Inspection history · 71
11 March 2016
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5831343
24 October 2013
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4740640
4 March 2010
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3689906
5 February 2010
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3682424
3 February 2010
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3674742
29 January 2009
Annual Inspection · Deficiency Check · Drydock Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3402158
4 August 2008
Cargo Tank Internal · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3287117
28 November 2007
MARPOL Annex I Examination · Internal Structural Exam · Annual Inspection · Drydock Extension · Cargo Tank Internal
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3105031
12 January 2007
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2852048
13 November 2006
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2819580
1 March 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2593792
25 October 2005
COI Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2521477
9 August 2005
Hull Examination · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2462186
29 June 2005
MTSA Verification
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2407859
22 June 2005
Cargo Tank Internal · Internal Structural Exam · Drydock Extension
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2399740
28 April 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2345036
23 February 2005
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2297586
1 February 2005
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2284901
31 January 2005
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2284011
30 January 2005
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2283824
25 August 2004
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 2176224
18 December 2003
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1966021
17 July 2003
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1849119
28 February 2003
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1750956
10 December 2002
Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1717111
16 September 2002
Hull Examination · Internal Structural Exam
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1673418
3 October 2001
Re-Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 1662636
18 October 2000
Hull Examination · Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1369897
29 September 2000
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1453806
15 September 2000
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1395540
23 July 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 778368
23 July 1999
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1105111
2 July 1999
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1469910
15 April 1999
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 522100
30 June 1998
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1473499
30 April 1998
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 789794
17 October 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 774941
5 August 1997
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1372073
17 July 1997
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1380933
16 July 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1392501
18 July 1995
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1186034
6 July 1995
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1191986
5 July 1995
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 882400
13 June 1995
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1360110
1 December 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 673166
1 September 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 673167
16 August 1994
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1363078
9 August 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 162160
22 July 1994
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1358483
30 October 1993
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 497700
19 July 1993
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1434062
29 April 1993
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 470591
26 February 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 839054
9 February 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1137498
17 July 1992
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 958329
16 April 1992
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 121240
10 October 1991
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 953482
12 June 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916572
6 April 1990
Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 910954
6 September 1989
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 895772
8 September 1988
Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1350497
2 September 1988
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1043173
2 January 1988
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 447586
23 September 1987
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1318950
10 March 1987
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 466609
17 February 1987
Type not recorded
No type recorded · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 444451
16 September 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1313571
20 September 1985
Credit Drydock · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297682
10 September 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 975031
31 August 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272841
9 July 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971961
Deck/Cargo › Mooring/Anchoring › Winch
Issued 12 March 2010
Resolved
Electric means of starting equipment are not of the approved type for the location.
"Weather locations. The following locations in the weather are Class I, Division 1 (Zone 1) locations (except the open deck area on an inorganic acid carrier which is considered a non-hazardous location) and may have only approved intrinsically safe, explosionproof, or purged and pressurized electrical equip."
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 4 May 2017
Resolution: Vessel has been out of service since 2009. Closed deficiencies due to Administrative procedures. Vessel will have to undergo a full COI inspection prior to operating in a commercial status.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 5 February 2010
Resolved
Draft marks were found painted over in same color as hull.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 12 March 2010
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 February 2010
Resolved
Several Cargo Tank Hatch Dogs were found innoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Deck/Cargo › Holds/Tanks › Coaming
Issued 5 February 2010
Resolved
Improper Size and installation of gasket material in door leading to FWD Hold/Rake Void.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 February 2010
Resolved
Vessel navigation lights were absent and not readily available on the tow.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Pollution Prevention/Response › Prevention Equipment › Emergency Control Systems (tank barges)
Issued 5 February 2010
Resolved
Emergency Shutdown for FWD prime mover inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 5 February 2010
Resolved
Wasted threads on Mechanical plugs for coaming IWO STBD Bow
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 5 February 2010
Resolved
Vessel could not produce VRP or VRP approval letter.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 February 2010
Resolved 4 March 2010
Documentation › Certificates/Documents › International Load Line Certificate
Issued 3 February 2010
Resolved
Provide proof that Annual International Load Line Survey is completed.
Action required: 705 - Other - as specified
Due 5 February 2010
Resolved 4 March 2010
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 3 February 2010
Resolved
Provide complete set of Transfer Procedures as per 33 CFR 155.
Action required: 705 - Other - as specified
Due 5 February 2010
Resolved 12 March 2010
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 3 February 2010
Resolved
Provide Shipboard Oil Pollution Emergency Plan for examination.
Action required: 705 - Other - as specified
Due 5 February 2010
Resolved 12 March 2010
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 14 March 2009
Resolved
Provide an approved anchor system in accordance with 33 CFR 155.230(b)(1).
Action required: 705 - Other - as specified
Due 14 September 2009
Resolved 4 May 2017
Resolution: Vessel has been out of service since 2009. Closed deficiencies due to Administrative procedures. Vessel will have to undergo a full COI inspection prior to operating in a commercial status.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 March 2009
Resolved
Provide cover over both prime movers.
Action required: 705 - Other - as specified
Due 14 April 2009
Resolved 5 February 2010
Resolution: Deficiency was found corrected.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 14 March 2009
Resolved
Provide two B-II portable fire extinguishers.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Provided two B-II portable fire extinguishers.
Fire Fighting › Remote Fuel Shutoff › General
Issued 14 March 2009
Resolved
Properly install new engine shutdown cables to prove proper operation of engine shutdowns.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Properly installed new engine shutdown cables for engine shutdowns.
Construction/Loadline › Penetrations › Valve Flange
Issued 14 March 2009
Resolved
Properly label all valves and prove operation and ability to operate.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Properly labeled all valves and proved operation and ability to operate.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 14 March 2009
Resolved
Properly label the hydraulic testing of the piping to correspond with test paperwork with proper date and MAWP (maximum allowable working pressure).
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Properly labeled the hydraulic testing of the piping to correspond with test paperwork with proper date and MAWP (maximum allowable working pressure).
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 14 March 2009
Resolved
Properly inspect all flame screens and provide new screens where necessary and properly label cargo tank abbreviation to a contrasting color.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Provided new flame screens where needed and properly labeled cargo tanks.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 14 March 2009
Resolved
Provide navigation lights.
Action required: 705 - Other - as specified
Resolved 17 March 2009
Resolution: Provided navigation lights.
Construction/Loadline › Hull › Bottom Plating
Issued 29 January 2009
Resolved
Crop and renew inset stbd bilge knuckle where previous NDT was conducted.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Cropped and provided insert to repair inset on the stbd bilge knuckle.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 January 2009
Resolved
Weld 4 deck longitudinals in forward wrake.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Welded all 4 deck longitudinals in forward wrake.
Documentation › Certificates/Documents › International Load Line Exemption Certificate
Issued 29 January 2009
Resolved
Vessel failed to carry on board a valid International Load Line Exemption Certificate per 46CFR42.09-1(b).
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Vessel has valid International Load Line Certificate.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 29 January 2009
Resolved
Air test number 1 port and stbd cargo tanks for the purpose of checking for leaks on the collision bulkhead.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Conducted successful air test of the no. 1 port and stbd cargo tanks.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 29 January 2009
Resolved
Remove the two (2) containments by way of number 1 stbd cargo tank.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Removed the two containments by way of number 1 stbd cargo tank.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 29 January 2009
Resolved
Descale forward ventilation and piping and conduct a pressure test.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Descaled forward ventilation and piping and conducted a pressure test.
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 29 January 2009
Resolved
Repair or replace coaming on door entrance to forward rake.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Repaired coaming on door entrance to forward rake.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 29 January 2009
Resolved
Repair or replace hatch cover hinge to number three (3) port cargo tank.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Repaired hatch cover hinge to number three port cargo tank.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 29 January 2009
Resolved
Repair piping on the containments between numbeer three (3) and number four (4) cargo tanks and repair containment boxes both port and forward stbd.
Action required: 705 - Other - as specified
Resolved 14 March 2009
Resolution: Repaired piping on the containments between numbeer three (3) and number four (4) cargo tanks and repaired containment boxes both port and forward stbd.
Engineering › Diesel Engine (auxiliary) › Valve
Issued 28 November 2007
Resolved
Replace or plug hollow drain screws in bottom of fuel/water separators on both cargo pump prime movers. PRIOR TO RETURN TO SERVICE.
Action required: 705 - Other - as specified
Resolved 6 December 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 28 November 2007
Resolved
Service or remove excess portable fire extinguishers whose service date is expired or whose contents are in "red zone" of gauge. PRIOR TO RETURN TO SERVICE.
Action required: 705 - Other - as specified
Resolved 6 December 2007
Resolution: Excess extinguishers removed.
Pollution Prevention/Response › Response Equipment › Non-sparking Portable Pump/Hoses
Issued 28 November 2007
Resolved
Replenish oil spill response equipment (i.e. sorbent pads, srobent boom, nonsparking shovels & scoops, nonsparking pump). PRIOR TO RETURN TO SERVICE.
Action required: 705 - Other - as specified
Resolved 6 December 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 28 November 2007
Resolved
Conduct annual test of cargo pump relief valves; verify proper operation w/in 10% of design pressure.
Action required: 705 - Other - as specified
Due 3 January 2008
Resolved 6 December 2007
Resolution: Bench tested by Tallaboa Tank, Inc., Penuelas.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 28 November 2007
Resolved
Bench test or renew cargo pressure gauges if not otherwise calibrated or renewed within previous 12 months.
Action required: 705 - Other - as specified
Due 3 January 2008
Resolved 6 December 2007
Construction/Loadline › Structures › Door
Issued 13 November 2006
Resolved
PROVE PROPER OPERATION OF FORWARD RAKE ACCESS WATERTIGHT DOOR.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 12 January 2007
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 13 November 2006
Resolved
PROVIDE DEDICATED FIRE CONTROL PLAN CONTAINER.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 12 January 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 13 November 2006
Resolved
PROVIDE ANNUAL SERVICING FOR EXTRA PORTABLE DRY CHEM FIRE EXTINGUISHER FOUND IN FIRE LOCKER OR PERMANENTLY REMOVE FROM VESSEL
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 4 May 2017
Resolution: Removed from vessel.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 13 November 2006
Resolved
PROVIDE PULLEY AND MAKE PERMANENT REPAIRS FOR CARGO PUMP ENGINE EMERGENCY SHUTDOWN CABLE AT FORWARD, INBOARD CONTAINMENT COAMING, AS SHOWN.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 12 January 2007
Deck/Cargo › Holds/Tanks › Coaming
Issued 13 November 2006
Resolved
MAKE PERMANENT REPAIRS TO CARGO PUMP ENGINE CONTAINMENT COAMING, FORWARD, WHERE FOUND HOLED.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 12 January 2007
Construction/Loadline › Structures › Trunk
Issued 13 November 2006
Resolved
MAKE TEMPORARY REPAIRS TO TWO HOLES FOUND IN TOP OF FORWARD RAKE VESTIBULE ACCESS, AS SHOWN.
Action required: 705 - Other - as specified
Due 31 December 2006
Resolved 12 January 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 25 October 2005
Resolved
PRIOR TO CARGO OPERATIONS, REPLACE WITH SERVICABLE OR SERVICE ALL EXPENDED PORTABLE FIRE EXTINGUISHERS FOUND ON BOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 October 2005
Resolved 25 October 2005
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 25 October 2005
Resolved
PRIOR TO CARGO OPERATIONS, PROVIDE, IDENTIFY AND INSTALL DECK PLAN ON MAIN DECK, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 October 2005
Resolved 25 October 2005
Resolution: INSTALLED ON MAIN DECK, AFT HOUSE, FACING FORWARD.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 22 June 2005
Resolved
#5 Stbd - Renew wasted knife edge on the CT hatch cover. #5 Port - Renew wasted knife edge on the CT hatch cover. #5 port - Renew hinge supports on the CT hatch cover. Correct in 30 days or at next dry dock whichever comes first.
Due 22 July 2005
Resolved 25 September 2005
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 22 June 2005
Resolved
#6 port - Renew support eyes for the flame screen dogging hatch. #6 port - Renew reach rod shaft below valve wheel on deck. #6 Renew dogging lever for flame screen hatch.C orrect in 30 days or at next dry dock whichever comes first
Due 22 July 2005
Resolved 25 September 2005
Construction/Loadline › Structures › Cofferdam
Issued 22 June 2005
Resolved
Stern Rake - Crop and renew as original two vertical stiffiners as marked. Correct in 30 days or at next dry dock whichever comes first
Due 22 July 2005
Resolved 25 September 2005
Construction/Loadline › Hull › Stiffener
Issued 22 June 2005
Resolved
Bow rake - Weld vertical stiffiner in fwd/ stbd side as marked, prior to receiving ISE credit.
Action required: 705 - Other - as specified
Resolved 22 June 2005
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 22 June 2005
Resolved
# 6 Port cargo tank. Properly insert the tank top/deck plating in two areas that are holed. From inside the cargo tank light is visible through the steel. From the deck it was not possible to locate the holes due to the non skid covering. 6 port CT may not carry cargo until proper repairs are witnesed by a USCG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 September 2005
Resolved 22 June 2005
Deck/Cargo › Holds/Tanks › Ullage
Issued 22 June 2005
Resolved
#1 Port cargo tank: Remove old heating piping that is loose near the tank hatch opening. Fire/sparking hazard. Remove prior to carrying cargo in 1 port CT..
Action required: 705 - Other - as specified
Resolved 22 June 2005
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 22 June 2005
Resolved
#1 Port Caqrgo Tank: Renew support eyes for the flame screen doging hatch. #1 CT: Renew reach rod bracket at the valve handle on the deck, adjacent to the hatch.
Due 22 July 2005
Resolved 25 September 2005
Deck/Cargo › Holds/Tanks › Hatch
Issued 22 June 2005
Resolved
#3 Port Cargo Tank: Renew reach rod shaft below the valve wheel on deck and its bracket that attaches to the cargo tank hatch.
Due 22 July 2005
Resolved 25 September 2005
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, RENEW FLAME SCREEN ON CARGO TANK #4 PORT, #5 PORT AND #5 STARBOARD PRESSURE/VACUUM VALVE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, PROVIDE ANNUAL SERVICING OF ALL PORTABLE FIRE EXTINGUISHERS ON BOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, PROVIDE AND INSTALL APPROVED MOUNTING BRACKETS FOR ALL PORTABLE FIRE EXTINGUISHERS ON BOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, TEST AND MARK FLEXIBLE CARGO HOSES AND FIXED CARGO PIPING IN ACCORDANCE WITH 33 CFR 154.500
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS AND PRIOR TO DEPARTING THE PORT OF ST. THOMAS, USVI, PROVIDE VALID CERTIFICATE OF FINANCIAL RESPONSIBILITY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, PROVIDE OIL TRANSFER PROCEDURES WITH LISTING OF ALL PERSONS-IN-CHARGE.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Marking
Issued 25 August 2004
Resolved
PRIOR TO CONDUCTING CARGO OPERATIONS, PROPERLY IDENTIFY/MARK/LABEL STOWAGE LOCATION OF EACH PORTABLE FIRE EXTINGUISHER ON BOARD.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 August 2004
Resolved 9 September 2004
Communications › Visual Communication › Red Warning Signal
Issued 18 December 2003
Resolved
Red warning flag needs to be painted red.
Due 18 December 2003
Resolved 18 December 2003
Resolution: Flag painted.
Deck/Cargo › Holds/Tanks
Issued 18 December 2003
Resolved
Cargo pump fuel tank needs to be labeled. LEGACY COMPONENT DESC: Fuel Tank
Due 18 December 2003
Resolved 18 December 2003
Resolution: Fuel tank labeled.
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 10 December 2002
Resolved
Provide approved brackets in the gear stowage locker for the fire extinguishers. LEGACY COMPONENT DESC: Mounting Bracket
Due 10 January 2003
Resolved 28 February 2003
Navigation › Collision/Grounding Avoidance
Issued 10 December 2002
Resolved
Provide a proper navigation light on the starboard side. LEGACY COMPONENT DESC: Navigation Lights
Due 10 January 2003
Resolved 28 February 2003
Pollution Prevention/Response › Prevention Equipment
Issued 10 December 2002
Resolved
Provide plugs for the on-deck oil containment combing. LEGACY COMPONENT DESC: Coamings
Due 10 January 2003
Resolved 28 February 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 10 December 2002
Resolved
The forward cargo pump is to remain out of service until satisfactorily inspected by a Coast Guard inspector. LEGACY COMPONENT DESC: Cargo Pump
Action required: 705 - Other - as specified
Due 17 August 2003
Resolved 23 February 2005
Resolution: ITEM MOVED TO SPECIAL NOTE
Documentation
Issued 29 September 2000
Resolved
Vessel's Certificate of Inspection (COI) issued 29SEP00 is contingent on completion of a satisfactory dry dock exam by USCG Inspection.
Condition: Unknown
Due 29 September 2000
Resolved 29 September 2000
Documentation
Issued 29 September 2000
Resolved
Following this one time, cargo loading and off loading; vessel is restricted from conducting any further commercial operation and is requiredto proceed directly to dry dock facility for a dry dock credited exam.
Condition: Unknown
Due 29 September 2000
Resolved 29 September 2000
Documentation
Issued 15 September 2000
Resolved
MAKE VESSEL AVAILABLE FOR DD/HULL INSPECTION
Condition: Unknown
Due 14 November 2000
Resolved 14 November 2000
Documentation
Issued 15 September 2000
Resolved
MAKE VESSEL AVAILABLE FOR COI EVALUATION.
Condition: Unknown
Due 14 November 2000
Resolved 14 November 2000
Deck/Cargo
Issued 2 July 1999
Resolved
Provide written report on cargo piping hydrostatic test conducted 13 Jun 99
Condition: Unknown
Due 2 July 1999
Resolved 2 July 1999
Deck/Cargo
Issued 2 July 1999
Resolved
Install muffler on prime mover for forward cargo pump and test emergency shutdown in the presence of a Marine Inspector prior to using pump for cargo transfer operations.
Condition: Unknown
Due 24 July 1999
Resolved 24 July 1999
Fire Fighting
Issued 2 July 1999
Resolved
Perform annual servicing on portable fire extinguishers.
Condition: Unknown
Due 24 July 1999
Resolved 24 July 1999
Documentation
Issued 30 June 1998
Resolved
PROVIDE EVIDENCE OF MOST CURRENT VESSEL RESPONSE PLAN LETTER ISSUED BY THE COAST GUARD AND PLACE IT WITH THE PLAN (BINDER).
Condition: Unknown
Due 21 July 1998
Resolved 24 July 1998
Construction/Loadline
Issued 30 June 1998
Resolved
NOTIFIED WHEN ALL DRAFT MARKINGS AND FUEL OIL TANKS STANCILS ARE COMPLETED TO THE SATISFACTION OF THE COAST GUARd MARINE INSPECTOR.
Condition: Unknown
Due 1 July 1998
Resolved 9 July 1998
Construction/Loadline
Issued 30 June 1998
Resolved
REPLACE WITH NEW GASKETS THE ONES AT THE STERN RAKE VOID HATCHES.
Condition: Unknown
Due 2 July 1998
Resolved 10 July 1998
Construction/Loadline
Issued 30 June 1998
Resolved
PROVIDE REPAIR PROPOSAL FOR THE EMERGENCY TOE PASS; WHICH SHOWS CLEAR SIGNSOF DEFECTIVE WELDING TO THE STRUCTURE, AT THE BOW.
Condition: Unknown
Due 31 July 1998
Resolved 11 October 1998
Engineering
Issued 30 June 1998
Resolved
REPLACE GENERATOR'S FUEL OIL LINE FLEXIBLE HOSES WITH APPROVED TYPE PER 46 CFR SUBCHAPTER F (WITH MECH. CONNECTIONS; NOT PLUG-IN HOSE TYPE).
Condition: Unknown
Due 2 July 1998
Resolved 10 July 1998
Deck/Cargo
Issued 30 June 1998
Resolved
REPLACE/RENEW #6 P&S PRESSURE/VACCUM RELIEF VALVES AS ORIGINAL.
Condition: Unknown
Due 21 July 1998
Resolved 24 July 1998
Documentation
Issued 17 July 1997
Resolved
PROVIDE COPY OF APPROVED SOPEP PRIOR TO SAILING.
Condition: Unknown
Due 17 August 1997
Resolved 26 July 1997
Documentation
Issued 17 July 1997
Resolved
PROVIDE COPY OF ITC TONNAGE CERTIFICATE.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Deck/Cargo
Issued 17 July 1997
Resolved
PROVIDE 30X30 MESH FLAME SCREENS FOR TANKS 3 P&S, 4P, AND 5 P&S PRIOR TO ANY CARGO TRANSFER.
Condition: Unknown
Due 17 August 1997
Resolved 20 August 1997
Deck/Cargo
Issued 17 July 1997
Resolved
PROPERLY MARK EMERGENCY SHUTDOWN.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Deck/Cargo
Issued 17 July 1997
Resolved
PROVIDE 30 X 30 MESH FLAME SCREENS FOR BOTH ENGINE DIESEL TANKS PRIOR TO OPERATING PRIME MOVERS.
Condition: Unknown
Due 17 August 1997
Resolved 20 August 1997
Construction/Loadline
Issued 17 July 1997
Resolved
PROVIDE GOOSE-NECK ON FOREPEAK VENT.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Unknown
Issued 17 July 1997
Resolved
PROVIDE COMPUTERIZED SHORE-BASED DAMAGE STABILITY I.A.W. 33 CFR 155.240.
Condition: Unknown
Due 17 July 1997
Resolved 17 July 1997
Documentation
Issued 17 July 1997
Resolved
PROVIDE COPY OF VESSEL RESPONSE PLAN APPROVAL LETTER.
Condition: Unknown
Due 17 August 1997
Resolved 20 August 1997
Deck/Cargo
Issued 17 July 1997
Resolved
TEST AND MARK ALL CARGO HOSE ASSEMBLIES I.A.W. 33 CFR 154.500 PRIOR TO ANY CARGO TRANSFER.
Condition: Unknown
Due 17 August 1997
Resolved 20 August 1997
Documentation
Issued 16 July 1996
Resolved
PLACE IOPP CERTIFICATE ON THE BARGE.
Condition: Unknown
Due 16 July 1996
Resolved 16 July 1996
Deck/Cargo
Issued 16 July 1996
Resolved
PROVE PROPER OPERATION OF BOTH DIESEL DRIVEN CARGO PUMPS, TO INCLUDE THE EMERGENCY STOPS.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Deck/Cargo
Issued 16 July 1996
Resolved
PROVIDE EVIDENCE OF SAT HYDRO TEST OF THE CARGO PIPING AND HOSE IAW 33CFR156.170.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Navigation
Issued 16 July 1996
Resolved
MAKE PROPER REPAIRS TO THE STARBOARD RUNNING LIGHT, PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Construction/Loadline
Issued 16 July 1996
Resolved
MAKE DRAFT MARKS LEGIBLE.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Lifesaving
Issued 16 July 1996
Resolved
MAKE PROPER REPAIRS TO THE DECK LOCKER DOORS.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Deck/Cargo
Issued 16 July 1996
Resolved
DRAIN OIL CONTAINMENT BELOW EACH MANIFOLD HEADER, PRIOR TO NEXT TRANSFER.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Deck/Cargo
Issued 16 July 1996
Resolved
REPAIR OR REPLACE THE P/V VALVE ON CARGO TANK #4 STBD. TANK IS NOT TO BE LOADED UNTIL REQ IS COMPLETE.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Deck/Cargo
Issued 16 July 1996
Resolved
PROVIDE EVIDENCE OF SAT TESTING OF THE CARGO PUMP RELIEF VALVE.
Condition: Unknown
Due 15 August 1996
Resolved 27 July 1996
Documentation
Issued 5 July 1995
Resolved
Vessel is not to load or discharge oil until an approved vessel response plan has been received and vessel's COFR is validated.
Condition: Unknown
Due 5 July 1995
Resolved 5 July 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR sidelong 6 aft of frame 3.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelongs 3, 4 and 5 at frame 3. (2) sidelong 3 at frame 1.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelongs 1 and 2 at frames 1 and 2. (2) sidelong 6 at port frame 2. (3) Insert around bolt patch on bottrom at frame 3 stbd. (4) Vee and Weld diagonal at aft center bulkhead.
Condition: Unknown
Due 13 June 1995
Resolved 15 June 1995
Deck/Cargo
Issued 13 June 1995
Resolved
Install overfill devices as required by 33 CFR 155.480 as referenced in Federal Register vol. 59, #203 of 21OCT94.
Condition: Unknown
Due 13 June 1995
Resolved 13 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR around (1) 10" crack on rubrail by #3 web. (2) 14"x36" on #5 web. (3) #3 port fwd sidelong. (4) Gauge along bottom 1 foot bkhd btween rake and 6P. (5) Replace #4 aft vertical web.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) #3 sidelong at frames 1, 2 and 3. (2) Insert around hole at bilge knuckel located 6' aft of frame 3.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelongs 2, 3 and 4 at frame 4.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelong #5 at frame 2.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelongs 2, 3, 4 and 5 at frame 2. (2) sidelong 1 at frame 1.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelongs 4, 5 and 7 at frame 2. (2) sidelong 4 aft of frame 1.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelong 2 at frame 2.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelong 3 at frame 2. (2) prove integrity of 3" x 3" doubler between bottom longs 1 and 2 aft of fwd bulkhead.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelong 5 at frame 3.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 13 June 1995
Resolved
CNR (1) sidelong 2 at frame 3. (2) sidelongs 2 and 3 at frame 2. (3) underdeck transverse bracket at frame 2. (4) sidelong 3, 5 and 6 at frame 1.
Condition: Unknown
Due 13 June 1995
Resolved 14 June 1995
Construction/Loadline
Issued 16 August 1994
Resolved
Repair as original damaged hull area around chine by forward port rake.
Condition: Unknown
Due 24 August 1994
Resolved 19 October 1994
Unknown
Issued 22 July 1994
Resolved
Hydrostaticly test air receiver or disable by disconnecting piping.
Condition: Unknown
Due 22 July 1994
Resolved 22 July 1994
Documentation
Issued 19 July 1993
Resolved
Provide proper oil transfer procedure prior to discharge or taking on of cargo.
Condition: Unknown
Due 22 July 1993
Resolved 21 July 1993
Documentation
Issued 19 July 1993
Resolved
Provide properly endorsed load line certificate.
Condition: Unknown
Due 1 August 1993
Resolved 16 December 1993
Documentation
Issued 19 July 1993
Resolved
Provide legible "emergency shutdown" placard for starboard motor.
Condition: Unknown
Due 1 August 1993
Resolved 21 July 1993
Deck/Cargo
Issued 19 July 1993
Resolved
Replace flame screens at cargo hatches S4, P3, and P1 prior to discharging or taking on cargo.
Condition: Unknown
Due 22 July 1993
Resolved 21 July 1993
Engineering
Issued 9 February 1993
Resolved
Install new upper radiator hose on forward cargo pump prime mover.
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Deck/Cargo
Issued 9 February 1993
Resolved
Replace broken stud for 6S cargo tank butterworth cover.
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Deck/Cargo
Issued 9 February 1993
Resolved
Install packing on all cargo tank reach rods.
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Deck/Cargo
Issued 9 February 1993
Resolved
Replace broken stud on butterworth cover for 3S & 5P cargo tank.
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Navigation
Issued 17 July 1992
Resolved
Paint towing diamond day shape black. Must be completed prior to vessel getting underway.
Condition: Unknown
Due 23 July 1993
Resolved 9 February 1993
Deck/Cargo
Issued 17 July 1992
Resolved
Demonstrate operation of emergency shutdown for forward diesel engine pump.Must be completed prior to cargo operations.
Condition: Unknown
Due 23 July 1992
Resolved 9 February 1993
Fire Fighting
Issued 17 July 1992
Resolved
Mark fire stations and extinguishers with fire station number.
Condition: Unknown
Due 23 July 1992
Resolved 9 February 1993
Navigation
Issued 17 July 1992
Resolved
Provide permanent battery installation for forward navigation lights. Paint shields black and modify shields so they are taller than the lights._x001C_Vsl restricted to daylight ops until completed.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Construction/Loadline
Issued 17 July 1992
Resolved
Repair multiple fractures in connection of hull to framing through out the vessel. Provide drawings showing original scantlings of vessel and conductgauging of vessel as directed by local Coast Guard inspector to determine overall suitability of vessel to continue in service.
Condition: Unknown
Due 7 June 1993
Resolved 7 June 1993
Deck/Cargo
Issued 17 July 1992
Resolved
Provide red flag as required during cargo operations. Must be completed prior to cargo operations.
Condition: Unknown
Due 23 July 1992
Resolved 9 February 1993
Deck/Cargo
Issued 17 July 1992
Resolved
Provide flame screen or make access hatch vaportight on forward diesel fueltank for cargo pumps.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Deck/Cargo
Issued 17 July 1992
Resolved
Provide copy of oil transfer procedures with listing of all persons-in- charge.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Deck/Cargo
Issued 10 October 1991
Resolved
REPAIR AND PROVE PROPER OPERATION OF CARGO EMERGENCY STOP ON STARBOARD CARGO PUMP.
Condition: Unknown
Due 9 January 1992
Resolved 9 January 1992
Deck/Cargo
Issued 10 October 1991
Resolved
REMOVE DETERIORATED 6" AND 3" CARGO HOSES FROM VESSEL.
Condition: Unknown
Due 9 January 1992
Resolved 9 January 1992
Deck/Cargo
Issued 10 October 1991
Resolved
REPLACE FLAME SCREENS ON #2 P & S CARGO VENTS.
Condition: Unknown
Due 9 January 1992
Resolved 9 January 1992
Accommodation/Occupational Safety
Issued 12 June 1990
Resolved
PROVIDE PLANS ON THE INSTALLED AIR RECEIVER THAT ARE CERTIFIED BY REGISTERED PROFESSIONAL ENGINEER IN ACCORDANCE WITH 46 CFR 54.01-5(E).
Condition: Unknown
Due 12 June 1990
Resolved 12 June 1990
Unknown
Issued 8 September 1988
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS ON SLOPE SHEET OF BOW RAKE MINIMUM INSERT SIZE IS 18"X18". REPAIRS ARE TO BE MADE TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988