Inspection history · 31
6 December 1993
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1401791
9 June 1993
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 832300
26 March 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1142408
8 March 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1142406
3 March 1993
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1145633
25 September 1992
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 942785
17 August 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 669260
9 June 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 540110
4 March 1992
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1461470
11 October 1991
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 459027
16 May 1991
Re-Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 921002
7 May 1991
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 503974
13 March 1991
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 520259
8 June 1990
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 904326
12 September 1989
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 526364
2 June 1989
Re-Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1040446
10 November 1988
Hull Examination
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1203335
11 August 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1343989
5 August 1988
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1034040
24 June 1988
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 497476
14 June 1988
Hull Examination · COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 890988
6 August 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1029832
26 May 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1337469
21 May 1987
Type not recorded
No type recorded · MSO CLEVELAND · USCG Great Lakes District (CGD-GL) · Activity 1025837
20 May 1987
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1332908
12 March 1987
Re-Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1324381
2 May 1986
COI Inspection
Physical examination · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1312529
29 April 1986
Credit Drydock
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 1308283
7 November 1985
Type not recorded
No type recorded · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 472991
26 September 1985
Credit Drydock
Administrative · MSO DETROIT · USCG Great Lakes District (CGD-GL) · Activity 991041
13 July 1984
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 534123
Deck/Cargo
Issued 3 March 1993
Resolved
AT NEXT GAS FREEING OR DRYDOCK PROVIDE PROTECTIVE GUARD OVER ALL VERTICAL EXHAUST STACKS AFT OF DECKHOUSE.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
MAINTAIN TEMPORARILY REPAIR TO PIN HOLE IN CARGO TANK TOP ADJACENT TO #4 CARGO TANK TRUNKS PRIOR TO OFF-LOADING PRESENT CARGO. MAKE PERMANENT REPAIR AT NEXT GAS FREEING OR DRYDOCK.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
REPAIR LEAK OF CARGO PIPING CROSSOVER VALVE PORTSIDE AFT PRIOR TO CARRY NEXT CARGO.
Condition: Unknown
Due 23 March 1993
Resolved 23 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
RENEW BROKEN CARGO PIPING VALVE PORTSIDE AFT PRIOR TO CARRY NEXT CARGO.
Condition: Unknown
Due 23 March 1993
Resolved 23 March 1993
Lifesaving
Issued 3 March 1993
Resolved
PROVIDE PROPER MARKING (VESSEL NAME AND HOMEPORT) TO ALL RING BUOYS.
Condition: Unknown
Due 23 March 1993
Resolved 23 March 1993
Construction/Loadline
Issued 3 March 1993
Resolved
PROVIDE AND RENEW GASKETS TO HATCHES TO PUMPROOM AND ENGINE ROOM MAIN DECK ENTRANCE HATCHES.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Construction/Loadline
Issued 3 March 1993
Resolved
CLEAN BILGES IN CARGO PUMP ROOM AT NEXT OFF-LOADING AND RE-PACK PORT CARGO PUMP.
Condition: Unknown
Due 23 March 1993
Resolved 23 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
DURING NEXT GAS FREEING OR DRYDOCKING INSTALL CARGO OIL CONTAINMENT, APPROXIMATELY 2 FEET HIGH, IN BILGE UNDER PORT AND STBD CARGO PUMPS TO CONTAIN CARGO OIL LEAKAGE FROM THE PUMPS TO WITHIN TWO (2) BILGE FRAME SPACES UNDER EACH PUMP.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Lifesaving
Issued 3 March 1993
Resolved
PROVIDE PROPER MARKING TO BUOYANT APPARATUS (VESSEL NAME).
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
PROVIDE GUARD/COVER OVER ROTATING SHAFT FOR WASHDOWN SEA PUMP DRIVE SHAFT LOCATED IN THE MACHINERY SPACE.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Engineering
Issued 3 March 1993
Resolved
MAKE OPERABLE FROM THE MAIN DECK, FUEL SHUT-OFF VALVES FOR THE PORT AND STARBOARD FUEL TANKS.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
REPAIR OR REMOVE ANCHOR WINDLASS AT NEXT DRYDOCK.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Construction/Loadline
Issued 3 March 1993
Resolved
CLEAN BILGES IN MACHINERY SPACE.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Deck/Cargo
Issued 3 March 1993
Resolved
CONDUCT PRESSURE TEST OF CARGO STEAM HEATING COILS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Accommodation/Occupational Safety
Issued 3 March 1993
Resolved
MAINTAIN TEMPORARY LIFELINES IN PLACE LOCATED PORT AND STBD SIDE AFT UNTIL NEXT GAS FREEING OR DRYDOCKING AND MAKE PERMANENT REPAIRS BY INSTALLING MISSING LIFELINES AND STANCHIONS OVER PORT AND STBD FUEL TANKS.
Condition: Unknown
Due 3 March 1993
Resolved 3 March 1993
Construction/Loadline
Issued 4 March 1992
Resolved
SUBMIT PLANS FOR ALTERATIONS OF MID-SHIP CARGO HOSE BOOMS AND INSTALLATION OF REPLACEMENT BOOM.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Lifesaving
Issued 4 March 1992
Resolved
CLEAN CARGO OIL FROM PUMPROOM GRATING/LADDERS TO REDUCE SLIPPING HAZARD, MUCK REMAINDER OF CARGO OIL IN PUMPROOM BILGES TO WITHIN TWO FRAMES UNDER EACH CARGO PUMP. PUMP ENGINEROOM BILGES
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Construction/Loadline
Issued 4 March 1992
Resolved
MARK VESSEL'S NEW NAME & HOMEPORT ON HULL
Condition: Unknown
Due 20 May 1992
Resolved 20 May 1992
Accommodation/Occupational Safety
Issued 4 March 1992
Resolved
REPIPE GALLEY SINK DRAIN PIPING SO IT DOES NOT DRAIN INTO ENGINEROOM BILGES
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Engineering
Issued 4 March 1992
Resolved
PROVIDE FIVE GALLON PORTABLE CONTAINMENT FOR FUEL FILL CONNECTION PRIOR TO NEXT DIESEL FUEL LOADING.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Deck/Cargo
Issued 4 March 1992
Resolved
AT NEXT GAS FREEING OR DRYDOCKING MAKE #1 & #2 PORT CARGO TANK REACH RODS VAPORTIGHT AT THE MAIN DECK AND RENEW/REPAIR SECURING DOG ON PORT ENGRM HATCH.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
RENEW MISSING DOG ON GALLEY HATCH AND PROVE WEATHERTIGHNESS OF HATCH.
Condition: Unknown
Due 20 May 1992
Resolved 20 May 1992
Construction/Loadline
Issued 4 March 1992
Resolved
RENEW GASKET ON PORTSIDE OF FOREPEAK HATCH. CHECK FOR PROPER SEAL.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Engineering
Issued 4 March 1992
Resolved
RENEW PORT FUEL OIL TANK FLAME SCREEN
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Electrical
Issued 4 March 1992
Resolved
PROVIDE COVERS FOR ALL STARTING BATTERIES IN ENGINEROOM
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Engineering
Issued 4 March 1992
Resolved
PROVIDE DRIP PANS UNDER OIL PIPING DRAINS, STRAINERS, AND EQUIPMENT SUBJECTTO NORMAL LEAKAGE OF OIL TO PREVENT DRAINING INTO THE BILGES (46 CFR 56.50-5(e) & 33 CFR 155.770) AT NEXT GAS FREEING OR DRYDOCKING.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Lifesaving
Issued 4 March 1992
Resolved
REMOVE APPROX 1' OF #6 CARGO OIL FROM PUMPROOM BILGES AND APPROX 4" OIL/WATER MIXTURE FROM MACHINERY SPACE BILGES PRIOR TO LOADING NEXT CARGO.
Condition: Unknown
Due 6 March 1992
Resolved 6 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
LABEL BILGE/WASHDOWN PUMP VALVES IN MACHINERY SPACE.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Documentation
Issued 4 March 1992
Resolved
PROVIDE FCC STATION LICENSES FOR VHF-FM RADIO
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Deck/Cargo
Issued 4 March 1992
Resolved
CONDUCT AND PROVIDE DOCUMENTATION OF CARGO PIPE RELIEF VALVE AND PRESSURE GAUGE ANNUAL TESTING.
Condition: Unknown
Due 20 May 1992
Resolved 20 May 1992
Accommodation/Occupational Safety
Issued 4 March 1992
Resolved
PROVIDE SYSTEM PLAN/MFG INFO/PIPING LAYOUT OF INSTALLED TYPE II MODEL M-30 MICROPHOR MSD SYSTEM. REPIPE MEANS OF PUMPING OUT MSD HOLDING TANK FROM INSTALLED MACHINERY BILGE SYSTEM TO SEPARATE OVERBOARD MEANS. DO NO MIX OIL & WATER SYSTEMS SUCH AS MACHINERY BILGE/MSD SYSTEM.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Electrical
Issued 4 March 1992
Resolved
HARD WIRE ELECTRICAL RECEPTICLE FOR GALLEY REFRIGERATOR.
Condition: Unknown
Due 13 April 1992
Resolved 13 April 1992
Deck/Cargo
Issued 14 June 1988
Resolved
REPAIR THE ANCHOR WINDLASS ON THE BOW OF THE BARGE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 14 June 1988
Resolved
PROPERLY SECURE THE ELECTRICAL CONDUIT PIPING ON THE PORT BOW AREA.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 14 June 1988
Resolved
PROVIDE THE PROPER LIGHT BULBS FOR THE RUNNING LIGHT FIXTURES ON THE BARGE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Construction/Loadline
Issued 26 May 1987
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIRS IN NUMBER 4S CARGO TANK AT THE EIGHT FOOT DRAFT LEVEL AT NEXT DRYDOCKING.
Condition: Unknown
Due 26 May 1987
Resolved 26 May 1987
Construction/Loadline
Issued 21 May 1987
Resolved
PINHOLE LEAK EVIDENT IN WAY OF #5 & 6 CARGO TANKS. CG 835 ISSUED TO REPAIR PRIOR TO LOADING CARGO.
Condition: Unknown
Due 21 May 1987
Resolved 21 May 1987