This record may be incomplete: the most recent inspection recorded for this vessel was 28 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
642 - Regulatory (Subpart C or D), Gross Ton
642 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-42492
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
PROPERLY ROUTE CARGO PUMP EMERGENCY SHUTDOWN CABLES ALONG MAIN DECK THRU CONDUIT AND PROVE PROPER OPERATION FROM AMIDSHIPS LOCATION.
Condition: Unknown
Due 3 September 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 11 April 1992Resolved
HYDROSTATICALLY TEST TO 225 PSI THE NEW CARGO PIPING ARRANGEMENT.
Condition: Unknown
Due 30 April 1992
Resolved 21 April 1992
Deck/Cargo
Issued 11 April 1992Resolved
PROVIDE PLANS AND SPECIFICATION SHEETS OF MATERIALS USED TO THE O.C.M.I. JACKSONVILLE, FL FOR THE NEW PIPING ARRANGEMENT.
Condition: Unknown
Due 30 April 1992
Resolved 21 April 1992
Deck/Cargo
Issued 11 April 1992Resolved
DEMONSTRATE PROPER OPERATION OF THE REMOTE PRIME MOVER SHUTDOWN FOR THE RECENTLY INSTALLED SECOND CARGO TRANSFER PUMP.
Condition: Unknown
Due 30 April 1992
Resolved 21 April 1992
Deck/Cargo
Issued 6 February 1992Resolved
RENEW ALL CARGO TANK REMOTE REACH ROD DECK PIPES/STUFFING TUBES.
Condition: Unknown
Due 6 February 1992
Resolved 6 February 1992
Construction/Loadline
Issued 22 February 1990Resolved
MAKE PERMANENT REPAIRS TO THE FRACTURE IN THE STERN RAKE IN WAY OF THE STARBOARD SKEG.
Condition: Unknown
Due 22 February 1990
Resolved 22 February 1990
Construction/Loadline
Issued 22 February 1990Resolved
PRODUCT RESIDUE EVIDENT IN THE STERN RAKE. GAS FREE & MAKE AVAILABLE FOR INTERNAL EXAMINATION PRIOR TO LOADING NEXT CARGO.
Condition: Unknown
Due 22 February 1990
Resolved 22 February 1990
Unknown
Issued 21 December 1989Resolved
REPAIR LEAKING FORWARD PORT CARGO MANIFOLD VALVE. PROVIDE PORTABLE CONTAIMENT UNTIL PERMANENT REPAIRS ARE MADE.
Condition: Unknown
Due 21 December 1989
Resolved 21 December 1989
Deck/Cargo
Issued 21 December 1989Resolved
REPLACE WORN FLAME SCREENS ON ULLAGE OPENINGS.
Condition: Unknown
Due 21 December 1989
Resolved 21 December 1989
Deck/Cargo
Issued 21 December 1989Resolved
REPAIR BROKEN EMERGENCY SHUTDOWN CABLE TO CARGO TRANSFER PUMP.
Condition: Unknown
Due 21 December 1989
Resolved 21 December 1989
Deck/Cargo
Issued 21 December 1989Resolved
REPAIR/REPLACE EXHAUST MUFFLER ON CARGO TRANSFER PUMP ENGINE.
Condition: Unknown
Due 21 December 1989
Resolved 21 December 1989
Deck/Cargo
Issued 21 December 1989Resolved
REMOVE DAMAGED CARGO TRANSFER HOSES FROM VESSEL.
Condition: Unknown
Due 21 December 1989
Resolved 21 December 1989
Deck/Cargo
Issued 7 October 1987Resolved
PROVE THE PROPER OPERATION OF THE CARGO PUMP SAFETY RELIEF VALVE PRIOR TO DISCHARGE OF CARGO.
Condition: Unknown
Due 7 October 1987
Resolved 7 October 1987
Construction/Loadline
Issued 10 September 1987Resolved
MAKE EFFECTIVE PERMANENT REPAIR TO THE SOURCE OF OIL LEAK IN WAY OF NO.3 STBD CARGO TANK BOTTOM BILGE KNUCKLE SEAM. PROVE THE OIL AND WATERTIGHTNESSAFTER REPAIR PRIOR TO CARGO OPERATION.
Condition: Unknown
Due 10 September 1987
Resolved 10 September 1987
Construction/Loadline
Issued 10 September 1987Resolved
PROVE THE OIL TIGHTNESS OF THE TRANSVERSAL BULKHEAD BETWEEN THE AFTER RAKE AND NO. 4 PORT AND STBD. CARGO TANKS.
Condition: Unknown
Due 10 September 1987
Resolved 10 September 1987
Construction/Loadline
Issued 10 September 1987Resolved
REWELD UNFINISHED WELD IN WAY OF THE MAIN DECK OF NO.1 STBD CARGO TANK APPROX. 5FT FROM FWD BULKHEAD AND 3 FT FROM THE CENTERLINE BULKHEAD.
Condition: Unknown
Due 10 September 1987
Resolved 10 September 1987
Navigation
Issued 10 September 1987Resolved
REPAIR STBD RUNNING LIGHT SCREEN BRACKET. REPAIR DETERIORATED JUNCTION BOX COVER IN WAY OF STBD RUNNING LIGHT POWER LINE.
Condition: Unknown
Due 10 September 1987
Resolved 10 September 1987
Deck/Cargo
Issued 18 November 1986Resolved
PROVE PROPER OPERATION OF CARGO PUMP SAFETY RELIEF VALVE PRIOR TO CARGO TRANSFER.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Documentation
Issued 18 November 1986Resolved
PROVIDE A VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY ON BOARD.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986