Inspection history · 20
28 April 2026
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8346864
19 March 2025
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8096021
5 March 2025
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8088907
3 April 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7888921
20 April 2023
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7671005
20 April 2023
Equivalency · Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7674370
6 March 2023
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7646287
19 July 2022
Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7510871
22 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7483754
2 July 2021
Type not recorded
No type recorded · Station Manasquan Inlet · USCG East District (CGD-E) · Activity 7245345
23 April 2021
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7181207
5 March 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7150734
30 July 2020
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7035389
24 March 2020
Administrative Inspection · Drydock Extension
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6931464
5 June 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6703138
13 April 2018
COI Inspection · Deficiency Check · DAPI Audit · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6391202
28 March 2018
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6361939
12 June 2017
DAPI Audit · Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6170674
27 May 2016
Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5888616
23 March 2016
Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5838684
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 March 2025
Resolved
All electrical installations shall be to the satisfaction of the marine inspector. Electrical outlet in storeroom had broken cover and was missing stuffing tube. Repair to the satisfaction of the MI.
183.01-15
(OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2025
Resolved 20 March 2025
Resolution: MI witnessed new outlet cover and stuffing tube installed during annual inspection.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 5 March 2025
Resolved
Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck. The forward port cleat was corroded at the base allowing for damage and water ingress into 02 holes found in the fiberglass beneath the base. Repair damaged fiberglass to the satisfaction of the MI.
176.25-5
(OLD T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2025
Resolved 20 March 2025
Resolution: MI witnessed repair of port cleat coorosion removed and fiberglass repair filled in during annual inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 April 2023
Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes. Found exposed wiring in pilot house where a fan was previously installed, on a water pump located aft of the starboard engine and steering bilge pump/light area. Install junction box on exposed wiring or remove unused wiring from space. 46 CFR 183.05-50(b)
Old-T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 17 May 2023
Resolution: Provided pictures of wires secured in juntion box & newly installed fan in pilot house.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 April 2023
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. No visual indicator for automatic bilge operation on vessel. Install visual indicator for installed automatic bilge pump system in pilot house.
46 CFR 182.530(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 18 May 2023
Resolution: Installed visual indicator for bilge system at operating station & provided video.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 April 2023
Resolved
A submersible electric bilge pump may be used as a power bilge pump...A positive shutoff valve is installed at the hull penetration. Vessel has two submersible electric bilge pump discharge locations with no positive shutoff valves installed: one in the engine space & one in steering. Install positive shutoff valve at both submersible electric bilge pump discharge locations prior to next dry dock. 46 CFR 182.5209(e)(7)
Action required: 705 - Other - as specified
Resolved 6 March 2025
Resolution: INstalled positive shutoff valves at both submersible electric bilge pump discharges.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 20 April 2023
Resolved
For fixed-gas fire extinguishing systems, the inspections and tests...The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. Annual report provided by owner showed no indication of heat sensor testing or weighing of the CO2 bottle. Provide new report attesting to heat sensor testing and that the bottle was weighed. 46 CFR 176.810(b)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 4 May 2023
Resolution: Provided report attesting to bottle weight & testing of alarms.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 April 2023
Resolved
Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light. Found 08 life jackets with no lights attached. Attach lights to life jackets. 46 CFR 180.75(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 17 May 2023
Resolution: Provided picture of new life jacket lights.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 April 2023
Resolved
Each life jacket must be marked with Type I retroreflective material. Found 24 life jackets with worn retroreflective material. Replace retroreflective material on the 24 lifejackets. 46 CFR 185.604(h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 18 May 2023
Resolution: Provided picture of life jackets with new retro.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 April 2023
Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. Found life float with missing float light. Replace missing float light. 46 CFR 180.175(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 May 2023
Resolved 4 May 2023
Resolution: Purchased new float light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 June 2022
Resolved
Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light approved in accordance with 161.012 in Subchapter Q of this chapter. Vessel is currently only maintaining 66 life jackets with water lights attached, and securing all other life jackets from use when operating on an oceans voyage. Install life jacket lights to the front shoulder area on the remaining 53 life jackets and do not keep any life jackets locked at any time. Rectify prior to carrying passengers on an oceans route. - 46 CFR 180.75
Action required: 705 - Other - as specified
Due 22 June 2022
Resolved 7 July 2022
Resolution: O/O submitted invoices to show purchase of 53 new PFD waterlights for opreation on oceans route.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 22 June 2022
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies. These drills shall be documented for review by the Coast Guard upon request. No log was being kept on board to document crew training or drills taking place. O/O logged man-overboard drill and fire drill scenario after conducting drills in presence of the marine inspector. - 46 CFR 185.420; 46 CFR 185.520; 46 CFR 185.524
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2022
Resolved 22 June 2022
Resolution: O/O logged man-overboard drill and fire drill scenario after conducting drills in presence of the marine inspector.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 22 June 2022
Resolved
The monthly EPIRB test shall be logged or otherwise documented. O/O did not have a log to document EPIRB tests. O/O documented the test after it was tested in presence of marine inspector. - 46 CFR 185.728(c)
Action required: 705 - Other - as specified
Due 22 June 2022
Resolved 22 June 2022
Resolution: O/O documented the test after it was tested in presence of marine inspector.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 22 June 2022
Resolved
Chemical testing of personnel must be conducted as required by 46 CFR 16 and 49 CFR 40. Vessel operator was unable to provide documentation attesting to enrollment in drug testing consortium or self testing of shipboard personnel. Provide documentation as required within 14 days (due by July 6, 2022). - 46 CFR 16.201(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 7 July 2022
Resolution: O/O submitted DAPI enrollment letter and crew list.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 June 2022
Resolved
Each floating waterlight must be approved in accordance with 161.010 in Subchapter Q of this chapter. The waterlights attached to vessel’s life ring buoy and all three life floats had expired batteries. Replace waterlight batteries with non-expired batteries within 14 days (due by July 6, 2022). - 46 CFR 180.70(d); 46 CFR 180.175(f)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 7 July 2022
Resolution: O/O submitted invoice for purchase of 4 new waterlight batteries for life ring buoy and 03 life floats.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 June 2022
Resolved
All wiring shall be run as high as practicable above bilges. The wires for installed underwater lights, located within the lazarette along the transom, are hanging loose in the bilge. Secure wiring above the bilge within 14 days (due by July 6, 2022). - 46 CFR 183.05-50(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 July 2022
Resolved 7 July 2022
Resolution: O/O submitted pictures of underwater light wiring secured above the bilge in lazarette.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2022
Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. The flame
screens shall consist of a single screen of corrosion resistant wire of at least 30 x 30 mesh. The flame screen currently installed on the vessel has a hole in it. Replace flame screen with appropriate 30 x 30 corrosion resistant wire of at least 30 x 30 mesh prior to next credit dry-dock (March 2023). - 46 CFR 182.20-35(d)
Action required: 705 - Other - as specified
Due 31 March 2023
Resolved 6 March 2023
Resolution: Confirmed installation during drydock conducted 06MAR2023 (MISLE activity 7646287)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 22 June 2022
Resolved
Except for engine exhausts, each inlet or discharge pipe that penetrates the hull within 6 inches of the deepest load waterline must have means to prevent water from entering the vessel. The port side generator discharge line did not have a positive action valve installed. Install a positive action valve as close as practicable to the hull. Rectify prior to next credit dry-dock
(March 2023). - 46 CFR 171.119
Action required: 705 - Other - as specified
Due 31 March 2023
Resolved 6 March 2023
Resolution: Confirmed that the associated through hull was in fact an engine exhaust during drydock conducted 06MAR2023 MISLE activity 7646287
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 April 2021
Resolved
Life float grab lines were bundled tightly with plastic zip-ties and painter/release lines were in snaked bundles with potential to tangle in netting/poles/gear near by on deck. Replace all grab-line bundle zip-ties and proceed to bundle life float painters and water-light lanyards with electrical tape, rubber bands, or other means that allows for loose bundles to maintain organized appearance but is easily releasable in an emergency. 46 CFR 180.130 (a) (5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2021
Resolved 27 May 2021
Resolution: zip ties have been removed and replaced with tape that have quick release dog ears.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 26 April 2021
Resolved
EPIRB hydrostatic release not marked with expiration. O/O needs to submit proof that hydro release was recently purchased and mark with replace date of 2 years from installation or replace assembly with new one. 46 CFR 185.740 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2021
Resolved 27 May 2021
Resolution: EPIRB has been properly marked with date of expiration (DEC 2022)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2021
Resolved
Replace rotted flexible fuel hose running to and from starboard engine fuel filter. 46 CFR 182.20-40(a)(2).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2021
Resolved 26 March 2021
Resolution: Received sat photographic evidence of hose replacement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2021
Resolved
Discharge end of vent pipes from fuel tanks must have a flame screen that is 30x30 mesh. Properly refit port fuel vent pipe with 30X30 mesh.46 CFR 182.20-35(d).
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2021
Resolved 26 March 2021
Resolution: Received photo evidence of flame screen replacement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 March 2021
Resolved
Bilge suctions shall be fitted with suitable strainers. Bilge strainer in fuel tank compartment is loose, securely attach.46 CFR 182.25-5(b).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2021
Resolved 26 March 2021
Resolution: O/O re attached bilge strainer and provided photo evidence.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2021
Resolved
Starboard engine wet exhaust hose has a gate valve at the hull penetration. This valve was unworkable. Clean and demonstrate full workability, remove valve, or replace valve so the end state is no risk of engine exhaust being impeded by a faulty valve. 46 CFR 176.804.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 April 2021
Resolved 26 March 2021
Resolution: Ball valve removed
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 30 July 2020
Resolved
Replace EPIRB hydrostatic release with a new one and mark it to expire 2 years from the day you install it. 46 CFR 185.740 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2020
Resolved 31 July 2020
Resolution: Ron emailed reciept showing new hydro purchase
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 5 June 2019
Resolved
Provide valid Medical Certificate for Captain.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 5 June 2019
Resolved 5 June 2019
Resolution: Captain had wife send photo of valid Medical Certificate from home. Advised Captain to keep with license.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 17 April 2018
Resolved
MAB01: Replace expired batteries in waterlights w/ appropriate batteries.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 25 April 2018
Resolution: New waterlights were purchased.
Lifesaving › Lifefloat › Float-free Link
Issued 17 April 2018
Resolved
MAB02: Provide CG Marine Inspector with new lifefloat data and info that float-free link is of proper strength for size of lifefloat.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 7 May 2018
Stability › Watertight Integrity › General
Issued 17 April 2018
Resolved
MAB03: Make penetrations in #2 space forward bulkhead watertight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 April 2018
Resolved 25 April 2018
Resolution: Hydraulic hose penetrations have been made watertight.
Lifesaving › Lifefloat › Float Free
Issued 12 June 2017
Resolved
RT01: Properly stow 06 person life float with spacers and in a float free arrangement. 46 CFR 180.137 (f) Due: 26 JUN 17
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 June 2017
Resolved 13 June 2017
Resolution: Verified in person, 06 person life float was properly stowed with spacers ontop of bigger life floats.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 7 June 2016
Resolved
Provide sufficient DOT approved alcohol testing devices onboard for all crew members.
Action required: 705 - Other - as specified
Due 14 June 2016
Resolved 10 June 2016
Communications › Radio Communications › VHF Radiotelephone
Issued 7 June 2016
Resolved
Connect Digital Selective Calling (DSC) feature on VHF Radio in accordance with FCC regulations. Contact local FCC technician for additional guidance.
Action required: 705 - Other - as specified
Due 7 July 2016
Resolved 30 June 2016
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 27 May 2016
Resolved
Provide company policy for drug and alcohol program
Due 7 June 2016
Resolved 7 June 2016
Lifesaving › Visual Distress Signals (General) › Condition
Issued 27 May 2016
Resolved
Provide light for life float vessel restricted to carrying passengers:
Oceans Warm Water - 58
Limited Coastwise warm water - 76
W/in 3nm of shore warm water - 113
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 27 May 2016
Resolved
Install cover on wire junction box on second deck aft.
Due 7 June 2016
Resolved 15 June 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 27 May 2016
Resolved
Provide first aid kit meeting 46CFR160.041
Due 7 June 2016
Resolved 15 June 2016