CAYO NORTE is a 1995 passenger vessel (inspected). The Coast Guard has recorded 97 inspections since 1995, most recently in December 2024, along with 235 deficiencies — 2 with no resolution recorded —, 5 operational controls, 1 with no removal date recorded and 5 casualty investigations between 2011 and 2013.
Records from 1995 to 2024. Most recent: inspection, 30 December 2024.
- Built
- 1995
- Last inspected
- 30 December 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 235 recorded · 2 without a recorded resolution
- Controls
- 1 with no removal date recorded
- Casualties
- 5 investigations · 2011–2013
Identity
1033227
9119505 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDC6941
426208
Flag
UNITED STATES
367063610 (licence lapsed)
Maury page id
psix-426208
Inspections, by type
…with no type recorded9
…past their stated due date1
Years with a record
24 calendar years (1995–2024)
The 97 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it497 - Convention (Subpart B), Gross Ton
83 - Regulatory (Subpart C or D), Gross Ton
152 - Convention (Subpart B), Net Ton
57 - Regulatory (Subpart C or D), Net Ton
83 - Regulatory (Subpart C or D), Gross Ton
152 - Convention (Subpart B), Net Ton
57 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WDC6941MMSI 367063610 · expired · compulsorily equipped · granted 13 August 2015, cancelled 27 September 2025
WCT8710MMSI not assigned · expired · voluntarily equipped · granted 13 February 1997, cancelled 7 January 2006
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 97
30 December 2024
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8052981
16 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6513674
27 March 2018
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6378770
1 June 2017
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6188966
7 April 2017
Deficiency Check · In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6131649
27 June 2016
Annual Inspection · MTSA Verification · DAPI Audit
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5920898
21 March 2016
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5837205
22 September 2015
Deadweight Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5758645
24 August 2015
Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5232003
3 October 2014
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4998092
29 August 2014
Damage Survey · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4968919
29 August 2014
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4984715
14 August 2014
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4954834
4 August 2014
Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4943647
4 June 2014
MTSA Verification · DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4879614
11 March 2014
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4814167
4 March 2014
MTSA Verification · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4811162
27 July 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4395969
26 July 2012
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4392089
13 June 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4343158
30 May 2012
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4329579
18 May 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4317457
17 January 2012
Deficiency Check · Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4227464
13 January 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4224343
12 January 2012
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4223744
24 December 2011
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4214304
21 December 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4212151
15 December 2011
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4208838
14 December 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4213077
2 December 2011
COI Inspection · MTSA/ISPS Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4208063
26 February 2010
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3688438
24 February 2010
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3686248
14 January 2010
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3663647
28 December 2009
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3656454
23 December 2009
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3654581
17 December 2009
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3652497
17 July 2008
Examination of Repairs
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3270357
25 June 2008
Internal Structural Exam · Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3247327
1 May 2008
Hull Examination · Internal Structural Exam · Re-Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3196408
27 March 2008
Administrative Inspection · Load Line/Change of Employment
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3172441
1 February 2008
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3140074
25 October 2007
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3086815
24 October 2007
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3086232
2 October 2007
Deficiency Check · In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3097475
16 September 2007
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3058641
4 April 2007
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2905145
2 February 2007
MTSA Verification · In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2865892
1 February 2007
MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2869484
13 September 2006
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2776147
7 August 2006
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2738733
26 May 2006
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2673529
20 April 2006
Deficiency Check · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2617046
31 March 2006
Deficiency Check · In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2631847
11 January 2006
Deficiency Check · COI Inspection · MTSA/ISPS Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2564606
15 October 2005
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2515074
22 September 2005
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2498717
1 July 2005
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2410167
26 October 2004
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2243342
7 September 2004
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2189506
24 August 2004
In-Service Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2175159
21 July 2004
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2140529
8 July 2004
MTSA Verification
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2126473
4 November 2003
Annual Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1941840
23 September 2003
In-Service Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1931523
21 August 2003
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1882872
14 May 2003
In-Service Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1794140
23 April 2003
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1779662
4 February 2003
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1739763
30 December 2002
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1724398
29 December 2002
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1724969
2 October 2002
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1683426
20 September 2002
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1678396
1 August 2002
Annual Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1654789
29 April 2002
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1610641
21 November 2001
Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1473642
29 October 2001
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1432584
26 October 2000
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1063990
3 October 2000
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 691598
29 September 2000
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1468997
24 August 2000
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 824811
29 April 2000
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1468571
4 August 1999
COI Inspection · Drydock Extension
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1448048
23 June 1999
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1090079
10 September 1998
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1468073
22 June 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 726961
6 April 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 210255
3 October 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1118145
25 August 1997
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1380977
30 July 1997
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1371921
11 April 1997
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1097356
6 August 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1357745
5 February 1996
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1421066
28 January 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 100511
10 August 1995
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1411211
25 July 1995
Initial Certification
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1353773
7 July 1995
Inclining Experiment
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1193640
14 June 1995
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1193644
Deficiency record · 235
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 16 August 2018
No resolution recorded
ZERO LENGTH OR BEAM: no dimension information (AIS Antenna Position ABCD values equals 0), ZERO DRAFT: no static draft information
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 June 2017
No resolution recorded
Conduct hull and internal structural exam.
Engineering › Diesel Engine (auxiliary) › Distributor (fuel injection)
Issued 27 June 2016
Resolved
Prove proper operation of the #3 (stbd inboard) main diesel engine prior to carrying passengers.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 27 June 2016
Resolved
Prove vessel crew members are trained and can properly demonstrate a man-overboard drill.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 27 June 2016
Resolved
Install missing stern ramp hinge pin.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 27 June 2016
Resolved
Prove current Inflatable Buoyant Apparatus embarkation arrangement is suitable; OR provide an alternative embarkation arrangement.
Engineering › Bilge Water Management System › Strainer
Issued 27 June 2016
Resolved
Replace wasted bilge suction strainers throughout vessel.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 June 2016
Resolved
Provide matte black inboard screens for navigational sidelights.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 27 June 2016
Resolved
Install missing overhead structural fire protection insulation at Deck 01 passenger area.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 27 June 2016
Resolved
clean oily wires on #2 (Port inboard) main diesel engine.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 June 2016
Resolved
Repair/eliminate dead-end wires on #4 main diesel engine (STBD outboard).
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 27 June 2016
Resolved
Replace ground detection panel bulbs located at main swtichboard.
Engineering › Sea-water System (primary cooling) › Piping
Issued 29 August 2014
Resolved
Prove proper operation of # 3 (stbd/Inboard) main diesel engine during sea trials.
Engineering › Sea-water System (primary cooling) › Piping
Issued 29 August 2014
Resolved
Provide a list of all damaged, repaied and/or replaced components of # 3 main diesel engine which where damaged during the incident.
Stability › Incline Test › General
Issued 21 August 2014
Resolved
Re-submit the stability information and calculations for the new approved stern ramp, including the proposed winch for stability test procedures of final stern ramp and all parts, components and appurtenances, for review and approval of the USCG MSC, prior installation.
Deck/Cargo › Cargo Stowage › General
Issued 21 August 2014
Resolved
Submit plans, drawings, data, calculations, load analysis and complete specifications for the proposed winch to operate the stern ramp for review and approval for the satisfaction of the USCG MSC, Prior installation.
Fire Fighting › Fire Main › Condition
Issued 4 August 2014
Resolved
Properly repair fire main piping due to hole found and correct water leak. Piping material must be IAW 46 CFR 56.60.
Fire Fighting › Fire Pumps › Pressure
Issued 4 August 2014
Resolved
Prove proper operation of fire main and fire pump.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 5 June 2014
Resolved
Provide a fire servicing certificate for portable fire extinguishers and CO2 system.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 5 June 2014
Resolved
Complete fire, abandon ship and man overboard and security drills.
Communications › Radio Communications › EPIRB
Issued 5 June 2014
Resolved
Replace hydrostatic release for EPIRB.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 5 June 2014
Resolved
Repair or Replace broken seats on lower deck.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 5 June 2014
Resolved
Remove debris located on steering room at portside.
Fire Fighting › Ventilation Systems › Fans
Issued 5 June 2014
Resolved
Remove oil from exhausts fans in the engine room.
Electrical › Electric Supply System (service) › Cable
Issued 5 June 2014
Resolved
Replace or provide a wire hanger on portside at the steeting room.
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 5 June 2014
Resolved
Replace wood deck on pump room with a non-combustible material.
Stability › Watertight Integrity › General
Issued 5 June 2014
Resolved
Make all bulkheads penetrations passing electrical wiring through all portside voids fwd to aft.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 5 June 2014
Resolved
Label valve release actuation lever on port & stbd for CO2 system controls.
Communications › Public Address System › Loudspeaker
Issued 5 June 2014
Resolved
Provide a public announcemt mean on deck # 1 on passenger area.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 5 June 2014
Resolved
Properly label both panels in the engine room.
Electrical › Electric Supply System (service) › Battery Charger
Issued 5 June 2014
Resolved
Provide a proper operation of a amp metter for battery charger, found not to be in operation.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 4 June 2014
Resolved
Provide a "blank" circuit breaker on 240v panel at the engine room.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 27 July 2012
Resolved
Perform an assessment on all exhaust system and address and repair all exhaust leaks by removing all exhaust lagging.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 27 July 2012
Resolved
Mark and identify all exhaust leaks and perform repairs.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 27 July 2012
Resolved
Provide a report to the USCG of all leaks detected in the exhaust system.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 26 July 2012
Resolved
Make ready for inspection all MDE exhaust system by removing all lagging in order to identify exhaust leaks.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 July 2012
Resolved
Properly install approved-type guards on all MDE.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 26 July 2012
Resolved
Remove all oily water & debris from engine rooma dn bilges; including the lazzarette.
Deck/Cargo › Cargo Stowage › General
Issued 30 May 2012
Resolved
Distinctly mark cargo deck with painted lines to indicate the vehicle runways and aisle spaces IAW 46 CFR 185.340 (a).
Navigation › Piloting/Steering › Steering Magnetic Compass
Issued 13 January 2012
Resolved
Repair/replace light for magnetic compass. * Vessel restricted to daytime operations.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 13 January 2012
Resolved
Prove proper operation of illumination of all operating station gauges.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 13 January 2012
Resolved
Prove proper operation of STBD Outboard RPM gauge.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 12 January 2012
Resolved
Prove proper operation of all gauges at the operating station in the presence of the attending CG marine inspector.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 15 December 2011
Resolved
Conduct sea trial in presence of an attending U.S. Coast Guard Inspector & prove proper operation of all (4) main diesel engines prior to carrying passengers.
Construction/Loadline › Penetrations › Pipe Flange
Issued 15 December 2011
Resolved
Make ballast tank ready for entry and conduct non destructive testing on pipe that was replaced in presence of attending U.S. Coast Guard Marine Inspector, prior to carrying passengers.
Construction/Loadline › Penetrations › Pipe Flange
Issued 2 December 2011
Resolved
Submit repair proposal for pipe connecting port and sttarboard muffler space. Pipe is presently severly wasted. If ballast tank has ballast water crew to mnitor space every 30 min.
Engineering › Sea-water System (primary cooling) › Piping
Issued 26 February 2010
Resolved
Sea water suction piping for #2 propulsion engine is holed and leaking. Imposed a restriction to secure this engine and associated sea valves and make only one trip with passengers.
Engineering › Sea-water System (primary cooling) › Piping
Issued 26 February 2010
Resolved
Sea water suction piping for #2 propulsion engine is holed and leaking. Imposed a restriction to secure this engine and associated sea valves and make only one trip with passengers.
Electrical › Lighting (service) › Lighting Fixture
Issued 26 February 2010
Resolved
Multiple gauges on the bridge for the main propulsion engines do not have lights for night operation. Vessel is restricted to daylight operations until repaired.
Engineering › Lubricating Oil Service System › Gauge
Issued 24 February 2010
Resolved
Prove proper operation of stbd outboard gauges for jacket water temp and lube oil pressure by 26Feb2010. While gauges are inoperable at operating station, conduct patrols/checks of local gauges every 15 to 20 minutes.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 28 December 2009
Resolved
Repair/replace door for CO2 room within seven days to the satisfaction of the attending CG Marine Inspector.
Communications › Radio Communications › EPIRB
Issued 23 December 2009
Resolved
Inop EPIRB due to fall. Sending continuous signal to shore. Vessel limited to 3 miles until repair/replacement of equipment.
Engineering › Shafting/Propeller Arrangements › Coupling Bolt
Issued 17 July 2008
Resolved
Bolt came off shaft at the coupling.
Engineering › Lubricating Oil Service System › Gauge
Issued 25 June 2008
Resolved
Opertating station on bridge does not have main engine lube oil pressure gauges. Install and test for proper operation.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 June 2008
Resolved
All batteries in engineroom have wing nuts. Replace with proper hardware.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 25 June 2008
Resolved
Ramp cable system missing protective cover.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 25 June 2008
Resolved
Port and stbd outboard J/w guages and redgear gauges not functioning correctly.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 25 October 2007
Resolved
Replace missing bolts in acess covers(4) aft two compartments.
Engineering › Steering Gear System › Hydraulic Hose
Issued 25 October 2007
Resolved
Repair/replace leaking hydraulic fittings in steering compartment.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 25 October 2007
Resolved
Repair leaking enineroom soft patches to include nut and bolts.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 25 October 2007
Resolved
Replace missing lifefloat light portside.
Engineering › Fuel Oil Service System › Valve
Issued 25 October 2007
Resolved
Label acuating handle stbd side engine room access.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 October 2007
Resolved
Replace broken light cover port side main deck.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 October 2007
Resolved
Replace 2 broken light covers stbd side main deck.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 25 October 2007
Resolved
Recertify fixed fire fighting system due to loose discharge nozzle.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 October 2007
Resolved
Install light cover passenger compartment fwd.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 October 2007
Resolved
Install light cover portside restroom.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 25 October 2007
Resolved
Reinstall hatch gasket first compartment aft collision bulkhead.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 25 October 2007
Resolved
Repair/replace multiple broken seating including arm rests.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 25 October 2007
Resolved
Reattach baseboard stbd side passenger compartment.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 October 2007
Resolved
Repair/replace 35 lifejackets in portside passenger compartments.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 October 2007
Resolved
Repair/replace 30 lifejackets in portside upper deck.
Lifesaving › Hand Flares › Condition
Issued 25 October 2007
Resolved
Replace missing 3 orange smoke distress markers.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 October 2007
Resolved
Repair/replace 17 life jackets in stbd side upperdeck life jacket locker.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 25 October 2007
Resolved
Label electrical panel on aft bulkhead of engine room.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 October 2007
Resolved
Replace 21 life jackets in stbdside passenger compartment lifejacket locker.
Electrical › Electric Supply System (service) › Cable
Issued 25 October 2007
Resolved
Remove wire nuts stbd side main deck overhead.
Electrical › Electric Supply System (service) › Battery Installation
Issued 25 October 2007
Resolved
Remove wing nuts from all batteries.
Engineering › Fuel Oil Service System › Filter
Issued 25 October 2007
Resolved
Replace missing Raycor filter bowl Starboard side generator.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 25 October 2007
Resolved
Replace hammer at actuation station portside engine room access.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 October 2007
Resolved
Replaced fractured terminal block board on top port outboard MDE.
Electrical › Electric Supply System (service) › Battery Charger
Issued 25 October 2007
Resolved
Clean replace oil saturated alternator windings port side Generator.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 October 2007
Resolved
Remove all dead end wiring from engineroom.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 25 October 2007
Resolved
Remove excess oil from engine room bilges.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 25 October 2007
Resolved
Install complete guard around port and stbd outboard MDE drive pulley.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 25 October 2007
Resolved
Reinstall CO2 siren, mounted backwards.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 25 October 2007
Resolved
Repair Engine room fire extinguisher bracket.
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 25 October 2007
Resolved
Repair oil leaks Stbd. Side outboard MDE. turbo chargers.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 October 2007
Resolved
Replace broken buss board Stbd. side outboard MDE.
Deck/Cargo › Holds/Tanks › Scuttle
Issued 25 October 2007
Resolved
Replace missing bolts around access covers in after 2 compartments.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 25 October 2007
Resolved
Repair leaking Engine room softpatchs.
Accommodation/Occupational Safety › Ventilation › General
Issued 25 October 2007
Resolved
Repair Stbd. side engine room exhaust fan control cover.
Lifesaving › Buoyant Apparatus › Serviceable
Issued 25 October 2007
Resolved
Repair Stbd. side Buoyant apparatus, holed.
Accommodation/Occupational Safety › Ventilation › General
Issued 25 October 2007
Resolved
Repair Stbd. side engine room exhaust fan broken drive belt.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 25 October 2007
Resolved
Repair excessive leaking on all 4 MDE. shafts.
Construction/Loadline › Hull › Longitudinal Frame
Issued 25 October 2007
Resolved
Gouge and weld fractured welds in steering compartment aft bulkhead.
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 25 October 2007
Resolved
Replace missing cap on jacket water storage tank.
Fire Fighting › Fire Pumps › Pressure
Issued 24 October 2007
Resolved
Repair holes in fire pump piping.
Electrical › Electric Generation Source (service) › Conductor
Issued 2 October 2007
Resolved
Cover shore power cables adrift. (shock potential)
Engineering › Lubricating Oil Service System › Gauge
Issued 2 October 2007
Resolved
Renew all leaking oil senders.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 October 2007
Resolved
Repair 4 broken seats.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 October 2007
Resolved
Repair oil leak in aft port hydraulic leak by gate winch.
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 16 September 2007
Resolved
Vessel rep. reported #1 port engine (outboard) failure en-route to Fajardo. Prove proper operation of engine to satisfaction of attending USCG Marine Inspector NLT 22 September 2007.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 19 April 2007
Resolved
Post all COI pages to be visible.
Engineering › Bilge Water Management System › Pump
Issued 19 April 2007
Resolved
Remove all excess oily water & excess trash from engineroom.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 4 April 2007
Resolved
Repair broken pilothouse windshield wiper.
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Head
Issued 4 April 2007
Resolved
Repair engine that does not exceed 1000 rpms and smokes excessively.
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Head
Issued 4 April 2007
Resolved
Repair engine #3 overheating problem.
Engineering › Reduction Gearing/Clutches › Gear, Jacking
Issued 4 April 2007
Resolved
Adjust or repair engine control for engine #4 (sticking)
Electrical › Lighting (service) › Conductor
Issued 4 April 2007
Resolved
Repair broken floodlight base on stbd 2nd deck.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 April 2007
Resolved
Renew all coroded deckplates.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 4 April 2007
Resolved
Install chain or suitable connection to vessel superstructure and to man overboard ladder as to keep person from falling in the water with ladder.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 September 2006
Resolved
Repair all 9 broken passenger seats.
Construction/Loadline › Penetrations › Weld
Issued 13 September 2006
Resolved
Paint door frame for womens bathroom.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 September 2006
Resolved
Repair stbd side door lock.
Engineering › Lubricating Oil Service System › Gauge
Issued 13 September 2006
Resolved
Repair inoperative engine alarms.
Engineering › Bilge Water Management System › Valve
Issued 7 August 2006
Resolved
Repair seized forepeak valve.
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 7 August 2006
Resolved
Correct all oil leaks in engine #1 and #4.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 7 August 2006
Resolved
Renew womans bathroom corroded door.
Engineering › Lubricating Oil Storage/Transfer System › Gauge
Issued 7 August 2006
Resolved
Repair all gauges lights.
Construction/Loadline › Penetrations › Gasket
Issued 7 August 2006
Resolved
Seal all leaking engine deck covers.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 7 June 2006
Resolved
Renew or repair defective radar.
Navigation › Collision/Grounding Avoidance › Radar
Issued 7 June 2006
Resolved
Repair defective dephtsounder.
Engineering › Bilge Water Management System › Not Operational
Issued 20 April 2006
Resolved
Remove excess oil i engineroom bilge.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 20 April 2006
Resolved
Repair craked stbd passenger window.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 20 April 2006
Resolved
Repair all 21 broken passenger seats.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 20 April 2006
Resolved
Correct aft winch oil leak on deck.
Engineering › Steering Gear System › Hand Pump
Issued 20 April 2006
Resolved
Correct steering oil leak in pilothouse.
Engineering › Reduction Gearing/Clutches › Bearing
Issued 20 April 2006
Resolved
Adjust pilothouse #3 engine control to operate properly. (stays in gear).
Engineering › Diesel Engine (propulsion-direct drive) › Gear, Timing
Issued 20 April 2006
Resolved
Repair pilothouse rpm gauge on engine #2.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 31 March 2006
Resolved
Repair broken glass window in stbd pssenger side door.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 31 March 2006
Resolved
Repair 12 broken passenger chairs.
Engineering › Steering Gear System › Actuator
Issued 31 March 2006
Resolved
Troubleshoot steering system slow response.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Gear/Clutch Starter (electric)
Issued 31 March 2006
Resolved
Install missing batteries on ship service generator.
Communications › Radio Communications › VHF Radiotelephone
Issued 10 January 2006
Resolved
Provide valid FCC Safety equipment certificate.
Navigation › Collision/Grounding Avoidance › Relative Motion Plotting Equipment
Issued 10 January 2006
Resolved
Provide local charts and all required navigational publications.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 January 2006
Resolved
Renew both navigation lights.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 January 2006
Resolved
Install both missings door handles on both pilothouse doors.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 10 January 2006
Resolved
Install retrotape on all liferings.
Construction/Loadline › Penetrations › Gasket
Issued 10 January 2006
Resolved
Free seized dogs on watertight doors in engineroom
Electrical › Electric Supply System (service) › Battery Installation
Issued 10 January 2006
Resolved
Install missing battery box covers.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 10 January 2006
Resolved
Repair 8 broken passenger seats.
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Location
Issued 10 January 2006
Resolved
Provide missing B5 semiportable fire extinguisher.
Engineering › Diesel Engine (propulsion-electric) › Crankcase
Issued 10 January 2006
Resolved
Provide operational hourmeters on all engines.
Construction/Loadline › Hull › Hull Plating
Issued 18 November 2004
Resolved
REMOVE VESSEL FROM SERVICE DUE TO SEVERE CORROSION ON HULL AND PLACE IN DRYDOCK FOR FURTHER EXAMINATION OF HULL CONDITION AND REPAIRS.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 24 August 2004
Resolved
REPAIR ALL PILOTHOUSE ALARMS
Stability › Watertight Integrity › General
Issued 24 August 2004
Resolved
REPAIR BOTH ENGINEROOM WATERTIGHT DOORS.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 24 August 2004
Resolved
RENEW WASTED PIPES FOR HYDRAULICS ON LOADING RAMP DOOR.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 24 August 2004
Resolved
RENEW WASTED STBD DOOR ON DECK AREA.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 23 August 2004
Resolved
REPAIR INOPERATIVE SEWAGE PUMP.
Electrical › Lighting (service) › Lighting Fixture
Issued 6 August 2004
Resolved
REPAIR ENGINEROOM LIGHS.
Engineering › Diesel Engine (propulsion-direct drive) › Waste Heat Recovery
Issued 6 August 2004
Resolved
REPAIR ALL NONFUNCTIONING ENGINE ALARMS
Engineering › Generator (propulsion/auxiliary-electric) › Battery
Issued 6 August 2004
Resolved
REPAIR #2 GENERATOR STARTER.
Engineering › Steering Gear System › Rudder Bearing
Issued 6 August 2004
Resolved
REPAIR #2 RUDDER EXCESSIVE WATER LEAKAGE.
Operations/Management › Pollution › Control of Discharge of Sewage
Issued 6 August 2004
Resolved
RENEW SEWAGE PUMP ELECTRICAL MOTOR.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 6 August 2004
Resolved
REPAIR 4 MISSING VEHICLE HOLD DOWN POINTS ON DECK.
Fire Fighting › Fire Hoses › Condition
Issued 21 July 2004
Resolved
PROVIDE 1 OPERATIONAL FIREHOSE AND MISSING NOZZLE.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 July 2004
Resolved
REPAIR CORRODED STAIRWELL TO PILOTHOUSE STBD SIDE.
Operations/Management › Navigation Safety › Requirements for Vessels at Anchor
Issued 21 July 2004
Resolved
Provide missing fwd anchor lock ( legacy item)
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 21 July 2004
Resolved
Install captain seat in permanent fashion.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 21 July 2004
Resolved
Repair all broken passenger seats.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 21 July 2004
Resolved
REPAIR PILOTHOUSE DEPHT SOUNDER.
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 4 November 2003
Resolved
Properly repair and re-install the electrical junction box on the portside airconditioning air-handler. LEGACY COMPONENT DESC: Electrical Junction Box
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 4 November 2003
Resolved
The passenger count of the vessel is reduced by 10 persons due to missing seats in the lower accomodation. This is a continual recurring requirement. It is obvisous the PRPA management pays little or no regard to the conidtion of the passenger accomodation. LEGACY COMPONENT DESC: Seating
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 4 November 2003
Resolved
Replace the starboard side steering void ladder and the starboard side midship wing void ladder. Both ladders were wasted from corrosion and the rungs fell through as the inspector entered the space. LEGACY COMPONENT DESC: Ladders
Lifesaving › Lifejacket/PFD (General)
Issued 4 November 2003
Resolved
Post proper life jacket donning placards on both sides of the upper deck and starboard side of the lower passenger accomodation. Prior to the carriage of passengers. LEGACY COMPONENT DESC: Donning Placards
Engineering › Diesel Engine (propulsion-reduction gear) › Governor
Issued 4 November 2003
Resolved
Repair the local engine guages for starboard inboard main engine. It is also recommnended to verify shaft rpms for this engine as it appears that the shaft revolutions are considerbly less than the other engines while operating at the same engine RPM which may indicate reduction gear failure. LEGACY COMPONENT DESC: Gauges
Lifesaving › Buoyant Apparatus
Issued 19 October 2003
Resolved
Three new Byoyant Apparatus were installed in place of three Life-Floats. Passenger count reduced to 120 passengers until three new life-floats are installed.
Navigation › Collision/Grounding Avoidance
Issued 21 August 2003
Resolved
Install proper 135 degree stern light shield as required by COLREGS prior to operations between the hours of unset and sunrise and at any time during periods of reduced visibility. To the satisfaction of the attending marine inspector.
LEGACY COMPONENT DESC: Navigation Lights
Construction/Loadline › Structures › Deck Plating
Issued 14 May 2003
Resolved
Repair the two middle cargo ramp hinge pins.
Engineering › Steering Gear System
Issued 23 April 2003
Resolved
Repair steering system hydraulic leak under pilothouse. LEGACY COMPONENT DESC: Hydraulic Hose
Electrical › Electric Generation Source (service)
Issued 23 April 2003
Resolved
Replace battery with bad terminal Starboard Battery Bank #1
Fire Fighting › Ventilation Systems
Issued 23 April 2003
Resolved
Inspect all engine space ventilation fans and replace or repair as nessecary. LEGACY COMPONENT DESC: Fans
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 23 April 2003
Resolved
Repair or replace the foward capstan.
Navigation › Collision/Grounding Avoidance
Issued 23 April 2003
Resolved
Repair or replace the vessels depth sounder. LEGACY COMPONENT DESC: Echo-sounding Device
Engineering › Bilge Water Management System
Issued 23 April 2003
Resolved
Remove all oily water from the engine room bilges and develop program to keep them keep them clean and dry.
Construction/Loadline › Structures › Door
Issued 23 April 2003
Resolved
Repair crack in center of stern ramp.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 August 2002
Resolved
Reattach loose shaft guard on outboard starboard main diesel engine.
Personnel › Certificates/Documents/Licenses
Issued 1 August 2002
Resolved
Provide evidence that all crewmembers have undergone required First Aid/CPR training. LEGACY COMPONENT DESC: Certificate, First Aid Course Completion
Electrical › Electric Supply System (service)
Issued 1 August 2002
Resolved
Properly secure port and starboard battery box covers LEGACY COMPONENT DESC: Battery Installation
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 1 August 2002
Resolved
Total passengers allowed is reduced by 10 to a maximun of 199 until the 10 broken seats in the lower passenger deck are repaired.
Lifesaving › Buoyant Apparatus
Issued 1 August 2002
Resolved
Repair small punctures in the llife float on port side.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 1 August 2002
Resolved
Repair RPM gauge on the inboard port main diesel engine.
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 1 August 2002
Resolved
Install mounting brackets for all losse extinquishers. LEGACY COMPONENT DESC: Mounting Bracket
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers
Issued 1 August 2002
Resolved
Required Type V Fire Extinquisher has been removed. Vessel is restricted frorm hauling any tank vessels or cargos listed in Title 49 CFR 172.101. No flammable or combustible products or product residue carried in tank trucks. Empty tank trucks not allowed unless they have a gas free certificate. LEGACY COMPONENT DESC: Condition
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 1 August 2002
Resolved
Due to not having the required B-V extinquisher vsl must have in addition to the required number of extinguishers. One B-II for every 5 passenger vechicles on deck. LEGACY COMPONENT DESC: Number
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 29 October 2001
Resolved
Demonstrate successful operation of fire dampers to the satisfaction of an attending Coast Guard Marine Inspector.
Engineering
Issued 29 September 2000
Resolved
Stop and correct main diesel engine number 3 (port, inboard) oil leakage through starboard side block gasket. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Provide Master's signed statement attesting to clean and satisfactory condition of all battery boxes, including removal of accumulated corrosion at cable terminals. By 3:00 P.M., Tuesday, October 03, 2000.
Accommodation/Occupational Safety
Issued 29 September 2000
Resolved
Provide Master's signed statement attesting to properly installed and operating ventilation fan in male marine sanitation device (MSD) room. By 3:00 P.M., Tuesday, October 03, 2000.
Electrical
Issued 29 September 2000
Resolved
Provide Master's signed statement attesting to blank-off and/or labeling offive (5) open slots in the navigation lights control panel at the pilothouse. By 3:00 P.M., Tuesday, October 03, 2000.
Deck/Cargo
Issued 29 September 2000
Resolved
Repair stern ramp winch pump hydraulic valve leakage. No later than October 27, 2000
Electrical
Issued 29 September 2000
Resolved
Repair service generator's battery charger located in the engine room, portside aft; missing amperage indicator (no needle). No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Repair main diesel engines' battery charger, located in the engine room, portside mid-body; amperage indicator not working. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Replace and/or adjust all main diesel engines protective guards into movingparts; number 4 (port, outboard) in worst condition. No later than October 27, 2000.
Accommodation/Occupational Safety
Issued 29 September 2000
Resolved
Fix eleven (11) unserviceable permanent passenger seating on main deck forward spaces. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Provide evidence of newly installed hoses to main diesel engines meeting SAE J-1942 (Hose and Hose Assemblies for Marine Applications) standards. Nolater than October 20, 2000.
Construction/Loadline
Issued 29 September 2000
Resolved
Apply coating/paint to bear steel and welds of recently installed plating by engine room39s aft bulkhead portside corner. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Stop and correct main diesel engine number 4 (port, outboard) oil leakage from blower. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Repair portside ventilation motor number 3 (engine room aft); leaking oil through fan. No later than October 27, 2000.
Engineering
Issued 29 September 2000
Resolved
Provide Master's signed statement attesting to satisfactory continuous operation of all engine room ventilation units. By 3:00 P.M., Tuesday, October 03, 2000
Engineering
Issued 24 August 2000
Resolved
OVERDUE REQUIREMENT ISSUED BY SJPMS; MI00010406; 29APR00; WITH COMPLIANCE DATE OF: 29JUN00; REISSUED FOR VIOLATION CASE: "RENEW ALL CHAFFED FUEL OIL AND LUBE OIL LINES FOR ENGINES 1 THROUGH 4."
Engineering
Issued 29 April 2000
Resolved
RENEW ALL CHAFFED FUEL OIL AND LUBE OIL LINES FOR ENGINES 1 THROUGH 4, NO LATER THAN 29JUN00.
Electrical
Issued 29 April 2000
Resolved
REPAIR ALL FLOURESCENT LIGHTING IN ENGINE ROOM NO LATER THAN 29MAY00.
Construction/Loadline
Issued 29 April 2000
Resolved
PRIOR TO CARRYING PASSENGERS, SECURE ALL MAIN DECK SOFT PATCHES.
Engineering
Issued 29 April 2000
Resolved
RENEW SEA WATER SUCTION PIPING FROM SEA STRAINER TO WATER PUMP ON PORT INBOARD MAIN ENGINE, NO LATER THAN 29MAY00.
Electrical
Issued 29 April 2000
Resolved
REMOVE CORROSION FROM BATTERY TERMINALS NO LATER THAN 05MAY00.
Engineering
Issued 29 April 2000
Resolved
REPAIR LEAKING SEA WATER STRAINER PORT OUTBOARD MAIN ENGINE, NO LATER THAN 05MAY00.
Lifesaving
Issued 29 April 2000
Resolved
PROVIDE PADDLES FOR LIFEFLOATS NO LATER THAN 05MAY00.
Construction/Loadline
Issued 29 April 2000
Resolved
LABEL ALL BILGE VALVES AS TO THEIR APPROPRIATE FUNCTIONS NO LATER THAN 05MAY00.
Engineering
Issued 29 April 2000
Resolved
REPLACE LUBE OIL SUMP DIPSTICK FOR PORT OUTBOARD MAIN ENGINE, NO LATER THAN05MAY00.
Construction/Loadline
Issued 10 September 1998
Resolved
RENEW AS ORIGINAL THE AFT PEAK JUNCTION VALVE & EXTENSION ROD MECHANISM, LOCATED AFT AT TEH STARBOARD SIDE.
Engineering
Issued 10 September 1998
Resolved
DO NOT OPERATE #1 PORT (OUTBOARD) ENGINE UNTIL PROOF/EVIDENCE IS PROVIDED TO THE SATISFACTION OF THE USCG MARINE INSPECTOR THAT CURRENT FUEL OIL LEAK(HIGH PRESSURE) AT THE LINE IS CORRECTED.
Unknown
Issued 10 September 1998
Resolved
FIX/REPLACE UNSEVICEABLE PUBLIC ANNOUNCEMENT (PA) SYSTEM.
Engineering
Issued 10 September 1998
Resolved
REPLACE/RENEW GASKET AT THE MANHOLE OF THE DIESEL TANK ON THE PORT SIDE.
Documentation
Issued 10 September 1998
Resolved
PROVIDE PROOF OF VALID CERTIFICATE OF DOCUMENTATION RENEWAL DECAL.
Navigation
Issued 10 September 1998
Resolved
FIX GPS ANTENNA AT PILOT HOUSE
Engineering
Issued 25 August 1997
Resolved
PROVIDE A MEATHOD OF DETERMINING THE AMOUNT OF FUEL IN THE FUEL TANKS IAW 49 CF 182.445 (b)
Lifesaving
Issued 25 August 1997
Resolved
PROVIDE COAST GUARD APPROVED FIRST AID KIT IAW 46 CFR 184.710
Accommodation/Occupational Safety
Issued 30 July 1997
Resolved
REPLACE BOTH NUTS AND BOLTS FOR TOP OF LADDER STARBOARD BALLAST TANK.
Accommodation/Occupational Safety
Issued 30 July 1997
Resolved
INSTALL VALVE OR CAP ON SEWAGE DISCHARGE CONNECTION.
Construction/Loadline
Issued 30 July 1997
Resolved
REPLACE NUT AND BOLT CONNECTION FOR TOP OF LADDER AT STEERING ROOM STARBOARD HATCH.
Lifesaving
Issued 30 July 1997
Resolved
INSTALL PERSONNEL COVER ON STERN RAMP WINCH.
Construction/Loadline
Issued 30 July 1997
Resolved
WELD UP PIPELINE PENETRATION OF FORWARD BULKHEAD IN STARBOARD SIDE WING VOID TANK. PIPE LOCATED ON STARBOARD SIDE OF CENTER LINE.
Construction/Loadline
Issued 30 July 1997
Resolved
REPAIR OR RENEW STARBOARD SIDE HATCH CLOSING DEVICE IN STEERING COMPARTMENT.
Engineering
Issued 30 July 1997
Resolved
RELOCATE REMOTE FUEL SHUT OFF VALVE TO WEATHER DECK PORT AND STARBOARD SIDES.
Construction/Loadline
Issued 30 July 1997
Resolved
OPEN FOR INSPECTION PORT SIDE BALLAST TANK. LOCATE DRAIN AND INSURE THAT THE INSIDE OF THE DRAIN SOCKET IS WELDED IN THE PORT SIDE BALLAST TANK.
Engineering
Issued 30 July 1997
Resolved
CLEAN OR REPLACE FLAME SCREENS ON FUEL OIL VENTS.
Documentation
Issued 25 July 1995
Resolved
PROVIDE PROOF OF REQUIRED FCC OPERATOR LICENSE.
Lifesaving
Issued 25 July 1995
Resolved
CONDUCT UNDERWAY DRILLS IN THE PRESENCE OF A USCG MARINE INSPECTOR PRIOR TOTHE CARRIAGE OF PASSENGERS OR CARGO.
Unknown
Issued 25 July 1995
Resolved
PROVIDE PROOF OF CREW ENROLLEMNT IN A RANDOM DRUG TESTING PROGRAM.
Navigation
Issued 25 July 1995
Resolved
PROVIDE NAVIGATIONAL CHARTS/PUBLICATIONS FOR AREA OF OPERATION.
Documentation
Issued 25 July 1995
Resolved
PROVIDE PLACARDING TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR INACCORDANCE WITH 33 CFR 151.59.
Deck/Cargo
Issued 25 July 1995
Resolved
PROVIDE MARKINGS ON THE VEHICLE DECK TO DENOTE VEHICLE RUNWAYS/AISLES. 46 CFR 185.20-20.
Fire Fighting
Issued 25 July 1995
Resolved
POST EMERGENCY CHECKOFF LISTS ACCESSIBLE TO CREW AND PASENGERS. 46CFR185.25
Casualty record · 5
14 December 2011Routine · role: Involved in a Marine Casualty · activity 4213077
23 April 2012Routine · role: Involved in a Marine Casualty · activity 4295841
23 January 2013Routine · role: Involved in a Marine Casualty · activity 4523673
13 February 2013Routine · role: Involved in a Marine Casualty · activity 4533238
17 December 2013Routine · role: Involved in a Marine Casualty · activity 4787150
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.