Records from 1994 to 2021. Most recent: inspection, 23 March 2021.
Documentation record
Registered dimensions (L × B × D)195.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 687 / net 687
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE GROUP · MADISONVILLE, LA, UNITED STATES · built 1994
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 10 April 2026 · expires 30 April 2027
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it687 - Simplified, Gross Ton
687 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 30
23 March 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7161404
30 March 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6911786
19 December 2018
Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6596356
25 May 2018
Hull Examination · Examination of Repairs · Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6419667
17 May 2017
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6146455
16 March 2016
COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5831288
27 March 2015
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5090116
8 September 2014
Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4975406
26 June 2013
Internal Structural Exam · Annual Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4630589
23 July 2012
Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4383179
10 June 2011
COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4038738
1 June 2010
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3748073
21 September 2009
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3600753
19 November 2008
Damage Survey · Drydock Exam · Internal Structural Exam · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3365558
18 October 2007
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3081524
10 August 2006
COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2739838
28 July 2005
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2440534
28 July 2004
Hull Examination · Periodic Inspection · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2142678
13 May 2004
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2071196
5 September 2003
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1897800
11 September 2002
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1674327
17 August 2001
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366562
9 August 2000
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1418754
16 September 1999
Re-Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1384250
16 October 1998
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1471172
3 December 1997
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1115669
2 January 1997
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1095993
13 November 1996
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1406002
12 December 1995
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1396415
20 December 1994
Hull Examination · Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1356943
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2008
Resolved
Observed a 6" fracture on the stern void upper starboard corner wrapper, a 2" hole in the stern void on the port bilge knuckle, an inset on the center bow rake slope sheet measuring 18" long, 10" wide, and 6" deep, and an inset measuring approximately 5' wide by 6' long in the #2 wing void with damage to 3 side longs and 1 channel side chord. Affected areas will be cropped and renewed.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 2 December 2008
Resolution: Verified repairs. See narative.
Construction/Loadline
Issued 16 September 1999
Resolved
Crop & renew damaged side shell & deck in # 3 stbd void.
Condition: Unknown
Due 16 September 1999
Resolved 17 September 1999
Construction/Loadline
Issued 16 September 1999
Resolved
Repair/replace buckled side cord in # 2 stbd void.
Condition: Unknown
Due 16 September 1999
Resolved 17 September 1999