Records from 1992 to 2026. Most recent: inspection, 10 August 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 70
10 August 2026
Deficiency Check · Vessel Attendance · Administrative Inspection · Damage Survey · In-Service Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8461026
8 July 2026
Deficiency Check · In-Service Inspection · Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8433565
30 June 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8420836
28 June 2026
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8417624
9 June 2026
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8395428
5 June 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8395520
4 June 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8390998
23 April 2026
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8354630
21 January 2026
Deficiency Check · Vessel Attendance · Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8299506
25 August 2025
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8217616
25 August 2025
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8305618
23 August 2025
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8216664
3 July 2025
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8174377
27 December 2024
MTSA Verification · Administrative Inspection · Examination of Repairs · In-Service Inspection · Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8051166
23 November 2024
In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 8038903
6 June 2024
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7929195
4 January 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7845210
3 January 2024
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7844710
25 August 2023
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7778774
3 August 2023
Administrative Inspection · Damage Survey · Welding Related Inspections Qualification Testing
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7759550
18 July 2023
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7746482
14 July 2023
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7742486
10 July 2023
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7738311
23 January 2023
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7625668
19 October 2022
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7580563
29 September 2022
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7568663
28 September 2022
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7575077
21 September 2022
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7563441
21 September 2022
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7563827
16 September 2022
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7560498
16 July 2022
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7522212
25 June 2022
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7490935
24 June 2022
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7485701
18 March 2022
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7414492
7 February 2022
Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7392619
15 November 2021
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7365356
25 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7339001
19 January 2021
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7126545
8 December 2020
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7108579
30 November 2020
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7103518
18 November 2020
Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7098131
27 October 2020
Drydock Extension · Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7084999
23 October 2020
Damage Survey
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7083278
10 July 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7003083
9 July 2020
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7002181
25 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6959864
28 January 2020
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6899456
21 January 2020
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6906207
29 July 2019
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6766202
5 June 2019
Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6704970
3 June 2019
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6702801
21 May 2019
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6689584
16 May 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6686491
8 January 2019
Internal Structural Exam · Administrative Inspection · Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6607259
3 December 2018
Examination of Repairs
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6591420
1 November 2018
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6573159
31 October 2018
Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6572505
18 September 2018
Examination of Repairs · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6543098
24 April 2018
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6398639
14 March 2018
Annual Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6320126
15 December 2017
Type not recorded
No type recorded · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6324985
17 January 2017
Annual Inspection · COI Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6072136
5 November 2016
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6042064
29 September 2016
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6012537
6 August 2016
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5964126
18 July 2016
Welding Related Inspections Qualification Testing · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5952498
15 June 2016
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5907942
19 May 2016
Type not recorded
No type recorded · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5887464
29 February 2016
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5824533
12 February 2016
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5816789
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 10 August 2026
Resolved
Crew identified water entering into #1 stbd bwt below waterline. Vessel must make temporary repairs prior to departure. Permanent repairs shall be completed by March 2027.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 August 2026
Resolved 12 August 2026
Resolution: MI observed satisfactory NDT of repair. ABS and OCMI deem this to be a permanent repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 March 2026
Resolved
All boilers which have repairs shall be subjected to a hydrostatic test of 1.5 times the mawp of the boiler. While removing mounts for 10 year inspection, a pipe connection on top of the starboard steam drum stripped its threads and needs to be repaired. The old pipe was removed and the threads into the drum were found to be bad. Schwarts Boiler Shop provided repair proposal to re-tap threads for 1". Boiler will need to be hydrostatically tested at 1.5x the MAWP once repaired.
Action required: 17 - Rectify deficiencies prior to departure
Due 10 March 2026
Resolved 10 March 2026
Resolution: Boiler was hydrostatically tested at 675 lbs (1.5x 450lb MAWP)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 March 2026
Resolved
Periodic safety test procedures must be submitted to the Coast Guard for approval. No approved PSTPs on board for SSDGs. Vessel must draft and submit PSTPs to MSC for review and approval.
Company submitted PSTPS to MSC for review. Company must provide approved procedures prior to fit out in 2027.
Action required: 705 - Other - as specified
Due 10 April 2026
Resolved 23 April 2026
Resolution: As per direction of MSC, perfomred local approval for PSTPs. Stamped copies of front page.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 March 2026
Resolved
Before the vessel leaves port and at all times during the voyage each lifesaving appliance must be in working order and ready for immediate use. The rescue boat has an approximately 1" by 2" piece of gel coast missing with exposed fiberglass. The viking tech on board recommended that the area be sealed with paint or other sealant.
Action required: 10 - Deficiency Rectified
Due 10 March 2026
Resolved 10 March 2026
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 10 March 2026
Resolved
Each muster station and embarkation station must be adequately illuminated with power supplied from the vessel emergency source of power.
Action required: 10 - Deficiency Rectified
Due 10 March 2026
Resolved 10 March 2026
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 March 2026
Resolved
Alcohol testing decives must be used according to the procedures specified by the manufacturer. Alcohol testing device was not calibrated and there was no personnel trained in the use of the equipment.
Action required: 10 - Deficiency Rectified
Due 10 March 2026
Resolved 10 March 2026
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 25 August 2025
Resolved
The steering system switched to Non-Follow up mode after the gear failed in Follow up mode. The ship shall prove proper operation of the steering gear prior to departure and must utilize sufficient tug assistance if they chose to moor in the Port of Cleveland. The Master shall keep the Marine Inspector abreast of changing conditions, and intentions aboard the ship.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 August 2025
Resolved 27 August 2025
Resolution: Witnessed satisfactory steering test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 May 2025
Resolved
All engineering systems shall be in accordance with the requirements in subchapter F. Main propulsion is inoperable due to rotors for main turbine requiring repair. Prove proper operation of main propulsion prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2025
Resolved 24 August 2025
Resolution: The propulsion system answered all throttle commands correctly, proving proper operation in forward and reverse. The boilers maintained temperature and pressures within design parameters throughout testing. The deficiency is cleared.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 23 November 2024
Resolved
Generator for cargo unloading equipment is leaking lube oil.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 December 2024
Resolved 23 November 2024
Resolution: Vessel master and MST2 duty PR found source of sheen coming from land and not from the vessel. Upon further investigation the vessel's generator was found to not be leaking oil.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 March 2022
Resolved
Vessel has rivets leaking water into the #1 Port Ballast tank at frames 29, 36, and 37. Vessel is restricted from movement from current position on Calumet River Turn Basin #5 until ABS Surveyor attends vessel and submits a repair or plan proposal to the local OCMI for review and approval.
Action required: 60 - Rectify deficiencies prior to movement
Due 1 April 2022
Resolved 19 March 2022
Resolution: USCG has excepted ABS report/repair plan for vessel. Finale temp repairs to be completed in Muskegon, MI and evidence provided of finale cement patches. Vessel clear to sail.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 February 2022
Resolved
The time delay on the fixed CO2 fire fighting system did not activate the release of agent within the maximum allowed time of 20% beyond the set time.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 11 March 2022
Resolved 12 March 2022
Resolution: Newly installed 68 second time delay released at 71 seconds, which is satisfactory. Defeciency is cleared.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 19 November 2020
Resolved
#1 Port Ballast Tank, temporary repairs made between frames 22 to 28 at side shell, and in way of second longitudinal frame from tank top. Temporary repairs included welding two doubler plates on 2nd longitudinal frame; one doubler 3/8 inch steel plate, apx 8 inch by 12 inch added iwo frames 23-24. Second doubler 3/8 inch steel plate, apx 15 inch by 15 inches added iwo frame 26-27. Additional weldment added in way of observed fractures and brackets. 2nd longitudinal frame from tank top, at frame 23 appears excessively distorted. Recommend with the #1 Port Ballast port side shell and frames between frame 22 (Bow Thruster Tunnel) to frame 28 (Swash or intermediate transvers bulkhead) be closely examined when making permanent repairs. Permanent repairs required to remove doublers installed and to renew any or all excessively distorted or fractured frames between frames 22 & 28 on or before March 31, 2020. IAW 46 CFR 92.01-10
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2021
Resolved 9 February 2021
Resolution: All noted repairs were visually inspected and accepted as satisfactory. Deficiency cleared.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 13 November 2020
Resolved
During a drydock extension examination, damage was discovered in the #1 port ballast tank at frames 22, 24, 28 and 36. Provide a repair proposal and complete repairs to the damage within 14 days to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2020
Resolved 19 November 2020
Resolution: Temp repairs made
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 12 July 2020
Resolved
Make permanent repairs to the #6 to #7 Port & Stbd Ballast Tanks Transverse Water Tight Bulkheads, FR 176, to cut, crop out and renew steel in way of temporary weld repairs. Temporary weldments apx 12 inches to 18 inches long were made to WTB's, with temporary weldments made on each side of the bulkheads, all located approximately 5 ft above the bottom shell and apx 8ft inboard of the side shell. Permanent repairs shall be completed on or before March 31, 2021, and shall be repaired to the satisfaction of the attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2021
Resolved 9 February 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 July 2019
Resolved
Continuous blowdown overboard discharge for boiler and evaporator leaking water. Complete permanent repairs prior to next annual inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 August 2019
Resolved 12 February 2020
Resolution: Valve rebuilt, test sat. Class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2019
Resolved
The vessels external covers over the man-hole covers of the power boilers have small amounts of water leaking from them.
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 June 2019
Resolved 5 June 2019
Resolution: Handhole seat face was ground and the gasket and handhole were replaced with new parts.
10 - Safety of Navigation › N/A - No Subsystem › Echo sounder
Issued 21 May 2019
Resolved
Vessel reported fathometer inoperable. Sector SSM issued a Letter of Deviation (LOD) to allow the vessel to transit to Detroit then conduct repair. Sector SSM received a request for a second LOD since the fathometer was unable to be repaired within the time period of the last LOD. LOD denied, make permanent proper repairs to the fathometer to the satisfaction of the attending marine inspector within a week. Vsl is limited to route between Alpena, [name withheld], WI, and Detroit, MI.
Condition: Damaged By Earlier Event
Due 28 May 2019
Resolved 25 May 2019
Resolution: Vsl provided evidence that fathometer is onboard and operating.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 3 December 2018
Resolved
The bulkhead between the #2 and #3 ballast tank located inboard near the slope has an approximate 12" fracture allowing free communication between the two ballast tanks. The fracture has been repaired with a doubler as a temp repair. Vessel is to affect permanent repairs no later than 31JAN19. Repair is to be a crop and renew and must be verified by an attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 January 2019
Resolved 4 April 2019
Resolution: ABS Surveyor [name withheld] reports that they conducted a satisfactory NDT on the insert. Deficiency is cleared.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 November 2018
Resolved
Doubler plate installed on forepeak tank top deck plate located at frame 8CL directly forward of anchor-chain hausepipes as a temporary repair. Provide gauging report and submit permanent repair plan to Coast Guard.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2019
Resolved 4 April 2019
Resolution: Satisfactory insert is installed and the deficiency is cleared.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 September 2018
Resolved
Found the starboard side channel at frame #21 to have an inset, in addition the six rivets that were caulked were loose with a minimal amount of water leaking and the three rivets below those were considerably loose and required repairs. Also found the #2 stringer rivets were loose (those rivets were not attached to the hull). Requsested a repair proposal be provided to CGMI for permanent repairs.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 September 2018
Resolution: Satisfactory repairs completed and tested to the satisfaction of the attending Marine Inspector.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 18 September 2018
Resolved
The leaking rivets were a hazardous condition on board the vessel. ANDRIE Inc. did not immediately report the hazardous condition to the nearest OCMI as required by 33 CFR 160.216.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 18 September 2018
Resolved 19 September 2018
Resolution: Hazardous condition was rectified.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 17 January 2017
Resolved
General arrangement plan needs to be updated to reflect changes in equipment and stowage.
Condition: Improper/Lack of Maintenance
Due 22 April 2017
Resolved 23 March 2017
Resolution: Corrected General Arrangement Plan on station with appropriate updates. Deficiency cleared.
Lifesaving › Launching Appliances › Davit
Issued 23 August 2016
Resolved
The new rescue boat davit installation does not have an approved plan/drawing for the electrical installation. Electrical plans shall be submitted and approved by USCG MSC, and verified by a CG Marine Inspector on or before 14 October 2016.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 13 October 2016
Resolution: Plans were submitted to MSC and approved. MI attended to verify installation.
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 6 August 2016
Resolved
Repair emergency generator main bus bar circuit breaker.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 9 August 2016
Electrical › Electrical Distribution System (emergency) › Cable
Issued 18 July 2016
Resolved
The electrical cable installed between the emergency switch board buss bar to the new rescue boat davit breaker could not be proved to be of a properly approved type of electrical cable IAW 46CFR111.60. Vessel to have the cable renewed with an approved marine type electrical cable IAW 46CFR111.60. Or prove compliance of the exisiting cable.
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 20 October 2016
Resolution: The electrical cable was replaced with an approved cable as required. Photos were verified to ensure completion. Cleared 835.
Lifesaving › Inflatable Liferafts › Servicing
Issued 29 February 2016
Resolved
Mold has formed along the canopy edge on the top bouyancy tube. The fabic is compromised due to the mold.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 29 February 2016
Resolution: Raft has been condemned. Vessel will be issued a new lift raft.