009 Resolved
Replace life ring located aft of pilot house.
Action required: 705 - Other - as specified
Due 14 August 2009
Resolved 17 September 2009
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 15 July 2009 Resolved
Provide proof of a marine radio operator license.
Due 14 September 2009
Resolved 17 September 2009
Construction/Loadline › Structures › Deck Plating
Issued 5 March 2009 Resolved
Remove and repair wasted area on starboard deck forward of structure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 March 2009
Construction/Loadline › Hull › Hull Plating
Issued 5 March 2009 Resolved
Identify where water is coming from in Port aft void.
Action required: 705 - Other - as specified
Due 27 March 2009
Resolved 27 March 2009
Engineering › Steam Turbine (auxiliary) › Valve, Nozzle Control
Issued 5 March 2009 Resolved
Repair/ Replace steam generator valve and prove proper operation of generator.
Action required: 705 - Other - as specified
Due 15 May 2009
Resolved 12 May 2009
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 22 June 2005 Resolved
Found one protable PKP fire extinguisher due for service on station. Extinguisher was removed from station and replaced with new.
Due 22 June 2005
Resolved 22 June 2005
Lifesaving › Lifejacket/PFD (Type II) › Condition
Issued 15 February 2005 Resolved
Provide 16 new adults size life preservers to replace failed jackets. Total passenger count reduced to 1032 until new jackets are on board.
Condition: Unknown
Due 6 April 2005
Resolved 6 April 2005
Resolution: Purchased 16 new adult PFD''s.
Engineering › Fuel Oil Service System › Valve, Control
Issued 15 February 2005 Resolved
repair reach rod for generator set fuel oil shut off valve, and prove proper operation.
Condition: Unknown
Due 23 April 2005
Resolved 25 March 2005
Resolution: Replaced valve reach rod.
Fire Fighting › Fire Hoses › Condition
Issued 15 February 2005 Resolved
Conduct hydrostatic test of all fire hoses on board vessel.
Due 25 April 2005
Resolved 25 March 2005
Resolution: Observed satisfactory hydro test of fire hoses.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 15 February 2005 Resolved
Conduct Man Over Board drill after new rescue boat davit system is in place.
Due 6 April 2005
Resolved 18 April 2006
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 15 February 2005 Resolved
Conduct test of both diesel generator set overspeed trips.
Due 23 April 2005
Resolved 6 April 2005
Resolution: observed sat operational test.
Engineering › Diesel Engine (auxiliary) › Block
Issued 15 February 2005 Resolved
Prove proper operation of both diesel generator set high cooling water temp alarms.
Due 23 April 2005
Resolved 6 April 2005
Resolution: Installed new alarm switches, observed sat operational test.
Fire Fighting › Fire Hoses › Condition
Issued 24 March 2004 Resolved
Provide 3 new 1 1/2" fire hoses to replace ones failed during inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 March 2004
Resolved 27 March 2004
Resolution: Observed new fire hoses on board and on station.
Operations/Management › Passenger Operations
Issued 27 February 2004 Resolved
Vessel to conduct dockside quarterly examination prior to conducting any passenger operations dockside.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 March 2004
Resolved 22 April 2004
Resolution: Vessel has conducted annual inspection for certification. This requirement no longer applies.
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 5 November 2003 Resolved
PROVIDE PROOF THAT CARPET INSTALLED ON BAND STAND MEETS FIRE CODE STANDARDS OR REMOVE SAME PRIOR TO THE CARRIAGE OF PASSENGERS DOCKSIDE OR UNDERWAY. LEGACY COMPONENT DESC: Recreation Space
Condition: Unknown
Due 30 November 2003
Resolved 30 November 2003
Resolution: Removed carpet from vessel.
Operations/Management › Drills/Instruction
Issued 26 March 2003 Resolved
Conduct satisfactory man overboard drill in the presence of Coast Guard Inspector. LEGACY COMPONENT DESC: Man Overboard Recovery
Due 25 April 2003
Resolved 9 July 2003
Resolution: Observed SAT drill during quarterly exam.
Lifesaving › Lifejacket/PFD (General)
Issued 25 July 2002 Resolved
MOUNT LABELS IDENTIFYING LOCATIONS OF CHILD/ADULT LIFEJACKETS AND INCLUDE NUMBER OF JACKETS AT EACH LOCATION WHERE LIFEJACKETS ARE LOCATED ON THE HURRICANE DECK. LEGACY COMPONENT DESC: Storage
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 August 2002
Resolved 27 August 2002
Resolution: Observed satisfactory lableing of lifejacket location and quantity.
Communications › Radio Communications
Issued 24 July 2002 Resolved
PROVIDE EMERGENCY RADIO PROCEDURES ON BRIDGE. LEGACY COMPONENT DESC: VFH Radiotelephone
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 August 2002
Resolved 27 August 2002
Resolution: Observed procedures in place.
Documentation
Issued 9 April 2002 Resolved
SUBMIT FOR NEW COFR REFLECTING NEW OPERATOR OF VESSEL. LEGACY COMPONENT DESC: COFR
Action required: 705 - Other - as specified
Due 24 April 2002
Resolved 24 April 2002
Resolution: VISUALLY VERIFIED CHECK TO COFR DESK..VSL AWAITINF RECIEPT OF DOCUMENT.
Documentation › Manuals/Policy Documentation
Issued 9 April 2002 Resolved
PROVIDE REVISED COPY OF HULL MAINTENANCE AND MONITORING PROGRAM FOR REVIEW BY LOCAL OCMI.
Action required: 705 - Other - as specified
Due 24 April 2002
Resolved 26 April 2002
Resolution: RECEIVED LTR FROM VSL MASTER FOR REVIEW BY LOCAL OCMI.
Construction/Loadline
Issued 25 April 2001 Resolved
DEMONSTRATE PROPER OPERATION OF VOID #18 BILGE SUCTION._x001C_ _x001C_
Condition: Unknown
Due 25 July 2001
Resolved 9 October 2001
Construction/Loadline › Hull › Hull Plating
Issued 25 April 2001 Resolved
PROPERLY CLEAN AND APPLY COATING TO INTERIOR VOIDS PER SUBMITTED YARD SPECIFICATION.
Condition: Unknown
Due 30 March 2002
Resolved 18 April 2006
Construction/Loadline › Hull › Hull Plating
Issued 25 April 2001 Resolved
PER CID LTR SER.#16711 DTD 09APR01 A HULL MAINTENANCE AND MONITORING PROGRAM NEEDS TO BE SUBMITTED TO INCLUDE ALTHOUGH NOT LIMITED T0: GALVANIC CORROSION SURVEY, ANNUAL UT OF AREAS PRONE TO ACCELERATED CORROSION, COATING MONITORING AND REPAIR ACTIONS WHEN WARRANTED.
Condition: Unknown
Due 30 March 2002
Resolved 18 April 2006
Electrical
Issued 25 April 2001 Resolved
REPLACE HURRICANE DECK AFT EMERGENCY EXIT LIGHTS WITH TYPE APPROVED FOR EXTERIOR SERVICE._x001C_
Condition: Unknown
Due 25 July 2001
Resolved 26 June 2001
Construction/Loadline
Issued 10 January 2001 Resolved
PROCEED TO AVAILABLE DRYDOCK CLEAN, GAS FREE, AND EFFECT PERMANENT REPAIRS TO DAMAGE AREAS VOID #14.
Condition: Unknown
Due 10 January 2001
Resolved 10 January 2001
Electrical
Issued 3 August 2000 Resolved
RE-ROUTE ELECTRICAL WIRING IN THE STBD TILLER BOX TO PREVENT POSSIBILITY OFCHAFFING ON THE STEERING GEAR GUIDE ROD.
Condition: Unknown
Due 3 August 2000
Resolved 3 August 2000
Navigation
Issued 3 August 2000 Resolved
REMOVE OLD WIRE CABLE FROM BENEATH THE PILOT HOUSE DECK VICINITY OF THE STEERING GEAR TO PREVENT THE POSSIBILITY OF SNAGGING STEERING COMPONENTS.
Condition: Unknown
Due 3 August 2000
Resolved 3 August 2000
Fire Fighting
Issued 29 April 2000 Resolved
PROPERLY ROUTE FIRE PUMP RELIEF VALVE DISCHARGE OVERBOARD TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 29 May 2000
Resolved 14 June 2000
Electrical
Issued 29 April 2000 Resolved
PROVIDE APPROVED ELECTRICAL GRADE MATTING IN FRONT OF SHIPS SEVICE SWITCHBOARD.
Condition: Unknown
Due 29 April 2000
Resolved 15 May 2000
Navigation
Issued 29 April 2000 Resolved
DEMONSTRATE PROPER OPERATION OF PORT FORWARD AND AFT SEARCHLIGHTS.
Condition: Unknown
Due 29 April 2000
Resolved 29 April 2000
Construction/Loadline
Issued 29 April 2000 Resolved
REMOVE DEAD ENDED PIPING (LEFT FROM REMOVAL OF OLD STEAM SIPHON SYSTEM) AT VESSEL'S NEXT DRYDOCKING.
Condition: Unknown
Due 29 April 2000
Resolved 29 April 2000
Fire Fighting
Issued 29 April 2000 Resolved
PROPERLY INSTALL AND TEST FIXED CO2 SYSTEM FOR BOTH SHIPS SERVICE DIESEL GENERATOR SETS.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Electrical
Issued 29 April 2000 Resolved
PROPERLY INSTALL DRIP SHIELD ABOVE SHIPS SERVICE SWITCHBOARD.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Electrical
Issued 29 April 2000 Resolved
DEMONSTRATE PROPER OPERATION OF REMOTE SHUT DOWNS FOR BOTH SHIPS SERVICE DIESEL GENERATOR SETS.
Condition: Unknown
Due 29 April 2000
Resolved 15 May 2000
Fire Fighting
Issued 29 April 2000 Resolved
PROPERLY INSTALL FUEL OIL CUTOUT SOLENOIDS IN BOTH SHIPS SERVICE GENERATOR SETS FIXED CO2 SYSTEMS PER APPROVED DRAWING.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Documentation
Issued 29 April 2000 Resolved
PROVIDE STABILITY CALCULATIONS FOR REVIEW BY LOCAL OCMI.
Condition: Unknown
Due 29 April 2000
Resolved 29 April 2000
Fire Fighting
Issued 29 April 2000 Resolved
DEMONSTRATE PROPER OPERATION OF PILOTHOUSE REMOTE START/STOP OF FIRE PUMP.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Electrical
Issued 29 April 2000 Resolved
PROPERLY INSTALL AND TEST REQUIRED GAGES AND METERS PER 46 CFR 111.30-25,_x001C_ ON NEW SHIPS SERVICE SWITCHBOARD.
Condition: Unknown
Due 29 April 2000
Resolved 29 April 2000
Fire Fighting
Issued 29 April 2000 Resolved
INSTALL DISCHARGE PRESSURE GAGE WITH SNUBBER ON NEWLY INSTALLED FIRE PUMP.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Fire Fighting
Issued 29 April 2000 Resolved
PROVIDE COPY OF SERVICING CERTIFICATE FOR PORTABLE AND SEMI-PORTABLE FIREFIGHTING EQUIPMENT.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Fire Fighting
Issued 29 April 2000 Resolved
PROVIDE 46 CFR 162. SERIES APPROVAL DOCUMENTATION ON FIXED CO2 SYSTEM FOR BOTH SHIP'S SERVICE DIESEL GENERATOR SETS.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Unknown
Issued 29 April 2000 Resolved
PROPERLY BAND STEAM PIPING LINE TO CALLIOPE AT AFT ROOF AREA.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Electrical
Issued 29 April 2000 Resolved
PROPERLY INSTALL AND DEMONSTATE PROPER OPERATION OF GROUND DETECTION LIGHTSON NEW SHIPS SERVICE SWITCHBOARD PER 46 CFR 111.05
Condition: Unknown
Due 29 April 2000
Resolved 29 April 2000
Electrical
Issued 1 December 1999 Resolved
REPLACE INOPERATIVE EMERGENCY LIGHTING ASSEMBLY ON FORWARD DANCE FLOOR.
Condition: Unknown
Due 1 December 1999
Resolved 1 December 1999
Engineering
Issued 1 December 1999 Resolved
REPLACE LEAKING UNLOADER VALVE ON LARGE AIR COMPRESSOR TANK.
Condition: Unknown
Due 1 December 1999
Resolved 1 December 1999
Lifesaving
Issued 31 August 1999 Resolved
REPLACE ALL PLASTIC TRASH CANS WITH METAL TRASH RECEPTACLES.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Lifesaving
Issued 31 August 1999 Resolved
PROVIDE MEANS OF SECURING PORTABLE PUMP ON MAINDECK.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Fire Fighting
Issued 31 August 1999 Resolved
Replace leaking fitting on the auxiliary fire pump.
Condition: Unknown
Due 30 September 1999
Resolved 30 September 1999
Engineering
Issued 28 May 1999 Resolved
Prior to conducting any repair work (i.e. drilling, hot work, gouging) on the boiler IWO leak or IWO of replaced handhole areas, provide radiographs_x001C_of the affected areas of the boiler to the satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 9 June 1999
Resolved 9 June 1999
Engineering
Issued 28 May 1999 Resolved
Complete radiographs of propulsion boiler drum repairs at anniversary of 2000 and 2001 Inspections for Certification to the satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 28 May 2000
Resolved 9 June 1999
Construction/Loadline
Issued 28 May 1999 Resolved
Demonstrate proper operation of bilge steam siphons in voids 5, 15, & 23 tothe satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 28 May 1999
Resolved 28 May 1999
Deck/Cargo
Issued 28 May 1999 Resolved
Replace wasted pipe nipple in steam supply line to capstan to the satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 26 June 1999
Resolved 9 June 1999
Engineering
Issued 28 May 1999 Resolved
Provide additional thermal insulation to exhaust piping IWO stack on Texas deck roof to the satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 28 May 1999
Resolved 28 May 1999
Engineering
Issued 28 May 1999 Resolved
Provide written proposal for boiler repair to local OCMI for review and approval prior to undertaking any repairs to boiler drums.
Condition: Unknown
Due 9 June 1999
Resolved 9 June 1999
Construction/Loadline
Issued 28 May 1999 Resolved
Affect permanent repairs to wasted areas of Main Deck as identified by hosetest at next drydock to the satisfaction of an attending Marine Inspector.
Condition: Unknown
Due 28 May 1999
Resolved 28 May 1999
Lifesaving
Issued 15 July 1998 Resolved
REPLACE PORT BRIDGE WING AND PORT FANTAIL RING BUOYS.
Condition: Unknown
Due 15 July 1998
Resolved 15 July 1998
Lifesaving
Issued 15 July 1998 Resolved
REPLACE THREE DAMAGED ADULT PFD'S IDENTIFIED. RESTENCIL OTHERS AS NEEDED.
Condition: Unknown
Due 23 July 1998
Resolved 23 July 1998
Construction/Loadline
Issued 17 April 1998 Resolved
PROVIDE APPROVED PLANS AND INSTALL POWER BILGE SYSTEM PRIOR TO 1999 OPERATIONAL SEASON.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Electrical
Issued 17 April 1998 Resolved
DEMONSTRATE PROPER ELECTRICAL LOAD TEST OF TURBINE GENERATORS.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Construction/Loadline
Issued 17 April 1998 Resolved
COMPLETE WATER/HOSE TEST OF MAIN DECK TO ENSURE WATERTIGHT INTEGRITY.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Lifesaving
Issued 17 April 1998 Resolved
REPAIR/REPLACE 13 ADULT PFD'S; NUMBER OF ADULT PASSENGERS ALLOWED REDUCED TO 986 PENDING COMPLETION.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Navigation
Issued 17 April 1998 Resolved
VESSEL IS RESTRICTED TO DOCKSIDE CARRIAGE OF PASSENGERS PENDING COMPLETION OF SATISFACTORY UNDERWAY OPERATIONAL AND MACHINERY TESTS.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Engineering
Issued 17 April 1998 Resolved
PROVE PROPER CALIBRATION OF MAIN STEAM GAUGE PRIOR TO OPERATING BOILER AT M.A.W.P.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Electrical
Issued 17 April 1998 Resolved
DEMONSTRATE OVERSPEED ON NO.1 AND NO.2 TURBINE GENERATORS.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Engineering
Issued 17 April 1998 Resolved
DEMONSTRATE PROPER OPERATION OF MAIN PROPULSION SYSTEM.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Lifesaving
Issued 31 March 1997 Resolved
REPAIR APPROXIMATE 2 FOOT SECTION OF INSULATION ON CALLIOPE STEAM PIPING.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Electrical
Issued 31 March 1997 Resolved
REPAIR EMERGENCY LIGHT AT TOP OF STAIRWAY LEADING TO DANCE FLOOR AREA.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 31 March 1997 Resolved
REPAIR/REPLACE 42 ADULT PFDs; VESSEL PASSENGER TOTAL LIMITED TO 957 PENDINGCORRECTION.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Electrical
Issued 8 October 1996 Resolved
REPAIR CHAFFED PUBLIC ADDRESS SYSTEM WIRING IN THE STARBOARD STEERING LINKAGE BOX ADJACENT TO THE BRIDGE; PROVIDE CHAFFING GEAR FOR SAME TO PREVENT FUTURE DAMAGE TO WIRING.
Condition: Unknown
Due 8 October 1996
Resolved 8 October 1996
Electrical
Issued 8 October 1996 Resolved
PERMANENTLY ATTACH BATTERY CABLES TO EMERGENCY BATTERY IN MACHINERY FLAT.
Condition: Unknown
Due 8 October 1996
Resolved 8 October 1996
Lifesaving
Issued 8 October 1996 Resolved
PROVIDE 16 ADDITIONAL ADULT PFD'S.
Condition: Unknown
Due 8 October 1996
Resolved 8 October 1996
Fire Fighting
Issued 8 October 1996 Resolved
REPLACE RUPTURED 1 1/2 INCH HOSE AT FIRE STATION NO. 3.
Condition: Unknown
Due 8 October 1996
Resolved 9 October 1996
Construction/Loadline
Issued 9 October 1995 Resolved
MAKE PERMANENT REPAIRS TO PINHOLES/CRACK IN BOTTOM PLATE #1S VOID AT TURN- OF-BILGE IN WAY OF GUSSET APPROX 12' AFT OF FWD BHD. PERMANENT REPAIRS TO BE COMPLETED IN SCHEDULED DRYDOCK NOVEMBER 1995. MAINTAIN TEMP REPAIRS VIASHINGLES/CEMENT BOX UNTIL PERMANENT REPAIRS ARE COMPLETED.
Condition: Unknown
Due 9 October 1995
Resolved 9 October 1995
Lifesaving
Issued 29 September 1995 Resolved
DESIGNATE/STENCIL LOCATION OF CHILD LIFE JACKET STOWAGE.
Condition: Unknown
Due 29 September 1995
Resolved 29 September 1995
Lifesaving
Issued 29 September 1995 Resolved
CLEAN OILY WATER FROM UNDER THE MAIN PROPULSION ENGINES AND AFT BILGES.
Condition: Unknown
Due 29 September 1995
Resolved 29 September 1995
Documentation
Issued 24 July 1995 Resolved
PROVIDE VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY.
Condition: Unknown
Due 9 August 1995
Resolved 9 August 1995
Documentation
Issued 24 July 1995 Resolved
PROVIDE PROOF OF USER FEE PAYMENT.
Condition: Unknown
Due 9 August 1995
Resolved 9 August 1995
Electrical
Issued 24 July 1995 Resolved
MAKE PERMANENT REPAIRS TO THE EMERGENCY LIGHT FORWARD OF THE BOILER.
Condition: Unknown
Due 24 July 1995
Resolved 24 July 1995
Lifesaving
Issued 24 July 1995 Resolved
PROVIDE 35 ADULT TYPE I PFD'S IN ADDITION TO THE 1019 ON BOARD_x001C_ FOR A TOTAL OF 1054. PASSENGER COUNT IS NOT TO EXCEED 964 BEFORE THIS ITEMIS CORRECTED.
Condition: Unknown
Due 24 July 1995
Resolved 24 July 1995
Lifesaving
Issued 24 July 1995 Resolved
REPAIR/REPLACE RING BUOY LIGHT PORT/FWD PILOT HOUSE.
Condition: Unknown
Due 9 August 1995
Resolved 9 August 1995
Electrical
Issued 24 July 1995 Resolved
REMOVE SPRING LOADED BATTERY CHARGER CLIPS AND MAKE PERMANENT CONECTIONS TOTHE BATTERY TERMINALS.
Condition: Unknown
Due 24 July 1995
Resolved 24 July 1995
Lifesaving
Issued 20 April 1995 Resolved
PROVIDE 149 ADULT PFD's. THE VESSEL IS NOT TO CARRY MORE THAN 850 PASSENGERS BEFORE THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 20 April 1995
Resolved 20 April 1995
Electrical
Issued 6 April 1995 Resolved
PROVIDE REMOTE SHUTDOWN FOR EMERGENCY GENERATOR.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Lifesaving
Issued 24 August 1994 Resolved
PROVIDE 86 TYPE I ADULT PFD'S IN ADDITION TO 968 ON BOARD FOR A TOTAL OF 1054, PASSENGER COUNT IS NOT TO EXCEED 913 PERSONS UNTIL THIS ITEM IS CORRECTED.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
Construction/Loadline
Issued 24 August 1994 Resolved
ATTACH REACH ROD TO FORWARD VOID BILGE SUCTIONS.
Condition: Unknown
Due 24 August 1994
Resolved 8 September 1994
Electrical
Issued 14 April 1994 Resolved
REPAIR LOOSE LIGHT FIXTURES IN THE LADIES REST ROOM ON THE DANCE FLOOR DECXK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Fire Fighting
Issued 14 April 1994 Resolved
PROVIDE 2 U.S. COAST GUARD APPROVED FIRE HOSE NOZZLES, FOR THE STATIONS ON THE UPPER DECK, TO REPLACE THE INSTALLED NON-APPROVED NOZZLES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Lifesaving
Issued 14 April 1994 Resolved
PROVIDE 38 ADULT SIZED LIFE PRESERVERS. THE TOTAL NUMBER OF PERSONS ALLLOWED IS REDUCED TO 1010 PERSONS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Electrical
Issued 14 April 1994 Resolved
INSTALL GUARDS ON THE LIGHT FIXTURES IN THE STAIRWAY LEADING FROM THE MAIN DECK TO THE UPPER DECK ON THE STARBOARD SIDE AFT. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 April 1994
Resolved 14 April 1994
Navigation
Issued 23 July 1993 Resolved
Properly mount comms battery and charger located ubder the pilot house._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Electrical
Issued 23 July 1993 Resolved
Provide means to test engine overspeed trip, low lube oil alarm and high jacket water temperature alarm on the emergency generator._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Electrical
Issued 23 July 1993 Resolved
Repair the following emergency lighting fixtures: starboard side of the Dance Floor and at the head of the main staircase.
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Electrical
Issued 23 July 1993 Resolved
Install emergency lighting fixtures in the fireroom to light the face of the boiler, and on the rear of the boiler to light the gage glass and pressure gauges._x001C_ _x001C_
Condition: Unknown
Due 23 July 1993
Resolved 23 July 1993
Electrical
Issued 9 April 1993 Resolved
PROVIDE WATERTIGHT PROTECTION FOR ALL OUTSIDE ELECTRIC LIGHTS EXPOSED TO THE WEATHER._x001C_ _x001C_ 46 CFR 111.75-20 _x001C_
Condition: Unknown
Due 9 April 1993
Resolved 9 April 1993
Fire Fighting
Issued 10 April 1992 Resolved
Install two USCG approved combination solid stream and water spray fire hose nozzles and two 4 ft low velocity water spray applicators on the dancefloor and port side firebox per 46CFR76.10-10(j), (j-1)(2) prior to the compliance date.
Condition: Unknown
Due 10 May 1992
Resolved 23 June 1992
Electrical
Issued 10 April 1992 Resolved
Provide ventilation for small battery installation in storage space immediately below pilothouse per 46CFR111.15-10(d) prior to compliance date.
Condition: Unknown
Due 10 May 1992
Resolved 23 June 1992
Accommodation/Occupational Safety
Issued 10 April 1992 Resolved
identify and repair leak in overhead in the Captain's quarters prior to thecompliance date.
Condition: Unknown
Due 10 May 1992
Resolved 23 June 1992
Lifesaving
Issued 10 April 1992 Resolved
Post embarkation signs on the main deck nearest each exit for boarding lifefloats per 46CFR78.47-43(b) prior to the compliance date.
Condition: Unknown
Due 10 May 1992
Resolved 23 June 1992
Engineering
Issued 10 April 1992 Resolved
Install a flame screen with 30X30 mesh or two screens of 20X20 mesh in the vents for the fuel oil tank per 46CFR56.50-85(a)(8) prior to the compliancedate.
Condition: Unknown
Due 10 April 1992
Resolved 10 April 1992
Lifesaving
Issued 10 April 1992 Resolved
Mark each ring life buoy with the vessel's name per 46CFR78.47-65 prior to the compliance date.
Condition: Unknown
Due 10 May 1992
Resolved 23 June 1992
Construction/Loadline
Issued 20 March 1992 Resolved
Install a suitable bilge strainer on each individual bilge suction per 46CFR56.50-50(g) prior to compliance date.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Construction/Loadline
Issued 20 March 1992 Resolved
Make permanent repairs to ensure watertight integrity of main transverse watertight bulkheads in way of openings for electric cable runs per 46CFR171.111(e) prior to compliance date.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 12 June 1991 Resolved
MAKE PERMANENT REPAIRS, OR REPLACE, THE MAIN FEED WATER PUMP._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Electrical
Issued 15 May 1991 Resolved
INSTALL AND TEST AUDIBLE ALARM ON EMERGENCY GENERATOR FOR LOW LUBE OIL AND HIGH JACKET WATER TEMPERATURE AS PER 46 CFR 112.50-1(I)
Condition: Unknown
Due 15 May 1991
Resolved 15 May 1991
Electrical
Issued 5 April 1991 Resolved
MAKE PERMANENT REPAIRS TO THE ELECTRICAL LIGHTING FIXTURES IN THE CAPSTAN ROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 April 1991
Resolved 5 April 1991
Construction/Loadline
Issued 5 April 1991 Resolved
INSTALL CAPTIVE CHAINS ON THE WATERTIGHT HATCH TO THE CAPSTAIN ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 April 1991
Resolved 5 April 1991
Lifesaving
Issued 5 April 1991 Resolved
STENCIL REQUIRED INFORMATION ON LIFEFLOATS NUMBERS 5 AND 6._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 April 1991
Resolved 5 April 1991
Fire Fighting
Issued 31 March 1989 Resolved
PROVIDE TWO (2) APPROVED COMBINATION FIREHOSE NOZZLES AND TWO (2) 4 FT., APPLICATORS.
Condition: Unknown
Due 31 March 1989
Resolved 31 March 1989
Lifesaving
Issued 31 March 1989 Resolved
PROVIDE 274 ADULT LIFE PRESERVERS. TOTAL PERSONS ALLOWED TO BE CARRIED SHALL BE REDUCED TO 774.
Condition: Unknown
Due 31 March 1989
Resolved 31 March 1989
Lifesaving
Issued 31 March 1988 Resolved
PROVIDE 44 ADULT LIFE PRESERVERS ON BOARD PRIOR TO 01 JUNE 1988. TOTAL PERSON ABOARD IS RESTRICTED TO 1004 UNTIL LIFE PRESERVERS ARE ON BOARD.
Condition: Unknown
Due 31 March 1988
Resolved 31 March 1988
Lifesaving
Issued 1 April 1987 Resolved
PROVIDE ABOARD 214 ADULT PFD'S.TOTAL PERSONS ABOARD IS RESTRICTED TO 834 UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 1 April 1987
Resolved 1 April 1987

Casualty record · 6

17 October 2009Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 4 injured · activity 3617388
3 April 2011Routine · role: Involved in a Marine Casualty · activity 3980158
4 March 2014Routine · role: Alleged Pollution Source · activity 4811153
2 June 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6170593
21 July 2018Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 6490139
20 September 2025Routine · role: Involved in a Marine Casualty · activity 8241049
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.