Inspection history · 19
7 April 2026
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8327966
9 April 2025
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8070820
2 May 2024
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7890084
24 October 2023
Administrative Inspection · Examination of Repairs · Drydock Exam · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7806796
20 April 2023
Periodic Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7665652
20 April 2023
Drydock Extension · Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7676656
14 April 2022
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7420591
25 October 2021
Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7323634
27 April 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7180834
9 April 2021
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7171820
5 May 2020
Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6948380
13 April 2020
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6938766
10 April 2019
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6659244
17 July 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6481709
11 April 2018
MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6389346
11 April 2017
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6121833
2 September 2016
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5990347
18 July 2016
Cargo Tank Internal · Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5944470
11 April 2016
MTSA/ISPS Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5849305
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 June 2026
Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. On systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate.
Instructions were not available for the operation of the CO2 system in a conspicuous place at or near the pull station.
46 CFR 34.15-10(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2026
Resolved 6 August 2026
Resolution: Instructions posted at cylinder location/pull box.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2026
Resolved
Each lifesaving appliance must be in good working order and ready for immediate use at all times.
The 160.050 approved ring life buoys located port and starboard were found in a deteriorated condition. The outer protective coating is dry-rotted and cracking, leaving the internal buoyant foam exposed to the elements.
46 CFR 199.190(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2026
Resolved 6 August 2026
Resolution: 3 new ring buoys purchased.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 April 2025
Resolved
Each vessel must carry lifejackets approved under approval series 160.155 or 160.176. Vessel only had 1 (one) type 1 PFD on board. Equip vessel with 01 additional type 1 PFD.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 21 April 2025
Resolution: Vessel was equiped with additional type I PFFD
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 April 2025
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port required to be marked on the stern of the vessel under § 67.123 of part 67 of this chapter. The block letters on the vessel's life buoy had peeled off. Remark lifebuoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 21 April 2025
Resolution: Lifebouy was re-labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 April 2025
Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. The battery for the self-igniting light was expired. Replace battery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 21 April 2025
Resolution: Battery was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 9 April 2025
Resolved
Each buoyant apparatus or lifefloat must be marked plainly in block capital letters and numbers with the name of the vessel and the number of persons approved to use the device as shown on its nameplate. The markings on the vessel's lifefloat were missing. Remark life float.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 21 April 2025
Resolution: Life float was re-labeled.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 April 2025
Resolved
A power-driven vessel underway shall exhibit a sternlight. The vessel's sternlight was extinguished. Replace bulb.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2025
Resolved 21 April 2025
Resolution: Bulb in sternlight was replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 April 2023
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. Both port and starboard lifebuoys are no longer serviceable. Replace both with new type approved lifebuoys to the satisfaction of attending Marine Inspector. 46 CFR 199.70(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2023
Resolved 25 April 2023
Resolution: O/O purchased, installed, and marked 02 new life rings. Accepted photo evidence.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 April 2023
Resolved
Each cable installation must meet — (1) Sections 6, of IEEE 45.8–2016. Metallic band strapping used for
cable support should be steel and corrosion treated if not a corrosion-resistant material. The support for all
cables should be such as to prevent undue sag, but in no case should exceed the distance between frames or 610 mm, whichever is less. Provide metal banding straps for the cabling in engine room, to the satisfaction of the attending marine inspector. 46 CFR 111.60-5, IEEE 45.8 -2016, 25.5
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2023
Resolved 25 April 2023
Resolution: Mechanical supports installed. Accepted photo evidence.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 27 April 2021
Resolved
Each collision bulkhead— Must extend to the bulkhead deck if in service on waters other than oceans. Make collision bulkhead water tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 25 May 2021
Resolution: Made collision bulkhead water tight.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 April 2021
Resolved
Ring buoy must have retroreflective tape. Instal retroreflective tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 25 May 2021
Resolution: Installed retroreflective tape.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 27 April 2021
Resolved
Each hose assembly must be marked with the: Date of manufacture; (2) Working pressure; Date of the last test. Port station 1" and 1 1/2" cargo hose not tested. Stbd station 1 1/2" hose not tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 3 June 2021
Resolution: All hoses tested and marked, sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 April 2021
Resolved
Every tankship shall have the name marked upon each bow and upon the stern, and the home port shall also be marked upon the stern. Home port not visible from stern.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2021
Resolved 25 May 2021
Resolution: Name and home port marked as required.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 April 2021
Resolved
A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 25 May 2021
Resolution: Gage installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 April 2021
Resolved
FCC Safety Radio Certificate and Radio Operator permit must be available for inspection. No FCC Safety Radio, nor Radio Operator permit available for inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2021
Resolved 25 May 2021
Resolution: Inspected all required FCC documents,sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 27 April 2021
Resolved
A tank vessel of any size using the waters of the exclusive economic zone to transship or lighter oil destined for a place subject to the jurisdiction of the United States must have Certificate of Financial Responsability issued by the National Pollution Center.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2021
Resolved 20 May 2021
Resolution: Issued in error. Not applicable due to vessel not operating seaward of the territorial sea.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 27 April 2021
Resolved
Compass must have light. Light inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2021
Resolved 25 May 2021
Resolution: Installed new compass light, tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 April 2019
Resolved
Each vessel must carry lifebuoys approved under approval series 160.150. Grab line on both ring lifebuoys is deteriorated.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2019
Resolved 23 April 2019
Resolution: Owner purchased new lifebuoys for vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 10 April 2019
Resolved
Each rigid liferaft must be marked with the name of the vessel and the hailing port. Rigid liferaft is not properly marked.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 April 2019
Resolved 29 April 2019
Resolution: Owner labeled buoyant apparatus IAW 46 CFR 199.176
09 - Working and Living Conditions › 092 - Working Conditions › Winches & capstans
Issued 10 April 2019
Resolved
Materials in workmanship shall be equivalent to the requirements of ABS. Mooring cleat mounted on the fwd bulwark is wasted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 May 2019
Resolved 23 April 2019
Resolution: Owner replaced fwd bulwark.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 April 2019
Resolved
All portable extinguishers onbaord tank vessels shall be of an approved type. Hose on extinguisher in the pilot house is cracked.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 10 April 2019
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 11 April 2018
Resolved
Vessels COD expired. Vessel owner renewed COD in MI's presence and will receive COD within a week. Issued CG-835 to provide current COD.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 April 2018
Resolved 2 May 2018
Resolution: Verified current COD on board vessel.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 11 April 2017
Resolved
Conduct annual servicing/inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 May 2017
Resolved 23 May 2017
Resolution: Verified portable fire extinguishers were inspected.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 11 April 2016
Resolved
Adjust/repair hatch for engine room leading to pilot house, will not completely close, by 24APR16.
Action required: 705 - Other - as specified
Due 24 April 2016
Resolved 25 April 2016
Resolution: Hatch for engine room was adjusted and closes properly
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 April 2016
Resolved
Install lagging on exhaust for diesel generator by 24APR16.
Action required: 705 - Other - as specified
Due 24 April 2016
Resolved 25 April 2016
Resolution: Lagging on diesel generator was installed,
Engineering › Fuel Oil Service System › Piping
Issued 11 April 2016
Resolved
Replace leaking fuel line for diesel generator by 25APR16.
Action required: 705 - Other - as specified
Due 24 April 2016
Resolved 25 April 2016
Resolution: Leaking fuel hose was replaced and no longer leaks,