KINSMAN ENTERPRISE

KINSMAN ENTERPRISE is a 1927 freight ship. The Coast Guard has recorded 79 inspections since 1986, most recently in December 2018, along with 118 deficiencies.

Records from 1986 to 2018. Most recent: inspection, 13 December 2018.

Built
1927
Last inspected
13 December 2018
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

5143302 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WAC4559
Flag
UNITED STATES
—
Maury page id
psix-41846

Inspections, by type

…with no type recorded35
Years with a record 13 calendar years (1986–2018)
The 79 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it9439 - Regulatory (Subpart C or D), Gross Ton
7457 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WAC4559MMSI not assigned · expired · compulsorily equipped · granted 29 March 1994, cancelled 26 September 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MISSISSIPPI Towing Vessel · MISLE 56413 · 9 December 1994 · activity 179672

Inspection history · 79

13 December 2018 Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6597381
10 April 2002 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1603078
13 March 2002 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1600805
15 August 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 783619
18 December 1995 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 886107
12 September 1995 Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 883332
10 July 1995 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1448663
13 June 1995 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 23800
5 May 1995 Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1336959
6 April 1995 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1405678
23 December 1994 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1403880
9 December 1994 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 179672
30 October 1994 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 48171
22 October 1994 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1359962
17 October 1994 Damage Survey · Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1459900
12 July 1994 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 163591
12 July 1994 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1461584
2 June 1994 Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 860602
26 April 1994 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1356616
3 January 1994 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1415930
16 December 1993 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1442089
5 December 1993 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 73335
9 August 1993 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 654856
30 June 1993 Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 847264
29 June 1993 Deficiency Check · Hull Examination
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1138971
12 June 1993 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 23142
12 June 1993 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1356308
30 April 1993 Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 836687
15 December 1992 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1140367
8 December 1992 Damage Survey
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1450740
22 October 1992 Examination of Repairs
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1432631
21 October 1992 Damage Survey
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1244408
17 October 1992 Damage Survey
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1471292
16 October 1992 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 173412
28 September 1992 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 222420
25 September 1992 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 6033
8 September 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 935378
1 August 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1259652
22 July 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1259080
8 July 1992 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1379683
6 December 1991 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1006249
18 November 1991 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 461789
7 November 1991 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 940883
9 October 1991 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1246059
27 September 1991 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1248258
12 August 1991 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1246621
30 July 1991 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1243735
1 July 1991 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 932332
7 June 1991 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1017392
26 May 1991 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 914694
13 December 1990 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1219109
30 August 1990 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 917898
7 August 1990 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1228852
16 July 1990 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 903493
11 July 1990 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1243967
5 July 1990 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 920332
20 June 1990 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 917477
15 June 1990 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1227459
23 May 1990 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 911579
25 April 1990 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 909851
14 April 1990 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1221246
20 December 1989 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 917327
27 September 1989 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 997011
5 September 1989 Deficiency Check
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1194653
1 September 1989 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1042421
17 August 1989 Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1196359
16 August 1989 Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1044156
25 July 1989 Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1339351
7 July 1989 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1037364
27 June 1989 Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1202265
23 June 1989 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1198772
14 June 1989 COI Inspection
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1343296
17 May 1989 Hull Examination
Physical examination · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1351326
4 May 1989 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 899130
31 August 1988 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1347917
29 August 1988 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1043066
1 August 1988 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1034503
1 December 1987 Type not recorded
No type recorded · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1023891
20 November 1986 Administrative
Administrative · MSO DULUTH · USCG Great Lakes District (CGD-GL) · Activity 1018704

Deficiency record · 118

Construction/Loadline
Issued 6 April 1995 Resolved
Prove proper operation of the two steam turbine ballast pumps and their overspeed trips.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Accommodation/Occupational Safety
Issued 6 April 1995 Resolved
MSD installations found lined up to pump directly overboard.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 6 April 1995 Resolved
Provide satisfactory number of ring buoy lights (12 required, 11 onboard) _x001C_to the satisfaction of the attending Coast Guard marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Electrical
Issued 6 April 1995 Resolved
Provide globes for electrical lights that have had globes removed and not renistalled to the satisfaction of the attending Coast Guard marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Engineering
Issued 6 April 1995 Resolved
Prove proper operation of the following pressure vessel relief valves: DC Heater, Deck Water Heat Exchanger, Evaporator.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Lifesaving
Issued 6 April 1995 Resolved
Conduct weight test of port lifeboat to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Engineering
Issued 6 April 1995 Resolved
RENEW/REPAIR PORT MAIN BOILER SUPERHEATER SAFETY VALVE PRIOR TO 20 APRIL 1995.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Electrical
Issued 6 April 1995 Resolved
REPAIR OVERSPEED TRIP DEVICE ON AFT SHIPS SERVICE TURBINE GENERATOR PRIME MOVER.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Engineering
Issued 6 April 1995 Resolved
Prove proper operation of audible alarm for engine room alarm system.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 6 April 1995 Resolved
Properly stow LPG cylinder for cookstove iaw 46 CFR 147 to the satisfactionof the attending Coast Guard marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Lifesaving
Issued 6 April 1995 Resolved
Demonstrate operation of two malfunctioning general alarms in fwd living spaces to the satisfaction of the attending Coast Guard marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Engineering
Issued 6 April 1995 Resolved
Prove proper operation of donkey auxiliary boiler automation.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 6 April 1995 Resolved
Provide sufficient number of immersion suits (41 required, 40 onboard, 37 sat., 3 unsat due to deterioration of air bladder hoses) to the satisfaction of the attending Coast Guard marine inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Navigation
Issued 6 April 1995 Resolved
Prove proper operation of loss of power alarm for the engine order telegraph.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Navigation
Issued 6 April 1995 Resolved
Restore angle indicator at the boat deck steering station to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Electrical
Issued 6 April 1995 Resolved
Demonstrate satisfactory operation of the stern light/restricted ability/_x001C_ out of control light panel alarm to the satisfaction of the attending CoastGuard Marine Inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Unknown
Issued 6 April 1995 Resolved
Demonstrate satisfactory operation of the sound powered phones at the boat deck steering station, engine rooom control station, and aft steering flat to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Navigation
Issued 6 April 1995 Resolved
Demonstrate satisfactory operation of hand powered steering from boat deck station to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 6 April 1995 Resolved
Conduct abandon ship drill to the satisfaction of the attending Coast GuardMarine Inspector.
Condition: Unknown
Due 7 May 1995
Resolved 7 May 1995
Engineering
Issued 6 April 1995 Resolved
Prove proper operation of diesel engine overspeed trip on Bow thruster_x001C_ prime mover.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Electrical
Issued 6 April 1995 Resolved
RENEW/REPAIR BATTERY CHARGER FOR DIESEL GENERATOR START BATTERIES.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Engineering
Issued 23 December 1994 Resolved
Series 1415 Consolidated Cast Steel Safety Valve located on Johnston Bros. Inc. auxiliary heating boiler drop lever cotter pin not properly spread to prevent falling out as a result of vibration & vessel movement. Cotter pinmust be spread prior to use of heating boiler to satisfaction of CG.
Condition: Unknown
Due 23 December 1994
Resolved 29 December 1994
Engineering
Issued 26 April 1994 Resolved
REPAIR LEAKING WATER COOLING LINE TO LUBE OIL COOLER TO THE SATISFACTION OFTHE COGNIZANT OCMI.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Lifesaving
Issued 26 April 1994 Resolved
REPAIR SAFETY RAIL STBD SIDE FWD #1 HATCH, AT SPAR DECK INTERFACE.
Condition: Unknown
Due 27 May 1994
Resolved 27 May 1994
Unknown
Issued 26 April 1994 Resolved
INSTALL A RELIEF VALVE ON THE AIR RECEIVER LOCATED IN #1 CARGO HOLD STBD SIDE.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Unknown
Issued 26 April 1994 Resolved
REPLACE RELIEF VALVE HAND LEVER ON VALVE LOCATED ON THE LOWER FWD E/R AIR RECEIVER.
Condition: Unknown
Due 27 May 1994
Resolved 27 May 1994
Electrical
Issued 26 April 1994 Resolved
INSTALL GLOBE AND GUARD ON LIGHT LOCATED IN THE LOWER FWD E/R OVERHEAD IWO OF AIR RECEIVER.
Condition: Unknown
Due 27 May 1994
Resolved 27 May 1994
Construction/Loadline
Issued 12 June 1993 Resolved
MAKE PERMANENT REPAIRS TO THE INSET SIDE PLATING AND LEAKING RIVETS IN THE FIRST FRAME SPACE AFT OF THE BOW THRUSTER JUST ABOVE THE TANK TOP IN THE BOW THRUSTER ROOM. DUE AT THE NEXT DRYDOCKING BUT IN NO CASE LATER THAN 15JUL93.
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Lifesaving
Issued 12 June 1993 Resolved
RENEW THE GRABLINES ON 8 RING BUOYS, (REJECTED RING BUOYS ARE MARKED WITH DUCT TAPE).
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Navigation
Issued 12 June 1993 Resolved
PROVIDE CURRENT COPIES OF THE LIGHT LIST, COAST PILOT #6 AND 33 CFR PARTS 1-199.
Condition: Unknown
Due 24 June 1993
Resolved 24 June 1993
Engineering
Issued 12 June 1993 Resolved
DEMONSTRATE OPERATION OF THE BOILER SMOKE ALARMS.
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Engineering
Issued 12 June 1993 Resolved
OPEN EXPANSION JOINTS IN THE COOLING SYSTEM FOR THE MAIN CONDENSORS FOR INTERNAL INSPECTION AT THE NEXT DRYDOCKING FOR ANY REASON. EXPANSION JOINTS MUST BE REPLACED AT 10 YEAR INTERVALS.
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Fire Fighting
Issued 12 June 1993 Resolved
MAKE PERMANENT REPAIRS TO PLUG ON DISCHARGE SIDE OF FIRE PUMP.
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Fire Fighting
Issued 12 June 1993 Resolved
MAKE PERMANENT REPAIRS TO NIPPLE ON RELIEF VALVE ON DISCHARGE SIDE OF FIRE PUMP.
Condition: Unknown
Due 12 June 1993
Resolved 12 June 1993
Construction/Loadline
Issued 8 December 1992 Resolved
REPLACE THE LOOSE RIVET AND REPAIR THE HORIZONTAL CRACK IN THE BULKHEAD BETWEEN #4 AND #5 STARBOARD BALLAST TANKS. THE CRACK IS JUST ABOVE THE BOTTOM STRAKE APPROXIMATELY 2 FEET FROM THE SIDE SHELL. THE LOOSE RIVET ISBESIDE THE CRACK.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Construction/Loadline
Issued 8 December 1992 Resolved
REPAIR THE HORIZONTAL CRACK IN THE BULKHEAD BETWEEN #4 AND #5 PORT BALLAST TANKS. THE CRACK IS APPROXIMATELY 2 INCHES FROM THE BOTTOM AND 3 FEET FROMTHE TURN OF THE BILGE.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Construction/Loadline
Issued 8 December 1992 Resolved
MAKE PERMANENT REPAIRS TO HULL DAMAGE IN #4P BALLAST TNK IN WAY OF CONCRETEPATCHES AT FLOOR #9. INSET STARTS IN FWD QTR OF #4P BALLAST TNK AND EXTENDSTO FWD QTR OF #5P BALLAST TNK. VESSEL TO UNLOAD PRESENT CARGO AT BUFFALO, NY AND THEN PROCEED TO DRYDOCK FOR REPAIR PRIOR TO CARRYING FURTHER CARGOS.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Construction/Loadline
Issued 17 October 1992 Resolved
MAKE PERMANENT REPAIRS TO CRACK IN NUMBER ONE STARBOARD BALLAST TANK, AT LAPPED JOINT IN WAY OF PLATE KEEL AND GARBOARD STRAKE.
Condition: Unknown
Due 17 October 1992
Resolved 17 October 1992
Engineering
Issued 8 July 1992 Resolved
Repack port boiler water gage glass shut off valves.
Condition: Unknown
Due 8 July 1992
Resolved 8 July 1992
Electrical
Issued 8 July 1992 Resolved
Repair light fixture apparatus port side 01 deck forward.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Construction/Loadline
Issued 8 July 1992 Resolved
Prove proper operation of all hatch dogs on main deck hatch in forepeak.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Accommodation/Occupational Safety
Issued 8 July 1992 Resolved
Replace broken gauge on galley propane system.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Deck/Cargo
Issued 8 July 1992 Resolved
Prove proper operation of aft anchor windlass.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Unknown
Issued 8 July 1992 Resolved
Install incinerator chimney to adequate height above the 01 deck.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Electrical
Issued 8 July 1992 Resolved
Replace missing light fixture globes and guards as pointerd out by Marine Inspector.
Condition: Unknown
Due 8 July 1992
Resolved 8 July 1992
Navigation
Issued 8 July 1992 Resolved
Make permanent wire splice to power supply to Cybernet VHF-FM radio.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Electrical
Issued 8 July 1992 Resolved
Renew electrical cords for deck lights aft of hatches 2, 4, 10, and 16.
Condition: Unknown
Due 8 August 1992
Resolved 22 July 1992
Engineering
Issued 27 September 1991 Resolved
RENEW LAGGING AS NECESSARY THROUGH OUT ENGINE ROOM._x001C_ NOTE: THIS ITEM IS TO REPLACE ITEM INADVERTANTLY CLEARED FROM CASE MI91020256 DATED 26MAY91. _x001C_
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Construction/Loadline
Issued 26 May 1991 Resolved
RENEW GASKETS AS NEEDED ON ALL WEATHER DECK WTD'S TO AFT CABIN._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
DEMONSTRATE WATER TIGHTNESS OF WTD TO BOW THRUSTER ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
PROVIDE CLOSURES FOR FIXED CATCHMENTS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Lifesaving
Issued 26 May 1991 Resolved
STENCIL LIFERAFT STATIONS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Fire Fighting
Issued 26 May 1991 Resolved
STENCIL HALON PULL STATIONS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Accommodation/Occupational Safety
Issued 26 May 1991 Resolved
CLEAN VENT FANS FOR GALLEY, (COUPOLA FAN AND RANGE HOOD.)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
CROP AND RENEW TO SOUND METAL THE WASTED SUPERSTRUCTURE ON THE 01 DECK STACK HOUSE, PORTSIDE UNDER VENT TRUNK SOFT PATCH._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
RENEW GASKETS ON ALL CARGO HOLD ACCESS SCUTTLES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
REPAIR 8" FREEZE FRACTURE IN CONDENSATE RETURN LINE AT FRAME 129 PORT HOLD_x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
DEMONSTRATE OPERATION OF PORT AFT ACCOMODATION LIGHT, PRESENTLY MISSING 1 LIGHT BULB, OTHERS OOC._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
INSTALL COVER BOX ON EMERGENCY GENERATOR CONNECTIONS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Deck/Cargo
Issued 26 May 1991 Resolved
MARK BOW THRUSTER FUEL OIL TANK TO READ "FUEL OIL - NO CUTTING OR BURNING"_x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
LABLE AFT PAINT LOCKER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
LABLE AFT PAINT LOCKER STEAM SMOTHERING VALVE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
REPAIR PORT MAIN STEAM STOP REMOTE OPERATING DEVICE OPEN/CLOSED INDICATOR._x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
REMOVE MERCURY FROM BEHIND OLD BOILER GUAGE BOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
PROVE OPERATION OF BOILER GUAGES IN OLD GUAGE BOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
PROVE OPERATION OF SHIPS SERVICE TURBO GENERATOR GUAGES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
RENEW PIGTAIL ON SPARDECK FORWARD FLOOD LIGHT, (BEHIND PILOT HOUSE.)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REPLACE MISSING GUARDS, GLOBES,AND LIGHT BULBS THROUGHOPUT ENGINE ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
PROPERLY SUPPORT PIPING IN FRONT OF BOILER FEEDWATER TREATMENT HOPPERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
PROVIDE PROPER GASKETS ON ENGINE ROOM SIDE PORTS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
BLANK MISSING CIRCUIT BREAKER IN AFT CABIN PANEL 1 (IN MESS ROOM.)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Accommodation/Occupational Safety
Issued 26 May 1991 Resolved
REMOVE EMPTY PROPANE BOTTLES FROM VESSEL, ALL BOTTLES ON BOARD MUST BE STOWED IN A PROPER RACK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
PROVIDE GLOBES, GUARDS, TIGHTEN COVER PLATES, AND PLUG MISSING KNOCKOUT ON ELECTRICAL FIXTURES IN CARGO HOLDS AS POINTED OUT BY INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
DEMONSTRATE WATERTIGHTNESS OF DOOR IN FOREWARD SUBDIVISION BULKHEAD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
MAKE THE FOREWARD SUBDIVISION BULKHEAD WATER TIGHT BY WELDING INSERT PLATESIN OPENINGS, AND PACKING ALL ENETRATIONS WITH APPROVED MATERIAL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
CROP AND RENEW TO SOUND METAL THE WASTED SECTIONS OF THE FOLLOWING MAIN DECK WTD'S: PORT - MESS ROOM, FANTAIL - ENGINE ROOM, STBD - COOK, DECK, OILER, OILER, OILER, BOILER ROOM._x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REPAIR OR RENEW VENT FAN #1 CONTROL PANEL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
RENEW LAGGING AS NECESSARY THROUGHT ENGINE ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
DIS-CONNECT UN-USED WIRE FROM #6 BREAKER IN REEFER PANEL, AND MARK BREAKER AS SPARE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REMOVE PERMANENTLY WIRED DROP LIGHT IN FITTING ROOM, (INSTALL PLUG AND RECPTICAL.)_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
HARD WIRE AFT ENGINE ROOM WORK BENCH OUTLET WITH APPROVED WIRE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
CLEAN REEFER MOTOR CONTROL BOXES AND POWER PANELS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REPAIR REEFER COMPRESSOR PIG-TAILS, LOOSE IN PLUG AND BOX STUFFING TUBES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
REMOVE UNUSED WIRING AND PIPING BEHIND OLD BOILER GUAGE PANEL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
CLEAN OUT AUTOMATION ALARM BATTERY CHARGER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
CLEAN BATTERY BANK BELOW HEATING BOILER POWER PANEL BY MAIN BOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
INSTALL COVERS AND/OR SCREENS ON COMMUTATORS OF MOTORS AND M/G SETS THROUGHOUT ENGINE ROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REPLACE ALL MATS IN FRONT OF ELECTRIC DISTRIBUTION PANELS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Fire Fighting
Issued 26 May 1991 Resolved
PROVIDE PROPER 4' FOG APPLICATOR FOR #9 FIRE STATION IN ENGINE ROOM (BY STBD SIDE PORT.)_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
PROVIDE (CONTROLER) PANEL BOX WIRING DIAGRAMS FOR CONTROLERS WHICH ARE MISSING SAME._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
RENEW GUAGE ON EMERGENCY FEEDWATER PUMP DISCHARGE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
HARD PIPE DRAIN LINE OVER #1M/G SET BEHIND MAIN BOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Accommodation/Occupational Safety
Issued 26 May 1991 Resolved
PROPERLY MOUNT NORRIS COOLERS IN ENGINE ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Accommodation/Occupational Safety
Issued 26 May 1991 Resolved
LABLE FORWARD END POTABLE WATER TANKS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
INSTALL PLUG IN MAIN STEAM LINE VENT IN ENGINE ROOM VESTIBULE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
PROVIDE GLOBES WHERE MISSING IN PASS. ROOM AND CREWS ROOM, (FOREWARD.)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Construction/Loadline
Issued 26 May 1991 Resolved
FREE UP THE DOGS ON THE 01 DECK STACK HOUSE VENT COVER, PORT SIDE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REMOVE OR RENEW PORT STACK LIGHT CABLE, PRESENTLY CUT OFF, AND HANGING._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Engineering
Issued 26 May 1991 Resolved
LABLE EMERGENCY SHUT DOWN SWITCH OUTSIDE HALON SYSTEM ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Lifesaving
Issued 26 May 1991 Resolved
PROVIDE SEVEN ADULT LIFE PRESERVERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Lifesaving
Issued 26 May 1991 Resolved
PROVIDE TWO EXPOSURE SUITS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Lifesaving
Issued 26 May 1991 Resolved
PROVIDE PROPER DRAIN BALL FOR #1 LIFEBOAT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
DEMONSTRATE OPERATION OF GENERAL ALARM BELL IN PASS. CABIN._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Electrical
Issued 26 May 1991 Resolved
REPAIR THE PIGTAIL IN THE FANTAIL FLOOD LIGHT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 May 1991
Resolved 26 May 1991
Deck/Cargo
Issued 15 June 1990 Resolved
REPLACE MISSING STBD BOWER ANCHOR. REPLACEMENT SHALL BE TO THE SATISFACTION OF THE LOCAL OCMI AND ABS REPRESENTATIVE. REPLACEMENT SHALL BE COMPLETED PRIOR TO LEAVING DULUTH BUT NO LATER THAN 30 JUNE 1990.
Condition: Unknown
Due 15 June 1990
Resolved 15 June 1990
Engineering
Issued 14 April 1990 Resolved
DEMONSTRATE OPERATION OF OVERSPEED TRIP ON FORWARD BOILER FEED WATER PUMP.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Engineering
Issued 14 April 1990 Resolved
DEMONSTRATE PROPER OPERATION OF LOW WATER ALARM.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Engineering
Issued 14 April 1990 Resolved
REPAIR OR RENEW AUXILIARY FEED WATER PRESSURE GAUGE.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Engineering
Issued 14 April 1990 Resolved
REPAIR OR RENEW PORT BOILER SUPERHEATER HIGH TEMPERATURE ALARM GAUGE.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Electrical
Issued 14 April 1990 Resolved
INSTALL MISSING BLANK IN FORWARD LIGHTING PANEL LOCATED ON REC DECK.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Engineering
Issued 14 April 1990 Resolved
MAKE PERMANENT REPAIRS TO AUXILIARY HEATING BOILER TUBES AND HYDROSTATICLY TEST TO 1.5 MAWP.
Condition: Unknown
Due 14 April 1990
Resolved 14 April 1990
Engineering
Issued 20 December 1989 Resolved
OPEN WARPED AREAS (IN WAY OF STEAM DRUM) OF BOILER CASING ON BOTH BOILERS, SO FURTHER INSPECTION CAN BE MADE.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Engineering
Issued 20 December 1989 Resolved
CONDUCT HYDROSTATIC TEST OF AUXILIARY HEATING BOILER TO 1 1/2 TIMES MAWP. TEST TO BE CONDUCTED PRIOR TO NEXT USE, BUT NOT LATER THAN 30 MAY 1990.
Condition: Unknown
Due 20 December 1989
Resolved 20 December 1989
Documentation
Issued 14 June 1989 Resolved
WITHIN 30 DAYS, PROVIDE OIL TRANSFER PROCEDURES IN ACCORDANCE WITH 33 CFR 155.750.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Electrical
Issued 14 June 1989 Resolved
WITHIN 30 DAYS, REPAIR OR REPLACE THE OVERSPEED TRIP DEVICE ON THE AUX (EMERGENCY) GENERATOR. UPON COMPLETION OF THE REPAIRS, THE OPERATION IS TO BE TESTED TO THE SATISFACTION OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Engineering
Issued 14 June 1989 Resolved
REPAIR OR REPLACE THE STARBOARD SUPERHEATER SAFETY RELIEF VALVE, AND HAVE IT SET AND SEALED IN THE PRESENCE OF A USCG MARINE INSPECTOR. THIS REQUIRE-MENT IS TO BE COMPLETED WITHIN 10 DAYS.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Navigation
Issued 14 June 1989 Resolved
WITHIN 60 DAYS, PROVIDE AN ACCURATE, UP TO DATE COMPASS DEVIATION TABLE. FOR COMPLETION OF THIS REQUIREMENT, SEND A COPY OF THE TABLE TO THIS OFFICE
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989 Resolved
WITHIN 7 DAYS, BUT IN NO CASE LATER THAN DEPARTURE FROM BUFFALO, NY ON THE FIRST TRIP, OPEN AND INSPECT THE #3 PORT BALLAST TANK FOR LOCATION OF A POSSIBLE HULL LEAK. IT IS FELT ANY DEFECT WOULD BE LOCATED BETWEEN THE LIGHT AND LOAD WATERLINE. THE EXAM SHALL BE TO THE SATISFACTION OF THE USCG
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.