MAURY USCG vessel records Sign in
← All vessels

INTERNATIONAL

INTERNATIONAL is a 1927 passenger vessel (inspected). The Coast Guard has recorded 75 inspections since 1985, most recently in June 2025, along with 117 deficiencies — 1 with no resolution recorded — and 1 operational control.

Records from 1985 to 2025. Most recent: inspection, 11 June 2025.

Built
1927
Last inspected
11 June 2025
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDF3795
Flag
UNITED STATES
367444080, 368400830
Maury page id
psix-41854

Inspections, by type

…with no type recorded2
…past their stated due date1
Years with a record 39 calendar years (1985–2025)
The 75 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)73.0 ft × 17.2 ft × 2.8 ft
Registered tonnagegross 56 / net 38
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ. W. SWANSON · WATERTON LAKE, MT, UNITED STATES · built 1927
Hull materialWood
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSEATTLE, WA
Trade endorsementsRecreational, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it56 - Regulatory (Subpart C or D), Gross Ton
38 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDP9630MMSI 368400830 · active · compulsorily equipped · granted 15 January 2025, expires 15 January 2035
WDF3795MMSI 367444080 · active · voluntarily equipped · granted 14 March 2020, expires 23 March 2030
WDF7041MMSI 338530000 · expired · compulsorily equipped · granted 1 March 2011, cancelled 1 May 2021
WTR8987MMSI not assigned · expired · compulsorily equipped · granted 25 March 1997, cancelled 10 June 2007
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 75

11 June 2025 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8157502
8 October 2024 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8026715
13 June 2024 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7934575
19 October 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7813113
13 June 2023 Administrative Inspection · Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7714449
16 June 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7479488
23 September 2021 Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7321734
17 May 2021 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7213570
23 September 2020 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7072932
10 July 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7003138
7 October 2019 Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6840393
3 June 2019 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6702626
28 September 2018 Internal Structural Exam · Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6550788
12 June 2018 COI Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6421912
27 September 2017 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6264347
13 June 2017 Examination of Repairs · COI Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6162694
6 October 2016 Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6020892
27 May 2016 Examination of Repairs · COI Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5888456
29 September 2015 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5745937
24 June 2014 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4887798
6 June 2012 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4335764
8 December 2011 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4204406
26 September 2011 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4160281
24 September 2010 Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3864416
16 October 2008 Internal Structural Exam · Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3359042
18 June 2008 Deficiency Check · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3219012
23 October 2007 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3085734
11 June 2007 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2958310
6 June 2007 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2953664
2 October 2006 Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2799434
20 June 2006 MTSA/ISPS Verification · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2641773
26 September 2005 Hull Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2505368
20 May 2005 COI Inspection · Internal Structural Exam · MTSA/ISPS Verification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2363121
20 June 2004 MTSA/ISPS Verification · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2104254
6 February 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2001824
21 October 2003 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1933332
17 June 2003 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1927376
3 October 2002 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1688153
18 June 2002 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1640743
28 May 2002 Administrative Inspection
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1622073
26 June 2001 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1068150
21 June 2001 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1437924
14 June 2000 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1443047
1 November 1999 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1131113
9 September 1999 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1122453
10 June 1999 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1393191
14 May 1998 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1090122
14 May 1998 Re-Inspection · Hull Examination · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1128436
25 July 1997 Re-Inspection · Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1386055
24 March 1997 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1104459
21 June 1996 Deficiency Check · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1095491
8 May 1996 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1088240
6 February 1996 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 874088
15 December 1995 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1191416
17 June 1995 Hull Examination · COI Inspection · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1079254
8 August 1994 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1181076
12 July 1994 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1177047
22 June 1994 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1136020
22 June 1994 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1136021
8 September 1993 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1431271
19 July 1993 Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1157885
17 June 1993 Hull Examination · COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1403631
16 June 1992 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 947008
16 May 1992 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 826008
27 December 1991 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1270998
6 August 1991 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 944014
20 June 1991 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 914054
20 June 1990 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 901321
23 May 1990 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 931885
14 June 1989 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1344819
26 August 1988 Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1347349
9 June 1988 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1205038
11 June 1987 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1010924
3 June 1986 COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1302184
10 June 1985 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1295818

Deficiency record · 117

08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 17 June 2025 No resolution recorded
Each vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level. Vessel shaft space has centerline separation, restricting water flow. Sensors independent, but only one alarms on bridge. Vessel to rig both to indicate on bridge before next operational season in 2026.
Action required: 705 - Other - as specified
Due 22 June 2026 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 13 June 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, The vessel is leaking water near the shaft penetration / bulkhead. Operator shall identify the source and cease the water intrusion to the satisfaction of the marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 June 2024
Resolved 4 July 2024
Resolution: Vessel has approved temp repairs.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 13 June 2024 Resolved
46 CFR 115.810(b); The vessel must conduct the following inspections and tests: For fixed-gas fire extinguishing systems, the inspections and tests required by Table 115.810(b) of this section, in addition to the tests required by 46 CFR 147.60 and 147.65. Vessel must provide evidence of the required servicing to the inspector. The pre-engineered firefighting system with no servicing reports.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Confirmed servicing was completed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 June 2024 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel had placards only posted below, away from the majority of life jacket stowage.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Placards posted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 June 2024 Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entranceway to that deck. Vessel had no marking on the rear stairway access to the upper deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Placard installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 June 2024 Resolved
Each ring life buoy on a vessel must: Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. Vessel had 01 ring buoy with no approval type.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Correct buoy's installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2024 Resolved
The marine employer shall ensure that all persons directly involved in a serious marine incident are chemically tested for evidence of dangerous drugs and alcohol in accordance with the requirements of 46 CFR 4.06. Vessel had no policy nor testing capabilities established to meet the timeline requirements.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2024
Resolution: Vessel has testing capabilities.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 June 2024 Resolved
An adult life jacket must be provided for each person carried on board a vessel. Vessel had 6 un-serviceable lifejackets.
Action required: 10 - Deficiency Rectified
Resolved 11 July 2024
Resolution: New LJ onboard.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 13 June 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, The vessel is leaking water near the shaft penetration / bulkhead. Operator shall identify the source and cease the water intrusion to the satisfaction of the marine inspector prior to next credit DDX.
Action required: 705 - Other - as specified
Resolved 21 July 2025
Resolution: Vessel 2024 yard repairs significantly decreased water ingress. See narrative for details.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 June 2023 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Identification of the items may be in words, or the appropriate symbols in International Maritime Organization (IMO) Resolution A.760(18), “Symbols Related to Life-Saving Appliances and Arrangements.” Letters and numbers must be at least 50 millimeters (2 inches) high. Symbols must be at least 100 millimeters (4 inches) square.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 June 2023 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Port MDE not operational. Must be rectified prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 June 2023 Resolved
L. The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 psi at the pump outlet. The pump outlet shall be fitted with a pressure gauge. Must be corrected prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 13 June 2023 Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 13 June 2023 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, flooding, heavy weather, or man overboard conditions. Instructions faded.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 13 June 2023 Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 13 June 2023 Resolved
Provide evidence of vessel's inflatable buoyant apparatus being placed back on the vessel appropriately.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 June 2023 Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be insulated where necessary to prevent injuries. Replace lagging on MDE exhaust.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2023
Resolved 29 July 2023
Resolution: Received signed letter from Master attesting to correction.
Construction/Loadline › Hull › Stiffener
Issued 6 October 2016 Resolved
Starboard buttblock at third strake from garboard, located just aft of house structure showed signs of rot and failure. Crop and renew failed block to original scantlings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 13 June 2017
Resolution: Verified repairs during COI inspection.
Construction/Loadline › Hull › Stringer
Issued 6 October 2016 Resolved
Starboard side strake, 11 strakes outboard of garboard, along the aft of house structure, showed signs of rot and failure. Crop and renew failed plank to original scantlings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 13 June 2017
Resolution: Verified repairs during 2017 COI inspection.
Construction/Loadline › Structures › Plowshare Breakwater
Issued 29 September 2015 Resolved
Stem noted with decay and hood ends of planks also noted with decay at attachment to stem. Replace stem and affected planks to original structure.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 13 June 2016
Resolution: Full repairs made to stem and decayed planks. Scarfed in new plank hood ends from plank #5 to #18 both port and starboard.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 24 September 2010 Resolved
Port and Starboard propellors reveal moderate pitting; Replace both propellers with like original.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2011
Resolved 30 June 2011
Resolution: Port and Starboard propellors replaced with 28" Manganese Bronze, 25" pitch, 3 blade props.
Construction/Loadline › Penetrations › Valve Flange
Issued 16 October 2008 Resolved
Requirement to exercise and lube starboard engine cooling water valve.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Construction/Loadline › Hull › Hull Plating
Issued 16 October 2008 Resolved
Replace the completely removed wood transom and starboard end frame that the transom fastens to.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Construction/Loadline › Hull › Bottom Plating
Issued 16 October 2008 Resolved
In #2 water-tight space port side, 3 feet aft of water-tight subdivision bulkhead, 3 planks up from keel, repair rot and schedule plank replacement next DDX.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Construction/Loadline › Hull › Bottom Plating
Issued 16 October 2008 Resolved
Replace 2 planks starboard side before turn of bilge 20 feet forward of transom, outboard of aft engine room space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 16 October 2008 Resolved
Repair port shaft guide bearing mount located forward of stern tube and shaft packing gland and align and secure guide bearing to new foundation.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Engineering › Steering Gear System › Rudder Bearing
Issued 16 October 2008 Resolved
Re-pour lead babbitt into lower guide bearing for rudder. (Single rudder duel shaft vessel).
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2009
Resolved 20 June 2009
Resolution: Inspected bearing during annual inspection 20JUNE2009, all sat.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve Actuating Gear
Issued 18 June 2008 Resolved
Linkage to Reduction Gear loose
Due 18 June 2008
Resolved 18 June 2008
Resolution: Double nuted conection
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 18 June 2008 Resolved
Un mounted fire ex
Due 18 June 2008
Resolved 18 June 2008
Resolution: Mounted fire fire ex
Engineering › Bilge Water Management System › Pump
Issued 18 June 2008 Resolved
Han portable bilge/fire pump diaphram damaged
Due 18 June 2008
Resolved 18 June 2008
Resolution: Replaced with new pump
Construction/Loadline › Hull › Stringer
Issued 18 June 2008 Resolved
WT bulkhead port side of Fantell at shaft log need to be made water tight small gap to be completed at next DDX
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 1 May 2009
Construction/Loadline › Hull › Hull Plating
Issued 23 October 2007 Resolved
Repair plank on port side 5 above from stem to fr 6.
Due 1 June 2008
Resolved 18 June 2008
Resolution: Completed sat
Construction/Loadline › Hull › Hull Plating
Issued 23 October 2007 Resolved
Repair plank stbd side 8 above mid ships located under aft cabin bunk.
Due 1 June 2008
Resolved 18 June 2008
Resolution: Completed sat
Construction/Loadline › Hull › Hull Plating
Issued 23 October 2007 Resolved
Remove and repair rot as requiered on transom.
Due 1 June 2008
Resolved 18 June 2008
Resolution: Completed sat
Construction/Loadline › Hull › Bracket
Issued 23 October 2007 Resolved
Remove/inspect/repair but block located on exterior of hull in way of engine bed port side.
Due 1 June 2008
Resolved 18 June 2008
Resolution: Completed sat
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 June 2007 Resolved
Prove proper operation of bilge alarms.
Condition: Improper/Lack of Maintenance
Due 18 June 2007
Resolved 18 June 2007
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 6 June 2007 Resolved
Repair s/w cooling leak on port engine exhaust manifold.
Due 18 July 2007
Resolved 7 August 2007
Resolution: Installed new plug.
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 June 2007 Resolved
Clearly label bilge alarms and automatic bilge pumps operating indicators at operating station.
Due 1 May 2008
Resolved 18 June 2008
Resolution: Tested Sat
Operations/Management › Drills/Instruction › Safety Orientation
Issued 6 June 2007 Resolved
Include emergency exit instructions during passenger orientation and label same.
Due 18 July 2007
Resolved 18 June 2008
Resolution: Verified Sat
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 6 June 2007 Resolved
Provide Echo-sounding Device.
Condition: Unknown
Due 1 May 2009
Resolved 1 May 2009
Construction/Loadline › Hull › Hull Plating
Issued 2 October 2006 Resolved
Port side amid ship 3 planks removed and to be replaced Bent frame port side under fuel tank crack at turn of bilge replace or sister
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 June 2007
Resolved 1 June 2007
Resolution: Sat repairs
Construction/Loadline › Structures › Superstructure
Issued 20 June 2006 Resolved
Bring railing into compliance w/ 46 CFR 177.900(d)(1) & (g) -- (177.35-1(c) in "Old T") : 39.5" w/ either wire mesh or 4" slats. Where built in lifejacket seat/container butts against the stern rail back aft where a, measurement is to be taken from seats.
Due 10 July 2006
Resolved 28 June 2006
Resolution: verified railing in compliance
Lifesaving › Rescue Boat › Boarding Ladder
Issued 20 June 2006 Resolved
During drill determined that rescue boat unable to adequately retrieve person from water. Provide adequate means to recover person from water to meet 180.210(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2007
Resolved 1 June 2007
Resolution: J hook for retrival installed
Lifesaving › Buoyant Apparatus › Capacity
Issued 20 June 2006 Resolved
Due to cold water, lack of rescue resources CG can no longer exempt all of SOLAS CH III; provide appropriate percentage of primary lifesaving by 06/18/07. Service interval of 2 years used on other company boats-- [name withheld] & Roddy Paul-- is acceptable.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2007
Resolved 1 June 2007
Resolution: Installed 100 person IBA
Operations/Management › Drills/Instruction › Abandon Ship
Issued 20 June 2006 Resolved
Change abandon ship/catastrophic ship's procedures, including placard, to have passengers move out of enclosed space & don lifejackets.
Due 10 July 2006
Resolved 28 June 2006
Resolution: verified abandon ship placards
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 20 June 2006 Resolved
Improve training procedures & documentation for fire/flooding & abandon ship to match vessel configuration after modified.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2007
Resolved 1 June 2007
Resolution: Drills sat
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 June 2006 Resolved
Several holes & gaps in all transverse bulkheads; they are not watertight. Make repairs & make all bulkheads watertight.
Due 10 July 2006
Resolved 21 June 2006
Resolution: sealed holes & gaps in watertight bulkheads
Construction/Loadline › Hull › Bottom Plating
Issued 26 September 2005 Resolved
Make permanent repairs to two planks found with dry rot prior to placing the vessel back into service following winter layup.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 June 2016
Resolution: Plank repaired to satisfaction of marine inspector prior to putting vessel in water.
Lifesaving
Issued 21 June 2001 Resolved
OUTFIT THE VESSEL WITH 02 LADDERS THAT CAN BE USED TO EVACUATE VESSEL AND RETRIVE PERSON IN WATER.
Condition: Unknown
Due 22 July 2001
Resolved 21 June 2001
Construction/Loadline
Issued 21 June 2001 Resolved
During the vessels next DDX, install bilge pumping system in the space aft of blkhead #4 (lazerette)
Condition: Unknown
Due 1 May 2002
Resolved 18 February 2004
Lifesaving
Issued 21 June 2001 Resolved
OUTFIT VESSEL W/08 LIFERINGS (4 WITH LINE) TO BE STATIONED AS FOLLOWS: 02 FWD-BOW AREA 01 WITH LINE, 02 AFT 01 WITH LINE, 04 UPPER DECK 02 WITH LINES.
Condition: Unknown
Due 22 July 2001
Resolved 21 June 2001
Documentation
Issued 21 June 2001 Resolved
Within the next 6 months (by DEC 22,2001) the M/V INTERNATIONAL shall come into compliance with the International Safty Managment Code.
Condition: Unknown
Due 22 December 2001
Resolved 18 February 2004
Lifesaving
Issued 21 June 2001 Resolved
REVISE THE CURRENT EMERGENCY CHECKOFF LIST TO INCLUDE SPECIFIC CREW MEMBER ASSIGNMENTS FOR ROUGH WEATHER AT SEA OR CROSSING HAZARDOUS BAR, MAN OVERBOARD, FIRE AT SEA.
Condition: Unknown
Due 22 July 2001
Resolved 21 June 2001
Documentation
Issued 21 June 2001 Resolved
DEVELOP AN EMERGENCY CHECKOFF LIST FOR ABANDON SHIP
Condition: Unknown
Due 22 July 2001
Resolved 21 June 2001
Construction/Loadline
Issued 21 June 2001 Resolved
DURING NEXT DDX MAKE BLKHD #4, TO MAXIUM EXTENT POSSIBLE WATER TIGHT.
Condition: Unknown
Due 1 May 2002
Resolved 18 February 2004
Construction/Loadline
Issued 21 June 2001 Resolved
During vessels next DDX,install bilge high level alarm in the space aft of blkhd #4 (lazerette)
Condition: Unknown
Due 1 May 2002
Resolved 18 February 2004
Fire Fighting
Issued 9 September 1999 Resolved
TEST NEW ENGINE SPACE FIRE SUPPRESION SYSTEM IN PRESENCE AND TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 9 September 1999
Resolved 9 September 1999
Fire Fighting
Issued 10 June 1999 Resolved
PROVIDE APPROVED FIRE SUPPRESSION SYSTEM FOR ENGINE ROOM IN ACCORDANCE WITH46CFR118.400.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Construction/Loadline
Issued 14 May 1998 Resolved
REPAIR FRAMES 3,6,7, AND 8 ON PORT SIDE, AFT OF COLLISION BULKHEAD.
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Navigation
Issued 14 May 1998 Resolved
MAKE MAST/ANCHOR LIGHT OPERATIONAL.
Condition: Unknown
Due 4 August 1998
Resolved 9 July 1998
Construction/Loadline
Issued 14 May 1998 Resolved
INSTALL STRINGER,PORT SIDE AFT, IN ENGINE ROOM TO SUPPORT 4 X 4.
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Construction/Loadline
Issued 14 May 1998 Resolved
DOUBLE CLAMP FLEX HOSE IN BILGE OVERBOARD DISCHARGE LINE.
Condition: Unknown
Due 4 August 1998
Resolved 9 July 1998
Lifesaving
Issued 21 June 1996 Resolved
POST LIFE JACKET DONNING INSTRUCTIONS.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Construction/Loadline
Issued 21 June 1996 Resolved
MAKE PROPER REPAIR TO #6 PORT FRAME LOCATED IN THE FOREPEAK IN WAY OF SISTER._x001C_ TO BE COMPLETED AT NEXT DDX.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Construction/Loadline
Issued 21 June 1996 Resolved
PROVIDE VALVE ON BILGE LINE THROUGH COLLISION BULKHEAD AS PER 152.25-5d.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Documentation
Issued 21 June 1996 Resolved
PROVIDE COPY OF VALID DATED CERTIFICATE OF DOCUMENTATION TO OFFICE AND HAVEORIGINAL ONBOARD.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Lifesaving
Issued 21 June 1996 Resolved
CLEAN ENGINE SPACE.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Engineering
Issued 21 June 1996 Resolved
DOUBLE HOSE CLAMP PORT AND STARBOARD ENGINE RAW WATER COOLING HOSES.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Electrical
Issued 21 June 1996 Resolved
PROVIDE INSULATING COVERS ON BATTERIES TERMINALS.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Lifesaving
Issued 21 June 1996 Resolved
REPLACE FWD STARBOARD RING BUOY.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Construction/Loadline
Issued 21 June 1996 Resolved
REMOVE ROT LOCATED AT THE BOTTOM STARBOARD AREA OF THE COLLISION BULKHEAD, AND SUBMIT PROPOSAL FOR PROPER REPAIR.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Navigation
Issued 21 June 1996 Resolved
REMOVE EXCESSIVE SLACK IN STEERING CABLE.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Engineering
Issued 21 June 1996 Resolved
LAG EXHAUST PORT ENGINE.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Fire Fighting
Issued 21 June 1996 Resolved
PROPERLY MOUNT ALL FIRE EXTINGUISHERS.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Fire Fighting
Issued 21 June 1996 Resolved
REPAIR WATER LEAKS STARBOARD FIRE/BILGE PUMP.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Lifesaving
Issued 21 June 1996 Resolved
REPLACE GRAB LINE ON STARBOARD RING BUOY._x001C_ TO BE COMPLETED PRIOR TO CARRYING PASSENGERS
Condition: Unknown
Due 18 July 1996
Resolved 18 July 1996
Lifesaving
Issued 21 June 1996 Resolved
INSTALL RETRO REFLECTIVE MATERIAL ON ALL RING BUOYS.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Lifesaving
Issued 21 June 1996 Resolved
LABEL LIFE JACKET STOWAGE LOCATIONS.
Condition: Unknown
Due 30 July 1996
Resolved 30 July 1996
Lifesaving
Issued 21 June 1996 Resolved
PROVIDE RETRO REFLECTIVE MATERIAL ON ALL LIFE JACKETS.
Condition: Unknown
Due 21 June 1996
Resolved 21 June 1996
Engineering
Issued 8 May 1996 Resolved
INSTALL LOCKING NUT OR PIN FOR PORT PROP.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Navigation
Issued 8 May 1996 Resolved
REPAIR RUDDER BY PROVIDING NEW UPPER AND LOWER BUSHINGS TO ELEVIATE EXCESS PLAY.
Condition: Unknown
Due 8 May 1996
Resolved 8 May 1996
Lifesaving
Issued 17 June 1995 Resolved
PROVIDE 9 ADULT TYPE ONE PFD'S. TOTAL PERSONS ALLOWED IS REDUCED TO 195 UNTIL THIS ITEM IS COMPLETED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 July 1995
Resolved 12 July 1995
Unknown
Issued 17 June 1995 Resolved
PROVIDE RANDOM DRUG TESTING DOCUMENTATION IAW 46 16.230 AND 46 CFR 16.260. IN ADDITION, PROVIDE PRE-EMPLOYMENT DOCUMENTATION IAW 46 CFR 16.210.
Condition: Unknown
Due 17 June 1995
Resolved 17 June 1995
Lifesaving
Issued 22 June 1994 Resolved
PROVIDE ELEVEN ADDITIONAL TYPE I ADULT PFD'S. TOTAL PERSONS ALLOWED IS REDUCED TO 193 UNTIL THIS ITEM IS COMPLETED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 June 1994
Resolved 22 June 1994
Electrical
Issued 22 June 1994 Resolved
PROPERLY CONNECT POSITIVE BATTERY CABLES TO PORT BATTERY._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 July 1994
Resolved 12 July 1994
Construction/Loadline
Issued 22 June 1994 Resolved
RENEW STEERING CABLE AND REPAIR OR RENEW DAMAGED FRAMING AS DISCUSSED WITH THE MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 June 1994
Resolved 22 June 1994
Fire Fighting
Issued 22 June 1994 Resolved
COMPLETE ANNUAL SERVICING OF ALL FIRE EXTINGUISHERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 July 1994
Resolved 12 July 1994
Electrical
Issued 22 June 1994 Resolved
REMOVE "REMOVABLE ELEMENT" FUSE FROM FIRE PUMP CLUTCH CONTROLLER AND REPLACE WITH UL LISTED FUSE RATED FOR THE CABLE SIZE AND LENGTH OF RUN._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 June 1994
Resolved 22 June 1994
Engineering
Issued 17 June 1993 Resolved
REPAIR LEAKING SEAL ON STBD MAIN ENGINE RAW WATER PUMP._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Engineering
Issued 17 June 1993 Resolved
REPAIR AND PROVE OPERATION OF DRIVE OIL GUAGE FOR THE STBD GEAR BOX._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 July 1993
Resolved 19 July 1993
Construction/Loadline
Issued 17 June 1993 Resolved
INSTALL CHECK VALVE ON THE FORWARD 110V BILGE PUMP DISCHARGE LINE PRIOR TO CARRIAGE OF PASSENGERS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Accommodation/Occupational Safety
Issued 17 June 1993 Resolved
INSTALL FORWARD HAND RAILS PRIOR TO CARRIAGE OF PASSENGERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Lifesaving
Issued 17 June 1993 Resolved
PROVIDE 19 ADDITIONAL ADULT PFD'S. TOTAL PERSONS ALLOWED IS REDUCED TO 184 UNTIL THIS ITEM IS COMPLETED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 July 1993
Resolved 19 July 1993
Fire Fighting
Issued 17 June 1993 Resolved
REPLACE ONE 50' X 1 1/2" FIRE HOSE PRIOR TO CARRIAGE OF PASSENGERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 June 1993
Resolved 17 June 1993
Documentation
Issued 16 June 1992 Resolved
PROVIDE PROOF OF VALID FCC STATION LICENSE.
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Engineering
Issued 16 June 1992 Resolved
PROPERLY MARK PORT FUELTANK SHUTOFF VAVLE IAW 46 CFR 185.30-20.
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Lifesaving
Issued 16 June 1992 Resolved
PROPERLY MARK LIFE PRESERVER STORAGE AREAS AFT IAW 46 CFR 185.30-10
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW RESCUE BOAT FALLS.
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Lifesaving
Issued 16 June 1992 Resolved
PROVIDE 4 ADDTIONAL TYPE 1 PFD'S.
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Engineering
Issued 16 June 1992 Resolved
RENEW PORT FUEL TANK VENT FLAME SCREEN IAW 46 CFR 182.20-35(d).
Condition: Unknown
Due 16 July 1992
Resolved 10 July 1992
Fire Fighting
Issued 20 June 1991 Resolved
REPLACE THE FLEXIBLE HOSE WITH AN ACCEPTABLE HOSE ON THE PORT FIRE PUMP SEACOCK.
Condition: Unknown
Due 4 July 1991
Resolved 6 August 1991
Construction/Loadline
Issued 20 June 1991 Resolved
MAKE PERMANENT ACCEPTABLE REPAIRS TO THE FOLLOWING STRUCTURAL MEMBERS: A. CRACKED FRAME ENG. COMPT. FR 14-PORT B. BAD CLAMP, ENG COMPT. FR 1-PORT C. CRACKED FRAME. ENG. COMPT. FR 29-PORT D. CRACKED FRAMES, CREW CABIN, FR 9&10, STARBOARD
Condition: Unknown
Due 20 June 1991
Resolved 20 June 1991
Lifesaving
Issued 20 June 1991 Resolved
APPLY RETROREFLECTIVE MATERIAL TO ALL LIFE JACKETS IN ACCORDANCE WITH 46 CFR 180.25-25.
Condition: Unknown
Due 20 June 1991
Resolved 20 June 1991
Fire Fighting
Issued 20 June 1991 Resolved
REMOVE THE NON-METALIC PIPE FROM THE FIREMAIN AND REPLACE WITH MATAL PIPE PER 46 CFR 181.15 AND 182.40-5(B).
Condition: Unknown
Due 1 July 1991
Resolved 6 August 1991
Fire Fighting
Issued 20 June 1991 Resolved
INSTALL SUITABLE CHECK VALVES ON THE DISCHARGE PIPE OF EACH FIRE PUMP TO EFFECTIVELY ISOLATE EACH PUMP.
Condition: Unknown
Due 1 July 1991
Resolved 6 August 1991
Fire Fighting
Issued 20 June 1991 Resolved
PROVIDE ONE FIRE HOSE NOZZLE PER 46 CFR 181.15-10(D)(2)._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 July 1991
Resolved 6 August 1991
Electrical
Issued 20 June 1991 Resolved
INSTALL ACCEPTABLE SPLICES IN 110 VOLT AC BILGE PUMP AUTOMATIC SWITCH WIRING.
Condition: Unknown
Due 20 July 1991
Resolved 6 August 1991
Fire Fighting
Issued 20 June 1991 Resolved
MAKE WHATEVER REPAIRS NECESSARY TO THE TWO INSTALLED FIRE PUMPS SO THAT THEDISCHARGE PRESSURE AND FLOW REQUIREMENTS OF 46 CFR 181.10-1(C) ARE MET.
Condition: Unknown
Due 4 July 1991
Resolved 6 August 1991
Fire Fighting
Issued 20 June 1991 Resolved
INSTALL AN ACCEPTABLE FLEXIBLE HOSE BETWEEN THE STARBOARD FIRE PUMP SUCTIONCOCK AND THE SUCTION PIPING.
Condition: Unknown
Due 4 July 1991
Resolved 6 August 1991
Construction/Loadline
Issued 14 June 1989 Resolved
MAKE PERMANENT REPAIRS TO THE FOLLOWING FR'S IN WAY OF THE PORT SIDE.3,8,4,&2 FM FWD BLHD VOID AFT OF E/R. FR'S ROTTED AT TURN OF BILGE. PLANK AT FR 8SOFT AND ROT INDICATED. FR'S 3 & 12 FM FWD BLHD PORT SIDE E/R ROTTED AT TURN OF BILGE. TO BE CROPPED AND RENEWED.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Fire Fighting
Issued 9 June 1988 Resolved
REMOVE THE ENGINE ROOM FIXED EXTINGUISHING SYSTEM, PRIOR TP PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Engineering
Issued 9 June 1988 Resolved
REMOVE NON-METALLIC PIPING MATERIALS FROM THE FIRE AND BILGE SYSTEM AND INSTALL ACCEPTABLE METALLIC MATERIALS, PRIOR TO PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Engineering
Issued 9 June 1988 Resolved
INSTALL A METALLIC CHECK VALVE IN THE FORWARD AUTOMATIC BILGE PUMP OVERBOARD LOCATED STARBOARD SIDE, PRIOR TO PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Engineering
Issued 9 June 1988 Resolved
PROPERLY MARK THE EMERGENCY FUEL SHUT OFF, PRIOR TO PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Fire Fighting
Issued 9 June 1988 Resolved
RENEW THE FIREMAIN DISCHARGE PRESSURE GUAGE, PRIOR TO PLACING THE VESSEL INSERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Lifesaving
Issued 9 June 1988 Resolved
PROVIDE 15 ADDITIONAL ADULT TYPE I PERSONAL FLOTATION DEVICES, PRIOR TO PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI. (ORIGINALLY ISSUED FOR COMPLIANCE NLT 18JUN88.)
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988
Engineering
Issued 9 June 1988 Resolved
PROVIDE SECOND FIXED POWER BILGE PUMP AS REQUIRED BY 46 CFR 182.25-10A, PRIOR TO PLACING THE VESSEL IN SERVICE, TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 9 June 1988
Resolved 9 June 1988

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.