Records from 1985 to 2002. Most recent: inspection, 19 September 2002.
Inspection history · 20
19 September 2002
Hull Examination
Physical examination · MSD SITKA · USCG Arctic District (CGD-A) · Activity 1677984
31 March 1998
Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1124568
30 October 1997
Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 781381
19 May 1997
Hull Examination · COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1442565
25 September 1996
Type not recorded
No type recorded · MSD SITKA · USCG Arctic District (CGD-A) · Activity 42991
20 May 1996
Type not recorded
No type recorded · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1084838
10 May 1996
Re-Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1439744
19 May 1995
Hull Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1382975
29 April 1994
COI Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1387537
10 May 1993
Hull Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 828016
29 April 1992
Hull Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 960161
30 April 1991
COI Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1225222
8 May 1990
Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1220842
10 May 1989
Hull Examination · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1339688
19 October 1988
Drydock Extension
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 887900
24 May 1988
COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 889211
28 March 1988
Administrative
Administrative · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1302330
15 May 1987
Re-Inspection · Hull Examination
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1027991
29 May 1986
Credit Drydock · Re-Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 1310811
9 May 1985
COI Inspection
Physical examination · MSO JUNEAU · USCG Arctic District (CGD-A) · Activity 990806
Construction/Loadline › Hull › Bottom Plating
Issued 19 September 2002
Resolved
Remove "homemade" seam compound consisting of 1823 Attco mixed with 45 - 55% Portland Cement and reseal seams with appropriate seam compound. LEGACY COMPONENT DESC: Hull Plating
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never follow thru with COI
Stability › Weathertight Integrity › General
Issued 19 September 2002
Resolved
Provide coamings in the three main deck weather tight doors in accordance with 46CFR171.124(d) LEGACY COMPONENT DESC: Coaming
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Fire Fighting › Fixed Gas Fire Extinguishing System › Control Valve
Issued 19 September 2002
Resolved
Provide fire detection and a fixed gas fire extinguishing system that meet the requirements of 46CFR181.400.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Electrical › Electric Supply System (service) › Battery Charger
Issued 19 September 2002
Resolved
Existing AC & DC Electrical System was removed. Provide new electrical drawings: one line diagram, cable lists, bills of materials, generator information, bus ties, feeders, branch circuits, circuit breakers, switches, batteries, and electrical load analysis. IAW 46CFR177.210 meeting 46CFR183. LEGACY COMPONENT DESC: Completely renewed system
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 19 September 2002
Resolved
Originally fitted with 671s at 165 horsepower, vessel now has 853s with higher hp and torque (unknown values at this time). Provide specifications; hp & torque differences and prove hull structure is adequate to support modern engine power in this Carvel planked wood hull. LEGACY COMPONENT DESC: Diesel Engine
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 19 September 2002
Resolved
Vessel previously had vertical dry exhausts through accommodations space. The new wet engine exhausts run up through deck and overboard amidships well above the waterline. Provide plans, prove proper installation/operation of this unusual configuration. LEGACY COMPONENT DESC: Exhaust System
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Engineering › Sea-water System (primary cooling) › Piping
Issued 19 September 2002
Resolved
Renew pvc elbows and plastic sea strainer from main engine cooling system and replace with metallic fittings IAW 46CFR182.710. LEGACY COMPONENT DESC: System Components
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Engineering › Fuel Oil Service System › Piping
Issued 19 September 2002
Resolved
Remove PVC elbows and CG A1 fuel hoses with runs more than 30 inches and provide metallic piping and couplings for fuel system IAW 46CFR182.710. Nonmetallic piping may be used if it meets the requirements of46CFR182.720.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Construction/Loadline › Structures › Air Pipe
Issued 19 September 2002
Resolved
Provide plans for structural modifications to 01 deck aft in way of aft household style weather tight door and area cutout in deck, where also are cut three transverse deck beams. Renew structural integrity of this area. LEGACY COMPONENT DESC: 01 deck modifications
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Accommodation/Occupational Safety › Heating › Burners
Issued 19 September 2002
Resolved
Remove wood stoves or provide installations that meet 46CFR184.200 and American Boat & Yacht Council (ABYC) A-3 "Galley Stoves" or A-7 "Boat Heating Systems" as appropriate. LEGACY COMPONENT DESC: Wood stoves
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Accommodation/Occupational Safety › Heating › Burners
Issued 19 September 2002
Resolved
Provide installation plans, specifications and prove that new oil fired air heater meets the requirements of 46CFR184.200 and American Boat & Yacht Council A-7 "Boat Heating Systems". LEGACY COMPONENT DESC: Oil fired air heater
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 19 September 2002
Resolved
Remove fuel system components: fuel lines valves, and filters from the passenger accommodations area and place in machinery space. LEGACY COMPONENT DESC: Filter/Strainer
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 19 September 2002
Construction/Loadline › Hull › Bottom Plating
Issued 19 September 2002
Resolved
The planking butt joint located on the stbd side of the lazerette, plank #2 down from the sheer strake is missing a butt block. Provide butt blocks in areas where missing, survey remaining butt joints in hull planking and install additional butt blocks as necessary. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Construction/Loadline › Hull › Bottom Plating
Issued 19 September 2002
Resolved
Stbd chine log is sprung from aft frames. Make repairs to aft bottom transverse frame at starboard side of transom, re-bolt chine log and recaulk seams LEGACY COMPONENT DESC: Chine Log
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Construction/Loadline › Hull › Hull Plating
Issued 19 September 2002
Resolved
Renew hull planking identified with marine borer (worm) damage in 2 places:
1) 12 inch by 14 ft. plank on stbd side above chine and;
2) #2 plank up from chine on port side amidships
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Construction/Loadline › Hull › Hull Plating
Issued 19 September 2002
Resolved
On the port side at the chine the first bottom plank and 12" x 14' side shell plank appear sprung and the joints on the chine are as large as 3/4". Make repairs, renew as necessary, and recaulk.
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Construction/Loadline › Hull › Hull Plating
Issued 19 September 2002
Resolved
Remove rub rail in way of port side and renew fractured plank #2 below sheer als possibly plank #4
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner enver followed thru with COI
Construction/Loadline › Hull › Transverse Frame
Issued 19 September 2002
Resolved
Provide proposal to make proper repairs in the fore peak to the port side frames 5,6, & 7 which are severely checked.
#5 & 7 on 3 planes and # 6 on 2 planes. Also remove vertical plate used to improperly draw/repair hull planking in bay 6.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner enver followed thru with COI
Construction/Loadline › Hull › Hull Plating
Issued 19 September 2002
Resolved
Renew the recently replaced plank on the port side where improperly sized, has a 1/4" gap, and is overfilled with caulking.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Electrical › Electric Supply System (service) › Battery Charger
Issued 19 September 2002
Resolved
If miscellaneous equipment such as washer & dryer, and office equipment remain, ensure that equipment loads and wiring are reflected on plans for electrical system and that installed equipment is suitable for marine use. LEGACY COMPONENT DESC: Miscellaneous Equipment
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Accommodation/Occupational Safety › Cooking Systems › LPG System Requirements
Issued 19 September 2002
Resolved
If the Propane Grill is to remain onboard; the grill installation must meet 46CFR184.200 & ABYC A-3 "Galley Stoves".
The LPG storage and supply must meet the requirements of 46CFR184.240 and;
ABYC A-1 "Marine Liquefied Petroleum Gas (LPG) Systems or Chapter 6 of NFPA 302.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 September 2002
Resolved 5 November 2014
Resolution: owner never followed thru with COI
Documentation
Issued 19 May 1997
Resolved
Conduct a small passenger vessel stability test on this vessel or the sister ship St. Nicholas, Vin=240856 for exposed waters for the issuance ofa valid stability letter.
Condition: Unknown
Due 1 November 1997
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past