Records from 1984 to 1994. Most recent: inspection, 8 February 1994.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 12
8 February 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 852916
31 December 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 852537
29 May 1989
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 916945
10 December 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000603
14 March 1988
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1352120
7 December 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1202570
3 November 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1331159
24 August 1987
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1003025
13 August 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1296682
2 July 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 989128
12 June 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 989125
28 November 1984
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1283968
Fire Fighting
Issued 24 August 1987
Resolved
PROVIDE HOSE FOR HAND FIRE PUMP.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Lifesaving
Issued 24 August 1987
Resolved
PROVIDE SEA PAINTER AND WEAK LINK FOR BUOYANT APPARATUS.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Engineering
Issued 24 August 1987
Resolved
REPAIR CLUTCH CONTROL CABLE ON STARBOARD ENG.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Engineering
Issued 24 August 1987
Resolved
REPAIR TEMPERATURE GAUGE ON PORT ENGINE ROOM CONSOLE.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Accommodation/Occupational Safety
Issued 24 August 1987
Resolved
RENEW DECK RAIL STANCHION PORT SIDE FORWARD.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Construction/Loadline
Issued 24 August 1987
Resolved
RENEW FORWARD STANCHION PORT SIDE OF DECK HOUSE IN WAY OF DRY ROT.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Construction/Loadline
Issued 24 August 1987
Resolved
MAKE #1 COMPARTMENT ACCESSIBLE FOR INSPECTION AND PROVIDE VENTILATION FOR COMPARTMENT.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Construction/Loadline
Issued 2 July 1986
Resolved
RENEW PRIMARY BILGE PIPING TO ALL COMPARTMENTS. PIPING SHALL BE HARD PIPED WITHOUT FLEXIBLE HOSES AND SHALL BE PROPERLY SUPPORTED. PVC PIPE IS NOT ACCEPTABLE.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
EXTEND PRIMARY BILGE PIPING TO FOREPEAK. PIPING SHALL BE NOTED LESS, THAN 1INCH NOMINAL PIPE SIZE BILGE LINE SHALL BE FITTED WITH SCREW DOWN VALVE IN WAY OF COLLISION BULKHEAD. VALVE MAY BE LOCATED AFT OF COLLISION BULKHEAD.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Fire Fighting
Issued 2 July 1986
Resolved
PROPERLY SUPPORT PIPING TO FIXED CO2 SYSTEM IN MACHINERY SPACE.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
RECAULK OR REFASTEN CHINE IN WAY OF FRAMES 9 -11 ON STARBOARD SIDE COUNTINGAFT FROM STEM.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Accommodation/Occupational Safety
Issued 2 July 1986
Resolved
RECAULK OR CHINE ON PORT SIDE IN WAY OF FRAMES 6 - 8 COUNTING FORWARD FROM TRANSOM.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
RECAULK OR REFASTEN PLANKS ON STARBOARD SIDE BETWEEN STERN AND SECOND FRAME.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Electrical
Issued 2 July 1986
Resolved
PROVIDE COVER TO JUNCTION BOX ADJACENT TO FIRE PUMP.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
HARD PIPE SECOND BILGE SYSTEM AND PROVIDE METALLIC VALVES AND THROUGH HULL FITTING. PROVIDE VISUAL INDICATEOR IN PILOT HOUSE TO INDICATE WHEN PUMP IS IN OPERATION.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
EXTEND COLLISION BULKHEAD TO WEATHER DECK.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
RENEW LONGITUDINAL DECK BEAM ON STARBOARD SIDE OF FORWARD PASSENGER CABIN.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
MAKE FORWARD WEATHER DECK WATERTIGHT AND PROPERLY SECURE SECOND STANCHION ON STARBOARD RAILING.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Navigation
Issued 2 July 1986
Resolved
RAISE WHITE AFT LIGHT SO AS TO BE VISIBLE ALL ROUND THE HORIZON.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Engineering
Issued 2 July 1986
Resolved
REMOVE OIL FROM BILGES IN MACHINERY SPACE AND FORWARD PASSENGER CABIN.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
PROVIDE MEANS OF SECURING DECK HATCHES.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 2 July 1986
Resolved
PROVIDE 30 SQUARE INCHES OF FREEING PORT AREA IN BULWARK.
Condition: Unknown
Due 2 July 1986
Resolved 2 July 1986
Construction/Loadline
Issued 12 June 1986
Resolved
RENEW BROKEN FRAME #12 STARBOARD SIDE.
Condition: Unknown
Due 12 June 1986
Resolved 12 June 1986
Construction/Loadline
Issued 12 June 1986
Resolved
RENEW THE 3RD PLANK FROM BOTTOM ON THE TRANSOM.
Condition: Unknown
Due 12 June 1986
Resolved 12 June 1986
Construction/Loadline
Issued 12 June 1986
Resolved
PROPERLY FASTEN THE TOP PLANK ON STARBOARD SIDE HULL AMIDSHIP AT BUTT.
Condition: Unknown
Due 12 June 1986
Resolved 12 June 1986