MAURY USCG vessel records
← All vessels

ROBLE N

ROBLE N is a 1995 freight ship. The Coast Guard has recorded 4 inspections in 2016, along with 4 deficiencies and 2 operational controls.

Records in 2016. Most recent: inspection, 18 July 2016.

Built
1995
Last inspected
18 July 2016
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 18 July 2016
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2016)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9113850
423408
Flag
CHILE
Maury page id
psix-423408

Documentation record

Tonnage as PSIX records it17392 - Convention (Subpart B), Gross Ton
10133 - Convention (Subpart B), Net Ton
28754 - Dead Weight, Metric Ton
34799 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 4

18 July 2016 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5945613
15 July 2016 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5941935
14 July 2016 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5941067
2 January 2016 ISPS II Exam · PII Safety Exam · Ballast Water Examination · COE-Offshore
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5788387

Deficiency record · 4

Fire Fighting › Remote Fuel Shutoff › General
Issued 2 January 2016 Resolved
0750-Fire prevention- Fire protection systems & fire fighting systems & appliances shall be maintained & ready for use. PSCO observed 03 quick closing fuel shut-off valves (01 for the boiler and 02 for the recirculation pumps) on the fuel oil service and settling tanks blocked in the open position. Valves are not capable of being remotely closed from outside the space. SOLAS 74(2014 Cons) II-2/14.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 January 2016
Resolution: Received ABS report attesting to proper operation of valves.
Documentation › Logs/Records › Oil Record Book
Issued 2 January 2016 Resolved
1710-Oil Record Book- Each operation shall be fully recorded in the ORB, so that all entries in the book appropriate to the operation are complete. PSCO noted inconsistencies with soundings and transfers. Values were rounded and approximated. MARPOL Annex I/Reg 17
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 February 2016
Resolved 7 January 2016
Resolution: Received ABS report confirming approximated values and stated training will be conducted on proper ORB logging procedures.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 2 January 2016 Resolved
0950-Electrical Equipment- Electrical installations shall be such that the safety of the passengers, crew, and ship from electrical hazards will be ensured. PSCO observed a transformer behind electrical switchboard in main control was ungrounded, unsecured, and powering the bridge air conditioning. SOLAS 74(04 Cons) II-1/40.1.3
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2016
Resolved 7 January 2016
Resolution: Received ABS report attesting to proper installation of transformer.
Engineering › Steering Gear System › Power Unit
Issued 2 January 2016 Resolved
0936-Steering Gear- Hydraulic power-operated steering gears shall be provided with a fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir. The hydraulic storage reservoir was found only 1/4 full (aprox 50L) and incapable of refilling one reservoir. SOLAS 74(04 Cons) II-1/29.12.3
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 January 2016
Resolution: Chief Engineer filled steering gear hydraulic reservoir to full capacity.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.