MAURY USCG vessel records Sign in
← All vessels

STROLLER IV

STROLLER IV is a 1934 passenger vessel (inspected). The Coast Guard has recorded 67 inspections since 1985, most recently in November 2025, along with 93 deficiencies and 12 casualty investigations between 2002 and 2019.

Records from 1985 to 2025. Most recent: inspection, 10 November 2025.

Built
1934
Last inspected
10 November 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
368328320
Maury page id
psix-41927

Inspections, by type

…with no type recorded15
Years with a record 34 calendar years (1985–2025)
The 67 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)48.7 ft × 12.2 ft × 4.7 ft
Registered tonnagegross 17 / net 15
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · SUMMERVILLE, NY, UNITED STATES · built 1934
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portKINGSTON, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 28 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it17 - Regulatory (Subpart C or D), Gross Ton
15 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDN9577MMSI 368328320 · active · compulsorily equipped · granted 8 August 2023, expires 8 August 2033
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 67

10 November 2025 COI Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8266707
12 August 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7977715
28 July 2023 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7754729
15 April 2022 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7594972
13 August 2019 DAPI Audit · COI Inspection · Administrative Inspection · Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6782808
13 August 2019 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6851299
4 August 2019 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6773553
4 August 2019 Damage Survey · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6781334
20 June 2019 Annual Inspection · DAPI Audit · Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6719971
15 June 2019 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6716766
6 November 2018 Deficiency Check · Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6580659
24 August 2018 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6524374
23 August 2018 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6524182
21 July 2018 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6487900
21 July 2018 Administrative Inspection · Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6487959
9 July 2018 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6473838
21 May 2018 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6419454
7 November 2016 Drydock Exam · Administrative Inspection · Deficiency Check · Plan Review "T" Boat · DAPI Audit · Internal Structural Exam · Annual Inspection · Examination of Repairs
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6040618
26 September 2016 Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6009731
31 May 2016 DAPI Audit · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5893642
4 June 2014 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4885746
20 May 2014 Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4873471
22 May 2012 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4328594
13 December 2011 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4207155
7 May 2009 DAPI Audit · Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3605451
5 November 2007 DAPI Audit · Deficiency Check · Annual Inspection · Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3093823
19 June 2007 Re-Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2968324
7 July 2006 Re-Inspection · Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2704851
26 July 2005 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2465117
27 June 2005 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2405461
11 May 2005 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2342670
10 June 2004 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2094093
20 May 2004 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2072762
12 May 2003 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1790060
12 November 2002 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1704000
12 August 2002 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1710309
1 July 2002 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1639416
23 May 2002 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1620100
21 June 2001 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1373520
15 May 2000 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1426393
17 May 1999 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1401010
7 October 1998 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 802966
3 June 1998 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1368799
29 April 1998 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1364543
21 May 1997 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1404416
19 June 1996 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 885427
3 June 1996 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1449933
4 May 1995 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1355208
7 June 1994 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1323032
12 May 1994 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1367057
20 May 1993 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1399869
20 May 1993 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1441977
28 October 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1379715
6 May 1992 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1419035
7 June 1991 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1033381
14 May 1991 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 915392
8 May 1990 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1221571
3 May 1989 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1039629
3 May 1988 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1044134
9 February 1988 Examination of Repairs
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1326676
28 January 1988 Examination of Repairs
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1321751
12 January 1988 Examination of Repairs
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1319485
11 December 1987 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1004333
13 November 1987 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1310183
5 May 1987 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1328941
6 May 1986 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1300092
20 May 1985 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1287998

Deficiency record · 93

01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 November 2025 Resolved
This subpart summarizes the responsibilities of documented and licensed mariners, marine employers, MRO, SAP and other chemical testing service providers in 49 CFR part 40. Conduct a DAPI audit in accordance with chemical testing program compliance audit checklist.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 December 2025
Resolved 4 December 2025
Resolution: DAPI certificate approved with MIS Trinity Cruise Company.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 August 2024 Resolved
A vessel must carry either a first aid kit approved under series 160.041 or a kit with equivalent contents and instructions. MI observed expired medications in first aid kit. Replace with approved kit within 7 days. 46 CFR 184.710
Action required: 705 - Other - as specified
Due 20 August 2024
Resolved 20 August 2024
Resolution: Received objective evidence of first aid being replaced with new kit.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 July 2023 Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type installed in accordance with 46 CFR part 76, except when a fixed-gas fire extinguishing system that is capable of automatic discharge upon heat detection is installed or when the space is manned: (1) A space containing propulsion machinery. Vessel does not have fire detection in the machinery space. Vessels heat detectors for their fixed gas fire extinguishing system failed to operate and were not properly installed. 46 CFR 181.405
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2023
Resolution: Vessel installed new heat detector heads in the engine compartment.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 July 2023 Resolved
Cylinders continuously in service without discharging shall be permitted to be retained in service for a maximum of 12 years from the date of the last hydrostatic test. Vessels Fixed gas fire-extinguishing system cylinder is over due for a hydro static test. 46 CFR 175.600 46 CFR 147.60 NFPA 12 NFPA
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2023
Resolution: Sea Safety installed new co2 bottle with good hydro date.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 28 July 2023 Resolved
ilge Alarm: A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Vessel does not have an indicator light installed at the operating station indicating the Bilge Pump is operating. 46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Vessel installed new bigle indicator lights.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 July 2023 Resolved
Engine Exhaust: Exhaust gas must not leak from the piping or any connections. Vessels exhaust coupling at the turbo is deteriorated and the internal bands are exposed. Replace/ repair exhaust coupling. 46 CFR 182.430
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Vessel installed new exhaust couplings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 28 July 2023 Resolved
There must be a means of accurately determining the amount of fuel in each fuel tank either by sounding or by an installed marine type fuel gauge. Vessels fuel gauge does no accurately display the amount of fuel in the tank. 46 CFR 182.445(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 November 2023
Resolution: Vessel submitted photographic evidence of fuel gauge working.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 July 2023 Resolved
Portable fire extinguishers other than wheeled extinguishers shall be installed using any of the following means. (1) Securely on a hanger intended for the extinguisher (2) In the bracket supplied by the extinguisher manufacture. (3) In a listed bracket approved for such purpose. Fire extinguisher by the operating station was not installed in a manufactures approved bracket. 46 CFR 175.600 NFPA 10
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Vessel mounted extingushier located at console.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 July 2023 Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions; (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock; (c) Minimize accidental personnel contact with energized parts. Vessel has multiple spliced wires throughout the vessel and wires not indicating which circuit they are protected by. Repair spliced wires and label circuits so they are readily and easily identifiable. 46 CFR 183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Vessel cleaned up wiring and removed dead end wires.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 July 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: (7)Inspection of all interior spaces to ensure that they are adequately ventilated and drained. De-water bilges in order for CGMI to inspect bilges. 46 CFR 176.802
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2023
Resolution: Vessel dewatered spaces and a visual examination by MI was conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 January 2020 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Due to multiple shaft failures, the vessel was previously required to submit detailed plans to the Marine Safety Center for review and comment. The Marine Safety Center came back stating that the current arrangement does not meet ABYC or ABS standards and that the current shaft is undersized given the details provided. Vessel must either submit revisions to previously submitted plans that show the current shaft arrangement meets ABYC or ABS standards and gain MSC approval or submit changes to their current design and gain approval from the Marine Safety Center. If changes are required to the current design, all alterations will need to be overseen by an attending marine inspector for installation and workmanship. No passengers are allowed to be carried until this deficiency is rectified.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 January 2020
Resolved 3 January 2024
Resolution: Uploaded MSC approval to documents tab in edit vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 August 2019 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel's connection to transmission via sheer pin failed causing vessel to loose propulsion and maneuverability while underway with passengers. Vessel must satisfactorily repair failed sheer pin and test under operational loads in the presence of an attending Marine Inspector. Vessel is forbidden from carrying passengers until such time as this deficiency is cleared.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 August 2019
Resolution: Vessel has satisfactorily replaced failed sheer pin and tested under operational loads in the presence of an attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 August 2019 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel's crew is required to visually inspect previous replaced sheer pin (beginning today) once a week and record visual inspection in ships log. Vessel must also submit detailed propulsion system casualty/repair history and the following information concerning the propulsion system (bill of materials, design calculations, and engine specifications) to the USCG Marine Safety Center (MSC) for review and comment. Any recommendations returned from MSC will then be reviewed by the O/O and Sector Buffalo Inspection Staff for possible further action.
Action required: 705 - Other - as specified
Resolved 19 December 2019
Resolution: The vessel's O/O submitted calculations to the MSC and they returned that the size of the shaft is too small for ABYC or ABS standards. A new "no sail" deficiency will be written to not allow the vessel to operate until resolved.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 18 July 2019 Resolved
Gages to indicate oil pressure shall be provided for propulsion engine. The gauge on the vessel is not currently functioning. Provide proof of correction within 14 days. 46 CFR 182.20-5 (b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2019
Resolved 31 July 2019
Resolution: The O/O replaced the gauge, which corrected the issue.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2019 Resolved
The life ring on the stern of the vessel is wasted and needs to be replaced or repaired. Replace or repair within 14 days and provide proof to Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2019
Resolved 31 July 2019
Resolution: The life ring was replaced.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical first aid
Issued 18 July 2019 Resolved
Multiple items in the first-aid kit are expired. Replace within 14 days and provide proof to Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2019
Resolved 31 July 2019
Resolution: The O/O replaced all the items in the med kit.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2019 Resolved
The battery on the water light that attaches to the ring buoy is expired. Replace within 14 days and provide proof to the Coast Guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2019
Resolved 31 July 2019
Resolution: The O/O replaced the battery in the lifebuoy.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 November 2018 Resolved
During the test of the fixed fire extinguishing system, the tech rep was not able to show a test of the 02 heat activated devices nor provide manufacturers testing procedures. Prove proper operation of 02 heat activated devices to the satisfaction of a Coast Guard Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 May 2019
Resolved 14 May 2019
Resolution: Corrected to the satisfaction of marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 November 2018 Resolved
No major repairs or alterations affecting the safety of the vessel shall be made without approval from the Office in Charge of Marine Inspections. All items listed below will require a written repair proposal submitted to our office within 07 days: 1. New Shaft Arrangement 2. Planking on the Port Side 3. All repairs of frames on the port side. 4. Transom caulking issues to include bottom planking and exhaust piping. 5. Frames in the area forward of the collision bulkhead. 6. Collision bulkhead repair.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 December 2018
Resolved 7 May 2019
Resolution: Cleared to the satisfaction of attending marine inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2018 Resolved
Received notification from the owner/operator that during a trip their shaft sheared off from the transmission and dropped into the bilge rendering the vessel with no means of propulsion. All machinery must be installed and maintained in such a manner as to afford adequate protection against machinery failure. Provide the specifications for the new shaft that will be installed and prove proper operation to Coast Guard Marine Inspector prior to carrying passenger.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 July 2018
Resolved 25 July 2018
Resolution: Observed new sectional shaft portion (304 SS) coming off of reduction gear. Shaft, coupling, u-joint connection, shear pin, key and keyway were installed and appeared in good order. Future permanent fix pending.
Stability › Weathertight Integrity › General
Issued 19 June 2018 Resolved
On the 19Jun2018 Deficiency Check, we discovered water in the bilge that appeared to be running steadily from aft to forward collecting near the bilge pump under the operating station. We were not able to determine if the water was coming from rain water into the aft hatch or from the hull. The bilge needs to be kept dry and monitored over the next 30 days to determine if further actions needs to be taken.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2018
Resolved 25 July 2018
Resolution: While attending vessel for damage survey related to shaft casualty, the Marine Inspector verifed replacement and relocation of bilge pump.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 7 June 2018 Resolved
The emergency procedures for the vessel to be written for that specific vessel's operation. The man overboard procedures state that they will put a crewmember in the water and the fire drill procedures state the Coast Guard would be called in an emergency. Both of these are not accurate to the vessel's operation. Update to reflect accurate procedures.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: Vessel O/O updated emergency procedures.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 5 June 2018 Resolved
At least one ring life buoy must be fitted with a lifeline. The 60ft line attached to the ring life buoy is wasted and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2018
Resolved 19 June 2018
Resolution: The vessel's O/O replaced the 60ft lifeline on the ring life buoy.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 5 June 2018 Resolved
A vessel must carry one floating waterlight. The battery on the waterlight was marked 2016. The battery needs to be replaced annually.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: The vessel's O/O replaced the battery in the floating waterlight.
Electrical › Lighting (service) › Conductor
Issued 5 June 2018 Resolved
Electrical equipment exposed to the weather must be watertight. Wires going to the stern light were made with an unauthorized splice. Wires need to be spliced in accordance with 46 CFR 183.340 (g)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: The vessel's O/O removed the splice and ran the wires as required.
Personnel › Certificates/Documents/Licenses › Certificate, First Aid Course Completion
Issued 5 June 2018 Resolved
The vessel's crew was not able to demonstrate the ability or knowledge to render basic medical treatment during a man overboard drill. The crew needs training to be able to provide this treatment.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 22 July 2018
Resolution: Received an email from the O/O with first aid certificates for all crewmembers.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 5 June 2018 Resolved
The crew should be trained prior to getting underway for emergency situations to include responding to a fire. The vessel's crew was not able to explain how to operate the fuel shut offs. Provide training to all crew members prior to getting underway.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 7 June 2018
Resolved 19 June 2018
Resolution: The vessel's O/O provided training to crew members and their knowledge was tested by attending Marine Inspector.
Navigation › Piloting/Steering › US Coast Pilot
Issued 5 June 2018 Resolved
Provide the most updated copies of charts, Coast Pilot and Light List on the vessel for the waters operated.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: The vessel O/O provided updated copies of all navigation publications.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 June 2018 Resolved
The first aid kit on board the vessel contained expired aspirin and neosporin. The kit needs to be updated with new items.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: The vessel O/O updated their first aid kit.
Stability › Watertight Integrity › General
Issued 5 June 2018 Resolved
A small amount of water is coming in through the deck on the stern. Water was found in the port aft corner of the transom. Find source of water intrusion and correct.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 June 2018
Resolved 19 June 2018
Resolution: The vessel O/O caulked the deck on the stern to eliminate the water intrusion.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 15 May 2017 Resolved
Provide adequate storage for life jackets, demonstration required.
Action required: 705 - Other - as specified
Due 15 May 2017
Resolved 19 May 2017
Resolution: Center wooden slats removed and demonstration of retrieval sat.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 15 May 2017 Resolved
Replace five (05) adult type I life jackets, vessel is limited to 45 passengers until corrected.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2017
Resolved 19 May 2017
Resolution: Additional five (05) adult type I's provided with appropriate markings.
Stability › Watertight Integrity › General
Issued 15 May 2017 Resolved
Reduce excessive leaking from shaft.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2017
Resolved 19 May 2017
Resolution: Witnessed satisfactory corrective measures limiting the ingress of water.
Fire Fighting › Fire Bucket › Stenciling
Issued 31 May 2016 Resolved
Mark fire buckets as required by cite.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2016
Resolved 31 May 2016
Resolution: Required marking completed prior to MI's departure.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 31 May 2016 Resolved
Remove from vessel & destroy 3 adult & 1 child life jackets found unsatisfactory condition.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 31 May 2016
Resolution: Inspection provided sufficient quantity of jackets on board. Condemned jackets destroyed prior to MI's departure.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 31 May 2016 Resolved
Provide corrosion resistant clip for 3' lanyard for life buoy. When stowed the line must be attached around the body of the ring buoy.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 17 June 2016
Resolution: Attended vessel and witnessing satisfactory installation of clip and lanyard.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 31 May 2016 Resolved
Provide battery for water light with current expiration date or replace battery annually.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 31 May 2016
Resolution: New battery with current expiration date installed prior to MI's departure.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 31 May 2016 Resolved
e-water all spaces & maintain dry & free of oil. Verification by Masters required prior to each daily operation. Entry in vessels log shall be completed.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 31 May 2016
Resolution: Oil water mixture removed from bilge with main space & water from forward void pumped. Space inspected with no further water intrusion identified. Masters verification of spaces required with finding to be logged prior to each daily operation.
Construction/Loadline › Hull › Bottom Plating
Issued 31 May 2016 Resolved
Identify leaking seams in mid-body port side & transom; inspect wood & replace planks or repack as appropriate to make vessel watertight. Make vessel available for in water internal inspection prior to 2017 operating season.
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 7 May 2019
Resolution: Open Deficiency from previous drydock. Cleared to the satisfaction of marine inspector.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 31 May 2016 Resolved
Provide annual servicing record for portable & fixed fire extinguishers.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 1 June 2016
Resolution: Annual servicing report provided.
Electrical › Lighting (service) › Lighting Fixture
Issued 22 May 2012 Resolved
Make proper repairs to wiring for spotlight (renew connectors and place wire in proper stuffing tube).
Action required: 705 - Other - as specified
Due 5 June 2012
Resolved 26 June 2012
Fire Fighting › Ventilation Systems › Fans
Issued 5 November 2007 Resolved
Install blower shutdown on engine blower to shutdown with CO2 discharge.
Action required: 705 - Other - as specified
Due 6 May 2008
Resolved 9 May 2008
Resolution: Wired into present alarm pressure switch.
Lifesaving › Visual Distress Signals (General) › Quantity
Issued 5 November 2007 Resolved
Provide 3 smoke or red flares.
Action required: 705 - Other - as specified
Due 6 May 2008
Resolved 9 May 2008
Lifesaving › Lifebuoys › Serviceable
Issued 5 November 2007 Resolved
Clean ring buoy and install new retro tape.
Action required: 705 - Other - as specified
Due 6 May 2008
Resolved 9 May 2008
Fire Fighting › Ventilation Systems › Ducts
Issued 19 June 2007 Resolved
Provide closure devices for air intakes
Action required: 705 - Other - as specified
Due 19 June 2007
Resolved 18 July 2007
Documentation › Logs/Records › Logbook (official)
Issued 19 June 2007 Resolved
Provide proper ship logs for training, passenger count, maintenance, ect.
Action required: 705 - Other - as specified
Due 19 July 2007
Resolved 18 July 2007
Navigation › Piloting/Steering › Marine Charts
Issued 19 June 2007 Resolved
Provide navigation charts, light list, ect.
Action required: 705 - Other - as specified
Due 19 July 2007
Resolved 18 July 2007
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 19 June 2007 Resolved
Provide safety chains for min 39.5 inches of deck on port starbard and aft entrances.
Action required: 705 - Other - as specified
Due 19 July 2007
Resolved 18 July 2007
Documentation › Markings/Placards › Vessel Number (state)
Issued 19 June 2007 Resolved
Provide proper stern name plate.
Action required: 705 - Other - as specified
Due 19 July 2007
Resolved 20 August 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 19 June 2007 Resolved
Remove engine external air supply intake hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 June 2007
Resolution: Air intake hose removed.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 9 May 2006 Resolved
Label stowage area for child life jackets (number and child)
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 9 May 2006 Resolved
Replace retro tape on 6 jackets as needed.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 9 May 2006 Resolved
Mount portable fire extinguishers with approved brackets.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 May 2006 Resolved
Properly support wires every 24" and provide chaffing as needed throughout vessel.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Electrical › Electrical Distribution System (service) › Bus Bar Connection
Issued 9 May 2006 Resolved
apply protective coating to bilge light connection.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 9 May 2006 Resolved
Provide vent clousures for fixed fire.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 9 May 2006 Resolved
Seal hole in forward bulkhead (space protected by fixed CO2)
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Engineering › Bilge Water Management System › Pump
Issued 9 May 2006 Resolved
Mount bilge pumps securing equipment in lower portion of bilge.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 May 2006 Resolved
Provide annual fixed fire service report.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Lifesaving › Lifebuoys › Serviceable
Issued 9 May 2006 Resolved
Clean and replace retro tape.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 May 2006 Resolved
Replace stern light lens cover.
Action required: 705 - Other - as specified
Due 16 July 2006
Resolved 26 June 2006
Resolution: Received verbal notification from o/o that stern light has been replaced and is burning brightly. Vessel has been place on list for spot checks upon next visit to the Rochester NY area.
Electrical › Electric Supply System (service) › Battery Installation
Issued 9 May 2006 Resolved
Properly secure battery box cover.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Fire Bucket › Quantity
Issued 9 May 2006 Resolved
Provide 1 more fire bucket, stenciled and with lanyard.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Engineering › Fuel Oil Service System › Vent Pipe
Issued 9 May 2006 Resolved
Replace 30 x 30 mesh screen for fuel vent.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 11 May 2005 Resolved
Operator does not have an EAP program in accordance with 46 CFR 16. Issued requirement to correct.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 June 2005
Resolved 27 June 2005
Resolution: EAP program in place.
Lifesaving › Lifejacket/PFD (Type I)
Issued 20 May 2004 Resolved
replace 2 unservicable life preservers. passenger capacity reduced to 47 until replaced LEGACY COMPONENT DESC: Condition
Due 21 June 2004
Resolved 9 June 2004
Lifesaving › Lifebuoys
Issued 20 May 2004 Resolved
repair ring buoy float light to operate as designed- operations restricted to daytime only until repaired LEGACY COMPONENT DESC: Self-igniting Lights
Due 21 June 2004
Resolved 9 June 2004
Lifesaving › Lifebuoys
Issued 20 May 2004 Resolved
mark ring buoy with vessel name LEGACY COMPONENT DESC: Markings (ship name/port)
Due 21 June 2004
Resolved 9 June 2004
Construction/Loadline › Hull › Side Shell
Issued 12 November 2002 Resolved
Renew plank removed from the starboard side.
Condition: Unknown
Due 31 December 2002
Resolved 19 December 2002
Resolution: New plank of similiar wood installed.
Construction/Loadline › Hull › Side Shell
Issued 12 November 2002 Resolved
Remove butt seam located below plank removed on starboard side.
Due 31 December 2002
Resolved 19 November 2002
Resolution: Block removed for inspection.
Construction/Loadline › Hull › Hull Plating
Issued 12 November 2002 Resolved
Remove 2nd and 3rd planks on transom, replace inkind.
Due 31 December 2002
Resolved 19 December 2002
Resolution: Planks renewed inkind.
Construction/Loadline › Hull › Bracket
Issued 12 November 2002 Resolved
Renew wasted steel corner brackets on shaft log.
Due 31 December 2002
Resolved 19 December 2002
Resolution: New steel brackets installed.
Construction/Loadline › Hull
Issued 12 November 2002 Resolved
Remove propeller for shaft inspection.
Due 31 December 2002
Resolved 19 December 2002
Resolution: Shaft keyway in good condition.
Construction/Loadline › Hull
Issued 12 November 2002 Resolved
Renew wasted and cracked frame on the port side of the transom. LEGACY COMPONENT DESC: Framing
Due 31 December 2002
Resolved 19 December 2002
Resolution: New frames installed.
Construction/Loadline › Hull › Hull Plating
Issued 12 November 2002 Resolved
Renew wasted planks on port and starboard side of transom.
Due 31 December 2002
Resolved 19 December 2002
Resolution: Entire transom replanked.
Construction/Loadline › Hull
Issued 12 November 2002 Resolved
Renew two cracked frames on starboard side mid-ship. LEGACY COMPONENT DESC: Frames
Due 31 December 2002
Resolved 19 December 2002
Resolution: Frames removed and renewed.
Documentation › Logs/Records
Issued 23 May 2002 Resolved
Drills and Training of crew members were not logged. Captain stated that drills do occur, and the actual drills did make that apparent. Issue was that these events need to be logged. Operator advised that logging of drills actually protects his company and he stated it will be done in the future LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Condition: Unknown
Due 30 June 2003
Resolved 25 June 2002
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 23 May 2002 Resolved
Pressure Diaphrams on pre-engineered, (auto) CO2 system were intermittent. Manual activation test worked fine. Contractor hired and parts on order to correct. LEGACY COMPONENT DESC: Operating Controls
Condition: Unknown
Due 30 June 2002
Resolved 25 June 2002
Fire Fighting
Issued 15 May 2000 Resolved
Install 3 fire buckets in accordance with 46 CFR 181.610.
Condition: Unknown
Due 15 May 2000
Resolved 15 May 2000
Navigation
Issued 15 May 2000 Resolved
Reconfigure stern light to show only 135 degrees. Ensure anchor light is available.
Condition: Unknown
Due 15 May 2000
Resolved 15 May 2000
Lifesaving
Issued 15 May 2000 Resolved
Replace torn ring buoy.
Condition: Unknown
Due 15 May 2000
Resolved 15 May 2000
Unknown
Issued 21 May 1997 Resolved
PROVIDE APPROVED FIRST AID KIT
Condition: Unknown
Due 25 July 1997
Resolved 25 July 1997
Unknown
Issued 21 May 1997 Resolved
REPACK/ADD PACKING TO RUDDER POST.
Condition: Unknown
Due 25 July 1997
Resolved 25 July 1997
Lifesaving
Issued 3 June 1996 Resolved
Provide 9 additional adult Type I pfds. Vessel is limited to 40 total persons until additional pfds are provided. Requirement may be cleared by faxing a copy of pfd invoice to [phone withheld].
Condition: Unknown
Due 3 June 1996
Resolved 3 June 1996
Fire Fighting
Issued 12 May 1994 Resolved
Provide two (2) B-II portable fire extinguishers prior to taking passengersfor hire.
Condition: Unknown
Due 12 May 1994
Resolved 12 May 1994
Construction/Loadline
Issued 12 May 1994 Resolved
Replace the 3rd frame on the starboard side forward. Work to be accomplished during the winter lay-up period. Repairs to be to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 12 May 1994
Resolved 12 May 1994
Construction/Loadline
Issued 28 October 1992 Resolved
SISTER THREE FRAMES AS MARKED ON PORT SIDE AND REPLACE FRAME AS MARKED. BUTTS TO BE SPACED IAW GOOD MARINE PRACTICE.
Condition: Unknown
Due 28 October 1992
Resolved 28 October 1992
Construction/Loadline
Issued 6 May 1992 Resolved
Renew planks frame and butt block marked by attending inspector prior to next operating season. Examine area frequently and no longer than weekly and immediatly report any leakage to [name withheld].
Condition: Unknown
Due 6 May 1992
Resolved 6 May 1992
Lifesaving
Issued 6 May 1992 Resolved
Conduct fire and man overboard drill.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Lifesaving
Issued 6 May 1992 Resolved
Provide additional 11 adult PFD's. Vessel is limited to carrying 42 adultsincluding passengers and crew until the PFD's are provided.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Electrical
Issued 6 May 1992 Resolved
Provide enclosure for MDE driven 117VAC generator connections, and fasten cable run to overhead fwd of generator.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Navigation
Issued 14 May 1991 Resolved
PROVIDE AN ANCHOR BALL DAYSHAPE.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Engineering
Issued 14 May 1991 Resolved
PROVIDE A HEAT DEFLECTOR FOR THE RACOR FUEL FILTER.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991

Casualty record · 12

12 August 2002Routine · role: Involved in a Marine Casualty · activity 1710309
26 July 2005Routine · role: Involved in a Marine Casualty · activity 2465117
26 August 2012Routine · role: Involved in a Marine Casualty · activity 4424591
27 August 2012Routine · role: Involved in a Marine Casualty · activity 4452245
4 June 2014Routine · role: Involved in a Marine Casualty · activity 4885746
9 July 2018Routine · role: Involved in a Marine Casualty · activity 6473838
21 July 2018Routine · role: Involved in a Marine Casualty · activity 6487900
23 August 2018Routine · role: Involved in a Marine Casualty · activity 6524182
24 August 2018Routine · role: Involved in a Marine Casualty · activity 6524374
15 June 2019Routine · role: Involved in a Marine Casualty · activity 6716766
4 August 2019Routine · role: Involved in a Marine Casualty · activity 6773553
13 August 2019Routine · role: Involved in a Marine Casualty · activity 6851299
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.