Records from 1985 to 1990. Most recent: inspection, 29 June 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 11
29 June 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1229957
25 May 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1350026
13 April 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1195698
29 June 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1031041
7 October 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1012530
1 October 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1318663
20 March 1987
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1326329
1 December 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1021118
10 June 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1302585
20 March 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 994971
3 June 1985
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 990993
Engineering
Issued 1 October 1987
Resolved
RENEW PROPELLER LOCK NUT COTTER PIN.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
INSTALL FORWARD SECTION OF MAIN ENGINE COOLING WATER DUPLEX STRAINER.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
PROVIDE FLAME SHIELD ON RAYCOR FUEL FILTER.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Electrical
Issued 1 October 1987
Resolved
RENEW SCREW TYPE BATTERY CABLE CONNECTIONS WITH SWEDGE TYPE ON ALL BATTERY CONNECTIONS.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987
Resolved
INSTALL TWO EACH FREEING PORTS IN WELL DECK ON PORT AND STARBOARD SIDES.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
PROVIDE STOP OR CHECK VALVES ON THE FOLLOWING THROUGH HULL CONNECTIONS: BILGE PUMP IN ENGINE SPACE, BILGE PUMP FORWARD, DRAIN LINE AFT STARBOARD SIDE.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
RENEW CUTLASS BEARING IN PROPELLER SHAFT STRUT.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987
Resolved
RENEW PLUG IN PLANK #2 FROM KEEL STARBOARD SIDE AMIDSHIPS.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
OPEN MAIN ENGINE COOLING SEA VALVE FOR INSPECTION.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
RENEW FORWARD BILGE PUMP DISCHARGE HOSE WITH CRUSH-RESISTANT TYPE.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987
Resolved
PROVIDE PIPE PLUG ON THROUGH HULL VALVE FORWARD PORT SIDE BELOW BILGE PUMP OVERBOARD.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987
Resolved
RENEW RUBBER HOSE SECTIONS ON BILGE MAIN WITH HARD PIPE.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987
Resolved
RENEW RIBS WHERE ROTTED #11 AND #12 AFT OF BULKHEAD IN ENGINE SPACE PORT SIDE (TO PORT PROPELLER SHAFT STUFFING BOX).
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Deck/Cargo
Issued 10 June 1986
Resolved
REPAIR CRACKED BILGE OVERBOARD CONNECTION AT HULL PENENTRATION AND PROVIDE PROPER UNDER DECK SUPPORT.
Condition: Unknown
Due 10 June 1986
Resolved 10 June 1986
Construction/Loadline
Issued 10 June 1986
Resolved
EQUIP AFT HATCH COVER TO STEERING GEAR COMPARTMENT WITH RESTRAINING CHAIN.
Condition: Unknown
Due 10 June 1986
Resolved 10 June 1986
Deck/Cargo
Issued 10 June 1986
Resolved
REPAIR BREAK IN BILGE MAIN. FLEXIBLE HOSE IN PLACE NOT ACCEPTABLE.
Condition: Unknown
Due 10 June 1986
Resolved 10 June 1986