VALLEY VIEW FERRY is a 1946 passenger barge (inspected). The Coast Guard has recorded 30 inspections since 1985, most recently in October 1998, along with 60 deficiencies.
Records from 1985 to 1998. Most recent: inspection, 27 October 1998.
- Built
- 1946
- Last inspected
- 27 October 1998
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 60 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
257141
42489
Flag
UNITED STATES
—
Maury page id
psix-42489
Inspections, by type
…with no type recorded8
Years with a record
14 calendar years (1985–1998)
The 30 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 28 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Tonnage as PSIX records it16 - Regulatory (Subpart C or D), Net Ton
16 - Regulatory (Subpart C or D), Gross Ton
16 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 30
27 October 1998
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 805292
27 October 1998
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 805316
1 September 1998
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1415044
21 July 1998
Hull Examination · Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1468863
14 July 1997
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1416532
28 May 1996
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1085409
7 January 1996
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 185528
22 November 1995
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 879534
18 October 1995
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 879870
27 October 1994
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 866662
6 October 1994
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1172429
1 September 1994
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1171787
21 July 1994
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 864353
1 July 1994
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 218151
13 July 1993
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1385105
14 December 1992
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1139889
6 November 1992
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1267447
27 October 1992
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1262413
22 October 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 941484
21 September 1992
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 959134
25 August 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 957117
23 July 1992
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1260770
25 September 1991
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 936409
23 July 1991
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1001701
30 July 1990
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1216168
7 June 1989
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1203747
9 June 1988
Hull Examination · COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1204776
12 August 1987
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1336720
25 June 1986
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 996478
4 June 1985
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 981443
Deficiency record · 60
Documentation
Issued 1 September 1998
Resolved
Provide proof of valid state registration for the towing vessel.
Lifesaving
Issued 1 September 1998
Resolved
Replace deteriorated ring bouy.
Lifesaving
Issued 1 September 1998
Resolved
Apply adequate retroreflective tape on both sides of reversible PFD's.
Lifesaving
Issued 1 September 1998
Resolved
Replace/repair inoperative water light on ring bouy.
Construction/Loadline
Issued 21 July 1998
Resolved
FILL-WELD SEVERELY PITTED AREAS ON SIDE AND BOTTOM PLATING.
Construction/Loadline
Issued 21 July 1998
Resolved
REPLACE WORN RAMP SOCKETS FOR ATTACHMENT OF RAMPS TO FERRY BODY.
Construction/Loadline
Issued 21 July 1998
Resolved
GOUGE AND REWELD CRACKED WELDS ON FERRY RAMPS.
Construction/Loadline
Issued 21 July 1998
Resolved
PER OWNER, COMPLETE INSTALLATION OF 10' X 14' X 1/2" PLATE ON TO RAKE SECTION OF FERRY BODY.
Lifesaving
Issued 18 October 1995
Resolved
REPLACE THE CRACKED RING BUOY LIGHT WITH USCG APPROVED TYPE. VESSEL IS RESTRICTED TO DAYLIGHT OPERATIONS UNTIL CORRECTED.
Engineering
Issued 18 October 1995
Resolved
INSTALL A FUEL FILL CAP FOR THE TOWBOAT FUEL TANK.
Engineering
Issued 18 October 1995
Resolved
INSTALL A MINIMUM 5/8 INCH VENT LINE TO THE FUEL TANK.
Engineering
Issued 18 October 1995
Resolved
REMOVE THE FUEL RETURN LINE FROM THE FUEL VENT AND REDIRECT THE LINE TO THEFUEL TANK.
Electrical
Issued 18 October 1995
Resolved
INSTALL A GUARD AROUND THE EXPOSED LAMP ABOVE THE MAIN ENGINE.
Electrical
Issued 18 October 1995
Resolved
MAKE PERMANENT WIRE SPLICE, IN ACCORDANCE WITH 46 CFR 183.05-50(b), ON THE CONDUCTORS IN THE OVERHEAD ADJACENT TO THE ENGINE ROOM COMPARTMENT.
Lifesaving
Issued 18 October 1995
Resolved
PROVIDE ONE 24" RING LIFE BUOY PER 46 CFR 180.30-5(a).
Construction/Loadline
Issued 18 October 1995
Resolved
INSTALL SAFETY PINS IN THE FORWARD AND AFT LOADING RAMP ADJUSTMENT ARMS.
Engineering
Issued 18 October 1995
Resolved
INSTALL A AIR FILTER ON THE MAIN DIESEL ENGINE.
Engineering
Issued 18 October 1995
Resolved
INSTALL A PROTECTIVE GUARD OVER THE DIESEL ENGINE FLY WHEEL.
Electrical
Issued 18 October 1995
Resolved
PROVIDE RETENTION DEVICES ON THE NAVIGATION LIGHT WIRING TO PREVENT CHAFINGOF THE WIRES ON THE SIDE OF THE VESSEL.
Deck/Cargo
Issued 18 October 1995
Resolved
REPLACE THE TOW BOAT SHACKLE ATTACHED TO THE STERN TOW LINE.
Electrical
Issued 18 October 1995
Resolved
INSTALL A BATTERY COVER ON THE OUTBOARD ENGINE STARTING BATTERY.
Fire Fighting
Issued 18 October 1995
Resolved
PROVIDE ONE PORTABLE TYPE B-II FIRE EXTINGUISHER.
Fire Fighting
Issued 18 October 1995
Resolved
REPLACE THE FIRE HOSE WITH A 5/8 INCH I.D. COMMERCIAL GRADE GARDEN HOSE.
Construction/Loadline
Issued 27 October 1994
Resolved
MAKE PERMANENT REPAIRS TO AFT RAMP I-BEAM SUPPORTS. I-BEAMS BENT DUE TO WEAR FROM NORMAL OPERATIONS. DAMAGED I-BEAMS WERE REPLACED WITH NEW ONES.
Construction/Loadline
Issued 6 October 1994
Resolved
MAKE PERMANENT REPAIRS TO AFT RAMP I-BEAM SUPPORTS. I-BEAMS BENT DUE TO WEAR FROM NORMAL OPERATIONS.
Fire Fighting
Issued 1 September 1994
Resolved
PROVIDE B-V SEMIPORTABLE FOAM/DRY CHEMICAL FIRE EXTINGUISHER PER 49 CFR 176.315.
Deck/Cargo
Issued 1 September 1994
Resolved
COMPLETE RENOVATION OF SHORE-SIDE MOORINGS TO PROVIDE SUFFICIENT MOORING POINTS FOR FERRY.
Lifesaving
Issued 1 September 1994
Resolved
REPLACE ROPE SAFETY LINES AT EACH END OF FERRY WITH CABLE/CHAIN. ENSURE SUFFICIENT HOOK-UP POINT ON FERRY TO SUPPORT CABLE/CHAIN.
Construction/Loadline
Issued 21 July 1994
Resolved
RENEW HOSE ON PORTABLE BILGE PUMP ABOARD ATTACHED UNINSPECTED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
RENEW SOLENOID WIRING TO MAIN ENGINE ON ATTACHED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
MOUNT MAIN ENGINE COIL ON ATTACHED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
DOUBLE CLAMP ALL E/R HOSE CONNECTIONS ON ATTACHED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
INSTALL FLAME SCREEN ON F/O VENT ABOARD ATTACHED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
RENEW LOWER HEATER HOSE ON ATTACHED TOWING VESSEL.
Engineering
Issued 21 July 1994
Resolved
PROVIDE PROPER INSULATION ON MAIN ENGINE EXHAUST ABOARD ATTACHED TOWING VESSEL.
Construction/Loadline
Issued 21 July 1994
Resolved
REWELD CRACK IN PORT STERN LOADING RAMP STANCHION SUPPORT.
Lifesaving
Issued 21 July 1994
Resolved
PROVIDE APPROVED LIGHT FOR RING BUOY.
Navigation
Issued 21 July 1994
Resolved
RENEW CAP ON AUX STEERING GAS TANK.
Documentation
Issued 23 July 1992
Resolved
Provide and post a copy of the vessel's stability letter dated 1Jun58 priorto the compliance date.
Accommodation/Occupational Safety
Issued 23 July 1992
Resolved
Post the Emergency Checkoff list per 46CFR185.25-1(a) prior to the compliance date.
Lifesaving
Issued 23 July 1992
Resolved
Provide two adult PFDs per 46CFR180.25-5(a) prior to the compliance date; number of passengers vessel can carry in the interim is reduced to 10 vice 12.
Construction/Loadline
Issued 23 July 1992
Resolved
Replace damaged natural vent duct on port side of engineroom of uninspectedtowing vessel per 46CFR25.40-1(a) prior to the compliance date.
Engineering
Issued 23 July 1992
Resolved
Resecure grounding strap at fuel fill opening prior to the compliance date.
Fire Fighting
Issued 23 July 1992
Resolved
Provide a nozzle for the fire hose per 46CFR181.15-10(e) prior to the compliance date.
Fire Fighting
Issued 23 July 1992
Resolved
Provide one (each) hand portable fire extinguisher for the barge and towingvessel that bears a current inspection tag, and remove three outdated hand portable fire extinguishers from vessels per 46CFR181.30-1(a) prior to the compliance date.
Engineering
Issued 23 July 1992
Resolved
Remove auxiliary propulsion equipment (outboard motor, plastic gas tank, & 12 volt battery) from vessel until such time as the installation of such has been reviewed and approved by the Officer in Charge, Marine Inspection per 46CFR182.05-5(b) prior to the compliance date.
Lifesaving
Issued 23 July 1992
Resolved
Mark the storage container for adult PFDs to reflect 13 vice 12 PFDs per 46CFR185.30-10 prior to the compliance date.
Accommodation/Occupational Safety
Issued 23 July 1992
Resolved
Resecure loose railings and replace dryrotted railings per 46CFR177.35-1(c)prior to the compliance date.
Navigation
Issued 23 July 1992
Resolved
Replace burnt out light bulb in port sidelight per 33USC2022(b) prior to the compliance date.
Accommodation/Occupational Safety
Issued 23 July 1992
Resolved
Reattach a loose rail stanchion to the main deck on starboard side forward per 46CFR177.35-1(a) prior to the compliance date.
Electrical
Issued 23 July 1992
Resolved
Resecure electrical conduit to deck between the sidelights on bow ramp per 46CFR183.05-50(a)(2) prior to the compliance date.
Accommodation/Occupational Safety
Issued 23 July 1992
Resolved
Remove debris from bilges of uninspected towing vessel prior to the compliance date.
Engineering
Issued 23 July 1992
Resolved
Vent the fuel tank on the uninspected towing vessel directly to the exterior of the vessel, disconnecting it from vent lines to the fuel fill line and internal combustion engine prior to the compliance date.
Electrical
Issued 23 July 1992
Resolved
Replace an electrical outlet at entranceway to engineroom with approved type per 46CFR183.05-35(a) prior to the compliance date.
Documentation
Issued 23 July 1992
Resolved
Provide proof of drug testing program for marine employees per 46CFR16 prior to the compliance date.
Navigation
Issued 23 July 1991
Resolved
Provide navigation lights (sidelights, towing lights) on the towing vessel in accordance with Rule 24(i) of the Inland Navigation Rules prior to compliance date.
Fire Fighting
Issued 23 July 1991
Resolved
Provide one hand operated portable fire pump/bilge pump having a minimum capacity of 5 GPM as required by 46CFR181.10-5(a)(b) prior to compliance date.
Engineering
Issued 23 July 1991
Resolved
Install at least two exhaust ventilator ducts fitted with cowls for the removal of explosive or flammable gases from the bilges of the engineroom in the towing vessel as required by 46CFR25.40-1(a) prior to compliance date.
Electrical
Issued 23 July 1991
Resolved
Install manually reset, tripfree circuit breakers for each ungrounded current-carrying electrical conductor or fuse on the towing vessel prior tothe compliance date.
Navigation
Issued 23 July 1991
Resolved
Provide navigation lights (sidelights, sternlight) on the passenger barge in accordance with Rule 24(f) of the Inland Navigation Rules prior to compliance date.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.