Records from 1982 to 1992. Most recent: inspection, 21 October 1992.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 90
21 October 1992
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1247141
8 September 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 642970
7 September 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 443074
27 June 1992
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 954801
26 June 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 29674
26 June 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 37975
5 February 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 348714
4 February 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 954990
3 February 1992
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 948902
17 January 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 112041
31 December 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1257595
30 December 1991
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 953216
21 December 1991
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 347785
1 November 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 934169
21 October 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250022
15 October 1991
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 937964
29 July 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 642965
16 March 1991
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 445836
1 February 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 931539
8 January 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 916157
4 January 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1218875
4 January 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1243533
14 December 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1241848
10 December 1990
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 914230
18 October 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 907186
15 August 1990
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 443587
20 July 1990
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 913782
11 July 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 904620
13 June 1990
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1222990
27 March 1990
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 915982
2 March 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1234877
15 February 1990
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 479140
7 February 1990
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1242819
25 January 1990
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1210869
3 December 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1216870
24 September 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1209103
17 May 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 518344
9 May 1989
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 330249
7 May 1989
Damage Survey · Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1344422
9 March 1989
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1201490
7 March 1989
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 888942
10 February 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1036735
20 December 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1032984
7 December 1988
Examination of Repairs
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1210502
6 October 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 509690
26 August 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1346985
26 July 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1034630
21 April 1988
Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1036007
16 April 1988
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 438956
8 April 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 513484
14 December 1987
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 522151
17 November 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1025716
28 October 1987
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1024622
6 August 1987
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 514625
14 June 1987
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 495660
28 April 1987
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1012067
23 March 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1325394
25 February 1987
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1310803
14 January 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1010022
17 November 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1019971
18 August 1986
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 488475
1 August 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 468546
23 July 1986
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1298047
17 July 1986
Damage Survey
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1293195
26 June 1986
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1303798
24 March 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 995027
5 March 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 991323
13 January 1986
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 993959
10 December 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 990700
25 November 1985
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 521611
5 September 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 989062
30 July 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 982881
12 July 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1289869
14 June 1985
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1287062
9 May 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 985935
23 April 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 982490
23 April 1985
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 983425
18 March 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 978869
13 March 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1285734
25 November 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 974583
14 November 1984
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 975809
15 August 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1282931
21 June 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1280350
15 May 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1281756
11 April 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 973950
5 November 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276781
17 March 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1278067
13 October 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276221
2 April 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 964460
18 January 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1272124
Construction/Loadline
Issued 27 June 1992
Resolved
PRIOR TO LEAVING GATX CARTERET BERTH #3 YOU ARE DIRECTED TO SUBMIT A DIVERSREPORT IN REFERENCE TO VESSEL'S SOFT GROUNDING TO MIO NY UPON APPROVAL FROMOCMI OR COGNIZANT MARINE INSPECTOR YOU MAY CONTINUE ON YOUR VOYAGE._x001C_ _x001C_
Condition: Unknown
Due 11 August 1992
Resolved 11 August 1992
Construction/Loadline
Issued 30 December 1991
Resolved
PROVIDE GAUGING REPORT OF BOILER ROOM DECK TO MARINE SAFETY OFFICE INSPECTING REPAIRS OF DECK AND TO MSO PORT ARTHUR, TX._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 January 1992
Resolved 7 February 1992
Unknown
Issued 30 December 1991
Resolved
MAKE AIR RECEIVER IN AFT PUMPROOM READY FOR HYDROSTATIC TEST AT 1.5xMAWP, PROVIDE MAUFACTURER'S DATA REPORT FOR SAME AIR RECEIVER AND REMOVE PAINT FROM NAMEPLATE._x001C_ _x001C_
Condition: Unknown
Due 10 January 1992
Resolved 10 January 1992
Electrical
Issued 30 December 1991
Resolved
RENEW OR REPAIR EXPLOSION PROOF LIGHT IN ENGINEER'S PAINT LOCKER. GLOBE GUARD IS LOOSE. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 January 1992
Resolved 22 January 1992
Construction/Loadline
Issued 30 December 1991
Resolved
CROP AND RENEW AREAS IN BOILER ROOM DECK IN WAY OF RED HAND PATCHES._x001C_
Condition: Unknown
Due 7 February 1992
Resolved 7 February 1992
Lifesaving
Issued 30 December 1991
Resolved
REMOVE PAINT FROM ENGINEER'S WORKSHOP.
Condition: Unknown
Due 22 January 1992
Resolved 22 January 1992
Lifesaving
Issued 21 October 1991
Resolved
MAKE PERMANENT REPAIRS TO LIFEBOAT DAVITS #'S THREE AND FOUR, TO SATISFACTION OF COGNIZANT OCMI._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 October 1991
Resolved 21 October 1991
Lifesaving
Issued 21 October 1991
Resolved
VESSEL IS LIMITED TO COASTWISE (DOMESTIC) VOYAGES UNTIL PERMANENT REPAIRS TO LIFEBOAT DAVITS #3 AND #4 HAVE BEEN COMPLETED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 October 1991
Resolved 21 October 1991
Unknown
Issued 10 December 1990
Resolved
MAKE PERMANENT REPAIRS TO INTERMITTENT ELECTRICAL FAULT IN BILGE MONITOR. ALL MACHINERY SPACE OILY WASTE/BILGE WATER TO BE RETAINED ON BOARD UNTIL COMPLETE.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
INSTALL LAGGING ON STEAM SUPPLY & EXHAUST PIPING TO BILGE & BALLAST PUMP INFORWARD PUMP ROOM. TO BE COMPLETED PRIOR TO DEPARTING THE PORT ARTHUR ZONE.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
SET & SEAL PORT BOILER SUPERHEATER SAFETY VALVE. TO BE COMPLETED PRIOR TO DEPARTING THE PORT ARTHUR ZONE.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
SATISFACTORILY TEST BALLAST MONITORING SYSTEM IN PRESENCE OF A COAST GUARD MARINE INSPECTOR OR PROVIDE THE COGNIZANT OCMI WITH A WRITTEN REQUEST TO REMOVE DUE TO BALLAST DISCHARGE RESTRICTIONS ON VESSEL CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
UPDATE & SUBMIT FIRE CONTROL PLAN TO THE COGNIZANT OCMI FOR APPROVAL.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
PROVIDE THE COGNIZANT OCMI WITH COPY OF FOAM ANALYSIS REPORT.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Unknown
Issued 10 December 1990
Resolved
REINSTALL PORT FORWARD EMBARKATION LIGHT & PROVE PROPER OPERATION. TO BE COMPLETED PRIOR TO DEPARTING THE PORT ARTHUR ZONE.
Condition: Unknown
Due 10 December 1990
Resolved 10 December 1990
Construction/Loadline
Issued 20 July 1990
Resolved
MAKE PERMANENT REPAIRS TO HOLE IN HULL PLATE IN WAY OF FRAMES 32 & 33 NEAR MAIN CIRC PUMP TO SATISFACTION OF COGNIZANT MARINE INSPECTOR AT NEXT DRYDOCK, AND NO LATER THAN 31OCT90.
Condition: Unknown
Due 20 July 1990
Resolved 20 July 1990
Construction/Loadline
Issued 20 July 1990
Resolved
CONDUCT GAUGING OF HULL AND REPORT RESULTS OF SAME TO COGNIZANT MARINE INSPECTOR AT NEXT DRYDOCK, AND NO LATER THAN 31OCT90.
Condition: Unknown
Due 20 July 1990
Resolved 20 July 1990
Documentation
Issued 13 June 1990
Resolved
CHECK ALL HULL MARKINGS, EQUIPMENT MARKINGS, AND ANY OTHER MARKINGS ONBOARD THAT BEAR THE VESSEL NAME TO SEE THAT THEY HAVE BEEN CHANGED TO THENEW VESSEL NAME "STAR MISSISSIPPI". TO BE CHECKED AT NEXT U.S. PORT.
Condition: Unknown
Due 13 June 1990
Resolved 13 June 1990
Construction/Loadline
Issued 27 March 1990
Resolved
MAKE PERMANENT REPAIRS TO STBD AUX SEACHEST STEAM LINE USING AN APPROVED PROCEDURE TO THE SAT. OF THE OCMI AT THE VESSEL'S NEXT DRYDOCKING NLT 31 OCTOBER 1990.
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990
Construction/Loadline
Issued 27 March 1990
Resolved
MAINTAIN TEMPORARY WELDED REPAIRS TO STBD AUX SEACHEST STEAM LINE UNTIL PERMANENT REPAIRS ARE MADE AT NEXT DRYDOCKING IN OCT 1990.
Condition: Unknown
Due 27 March 1990
Resolved 27 March 1990
Unknown
Issued 7 February 1990
Resolved
PROVIDE MANUFACTURERS DATA PLATE FOR #3 MOTOR LIFEBOAT.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Unknown
Issued 7 February 1990
Resolved
PROVIDE EVIDENCE OF HYDROSTATIC TESTING OF ON-DECK CARGO PIPING, CARGO HOSES AND CARGO PUMP RELIEF VALVES TO 225PSI.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Unknown
Issued 7 February 1990
Resolved
MAINTAIN TEMPORARY REPAIRS IN PORT DOUBLE BOTTOM TANK #2 AND MONITOR THE SITUATION BY SAMPLING THE RESERVE FEED WATER TANK FOR SALT CONTENT DAILY FOR THE NEXT 7 DAYS AND THENCE EVERY OTHER DAY AND LOG THE RESULTS UNTIL PERMANENT REPAIRS ARE COMPLETE.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Unknown
Issued 7 February 1990
Resolved
MAKE PERMANENT REPAIRS TO #2 PORT DBL BOTTOM.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Construction/Loadline
Issued 25 January 1990
Resolved
A PERMANENT REPAIR PROPOSAL MUST BE SUBMITTED AND REPAIRS ACCOMPLISHED TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR PRIOR TO THE COMPLETION OF THE NEXT SCHEDULED DRYDOCK OR NOT LATER THAN 30NOV90.
Condition: Unknown
Due 25 January 1990
Resolved 25 January 1990
Construction/Loadline
Issued 25 January 1990
Resolved
PRIOR DEPRT PORT OF NY, EFFECT TEMP REPRS TO 32" FRAC IN WAY OF #2 PT DBL BTM FRESH WATER TK BY DRILL STOPPING FRAC ENDS & APPLYING WELDED BOX PATCH TO INSIDE OF TK. A PERM REPR PROPOSAL SUB & REPRS ACCOMPLISHED TO SAT OF - ATTENDING USCGMI PRIOR TO COMPLETION OF THE NEXT SCHED D/D OR NLT 20NOV90.
Condition: Unknown
Due 25 January 1990
Resolved 25 January 1990
Engineering
Issued 24 September 1989
Resolved
CONDUCT FIRESIDE/WATERSIDE EXAMINATION FOR COAST GUARD CREDIT.
Condition: Unknown
Due 24 September 1989
Resolved 24 September 1989
Engineering
Issued 24 September 1989
Resolved
MAINTAIN TEMPORARY REPAIRS TO STARBOARD BOILER INNER CASING AND REFRACTORY.PROVIDE EVIDENCE OF ACCEPTABILITY OF TEMPORARY REPAIRS FROM BOILER MANUFACTURER.
Condition: Unknown
Due 24 September 1989
Resolved 24 September 1989
Engineering
Issued 24 September 1989
Resolved
MAKE PERMENANT REPAIRS TO STARBOARD BOILER INBOARD AND OUTBOARD INNER CASINGS AND REFRACTORY.
Condition: Unknown
Due 24 September 1989
Resolved 24 September 1989
Construction/Loadline
Issued 7 May 1989
Resolved
MAKE TEMPORARY REPAIRS TO AFT PEAK TANK, PORT SHELL PLATE (BELOW STERN TUBE). PERMANENT REPAIRS TO SAME AT NEXT DRYDOCKING OR NO LATER THAN NEXT SCHEDULED DRYDOCKING; 28OCT90.
Condition: Unknown
Due 7 May 1989
Resolved 7 May 1989
Electrical
Issued 10 February 1989
Resolved
MAKE OPERABLE BOTH REEFER SPACES ALARMS PRIOR TO VESSEL DEPARTING PORT.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Electrical
Issued 10 February 1989
Resolved
MAKE OPERABLE THE TELEGRAPH SYSTEMS POWER FAILURE ALARM ON THE BRIDGE.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Lifesaving
Issued 10 February 1989
Resolved
STENCIL LIFEBOATS WITH CAPACITY AND HOME PORT.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Fire Fighting
Issued 10 February 1989
Resolved
PROVIDE FOAM ANALYSIS REPORT TO MSO PORT ARTHUR.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Engineering
Issued 10 February 1989
Resolved
MAKE OPERABLE BOTH RELIEF VALVES ON THE EVAPORATOR PRIOR TO VESSEL LEAVING PORT.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Engineering
Issued 10 February 1989
Resolved
CONDUCT A FIRESIDE AND WATERSIDE EXAMINATION OF BOTH MAIN PROPULSION BOILERS AT NEXT DRYDOCK.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Engineering
Issued 10 February 1989
Resolved
CONDUCT AN INTERNAL EXAMINATION OF THE DC HEATER AT NEXT DRYDOCK.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Electrical
Issued 10 February 1989
Resolved
REMOVE THE INOPERABLE BATTERY CHARGER AND ITS ASSOCIATED DEAD-ENDED CABLES IN THE EMERGENCY DIESEL GENERATOR ROOM.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Electrical
Issued 10 February 1989
Resolved
INSTALL LEAD LINING IN THE EMERGENCY BATTERY BOX IN THE EMERGENCY DIESEL GENERATOR ROOM.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Accommodation/Occupational Safety
Issued 10 February 1989
Resolved
RE-INSTALL THE MISSING HAND RAILS AT THE PERIMETER OF THE STACK DECK AND ATTHE TOP OF THE OUTSIDE STAIRS TO THE STACK DECK.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Engineering
Issued 10 February 1989
Resolved
CONDUCT AN INTERNAL EXAMINATION OF THE MAIN CONDENSER EXPANSION JOINT AT NEXT DRYDOCK.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Deck/Cargo
Issued 26 July 1988
Resolved
REMOVE TEMPORARY REPAIRS AND MAKE PERMANENT REPAIRS TO P/V VALVE STANDPIPESFOR CARGO TANK EXPANSION TRUNKS #7 STBD & #9 CENTER.
Condition: Unknown
Due 26 July 1988
Resolved 26 July 1988
Deck/Cargo
Issued 28 October 1987
Resolved
PRIOR TO HANDLING CARGO THE OPERATION OF THE OIL DISCHARGE MONITERING SYSTEM SHALL BE DEMONSTRATED TO AN ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 28 October 1987
Resolved 28 October 1987
Construction/Loadline
Issued 17 July 1986
Resolved
RENEW WASTED DECK AND HULL AFFECTED AREA IN AFTER ROPE LOCKER IN WAY OF MAIN DECK; APPROX 6" ABOVE AND BELOW MAIN DECK. THESE REPAIRS SHALL BE COORDINATED WITH HULL GAGINGS. ALSO, RENEW ALL WASTED STIFFENERS TO SOUND METAL AS GAGINGS REQUIRE. MAKE TEMPORARY REPAIRS AS NECESSARY TO MAINTAIN
Condition: Unknown
Due 17 July 1986
Resolved 17 July 1986
Electrical
Issued 26 June 1986
Resolved
REPAIR AND PROVE SATISFACTORY OPERATION OF THE EMERGENCY GENERATOR LOW LUBE OIL ALARM.
Condition: Unknown
Due 26 June 1986
Resolved 26 June 1986
Engineering
Issued 26 June 1986
Resolved
RENEW ALL ENGINEROOM MAIN AND AUXILIARY CIRCULATORY SYSTEM RUBBER EXPANSIONJOINTS.(THREE IN MAIN AND ONE IN AUXILIARY.)
Condition: Unknown
Due 26 June 1986
Resolved 26 June 1986
Lifesaving
Issued 12 July 1985
Resolved
REPAIR IN KIND THE SHEAVE PIN BRACKET, AND REPLACE THE SHEAVE PIN ON THE FORWARD DAVIT ARM ON THE AFT PORT LIFEBOAT UPON YOUR DEPARTURE FROM PORT ARTHUR, TEXAS. AFTER REPAIRS ARE COMPLETED, CONDUCT A WEIGHT TEST OF THE AFT PORT LIFEBOAT DURING YOUR NEXT PORT CALL AT PORT ARTHUR, TEXAS.
Condition: Unknown
Due 12 July 1985
Resolved 12 July 1985
Engineering
Issued 23 April 1985
Resolved
REPAIR STACK GAS LEAKS AT DC HEATER LEVEL-BOTH BOILERS.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Lifesaving
Issued 23 April 1985
Resolved
OPERATE MOTOR LIFEBOAT IN THE WATER-MAKE APPROPRIATE LOG ENTRY AND FORWARD COPY TO THIS UNIT.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Electrical
Issued 23 April 1985
Resolved
PROVIDE EMERGENCY LIGHTING SYSTEM IAW 46 CFR 112.05-5 FOR PASSAGEWAYS IN FWD AND AFAT HOUSES AND NAVIGATING BRIDGE.ITEM #3 CAN BE SATISFIED BY SUB- MISSION OF TEST DATA SHEET(PROVIDED) TO THIS UNIT.ITEM#10 CAN BE SATISFIED BY SUBMISSION OF PHOTOCOPY FROM VESSEL'S LOG. ITEMS 1-2,4-9 AND 11 ARE TO
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Engineering
Issued 23 April 1985
Resolved
RENEW DOOR AND LANDING FRAME ON EVAPORATOR
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Engineering
Issued 23 April 1985
Resolved
REPAIR DOOR LANDING ON DISHED HEAD AND WELD NOZZLE ATTACHMENTS ON INSIDE ON MAIN CONDENSER.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Deck/Cargo
Issued 23 April 1985
Resolved
HYDROSTATICALLY TEST CARGO OR PIPING TO 1.5 MAWP IN ACCORDANCE WITH 33 CFR 156.170.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Lifesaving
Issued 23 April 1985
Resolved
PROVIDE AND INSTALL LIMIT SWITCHES ON ALL FOUR (4) LIFEEBOAT DAVITS IN ACCORDANCE WITH 46 CFR 160.015-3(I) ONCE APPROVAL FOR PREVIOUSLY SUBMITTED DRAWINGS HAS BEEN SECURED.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Engineering
Issued 23 April 1985
Resolved
TEST RELIEF VALVE ON EVAPORATOR IN CONJUNCTION WITH REPAIRS.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Construction/Loadline
Issued 23 April 1985
Resolved
INSERT WASTED WEB FRAME IN SHAFT ALLEY, STBD SIDE, 7TH FRAME FROM AFT BHD, BELOW WALKWAY LEVEL.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Construction/Loadline
Issued 23 April 1985
Resolved
REPAIR/REPLACE WATERTIGHT DOOR DOOR ON POGO DOCK, PORT SIDE IN AFT HSE.
Condition: Unknown
Due 23 April 1985
Resolved 23 April 1985
Deck/Cargo
Issued 25 November 1984
Resolved
MAKE PERMANENT REPAIRS TO THE UPPER OUTBOARD CORNER OF THE BULKHEAD BETWEEN#2 AND #3 CARGO TANKS WHERE THE EXISTING DOUBLER IS INSTALLED AT THE NEXT SCHEDULED DRYDOCKING.
Condition: Unknown
Due 25 November 1984
Resolved 25 November 1984
Unknown
Issued 11 April 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE TEXACO MISSISSIPPI, DN245082.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Construction/Loadline
Issued 11 April 1984
Resolved
WELD FRACTURE IN FORECASTLE, 2ND SIDE LONG FROM OVERHEAD, PORT SIDE.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984
Unknown
Issued 11 April 1984
Resolved
MAKE PERMANENT REPAIRS TO THE STEAM RETURN LINES FORWARD OF AMIDSHIP HOUSE.
Condition: Unknown
Due 11 April 1984
Resolved 11 April 1984