Records from 1995 to 2024. Most recent: inspection, 6 July 2024.
Documentation record
Registered dimensions (L × B × D)48.0 ft × 13.5 ft × 7.2 ft
Registered tonnagegross 31 / net 25
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOAST GUARD YARD · CURTIS BAY, MD, UNITED STATES · built 1971
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 14 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it31 - Simplified, Gross Ton
25 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 10
6 July 2024
Type not recorded
No type recorded · Station Valdez · USCG Arctic District (CGD-A) · Activity 7952147
7 October 1999
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1045508
5 October 1998
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1424646
27 April 1998
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 789639
8 October 1997
Hull Examination · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1407984
29 April 1997
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1091697
17 September 1996
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1414697
14 September 1995
Plan Review "T" Boat · Initial Certification · Inclining Experiment
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 872511
14 September 1995
COI Inspection · Inclining Experiment · Initial Construction-Excluding Oversight
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1164116
8 June 1995
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1190302
Accommodation/Occupational Safety
Issued 5 October 1998
Resolved
Label emergency escapes in accordance with 46 CFR 185.606
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Electrical
Issued 5 October 1998
Resolved
Prove proper operation of electronic equipment
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Construction/Loadline
Issued 5 October 1998
Resolved
repair or replace bilge pump and float switch in lazarette
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Electrical
Issued 5 October 1998
Resolved
Repair or replace docking light fixtures
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Construction/Loadline
Issued 5 October 1998
Resolved
Repair or replace bilge pump float switch in bilge under fwd compartment
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Lifesaving
Issued 5 October 1998
Resolved
Prove proper operation of propulsion and auxiliary equipment and fire/bilgepumps
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Construction/Loadline
Issued 5 October 1998
Resolved
Relocate all bilge high level alarns closer to the bottom of the bilge
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Fire Fighting
Issued 5 October 1998
Resolved
Repair or replace all portable fire extinguisher brackets
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Lifesaving
Issued 5 October 1998
Resolved
Conduct operational tests and drills prior to the start of 1999 tourist season
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Lifesaving
Issued 5 October 1998
Resolved
Reinstall all primeary lifesaving equipment prior to carrying passengers
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Navigation
Issued 5 October 1998
Resolved
Repair or replace and prove proper operation of the stern light
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Construction/Loadline
Issued 5 October 1998
Resolved
Repair or replace keel in way of damaged area
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Construction/Loadline
Issued 5 October 1998
Resolved
Clean all bilges of oil or oil residue
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Engineering
Issued 5 October 1998
Resolved
Replaced oil soaked insulation blankets on stbd engine exhaust system
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Engineering
Issued 5 October 1998
Resolved
Repair or replace the engine exhaust for the stbd engine where it penetrates the aft bulkhead of the engine compartment.
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Electrical
Issued 5 October 1998
Resolved
Properly install bulkhead fitting for transducer/speed indicator in transom
Condition: Unknown
Due 5 October 1998
Resolved 5 October 1998
Lifesaving
Issued 8 October 1997
Resolved
Procure/provide one (1) orange smoke distress signal.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Lifesaving
Issued 8 October 1997
Resolved
Procure/provide six (6) red flare distress signals.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Lifesaving
Issued 8 October 1997
Resolved
Conduct operational tests and drills prior to start of 1998 tourist season.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Lifesaving
Issued 8 October 1997
Resolved
Prove proper operation of float for ring buoy.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Electrical
Issued 8 October 1997
Resolved
Prove proper operation of electronic equipment.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Lifesaving
Issued 8 October 1997
Resolved
Prove proper operation of propulsion and auxilliary equipment and fire/bilge pumps.
Condition: Unknown
Due 8 October 1997
Resolved 8 October 1997
Lifesaving
Issued 17 September 1996
Resolved
PROVIDE WATERTIGHT CONTAINER FOR VDS.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROVIDE WATERLIGHT FOR LIFERING.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROVIDE WATERLIGHT LINE TO LIFEFLOAT OF CORRECT LENGTH- 18 FEET.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PERMANENTLY MARK EPIRB WITH VESSEL NAME.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
CONDUCT UNDERWAY MAN OVERBOARD AND FIRE DRILL.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Documentation
Issued 17 September 1996
Resolved
CONDUCT SIMPLIFIED STABILITY TEST TO ACCOUNT FOR NEWLY INSTALLED BALLAST.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROVIDE PROPER LIFE JACKET PLACARD.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Fire Fighting
Issued 14 September 1995
Resolved
PROCURE/INSTALL PROPER FIRE EXTINGUISHER BRACKET (B-II) IN FWD ACCOMODATIONSPACE
Condition: Unknown
Due 14 September 1995
Resolved 14 September 1995
Navigation
Issued 14 September 1995
Resolved
PROVIDE COMPASS DEVIATION CARD
Condition: Unknown
Due 14 September 1995
Resolved 14 September 1995