This record may be incomplete: the most recent inspection recorded for this vessel was 31 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1531 - Regulatory (Subpart C or D), Gross Ton
1517 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-42674
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
MAKE PERMANENT REPAIRS IN WAY AT A TEMPORARY PATCH IN #5 PORT CARGO TANK, FIRST BAY AT THE TURN OF THE BILGE.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Deck/Cargo
Issued 5 March 1990Resolved
GAS FREE ALL CARGO TANKS AND MAKE TANKS AVAILABLE FOR A INTERNAL EXAMINE, PRIOR TO CARGO OPERATIONS.
Condition: Unknown
Due 5 March 1990
Resolved 5 March 1990
Accommodation/Occupational Safety
Issued 4 March 1988Resolved
REPLACE MISSING SAFETY LINES AROUND AFT DECK AREA AND FORWARD SECTION OF CARGO DECK AT THE VESSEL'S NEXT DRYDOCKING OR WHEN MADE GAS FREE.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Fire Fighting
Issued 4 March 1988Resolved
PROVIDE A SPARE APPROVED AND CHARGED CYLINDER FOR THE SELF CONTAINED BREATHING APPARATUS AND PROVIDE OPERATING INSTRUCTION FOR THE UNIT. ALSO LABEL ACCOMODATION SPACE DOOR TO INDICATE BREATHING APPARATUS LOCATION.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Deck/Cargo
Issued 4 March 1988Resolved
REPAIR PUMPROOM POWER EXHAUST VENT FAN AND TEST RUN, DEMONSTRATING REMOTE EMERGENCY SHUTDOWN IN THE PRESENCE OF A CG MARINE INSPECTOR. VESSEL MAY NOTLOAD GRADE A,B OR C CARGOES UNTIL THIS REQUIREMENT HAS BEEN CLEARED.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988Resolved
RENEW THRU DECK SPOOL PIECE ON AFT STARBOARD FUEL TANK VENT RISER AT THE VESSEL'S NEXT DRYDOCKING OR WHEN MADE GAS FREE.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Deck/Cargo
Issued 4 March 1988Resolved
REMOVE ALL OIL FROM PUMPROOM AND PIPING. TIGHTEN FLANGES AND REPLACE GASKETTS AS NECESSARY TO STOP LEAKS.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Electrical
Issued 4 March 1988Resolved
PROVIDE SEALED CONNECTIONS FOR ALL STARTING BATTERY TERMINALS SUCH THAT NO BARE CONDUCTOR SHOWS BETWEEN CABLE INSULATOR AND CONNECTOR.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Construction/Loadline
Issued 12 January 1988Resolved
SIDESHELL PLATING CRACKED AT BULKHEAD OF CARGO TANKS 3 AND 4 PORTSIDE FROM MAINDECK TO TWO FEET DOWN INCLUDING RUB RAIL. BARGE REQUIRED TO DISCHARGE PRESENT CARGO PRIOR TO BEING MOVED. PERMANENT REPAIRS ARE REQUIRED PRIOR TOLOADING NEXT CARGO.
Condition: Unknown
Due 12 January 1988
Resolved 12 January 1988
Construction/Loadline
Issued 2 October 1987Resolved
REPLACED DAMAGED BOTTOM PLATING IN WAY OF THE FOREPEAK AND NO. 1P CARGO TANK. - PLATES B2, B3 AND C2.
Condition: Unknown
Due 2 October 1987
Resolved 2 October 1987
Construction/Loadline
Issued 2 October 1987Resolved
REPLACED BUCKLED SECTIONS OF THE DECK PLATING (A STRAKE) IN 1P/S, 2S/P, 4S, 5S/P CARGO TANKS.
Condition: Unknown
Due 2 October 1987
Resolved 2 October 1987
Construction/Loadline
Issued 2 October 1987Resolved
REPAIRED HOLED SIDE SHELL PLATING IN WAY OF THE AFT PORT CORNER OF THE PUMPENGINE ROOM.
Condition: Unknown
Due 2 October 1987
Resolved 2 October 1987