MAURY USCG vessel records Sign in
← All vessels

COMMANDER

COMMANDER is a 1917 public vessel, unclassified. The Coast Guard has recorded 72 inspections since 1984, most recently in January 2022, along with 133 deficiencies — 1 with no resolution recorded — and 2 casualty investigations between 2007 and 2009.

Records from 1984 to 2022. Most recent: inspection, 20 January 2022.

Built
1917
Last inspected
20 January 2022
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCY4927
Flag
UNITED STATES
367347590 (licence lapsed)
Maury page id
psix-41753

Inspections, by type

…with no type recorded9
…past their stated due date1
Years with a record 32 calendar years (1984–2022)
The 72 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 1979.

Documentation record

Tonnage as PSIX records it14 - Regulatory (Subpart C or D), Gross Ton
10 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WCY4927MMSI 367347590 · expired · voluntarily equipped · granted 4 April 2008, cancelled 25 August 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 72

20 January 2022 Administrative Inspection
Administrative · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7382825
20 October 2021 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7331716
17 June 2016 Plan Review "T" Boat · Examination of Repairs · Deficiency Check · Internal Structural Exam · Administrative Inspection · In-Service Inspection · Construction Oversight · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5915426
28 July 2015 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5194507
19 January 2012 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4227471
20 December 2011 Internal Structural Exam · Examination of Repairs · Administrative Inspection · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4211370
3 February 2010 Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3676873
8 January 2009 Hull Examination · Annual Inspection · Examination of Repairs · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3388648
11 March 2008 Deficiency Check · Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3163096
12 July 2007 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3014806
1 March 2007 COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2879793
22 May 2006 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2655568
8 May 2006 Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2649498
2 December 2005 Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2553692
26 April 2005 MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2342960
10 January 2005 Hull Examination · Internal Structural Exam
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2271765
26 April 2004 MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2052687
27 March 2004 Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2032334
12 January 2004 Type not recorded
No type recorded · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1981739
30 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1986335
30 April 2003 Deficiency Check · Annual Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1784257
13 February 2003 Hull Examination · Internal Structural Exam
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1743402
25 April 2002 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1609651
3 July 2001 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1068257
30 April 2001 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1447112
25 April 2000 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1432318
29 October 1999 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130503
16 August 1999 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1365326
4 May 1999 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 792779
4 May 1999 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 792891
26 April 1999 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1378659
22 January 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 787706
30 December 1998 Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1420016
27 April 1998 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1124405
2 January 1998 Damage Survey
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1419871
1 November 1997 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 112061
5 June 1997 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 777263
28 April 1997 MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1095778
27 March 1997 Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1392710
6 November 1996 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 859207
30 September 1996 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1142432
24 July 1996 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 64556
20 May 1996 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1088247
29 April 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1363749
28 December 1995 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 874214
19 April 1995 MARPOL Annex V Examination · Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1371053
27 April 1994 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1169592
9 December 1993 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1160715
29 April 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1133309
3 December 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 826402
28 April 1992 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 957016
29 January 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 947328
17 January 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1006740
25 April 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 937997
27 December 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 914951
3 May 1990 Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 928994
28 February 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1230406
11 October 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339955
1 May 1989 Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1001100
20 April 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1200333
23 January 1989 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1205510
14 December 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1036020
28 November 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1206289
16 August 1988 Examination of Repairs
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1038724
5 July 1988 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1208294
27 April 1988 Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1346663
24 November 1987 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1020557
10 June 1987 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1311871
10 October 1986 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327946
30 April 1986 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1299709
13 January 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1300147
12 October 1984 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1285676

Deficiency record · 133

Construction/Loadline › Structures › Deck Plating
Issued 3 April 2012 Resolved
Repair leaks in upper passenger deck. Evaluate wood structure IWO leaks to insure soundness.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: Repairs made to upper passenger deck to combat leaking, no apearent leaking ongoing
Communications › Alarms/Indicators › Bilge Alarm
Issued 3 April 2012 Resolved
Repair & prove operation of E/R bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: E/R bilge alarm operational
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 3 April 2012 Resolved
Vacuum or by other acceptable method clean all debris and oily waste from bilges Throughout the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: All debris removed from bilges
Electrical › Electric Supply System (service) › Battery Installation
Issued 3 April 2012 Resolved
Secure battery box forward of the 115 VAC diesel genset located at the port aft section of the E/R.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: Battery box secured
Documentation › Certificates/Documents › Certificate of Inspection
Issued 19 January 2012 Resolved
Vessel's COI expired on 3/1/2012. Vessel must conduct COI Inspection in normal operating area prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: COI inspection complete
Construction/Loadline › Hull › Bottom Plating
Issued 20 December 2011 Resolved
In addition to item #5 of activity #3954015 an additional bottom plank in the aft compartment outboard to port of the previously noted plank was found w/ soft surface & borer damage. Plank to be replaced
Action required: 705 - Other - as specified
Resolved 3 April 2012
Resolution: Completed. Examined and found tight during a post drydock U/W exam.
Engineering › Steering Gear System › Linkage
Issued 20 December 2011 Resolved
Rudder quadrant found worn. Remove and repair or renew.
Action required: 705 - Other - as specified
Resolved 3 April 2012
Resolution: Repaired by machine/welding shop. Reinstalled & tested during U/W exam.
Construction/Loadline › Hull › Transverse Frame
Issued 20 December 2011 Resolved
Aft compartment port bottom/side frame outboard of rudder post found wasted & fractured. Renerw.
Action required: 705 - Other - as specified
Resolved 3 April 2012
Resolution: Completed. Examined and found tight during a post drydock U/W exam.
Construction/Loadline › Structures › Deck Plating
Issued 20 December 2011 Resolved
Main deck over compartment #2 IWO beverage serving area and aft to port gangway found soft from wet rot. Excess water seeping from galley equipment appears to be the cause of the rotted deck. Replace deck to sound wood. Examine underdeck structure W/ USCG. Make changes to galley area to prevent future water accumulation on deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 April 2012
Resolution: Many U/D frames R&R in addition to decking. (See Narrative)
Construction/Loadline › Hull › Keel
Issued 20 December 2011 Resolved
Galvanic delignification found at forward end of shaft log. Remove metal hardware for further exam and propose repair.
Action required: 705 - Other - as specified
Resolved 12 March 2012
Resolution: Examined and determined that damage is not significant enough to need immediate attention. Note to monitor and evaluate at next year’s drydocking.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 December 2011 Resolved
Provide an approved wiring plan for the AC system aboard and repair the AC electrical system. Fire damage.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 27 March 2012
Resolution: Plan submitted to [name withheld].
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 20 December 2011 Resolved
Verify pipe fittings in CO2 system at the manifold IWO the CO2 cylinders are sch 80 fittings.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: CO2 system serviced by certified maintenance company
Construction/Loadline › Hull › Hull Plating
Issued 20 December 2011 Resolved
Treat hull internals to exterminate wharf borer infestation. Wharf bores eat the wood from the inside of the hull. This is important as they have eaten away over 50% of the thickness of an oak bottom plank in two years or less. The lava will mature during May, mate over the summer & return to lay eggs in Sep-Oct.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 April 2012
Resolved 27 April 2012
Resolution: Hull treated with approved product
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 December 2011 Resolved
Complete repairs to 115 VAC distribution system to the satisfaction of the cognizant OCMI. (Sector NY)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2012
Resolution: Repairs completed
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 9 March 2010 Resolved
One adult PFD found w/ a loose/missing reflector tape.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 March 2010
Resolved 9 March 2010
Resolution: Vessel had extra aboard. Defective PFD removed.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 9 March 2010 Resolved
14 child PFDs found to have rotted material and ripped upon manual testing.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 March 2010
Resolved 9 March 2010
Resolution: Vessel had many extra aboard. Defective PFDs removed.
Construction/Loadline › Hull › Side Shell
Issued 3 February 2010 Resolved
Replace four planks above waterline on port side as marked.
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 4 March 2010
Resolution: All planks renewed satisfactorily. Port side planks IWO E/R two replaced w/ one longer plank. See inspection narrative.
Construction/Loadline › Hull › Transverse Frame
Issued 3 February 2010 Resolved
Replace two futtocks of port side frame #34.
Action required: 705 - Other - as specified
Due 31 March 2010
Resolved 4 March 2010
Resolution: Completed satisfactory.
Construction/Loadline › Structures › Superstructure
Issued 3 February 2010 Resolved
Remove rotted sections of dog house on upper deck IWO ladderway and renew rotted frames & coaming. (Owners work list.) N.B. After opening for exam plastic filler found in underdeck beams. All wasted wood to be replaced. FRP deck covering needs to be installed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 April 2010
Resolved 5 April 2010
Resolution: Underdeck beams & carlings IWO ladderway penetration at upper deck as well as associated deck planking & FRP/epoxy deck covering renewed.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 3 February 2010 Resolved
FCC Radiotelephony Certificate .
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 25 March 2010
Resolution: FCC CERT provided & noted in vessel document record of MISLE
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 March 2009 Resolved
Replace expired items in First aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 10 March 2009
Resolution: Corrected date of exam.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 March 2009 Resolved
Fit light fixture in MSD space w/ a globe & guard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 31 March 2009
Resolution: Completed.
Construction/Loadline › Hull › Bottom Plating
Issued 9 March 2009 Resolved
Repair leak at keel/garboard in aft compt IWO shaft log.
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 31 March 2009
Resolution: Reaved out caulking & recaulked. Leak controled.
Engineering › Bilge Water Management System › Valve
Issued 8 January 2009 Resolved
Repair forepeak bilge suction valve reach rod.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 February 2009
Resolved 28 January 2009
Resolution: Bolted securely to valve handle.
Engineering › Bilge Water Management System › Valve
Issued 8 January 2009 Resolved
Replace forepeak bilge suction control valve at collision bhd. Renew associated piping as necessary.
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 February 2009
Resolved 28 January 2009
Resolution: Valve opened, cleaned, lubed and found sat.
Construction/Loadline › Hull › Transverse Frame
Issued 8 January 2009 Resolved
In compartment w/ MSD holding tank: port / 6th frame fwd of aft bhd rotted (see section near butt block). Also check adjacent floor timber inboard of the above section ( rotted IWO fwd end of waste tank).
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Complete frame R&R.
Construction/Loadline › Hull › Transverse Frame
Issued 8 January 2009 Resolved
In compartment w/ MSD holding tank: 3rd frame fwd of aft bhd stbd bottom. Rotted where old fill section with epoxy filler.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Renewed.
Construction/Loadline › Hull › Transverse Frame
Issued 8 January 2009 Resolved
In compartment w/ MSD holding tank: bottom frame stbd of keel (near centerline) found loose from bottom planking. Frame is old non-glued laminated frame. If found to have sound wood when dried then refasten. If wood not sound R & R.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Refastened w/ galvanized steel carriage bolts.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 January 2009 Resolved
In compartment w/ MSD holding tank: Aft bhd common with E/ R...refasten lower 2'. (Galvanized nails appear wasted.) Replacement fasteners may be nails as original or screws.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 31 March 2009
Resolution: COMPLETED.
Construction/Loadline › Hull › Transverse Frame
Issued 8 January 2009 No resolution recorded
Add 4 bolts to floor timber in Lazarett IWO shaft log (just aft of shaft coupling) Verify if existing bolts penetrate bottom planking. If they do then replace w/ bolts. If they don't then lag bolts will suffice.
Action required: 705 - Other - as specified
Due 20 February 2009 — due date passed with no resolution recorded
Resolution: Floor timber R&R and fastened w/ Galvanized carriage bolts.
Construction/Loadline › Hull › Keel
Issued 8 January 2009 Resolved
Add one new lag bolt to each floor timber in Lazarett from E/R bhd aft to floor timber IWO shaft coupling.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Added two new keel lag bolts to each floor timber.
Construction/Loadline › Hull › Keel
Issued 8 January 2009 Resolved
In compartment w/ MSD holding tank: add one new keel bolt/lag bolt to each floor timber.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Add two new keel lag bolts to each floor timber.
Construction/Loadline › Hull › Stiffener
Issued 8 January 2009 Resolved
Repair, realign and re-bolt, loose steel gusset IWO sternpost to horn timber connection. N.B. the sternpost is pushing up on the underside of the aft deck and deforming it upwards while on railway. Set new fastening bolts w/ bungs but do not tighten and set to spacing wedge until vessel refloated and sternpost settles back in normal place.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Floor timber renewed. All refastened after hydraulic jacks used to realign sagged aft section of vessel.
Engineering › Steering Gear System › Rudder Stock
Issued 8 January 2009 Resolved
Straighten bent rudder and rudder stock. Repair loose lower gudgeon, quadrant and correct key to keyway fit. renew bearings and packing as necessary.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 31 March 2009
Resolution: Completed.
Construction/Loadline › Structures › Deck Plating
Issued 8 January 2009 Resolved
Replace rotted section of deck toe rail & rail cap beginning at stbd fwd superstructure gangway access and working fwd.
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 28 January 2009
Resolution: Completed.
Construction/Loadline › Hull › Bottom Plating
Issued 8 January 2009 Resolved
Several butt block seams reaved out as well as seams and recaulked. This is routine maintenance preformed each year along w/ zinc renewal and antifouling painting.
Due 30 January 2009
Resolved 12 January 2009
Construction/Loadline › Hull › Keel
Issued 8 January 2009 Resolved
Renew cutwater on stem.
Due 12 January 2009
Resolved 8 January 2009
Resolution: Completed satisfactorily prior to arrival of inspector.
Electrical › Electrical Distribution System (service) › Conductor
Issued 8 January 2009 Resolved
Remove wire nuts from splice for bilge alarm & pump in second compt. and make a proper splice w/ a crimp and electrical tape.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 31 March 2009
Resolution: Corrected
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 March 2008 Resolved
Label bilge alarm annunciator panel.
Due 31 March 2008
Resolved 11 March 2008
Resolution: Corrected during exam.
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 March 2008 Resolved
Provide an audible bilge alarm that will continue to sound until reset or silenced by physical action of operator.
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 29 April 2008
Resolution: Three new audio/visual alarms installed on exsisting wiring and float switches.
Engineering › Fuel Oil Service System › Filter
Issued 11 March 2008 Resolved
Remove open bonnet petcocks from fuel filters.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 29 April 2008
Resolution: Replaced w/ ball valves. Plugs in bottom of ball valve.
Electrical › Electric Supply System (service) › Cable
Issued 11 March 2008 Resolved
Fit chaffing protection on wire from fwd belt driven alternator on MDE.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 11 March 2008
Resolution: Corrected during inspection.
Electrical › Electrical Distribution System (service) › Conductor
Issued 11 March 2008 Resolved
Install a metal securing hanger w/ insulated chaffing on the E/R wiring at least every two feet. Note the plastic wire ties are satisfactory to assist bundling the conductors but not as hangers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 29 April 2008
Resolution: Completed.
Electrical › Electric Supply System (service) › Cable
Issued 11 March 2008 Resolved
Secure chaffing protection to MDE electric starting motor supply conductor from battery.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 11 March 2008
Resolution: Corrected during inspection.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 11 March 2008 Resolved
Clean toilet paper/etc. from E/R area fwd port IWO sanitary piping from heads to MSD tanks. Prove piping clear and watertight.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2008
Resolved 29 April 2008
Resolution: Completed.
Construction/Loadline › Structures › Manhole
Issued 11 March 2008 Resolved
Free and prove operation of all main deck hatch dogs
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 April 2008
Resolved 2 April 2008
Resolution: Corrected.
Construction/Loadline › Structures › Manhole
Issued 11 March 2008 Resolved
Provide securing chains / cables for deck hatches
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2008
Resolved 2 April 2008
Resolution: Corrected.
Accommodation/Occupational Safety › Ventilation › General
Issued 11 March 2008 Resolved
Reconnect power vent pipe in aft compartment
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 29 April 2008
Resolution: Completed.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 11 March 2008 Resolved
Provide overcurrent protection on remote starter wire from solenoid to bridge switch. Prove operation of circuit.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 April 2008
Resolved 29 April 2008
Resolution: O/O located circuit in place but needed to replace momentary contact starter switch. New button switch installed & remote starter functioned sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 11 March 2008 Resolved
Galvanized piping connecting alarm switch to main CO2 cyl manifold appears to be the improper grade and sch piping. Have system evaluated by a NFPA knowledgeable svc company for compliance with CG approved plans. Correct and then test satisfactorily.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2008
Resolved 2 April 2008
Resolution: Manifold removed and repiped w/ correct galvanized pipe, (A-106 seamless), and correct fittings.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 March 2008 Resolved
Service fixed CO2 system in the presence of a CG marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2008
Resolved 2 April 2008
Resolution: Completed.
Electrical › Electric Supply System (service) › Cable
Issued 11 March 2008 Resolved
Provide a plan of the modifications to the electric supply system to the aft power vent for review by the OCMI. Prior to energizing the 12 vdc to 120 vac modification plan must be approved & installation examined by a CG marine inspector. 4.29.08 Returned for additional information. Plan recieved. 5.14.08. Under review.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2008
Resolved 20 May 2008
Resolution: Reviewed instalation and load connected to an existing 120 vac panel. Max run = 70'' considering both conductors w/ load of 1.6 amps on 14 AWG boat cable. Installation completed satisfactorily.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 11 March 2008 Resolved
Black iron A 106 seamless pipe utilized from the manifold to the discharge heads meets the pressure requirements but is not galvanized inside & out as required per type approved manual for CO2 system. [name withheld] will permit 1 year to make corrections to the pipe system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 31 March 2009
Resolution: Witnessed sat 600 psi pressure test of replacement piping. Weighed both CO2 cyl. Witnessed test of controls and alarms. Test conducted by shipyard personnel IAW NFPA rules.
Construction/Loadline › Hull › Hull Plating
Issued 8 May 2006 Resolved
Recaulk areas where hull meets deck in all voids. Currently there is 1/2 inch opening allowing water to enter boat. Areas are above waterline and marked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2006
Construction/Loadline › Hull › Bracket
Issued 8 May 2006 Resolved
Repair / sister frame underneath shaft boot, current frame is wasted and rotted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2006
Construction/Loadline › Hull › Hull Plating
Issued 8 May 2006 Resolved
In lazarette recaulk all areas allowing water ingress. All areas have been marked and discussed with rep.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2006
Construction/Loadline › Hull › Hull Plating
Issued 8 May 2006 Resolved
In forepeak, recaulk all areas allowing water ingress. All areas have been marked and discussed with rep.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2006
Construction/Loadline › Hull › Hull Plating
Issued 8 May 2006 Resolved
Repair rotted and holed plank, as discussed with rep.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 June 2006
Engineering › Fuel Oil Service System › Tank
Issued 26 April 2005 Resolved
NY02: Electrically bond both fuel tanks to a common ground.
Due 3 May 2005
Resolved 2 May 2005
Resolution: Both port and stbd fuel tanks were bonded to a common ground. Photos rec''d via email.
Documentation › Certificates/Documents › FCC SSL
Issued 26 April 2005 Resolved
NY01: Provide copy of valid FCC safety certificate.
Due 3 May 2005
Resolved 2 May 2005
Resolution: Exam completed and certificate now on board. Cleared via email.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 26 April 2004 Resolved
Provide annual servicing paperwork for fixed fire extinguisher.
Due 30 April 2004
Resolved 27 April 2004
Construction/Loadline › Structures
Issued 26 April 2004 Resolved
Remove angel hair on stbd fwd bulhead in Lazarette.
Due 30 April 2004
Resolved 27 April 2004
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 26 April 2004 Resolved
Tighten shaft packing in Lazarette.
Due 30 April 2004
Resolved 27 April 2004
Construction/Loadline › Hull
Issued 29 July 2003 Resolved
Locate source of water intrusion IWO horn timber/sampson post/keel and arrest. Until corrected, vessel restricted to speeds no more than required to maintain minimum steerage, no more than 1000 feet from shore and 15 minute rounds of lazarette indicated in vessel's log.
Due 3 November 2003
Resolved 25 February 2004
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 30 April 2003 Resolved
Provide proof of enrollment in a consortium or evidence of a self-managed chemical testing program. Complete prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 April 2003
Resolved 2 May 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 30 April 2003 Resolved
Install 2" distribution line past last orifice in engine room to fixed fire extinguising piping. Provide testing certificate of piping after installation. LEGACY COMPONENT DESC: Piping
Due 14 May 2003
Resolved 17 June 2003
Engineering › Sea-water System (primary cooling)
Issued 30 April 2003 Resolved
Make permanent repairs to raw water discharge line (minor leak) in engine room. LEGACY COMPONENT DESC: Piping
Due 7 May 2003
Resolved 17 June 2003
Fire Fighting › Ventilation Systems
Issued 30 April 2003 Resolved
Make provisions to close vents to engine room (mens/womens head, beneath stairwell, those areas where daylight is visible). LEGACY COMPONENT DESC: Duct Hatches
Due 14 May 2003
Resolved 17 June 2003
Engineering › Steering Gear System
Issued 30 April 2003 Resolved
Tighten rudder post packing. LEGACY COMPONENT DESC: Rudder Stock
Due 7 May 2003
Resolved 17 June 2003
Construction/Loadline › Hull
Issued 30 April 2003 Resolved
Make proper repairs to location of water intrusion between stbd B & C strake at frame 9 in lazarette. Until corrected, vessel restricted to speeds no more than required to maintain minimum steerage, no more than 1000 feet from shore and 15 minute rounds of space indicated in vessel's log. LEGACY COMPONENT DESC: Bottom Plating
Due 30 April 2003
Resolved 17 June 2003
Electrical › Electric Supply System (service)
Issued 25 April 2002 Resolved
Properly wire junction box for oil drain pump in engine room. LEGACY COMPONENT DESC: Oil Drain Pump
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 May 2002
Resolved 2 May 2002
Resolution: Witnessed proper installation of junction box for oil pump.
Accommodation/Occupational Safety › Occupational Safety
Issued 25 April 2002 Resolved
Properly mark emergency exit for engine room. LEGACY COMPONENT DESC: Emergency Escape
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 2 May 2002
Resolution: Witnessed proper marking IWO escape hatch.
Construction/Loadline › Markings
Issued 25 April 2002 Resolved
Provide draft marks. LEGACY COMPONENT DESC: Draft Marks/Indicating System
Condition: Unknown
Action required: 705 - Other - as specified
Due 9 May 2002
Resolved 2 May 2002
Resolution: Witnessed proper marking of draft marks.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 25 April 2002 Resolved
Properly weigh CO2 cylinders for fixed fire extinguishing system IAW Table 115.810(b). Submit report to attending marine inspector. LEGACY COMPONENT DESC: Operating Controls
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 2 May 2002
Resolution: Received servicing certificate for CO2 cylinders.
Engineering › Bilge Water Management System
Issued 25 April 2002 Resolved
Provide proper marine grade hose and positive stop closure valves for Rule bilge pumps. LEGACY COMPONENT DESC: Hose and Valves
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 2 May 2002
Resolved 2 May 2002
Resolution: Witnessed proper installation of marine grade hose and valves.
Navigation
Issued 30 April 2001 Resolved
Provide light list for intended voyage.
Condition: Unknown
Due 6 May 2001
Resolved 15 June 2001
Lifesaving
Issued 30 April 2001 Resolved
Provide 1st aid kit with updated medications and and splint.
Condition: Unknown
Due 6 May 2001
Resolved 15 June 2001
Fire Fighting
Issued 30 April 2001 Resolved
Provide automatic shutdown for blower from heads to engine room upon release of CO2, or remove blower.
Condition: Unknown
Due 6 May 2001
Resolved 15 June 2001
Engineering
Issued 30 April 2001 Resolved
Provide 30 x 30 mesh flame screens for fuel tank vents.
Condition: Unknown
Due 30 April 2001
Resolved 30 April 2001
Construction/Loadline
Issued 30 April 2001 Resolved
Repair bilge alarm light for engine room. Chaeck space every 15 min while underway w/ pax until repairs complete.
Condition: Unknown
Due 30 April 2001
Resolved 30 April 2001
Lifesaving
Issued 30 April 2001 Resolved
Remove or properly secure Sears air compressor tank in engine room.
Condition: Unknown
Due 30 April 2001
Resolved 30 April 2001
Lifesaving
Issued 30 April 2001 Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 6 May 2001
Resolved 15 June 2001
Accommodation/Occupational Safety
Issued 30 April 2001 Resolved
Provide means to close vent openings from overhead of engine room into pax space.
Condition: Unknown
Due 30 April 2001
Resolved 30 April 2001
Construction/Loadline
Issued 26 April 1999 Resolved
INSTALL NON-RETURN VALVES IN EACH BILGE SYSTEM PIPE FOR EACH COMPARTMENT.
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Navigation
Issued 26 April 1999 Resolved
PROVIDE CURRENT COPY OF SAFETY RADIO CERTIFICATE AND OPERATORS PERMIT
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Fire Fighting
Issued 22 January 1999 Resolved
Vessel is not to be operated with passengers for hire after March 11, 1999,until the above requirements have been cleared to the satisfaction of an attending U.S. Coast Guard Marine Inspector.
Condition: Unknown
Due 1 July 1999
Resolved 27 July 1999
Fire Fighting
Issued 22 January 1999 Resolved
Install a Fixed Fire Fighting System in machinery spaces in accordance withU.S. Coast Guard approved plans.
Condition: Unknown
Due 22 January 1999
Resolved 22 January 1999
Fire Fighting
Issued 22 January 1999 Resolved
Submit plans for review and approval for the installation of a Fixed Fire Fighting System in the machinery spaces in accordance with 46 CFR 181.115(b) and 46 CFR 181.400
Condition: Unknown
Due 1 July 1999
Resolved 27 July 1999
Documentation
Issued 27 April 1998 Resolved
OBTAIN SUPERVISOR TRAINING FOR DAPI PROGRAM.
Condition: Unknown
Due 27 April 1998
Resolved 27 April 1998
Electrical
Issued 28 April 1997 Resolved
PROVIDE COVERS FOR BATTERY BOXES.
Condition: Unknown
Due 14 May 1997
Resolved 30 June 1997
Lifesaving
Issued 28 April 1997 Resolved
PROVIDE PROPER LANYARD FOR WATER LIGHT ON RING BUOY.
Condition: Unknown
Due 14 May 1997
Resolved 30 June 1997
Lifesaving
Issued 29 April 1996 Resolved
PROVIDE PROPER LINE FOR RING BUOY.
Condition: Unknown
Due 21 May 1996
Resolved 21 May 1996
Lifesaving
Issued 29 April 1996 Resolved
PROVIDE EMERGENCY BROADCAST PLACARD IN THE PILOT HOUSE.
Condition: Unknown
Due 21 May 1996
Resolved 21 May 1996
Construction/Loadline
Issued 28 December 1995 Resolved
SEAL GAP AT INTERSECTION OF STBD SIDE & #1 &#2 UNDERDECK BEAM STBD IN #2 COMPT.
Condition: Unknown
Due 28 December 1995
Resolved 28 December 1995
Fire Fighting
Issued 28 December 1995 Resolved
RECHARGE/RENEW BII FIRE EXTINGUISHER AT ENTRANCE TO THE ENGINE SPACE PRIOR TO SAILING.
Condition: Unknown
Due 28 December 1995
Resolved 28 December 1995
Accommodation/Occupational Safety
Issued 28 December 1995 Resolved
COMPLETE INSTALATION OF FOREPEAK VENTS
Condition: Unknown
Due 28 December 1995
Resolved 28 December 1995
Construction/Loadline
Issued 3 December 1992 Resolved
RENEW APPROX 18"X6" SECTION OF FWD PORTION OF MAIN DECK STBD SIDE. (JUST_x001C_ FORWARD OF MOORING BITT), TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR. VESSEL IS RESTRICTED FROM CARRYING PASSENGERS UNTIL THIS ITEM IS COMPLETED.
Condition: Unknown
Due 3 December 1992
Resolved 3 December 1992
Construction/Loadline
Issued 17 January 1992 Resolved
REPLACE TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR FOR #8 AND#9 RUB RAIL SUPPORTS ON THE STARBOARD SIDE. THE ABOVE ITEM TO BE COMPLETEDBY 3 MAY 1992.
Condition: Unknown
Due 21 February 1992
Resolved 21 February 1992
Electrical
Issued 27 December 1990 Resolved
RELOCATE BATTERY CHARGER BREAKER BOX (CURRENTLY ON PORT SIDE) TO READILY ACCESSIBLE LOCATION IN ENGINE ROOM.
Condition: Unknown
Due 27 December 1990
Resolved 27 December 1990
Engineering
Issued 27 December 1990 Resolved
INSTALL PROPER BELT GUARD(S) ON MDE BELT, PULLEY AREA.
Condition: Unknown
Due 27 December 1990
Resolved 27 December 1990
Electrical
Issued 27 December 1990 Resolved
INSTALL BUTT CONNECTORS ON ALL IN LINE WIRING FOR AUTO ELECTRIC BILGE PUMPS.
Condition: Unknown
Due 27 December 1990
Resolved 27 December 1990
Electrical
Issued 27 December 1990 Resolved
PROPERLY INSULATE BARRIER STRIPS (FOR AUTO ELEC BILGE PUMPS MONTIOR) ON ALLAUTO ELEC. BILGE ALARMS.
Condition: Unknown
Due 27 December 1990
Resolved 27 December 1990
Construction/Loadline
Issued 3 May 1990 Resolved
REPLACE SEA VALVE IN ENGINE ROOM STBD/ S FOUNDATION BLOCK DUE TO DELAMINATED/ROTTEN PLYWOOD BLOCK.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Electrical
Issued 3 May 1990 Resolved
PROVE PROPER OPERATION OF INSTALLATION OF 32 VOLT SYSTEM, PRIOR TO OPERATING AT NIGHT.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Electrical
Issued 3 May 1990 Resolved
PROPERLY SUPPORT FUEL LINE AND WATERLINE TO THE GENERATOR ENGINE.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Construction/Loadline
Issued 11 October 1989 Resolved
MAKE PROPER PERMANENT REPAIRS TO BOW PLANKING AND STEM;VESSEL IS RESTRICTEDFROM CARRYING PASSENGERS UNTIL REPAIRS ARE COMPL. TO THE SATISFACTION OF A CG MARINE INSPECTOR & IN NO CASE LATER THAN 31DEC89.NOTIFY [name withheld]/D VESSEL TO ALLOW FOR COAST GUARD INSPECTION BEFORE WORK COMMENCES.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Engineering
Issued 1 May 1989 Resolved
REPLACE LOWER SECTION OF BILGE SUCTION PIPING IN 2ND VOID FROM FORWARD AND INSTALL A SUITABLE STRAINER.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Lifesaving
Issued 1 May 1989 Resolved
PROVIDE 6 ORANGE SMOKE SIGNALS
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Lifesaving
Issued 1 May 1989 Resolved
PROVIDE 20 ADDITIONAL ADULT LIFE JACKETS
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Fire Fighting
Issued 1 May 1989 Resolved
PROVE PROPER OPERATION OF FIXED BILGE/FIRE PUMP AND PRESSURE TEST FIRE HOSEAND BILGE SUCTION.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Navigation
Issued 1 May 1989 Resolved
REPLACE ANCHOR HAWSER WITH A SUITABLE TYPE.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Lifesaving
Issued 1 May 1989 Resolved
PROVIDE A SUITABLE MEANS TO RECOVER AN UNCONSCIOUS PERSON FROM THE WATER, A LADDER AND/OR EMBARKATION PLATFORM.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Lifesaving
Issued 1 May 1989 Resolved
PROVIDE TWO WORK VESTS FOR PERSONNEL RECOVERING PERSON IN THE WATER.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Electrical
Issued 1 May 1989 Resolved
PROVIDE EVIDENCE OF GENERATOR ENGINE FLEXIBLE HOSE, WEATHER HEAD #H057 IS USCG ACCEPTED OR REPLACED.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Navigation
Issued 16 August 1988 Resolved
MAKE A PERMANENT REPAIR IN WAY OF TEMPORARY REPAIR TO THE RUDDER STOCK LOWER BUSHING.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Construction/Loadline
Issued 16 August 1988 Resolved
MAKE PERMANENT REPAIR IN WAY OF TEMPORARY REPAIR TO THE LEAKING HULL PLANK SEAMS ON THE STBD BOW.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Construction/Loadline
Issued 16 August 1988 Resolved
MAKE PERMANENT REPAIR IN WAY OF TEMPORARY REPAIR TO THE LEAKING HULL PLANK SEAMS AND BONDING STRAP BOLT AT THE ENGINE RM STBD SIDE BOTTOM PLANKS.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Construction/Loadline
Issued 16 August 1988 Resolved
MAKE A PERMANENT REPAIR IN WAY OF TEMPORARY REPAIR TO THE LEAKING BOTTOM PLANK SEAMS AT THE STEERING COMPARTMENT.
Condition: Unknown
Due 16 August 1988
Resolved 16 August 1988
Lifesaving
Issued 27 April 1988 Resolved
PROVIDE 3 ADDITIONAL ADULT LIFEPRESERVERS.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Electrical
Issued 27 April 1988 Resolved
PROVIDE U.S. COAST GUARD APPROVED PLANS FOR NEWLY INSTALLED 110 VOLT DIESEL GENERATOR.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Electrical
Issued 27 April 1988 Resolved
REPLACE RUBBER FLEXIBLE COOLING SUPPLY HOSE AND SYPHON LOOP HOSE.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Electrical
Issued 27 April 1988 Resolved
PROVIDE ADDITIONAL WIRE SUPPORTS FOR NEW GEN. WIRE RUNS THAT LIMITS IT TO DOUBLE BANKED.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Electrical
Issued 27 April 1988 Resolved
PROVE PROPER OPERATION OF GENERATOR'S DIESEL ENGINE SHUTDOWNS.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Unknown
Issued 27 April 1988 Resolved
LABEL REMOTE FUEL TANK SHUTOFFS WHICH ALSO INDICATES THE DIRECTION OF CLOSURE.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Engineering
Issued 27 April 1988 Resolved
CONDUCT 1 1/4 MAWP HYDROSTATIC TEST OF AIR RECEIVER.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Construction/Loadline
Issued 27 April 1988 Resolved
PROVIDE PROPER CAULKING TO PLANKING ON STBD BOW.
Condition: Unknown
Due 27 April 1988
Resolved 27 April 1988
Engineering
Issued 10 June 1987 Resolved
PROVIDE USCG ACCEPTED FLEXIBLE HOSES ON SALTWATER AND FUEL SERVICE LINES.
Condition: Unknown
Due 10 June 1987
Resolved 10 June 1987
Fire Fighting
Issued 10 June 1987 Resolved
PROVE PROPER OPERATION OF FIXED POWER FIREPUMP.
Condition: Unknown
Due 10 June 1987
Resolved 10 June 1987
Lifesaving
Issued 30 April 1986 Resolved
PROVIDE ONE U.S. COAST GUARD APPROVED WATERLIGHT FOR RING BUOY.
Condition: Unknown
Due 30 April 1986
Resolved 30 April 1986
Unknown
Issued 30 April 1986 Resolved
MAKE AVAILABLE BOTH AIR RECEIVERS RELIEF VALVES FOR TESTING.
Condition: Unknown
Due 30 April 1986
Resolved 30 April 1986
Lifesaving
Issued 30 April 1986 Resolved
RENEW SIX ORANGE SMOKE AND SIX RED FLARE DISTRESS SIGNALS.
Condition: Unknown
Due 30 April 1986
Resolved 30 April 1986
Lifesaving
Issued 30 April 1986 Resolved
PROVIDE TWO ADULT AND TWO CHILD'S TYPE 2 PFD'S.
Condition: Unknown
Due 30 April 1986
Resolved 30 April 1986
Engineering
Issued 12 October 1984 Resolved
RENEW WASTED FOREPEAK BILGE SUCTION LINE FROM COLLISION BULKHEAD TO LOWER ELBOW.
Condition: Unknown
Due 12 October 1984
Resolved 12 October 1984

Casualty record · 2

12 July 2007Routine · role: Involved in a Marine Casualty · activity 3014806
28 June 2009Routine · role: Involved in a Marine Casualty · activity 3535646
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.