Records from 1985 to 1990. Most recent: inspection, 11 January 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 13
11 January 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1223522
13 April 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1342310
28 March 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1197333
3 March 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1196744
7 June 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 888909
30 March 1988
Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1032853
3 April 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1020385
16 March 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1020378
19 August 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 988663
4 April 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1296519
20 March 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1296515
3 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1289352
13 March 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1288399
Accommodation/Occupational Safety
Issued 28 March 1989
Resolved
PROVE PROPER OPERATION OF ALL TOILETS AND BASINS.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Fire Fighting
Issued 28 March 1989
Resolved
PROPERLY LABEL BOTH FIRE STATIONS.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Electrical
Issued 28 March 1989
Resolved
PROVIDE LIGHT GLOBES FOR ONE LIGHTS IN ENGINE ROOM AND 2 LIGHTS IN AFTER CABIN.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Engineering
Issued 28 March 1989
Resolved
INSTALL GUARD ON SEWAGE PUMP IN ENGINE ROOM.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Construction/Loadline
Issued 28 March 1989
Resolved
PROVIDE SECURING CHAINS FOR ALL DECK HATCHES.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Fire Fighting
Issued 28 March 1989
Resolved
REPLACE OR REPAIR BOTH FIRE PUMPS. PROVE PROPER OPERATION. MEET PRESSURE (60 PSI)AT OUTLET) AND VOLUME (50 GPM) REQUIREMENTS.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Navigation
Issued 28 March 1989
Resolved
REPLACE ALL NAVIGATIONAL LIGHTS WITH COAST GUARD APPROVED LIGHTS HAVING A TWO MILE RANGE.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Accommodation/Occupational Safety
Issued 28 March 1989
Resolved
PERMANANTLY INSTALL LAZARETTE VENTS.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Lifesaving
Issued 28 March 1989
Resolved
PROVIDE (1) 24" RING BOUY.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Lifesaving
Issued 28 March 1989
Resolved
PROVIDE TWO ADDITIONAL CHILD'S LIFE PRESERVERS. TOTAL OF 13 LIFE PRESERVERSREQUIRED. TOTAL NUMBER OF CHILDREN ALLOWED ONBOARD IS LIMITED TO 11 UNITL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Electrical
Issued 28 March 1989
Resolved
PROVE PROPER OPERATION OF STARBOARD GENERATOR.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Engineering
Issued 28 March 1989
Resolved
CLEAN UP WIRING FOR GAUGE AND INSTRUMENTS FOR BOTH MAIN DIESEL ENGINES.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Lifesaving
Issued 28 March 1989
Resolved
REMOVE PLYWOOD BOXES COVERING BOUYANT APPARATUS.
Condition: Unknown
Due 28 March 1989
Resolved 28 March 1989
Construction/Loadline
Issued 3 March 1989
Resolved
INSTALL INDICATOR SWITCHES TO SHOW THAT DOORS ARE OPEN/CLOSED ON WATERTIGHTDOORS AT FRAMES 32 AND 37. INDICATE LIGHTS MUST ALSO BE INSTALLED AT VESSELOPERATOR'S POSITION ON BRIDGE.
Condition: Unknown
Due 3 March 1989
Resolved 3 March 1989
Construction/Loadline
Issued 3 March 1989
Resolved
CROP AND RENEW WASTAGE IN BULKHEAD, FRAME 32, IN WAY OF BILGE PIPE PENETRATION STBD SIDE.
Condition: Unknown
Due 3 March 1989
Resolved 3 March 1989
Construction/Loadline
Issued 3 March 1989
Resolved
CROP AND RENEW WASTAGE IN FORWARD BULKHEAD OF AFTER PEAK.
Condition: Unknown
Due 3 March 1989
Resolved 3 March 1989
Construction/Loadline
Issued 3 March 1989
Resolved
REPLACE ENTIRE UNDER DECK OF LAZ FRATE.
Condition: Unknown
Due 30 September 1990
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 3 March 1989
Resolved
RENEW FOURTH PLANK ABOVE ICE SHEEVING ON PORT BOW. MINIMUM LENGTH OF PLANK MUST BE FIVE FEET.
Condition: Unknown
Due 3 March 1989
Resolved 3 March 1989
Construction/Loadline
Issued 30 March 1988
Resolved
PROVIDE PERMANENT MEANS OF PROVIDING ADEQUATE VENTILATION TO THE BOTTOM PORTION OF THE LAZZETTE.
Condition: Unknown
Due 30 March 1988
Resolved 30 March 1988
Construction/Loadline
Issued 30 March 1988
Resolved
CROP & RENEW ROTTED SECTIONS OF CAP CRIB RAIL PORT SIDE.
Condition: Unknown
Due 30 March 1988
Resolved 30 March 1988
Construction/Loadline
Issued 30 March 1988
Resolved
REDECK AS ORIGINAL THE UPPER PASSENGER DECK. VESSEL PROHIBITED FROM CARRINGPASSENGERS THERE UNTIL REPAIRS COMPLETED AND EXAMINED BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 30 March 1988
Resolved 30 March 1988
Construction/Loadline
Issued 4 April 1986
Resolved
MAKE PERMANENT REPAIRS TO TRANSVERSE DECK BEAM OVER VERTICAL STANCION OVER NO. 3 MAIN DIESEL ENGINE.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Construction/Loadline
Issued 4 April 1986
Resolved
REPLACE ROTTED TRANSVERSE BEAMS AT FORWARD AND AFT OPENING OF EXHAUST STACK.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Accommodation/Occupational Safety
Issued 4 April 1986
Resolved
PROVIDE TWO VENTS INTO SPACE LOCATED BELOW CREW'S QUARTERS.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Engineering
Issued 4 April 1986
Resolved
PROVIDE RACOR FACTORY PROVIDED FIRE SHIELDS FOR RACOR FUEL FILTERS IN ENGINE ROOM (5 FILTERS).
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Engineering
Issued 4 April 1986
Resolved
COVER ALL EXPOSED EXHAUST PIPES IN ENGINE ROOM TO PROVIDE SUITABLE CREW PROTECTION.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Construction/Loadline
Issued 4 April 1986
Resolved
MAKE PERMANENT REPAIRS TO ROTTED LONGITUDINAL DECK BEAM OVER NO. 3 MAIN DIESEL ENGINE.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Engineering
Issued 4 April 1986
Resolved
ASSEMBLE AND TEST NO. 2 MAIN DIESEL ENGINE.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986
Construction/Loadline
Issued 4 April 1986
Resolved
REPLACE ALL WASTED BOLTS TYING FLOOR MEMBERS INTO FRAMES IN CREW QUARTERS.
Condition: Unknown
Due 4 April 1986
Resolved 4 April 1986