Documentation record
Registered dimensions (L × B × D)50.5 ft × 15.3 ft × 3.7 ft
Registered tonnagegross 14 / net 10
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ W NOLAN · ERIE, PA, UNITED STATES · built 1948
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGREENWICH, CT
Endorsements, as the file codes themcw_un
DocumentationValid · issued 5 March 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Regulatory (Subpart C or D), Gross Ton
10 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 19 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 19
10 June 2026
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8356702
17 June 2025
COI Inspection · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8157935
17 June 2025
In-Service Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8168867
3 January 2025
Plan Review "T" Boat · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8057016
3 December 2024
In-Service Inspection · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8043888
6 June 2024
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7908825
6 June 2023
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7704911
2 November 2022
Hull Examination · Internal Structural Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7587669
9 June 2022
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7471849
24 June 2021
Examination of Repairs · Damage Survey
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7234796
9 June 2021
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7221159
1 March 2021
Internal Structural Exam · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7145051
8 June 2020
Deficiency Check · COI Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6966327
29 May 2019
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6689601
13 February 2019
Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6625019
6 June 2018
Deficiency Check · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6436308
11 July 2017
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6205700
13 December 2016
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6057234
9 June 2016
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5902998
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 17 June 2025
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level. The alarm panel was not alarming as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 23 June 2025
Resolution: panel alarms verified
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 17 June 2025
Resolved
A hatch cover must have securing devices, attached to the hatch frame or coming by hinges or chains to prevent its loss. The two new hatch covers in the aft did not have any securing devices.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 23 June 2025
Resolution: chains provided
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 17 June 2025
Resolved
Each nozzle must be corrosion resistant and be capable of being changed between a solid stream and a spray pattern. The nozzle could not do a spray pattern.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2025
Resolved 23 June 2025
Resolution: Nozzle cleaned, witnessed operation test sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 June 2025
No resolution recorded
A submersible electric bilge pump may be used as a
power bilge pump provided a positive shutoff valve is installed at the hull penetration. Due at next dry dock.
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 June 2020
Resolved
Provide satisfactory evidence of the req'd servicing of the Fixed FF system in engine room. Fire boy. 46 CFR 176.810(b)(2)
Action required: 17 - Rectify deficiencies prior to departure
Due 26 June 2020
Resolved 26 June 2020
Resolution: Cylinder too old to be hydro-tested; O/O ISO new cylinder. System not required. Issued separate deficiency to lay out plan going forward.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 8 June 2020
Resolved
Fuel shut off valve req'd. Fuel shut off valve on port side found to be leaking. Repair/Replace valve.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 June 2020
Resolved 26 June 2020
Resolution: completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2020
Resolved
Excessive leaking on shaft seal in 3rd compartment. Repair.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 June 2020
Resolved 26 June 2020
Resolution: completed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 June 2020
Resolved
Pre-engineered fixed gas system in engine room shall be hydrostatically tested. Until hydro testing occurs, additional portable fire extinguishers must be located just outide the machinery space of the type & quantity noted below: One 4A:80B:C and one 10-B:C.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2020
Resolved 6 August 2020
Resolution: System removed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 13 February 2019
Resolved
During inspection of the vessels rails the rail courses were found to have openings greater then 4". The openings from the top of the bulwark to the top rail ranged from 12" to 18". Vessel to install additional rail courses to reduce the openings below 4" in accordence with 46CFR177.900(g)(iii).
Action required: 705 - Other - as specified
Due 28 February 2019
Resolved 27 March 2019
Resolution: Rail courses installed to meet the 4" rail spacing.
Fire Fighting › Fire Pumps › Gland Sealing
Issued 6 June 2018
Resolved
Fire pump leaking.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2018
Resolved 19 June 2018
Resolution: Received photograph of sealed fire pump, no longer leaking.
Electrical › Electric Supply System (service) › Battery Installation
Issued 6 June 2018
Resolved
Add cover to battery switch terminal.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2018
Resolved 19 June 2018
Resolution: Received photo of cover for battery terminal.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 6 June 2018
Resolved
Provide guard for exposed belts on MDE.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2018
Resolved 25 June 2018
Resolution: Received photo of added machinery guard, all sat.