MAURY USCG vessel records Sign in
← All vessels

FPS NEPTUNE

FPS NEPTUNE is a 1996 industrial vessel. The Coast Guard has recorded 55 inspections since 1995, most recently in March 2021, along with 54 deficiencies and 2 casualty investigations between 2003 and 2017.

Records from 1995 to 2021. Most recent: inspection, 12 March 2021.

Built
1996
Last inspected
12 March 2021
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

420608
Flag
UNITED STATES
—
Maury page id
psix-420608

Inspections, by type

…with no type recorded7
Years with a record 24 calendar years (1995–2021)
The 55 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records itNot recorded
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 55

12 March 2021 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7154923
13 January 2021 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7123986
28 January 2020 Damage Survey · Administrative Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6922099
6 December 2019 COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6866293
15 August 2019 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6835693
1 November 2018 Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6573683
10 August 2017 Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6235351
24 June 2017 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6201427
21 June 2017 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6186527
13 September 2016 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5999549
5 July 2016 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5931825
21 June 2016 Deficiency Check · Internal Structural Exam · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5914033
16 June 2016 In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5913179
1 May 2014 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4848101
6 June 2012 Hull Examination · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4541595
20 January 2012 In-Service Inspection · Hull Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4253932
20 July 2011 COI Inspection · Examination of Repairs · Underwater Inspection in lieu of Drydock · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4086087
3 February 2011 Plan Review (Other than "T") · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3998050
3 December 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3644627
9 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3528925
29 October 2008 Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3357946
19 September 2008 In-Service Inspection · Damage Survey · Administrative Inspection · Examination of Repairs · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3416087
8 July 2008 Administrative Inspection · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3291784
26 June 2007 Annual Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3027430
9 August 2006 Annual Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2740156
1 August 2005 COI Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2526260
15 June 2005 Administrative Inspection
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2426500
26 October 2004 Administrative Inspection
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2229394
26 October 2004 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2233284
20 September 2004 Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2861583
23 August 2004 Annual Inspection · In-Service Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2174421
20 August 2004 Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2585042
15 November 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1961381
19 September 2003 In-Service Inspection · Periodic Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1908599
9 October 2002 Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1687302
20 September 2002 In-Service Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1675311
28 November 2001 In-Service Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1625560
25 October 2001 Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1075724
13 March 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1067256
28 October 2000 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 189224
17 August 2000 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1384539
23 June 2000 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1462135
18 April 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433647
16 March 2000 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 816372
24 September 1999 Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1434983
27 September 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 150031
18 August 1998 Deficiency Check · Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1455624
5 December 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 784062
18 November 1997 Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1455623
20 October 1996 Initial Construction-Excluding Oversight · Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1392681
15 September 1996 Initial Construction-Excluding Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1398561
9 September 1996 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1355949
9 May 1996 Construction Oversight
Physical examination · Activities Europe · Activity 1363616
28 November 1995 Construction Oversight
Physical examination · Activities Europe - OLD · USCG Northeast District (CGD-NE) · Activity 1355561
9 August 1995 Construction Oversight
Physical examination · Activities Europe - OLD · USCG Northeast District (CGD-NE) · Activity 1383035

Deficiency record · 54

09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 December 2019 Resolved
Cab mount bolts n crane are worn and wasted. Identified as needing replacement during quarterly inspection dated 30May2019 but was not rectified. Replace in kind.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 January 2020
Resolved 9 December 2019
Resolution: Received photos that crane cab mount bolts had been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 December 2019 Resolved
Emergency generator has significant exhaust leak coming off the turbo charger. Repair leak and replace lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2019
Resolved 20 December 2019
Resolution: Photo evidence and statement from BS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 December 2019 Resolved
Emergency generator fuel oil supply line is dry rotted. Replace with flame resistant hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2019
Resolved 9 December 2019
Resolution: Photos received showing replacement of flexible rubber hoses for emergency generator with flame resistance designator showing.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 6 December 2019 Resolved
Draft Marks must be marked in contrasting color from the hull. Repaint Draft Marks. Extended 30 days due to inclimate weather.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 January 2020
Resolved 11 May 2020
Resolution: Got photographic evidence from OIM on this date.
Electrical › Electric Supply System (service) › Cable
Issued 10 August 2017 Resolved
During inspection of lifeboat davits, MIs found plastic wire ties on davit electrical cables. Replace to the satisfaction of the attending USCG MI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 September 2017
Resolved 8 September 2017
Resolution: Documentation provided for closure.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 10 August 2017 Resolved
Replace all aluminum paint lockers with steel to the satisfaction of the attending USCG MI.
Action required: 705 - Other - as specified
Due 11 September 2017
Resolved 8 September 2017
Resolution: Based on email provided by [name withheld].
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 10 August 2017 Resolved
Extended to 10Oct17. RSM. Marine Inspectors reviewed both the Marine Operations Manual (MOM) and the Emergency Evacuation Plan (EEP). During the review, MI's noted that both manuals do not meet the regulation after owner/operators change. Submit corrected MOM and EEP for approval to the satisfaction of the attending USCG MI.
Action required: 705 - Other - as specified
Due 10 October 2017
Resolved 9 November 2017
Resolution: Documentation supplied [name withheld] to clear deficiency.
Operations/Management › Drills/Instruction › Using Visual Distress Signals
Issued 27 March 2017 Resolved
General alarm could not be heard over the background noise near MBF 270 1st stage scrubber area of the facility. Either add more General Alarms, or add red flashing lights. 46CFR113.25-10
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 April 2017
Resolved 11 April 2017
Resolution: Received official Noble Energy correspondence from company attesting that 2 speakers and a beacon have been installed at the 1st stage scrubber. Cleared 835.
Engineering › Pressure Vessel › Pressure Gauge
Issued 12 July 2016 Resolved
Fire pump nitrogen air receivers: remove iso valves upstream of releif valves; clean off stamped data plates that have been painted over.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 25 July 2016
Resolution: Data plates cleaned off, now legible. Upstream iso valves removed. Not possible to bypass relief valves.
Lifesaving › Inflatable Liferafts › Markings
Issued 12 July 2016 Resolved
Post clear launching instructions at liferaft launching stations. Mark liferaft number and persons it is permitted to accommodate in immediate vicinity. The word "liferaft" or IMO symbol shall be used to ID stowage location.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 July 2016
Resolved 25 July 2016
Resolution: Posted
Fire Fighting › Fire Main › Condition
Issued 12 July 2016 Resolved
Fire main has excessive corrosion on spar deck. Survey entire fire main to ID and rectify other areas of excessive corrosion. (Id'd 363 bolts need replacing)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 12 October 2016
Resolution: Received letter of attestation to completion of fire main repairs from Kim Farmakakis of Noble Energy. Called attending ABS Surveyor [name withheld], to verify status of repair work.
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 12 July 2016 Resolved
Excessive wastage on primary escape ladder and backscratcher fall protection on column south side. Repair. mark/tape off potential hazard until repair work completed. Re-direct escape to water from only North side egress route. Replace corroded railing on spar deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 29 August 2016
Resolution: Replaced back-scatcher new and railings on spar deck. Witnessed work being performed during re-inspection/def check. ABS Surveyor [name withheld] will confirm work during next visit after tropical depression passes through.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 12 July 2016 Resolved
Renew ai rhoses on L/B#1. Markings are worn off w/ no pressure rating visible. Corrosion on fittings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 25 July 2016
Resolution: Replaced hoses in L/B#1
Lifesaving › Lifeboat › Canopy
Issued 12 July 2016 Resolved
L/B#1's retro tape on canopy is worn. Replace.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 25 July 2016
Resolution: replaced
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 12 July 2016 Resolved
Place 2" or taller wooden spacers beneath CO2 bottles serving MGT's to prevent corrosion.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 25 July 2016
Resolution: Placed fiberglass grating under bottles.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 12 July 2016 Resolved
Structural Fire Protection: i) mess deck exterior door has been modified. Repair/replace IAW FCP ii) Weightroom/laundry room quarters has 2 A/C units penetrating rated bulkhead. Rectify to comply w/ FCP iii)Control room door lockset removed and replaced w/ tape and door needs new gasket. Repair IAW FCP.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 9 September 2016
Resolution: [name withheld] submitted revised FCP that has spaces changed to Class-C bulkhead. [name withheld] approved FCP and sent back to Noble Energy. See Admin activity for approved FCP. Submitted FCP in documents.
Engineering › Bilge Water Management System › Not Installed
Issued 28 April 2009 Resolved
Install a fixed dewatering system in each quadrant of Deck 6 (Void Tanks 681, 682, 683, & 684). Systems should be capable of operation on the Emergency Bus. All applicable plans, including revisions to existing plans, are to be submitted to the CG Marine Safety Center for review and approval. This fixed system shall be installed & maintained as long as temp repairs/structural deficiencies exist.
Action required: 705 - Other - as specified
Due 1 June 2009
Resolved 11 March 2010
Resolution: Pumps installed in VTs 681, 682 & 683 to satisfaction of ABS & CG. Agreed that a pump was not req''d for VT 684 as there were no indications present. 4th pump was initially used as a spare, but later installed in 684. See AN 3416087 for addt''l details.
Construction/Loadline › Hull › Hull Plating
Issued 11 February 2009 Resolved
Provide complete analysis for the hull breaches and cracks in way of the Upper Buoyancy Can Guide Structure at Deck No. 6 (Void Nos. 681 through 684). Provide proposal for temporary and permanent repairs to the affected areas. The analysis and proposal are to be provided to Class, USCG Marine Safety Center, and OCMI and completed to the satisfaction of the same.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 10 March 2009
Resolution: Package was received 10Mar09. MSC Memo C1-0900877 concerning the review was dated 04Apr09. See AN 3416087 for addt''''l details.
Lifesaving › Launching Appliances › Release Mechanism
Issued 3 November 2008 Resolved
Provide documentation to show correction of Lifeboat hook deficiencies listed in the Schat-Harding servicing report dated 28May08. Deficiencies list excessive air gaps and recommend hook renewal. Hook/release gear renewal will require an additional 1.1 weight test.
Due 3 December 2008
Resolved 6 November 2008
Resolution: Recieved documentation from [name withheld], OIM, and [name withheld], with Schat-Harding showing that the air gap mentioned on the Lifeboat servicing report is just a wear indicator and does not pose a safety hazard.
Construction/Loadline › Hull › Bracket
Issued 31 August 2004 Resolved
Prove completion of ABS discrepency list issued on 31AUG04.
Due 30 September 2004
Resolved 26 October 2004
Resolution: Received e-mail reporting ABS discrepancy list completed.
Lifesaving › Lifefloat › Capacity
Issued 31 August 2004 Resolved
Prove falls cable replacement on all four falls on both lifeboat davits or prove cable was end for ended 30 months after installation as per 46 CFR 109.301(j)
Due 30 September 2004
Resolved 26 October 2004
Resolution: Received e-mail reporting this is compeleted.
Construction/Loadline › Structures › Superstructure
Issued 23 August 2004 Resolved
Fix space in safety nets on helicopter deck perimeter.
Due 30 September 2004
Resolved 26 October 2004
Resolution: Received e-mail reporting discrepancy completed.
Stability
Issued 14 November 2002 Resolved
Provide full and complete lightship change summary against original weights found in Rev. 2 of the operations manual. Provide statement from agency issuing stability letter as to weather or not a new stability letter issuance is required.
Due 30 December 2002
Resolved 24 December 2002
Electrical › Electric Generation Source (emergency) › Metallic Enclosure/Frame
Issued 14 November 2002 Resolved
Prove airtight integrity of turbine enclosures by cropping and renewing all wasted areas. LEGACY COMPONENT DESC: Metallic Enclosure/Frame
Due 30 December 2002
Resolved 30 August 2004
Electrical › Lighting (emergency)
Issued 14 November 2002 Resolved
Provide "E" labels on all emergency lighting in accordance with 46 CFR 112.43-17.
Due 30 December 2002
Resolved 3 December 2002
Engineering
Issued 14 November 2002 Resolved
Provide 100 PSI or less PSV valve on water heater in laundry room.
Due 30 November 2002
Resolved 3 December 2002
Fire Fighting › Automatic Sprinkler System
Issued 14 November 2002 Resolved
Repair cooling water leaks on both deluge prime movers.
Due 30 December 2002
Resolved 3 December 2002
Lifesaving › Lifeboat
Issued 14 November 2002 Resolved
Conduct annual strip, clean and inventory of lifeboats including change of fuel and fuel filters.
Due 20 November 2002
Resolved 3 December 2002
Lifesaving › Lifeboat
Issued 14 November 2002 Resolved
Provide proof of lowering, releasing and operating of lifeboats in the water including operation of sprinkler.
Due 30 November 2002
Resolved 3 December 2002
Lifesaving › Lifeboat
Issued 14 November 2002 Resolved
Prove relief valve setting on #1 lifeboat air bottle system.
Due 30 November 2002
Resolved 3 December 2002
Navigation › Collision/Grounding Avoidance
Issued 14 November 2002 Resolved
Prove proper operation of foghorn sequencing (18 off 2 seconds on).
Due 15 December 2002
Resolved 3 December 2002
Fire Fighting
Issued 13 September 2001 Resolved
PROVE PROPER OPERATION OF ALL FIRE DAMPERS ON ALL SOLAR TURBINES AND THEN INSTITUTE A PM PROCEDURE ON AT LEAST A MONTHLY BASIS TO INCLUDE TESTING, LUBRICATING, AND EXCERCISING.
Condition: Unknown
Due 26 November 2001
Resolved 24 June 2002
Resolution: PMS PLAN IMPLEMENTED AND FIRE DAMPERS CLOSE PROPERLY.
Lifesaving
Issued 13 September 2001 Resolved
REMOVE INFLATABLE LIFERAFTS OR EQUIP FOR DAVIT LAUNCHING.
Condition: Unknown
Due 1 November 2001
Resolved 1 November 2001
Resolution: DAVIT LAUNCHING EQUIPMENT REMOVED.
Lifesaving
Issued 13 September 2001 Resolved
DISCONNECT UTILITIES IMMEDIATELY THEN REMOVE WOOD QUARTERS UNIT FROM FACILITY. REPLACEMENT UNIT MUST BE CG APPROVED AND INSTALLATION MUST BE APPROVED BY PLAN REVIEW AND ACTUAL INSTALLATION.
Condition: Unknown
Due 6 November 2001
Resolved 6 November 2001
Resolution: WOOD QUARTERS REMOVED.
Lifesaving
Issued 13 September 2001 Resolved
PROVIDE LOGS, SPREADSHEETS, OR OTHER PROOF WHICH VERIFIES THE COMPLIANCE WITH THE DRILLS, TESTS AND TRAINING REQUIREMENTS OF 46 CFR 109.
Condition: Unknown
Due 26 November 2001
Resolved 26 November 2001
Resolution: DOCUMENTATION PROVIDED.
Construction/Loadline
Issued 13 September 2001 Resolved
COMPLETE HULL GAUGINGS FOR YEARS 3 AND 5 OF THE IN SERVICE INSPECTION PLAN.
Condition: Unknown
Due 4 April 2002
Resolved 4 April 2002
Fire Fighting
Issued 13 September 2001 Resolved
MAKE PERMANENT REPAIRS TO WEST FIRE WATER PUMP CASING.
Condition: Unknown
Due 15 November 2001
Resolved 15 November 2001
Resolution: PERMANENT REPAIRS MADE.
Accommodation/Occupational Safety
Issued 13 September 2001 Resolved
MAKE PERMANENT REPAIRS TO ALL DAMAGED HAND RAILS THROUGHOUT MEZZANINE LEVEL.
Condition: Unknown
Due 26 November 2001
Resolved 21 November 2001
Resolution: REPAIRS MADE.
Fire Fighting
Issued 13 September 2001 Resolved
PROVIDE PROOF OF SERVICING (ANNUAL) FOR ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 26 November 2001
Resolved 26 November 2001
Resolution: SERVICING REPORT PROVIDED.
Documentation
Issued 13 September 2001 Resolved
PROVIDE UPDATED OPERATIONS MANUAL ONBOARD TO REFLECT REVISION AS CITED ON STABILITY LETTER DATED 04DEC97.
Condition: Unknown
Due 26 November 2001
Resolved 26 November 2001
Resolution: UPDATED OPERATIONS MANUAL PROVIDED.
Fire Fighting
Issued 24 September 1999 Resolved
FABRICATE APPROPRIATE INSTRUCTION PLACARD INDICATING CORRECT VALVE LINE-UP FOR DELUGE SYSTEM AFFF FOAM BLADDER TANK.
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Fire Fighting
Issued 24 September 1999 Resolved
PROVE PROPER OPERATION OF CO2 ACTIVATED INTAKE LOUVER SYSTEM IN FRONT OF EACH TURBINE GENERATOR ENCLOSURE. MUST BE DEMONSTRATED TO CG MARINE INSPECTOR.
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Lifesaving
Issued 24 September 1999 Resolved
CONDUCT THE 110 PERCENT FULL LOAD RELEASE GEAR TEST ON BOTH LIFEBOATS AS REQUIRED BY 46 CFR 109.301(i)(5).
Condition: Unknown
Due 16 March 2000
Resolved 16 March 2000
Electrical
Issued 24 September 1999 Resolved
PROVE PROPER OPERATION OF SAFETIES (REVERSE POWER RELAY, OVERSPEED, LOW LUBE OIL PRESSURE ALARM/TRIP) ON ALL THREE TURBINE GENERATORS.
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Fire Fighting
Issued 24 September 1999 Resolved
PROVIDE LOCAL MANUAL OPERATION CAPABILITY TO THE FIVE AUTOMATIC (FUSIBLE LINK ACTIVATED) FIRE DAMPERS LOCATED IN THE MAIN QUARTERS IN THE OVERHEAD DUCTING; 3 IN MAIN CORRIDOR; ONE AT GALLEY-TO-MESSROOM DOOR; AND ONE IN BULKHEAD BETWEEN GALLEY AND OFFICE SPACE.
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Fire Fighting
Issued 24 September 1999 Resolved
Investigate operation procedures of currently installed automated fire dampers (hidden in overhead at draft stop locations).
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Fire Fighting
Issued 24 September 1999 Resolved
Provide documentation of recent laboratory analysis for AFFF foam concentrate. Include samples from AFFF foam bladder tank and one half (1/2) of the twelve foam hose reel stations.
Condition: Unknown
Due 9 March 2000
Resolved 9 March 2000
Accommodation/Occupational Safety
Issued 18 August 1998 Resolved
Make repairs to crushed vertical ladder safety caging leading from spar buoy top to boat landing area.
Condition: Unknown
Due 24 September 1998
Resolved 24 September 1998
Accommodation/Occupational Safety
Issued 18 August 1998 Resolved
Replace missing "swing" ropes at both boat landing areas.
Condition: Unknown
Due 24 September 1998
Resolved 24 September 1998
Fire Fighting
Issued 18 August 1998 Resolved
Repair or replace the leaking ambient pressure AFFF foam concentrate tanks at foam hose stations HR7 and HR9. Replace collapsed and ruptured foam concentrate pick-up tube on foam hose station HR3.
Condition: Unknown
Due 24 September 1998
Resolved 24 September 1998
Fire Fighting
Issued 18 August 1998 Resolved
Make repairs to both diesel driven fire pumps and prove proper operation ofautomatic start sequencing and overcrank protection for both.
Condition: Unknown
Due 24 September 1998
Resolved 24 September 1998
Engineering
Issued 18 August 1998 Resolved
Replace existing "general purpose" hose at all diesel fueling stations withAPI petroleum rated hose complete with factory-type end fittings. Provide hose nozzle drip containment at same hose stations.
Condition: Unknown
Due 24 September 1998
Resolved 24 September 1998
Lifesaving
Issued 5 December 1997 Resolved
Demonstrate compliance with the requirements of the 1996 edition of 46 CFR 109 (specifically 109.213). All new requirements for developing a training manual and/or audiovisual training aid program as well as the conducting and logging of same to be iaw ref. regs and D8 Guidance, enclosure (1).
Condition: Unknown
Due 5 December 1997
Resolved 5 December 1997
Fire Fighting
Issued 18 November 1997 Resolved
SEND IN MCC ROOM FM-200 CYLINDER FOR SERVICING AND RECHARGING.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998

Casualty record · 2

15 November 2003Routine · role: Involved in a Marine Casualty · 1 injured · activity 1961381
21 June 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 6186527
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.