Records from 2016 to 2026. Most recent: inspection, 13 May 2026.
Documentation record
Registered dimensions (L × B × D)46.7 ft × 15.3 ft × 8.0 ft
Registered tonnagegross 38 / net 30
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMDI BOATWORKS · SOUTHWEST HARBOR ME · built 1995
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portBOOTHBAY HARBOR, ME
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 23 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it38 - Simplified, Gross Ton
30 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
13 May 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8372560
17 March 2026
Drydock Extension
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8328008
28 October 2025
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8259090
30 October 2024
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 8027522
26 April 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7937658
24 October 2023
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7815329
24 October 2022
COI Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7582911
28 April 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7477265
25 October 2021
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7339422
23 October 2020
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7082996
24 April 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6943440
24 October 2019
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6841402
25 October 2018
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6570948
27 April 2018
Drydock Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6400837
24 October 2017
COI Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6271710
20 October 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5994246
14 January 2016
Drydock Exam · Administrative Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5797456
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 28 October 2025
Resolved
Each vessel must be provided with means to dewater each watertight compartment, the bilge pump float switch and high water alarm in the lazarette was found non funtional.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 November 2025
Resolved 14 November 2025
Resolution: The O/O provided proof of newly installed switch.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 28 October 2025
Resolved
Electrical wire run through the forward bulkhead in the engine room is not protected; penetration compromises watertight integrity.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 November 2025
Resolved 14 November 2025
Resolution: The vessel O/O provided pictures of the added protection for the bulkhead.