← All vessels
PT 728
Passenger (Inspected) · Passenger Ship class · Built 1940s · USCG Great Lakes District (CGD-GL) · Other hulls named PT 728
PT 728 is a 1945 passenger vessel (inspected). The Coast Guard has recorded 39 inspections since 1987, most recently in June 2017, along with 95 deficiencies and 1 casualty investigation in 2001.
Records from 1987 to 2017. Most recent: inspection, 22 June 2017.
- Built
- 1945
- Last inspected
- 22 June 2017
- Documentation
- Expired · documentation file of 10 September 2026
- Deficiencies
- 95 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2001
Identity
263958
WDE5716
42764
Flag
UNITED STATES
367754610
Maury page id
psix-42764
Inspections, by type
…with no type recorded3
Years with a record
15 calendar years (1987–2017)
The 39 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)71.2 ft × 18.0 ft × 7.3 ft
Registered tonnagegross 55 / net 15
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · ANNAPOLIS, MD, UNITED STATES · built 1945
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORT CLINTON, OH
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it55 - Regulatory (Subpart C or D), Gross Ton
15 - Regulatory (Subpart C or D), Net Ton
15 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDJ2034MMSI 367754610 · active · compulsorily equipped · granted 15 September 2016, expires 15 September 2026
WDE5716MMSI 367370660 · expired · compulsorily equipped · granted 29 July 2008, cancelled 29 September 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 39
22 June 2017
In-Service Inspection · Initial Certification · Administrative Inspection · COI Inspection · Construction Oversight · Plan Review "T" Boat
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6182948
12 September 2016
Attraction Vessel Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5998966
25 May 2016
Plan Review "T" Boat · In-Service Inspection · Construction Oversight
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5966989
11 July 2012
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4374398
3 July 2012
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4366214
27 June 2012
Administrative Inspection · Deficiency Check · Uninspected Passenger Vessel
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4358470
12 July 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4078646
29 September 2010
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3860412
28 July 2009
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3549968
6 January 2009
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3389254
26 August 2008
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3309620
26 August 2008
Excursion Permit · Deficiency Check
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 3309701
1 February 2008
COI Inspection · Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3155399
4 October 2007
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3073522
12 September 2007
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3089325
15 April 2007
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2931737
8 September 2006
Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2772733
22 August 2006
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2756297
19 August 2006
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2756107
14 August 2006
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2747490
10 August 2006
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2744466
26 July 2006
In-Service Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2725192
21 July 2006
In-Service Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2720289
8 July 2006
In-Service Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2705656
29 June 2006
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2695082
31 March 2006
Examination of Repairs · Damage Survey
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2627318
15 March 2006
In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 2605625
18 October 2005
COI Inspection · Deficiency Check · Hull Examination
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2516634
3 February 2005
Hull Examination
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2305900
3 November 2004
Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 2234187
24 August 2004
Damage Survey
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 2177107
30 July 2004
Deficiency Check
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 2150457
2 June 2004
Administrative Inspection · Hull Examination · Examination of Repairs
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 2085350
16 December 2003
Deficiency Check
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1965241
3 September 2003
Re-Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1894980
3 July 2002
MARPOL Annex V Examination · Initial Certification · COI Inspection · Deficiency Check · Hull Examination · Deadweight Survey
Physical examination · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1640253
2 May 2002
Administrative Inspection
Administrative · MSD MARATHON · USCG Southeast District (CGD-SE) · Activity 1610683
18 May 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 85299
13 July 1987
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1323305
Deficiency record · 95
Stability › Watertight Integrity › General
Issued 29 September 2010
Resolved
The Hatch cover to the engine space from the main deck has a broken gasket coaming. Vessel must repair or replace the hatch cover. 46CFR171.124(a)
Stability › Watertight Integrity › General
Issued 29 September 2010
Resolved
Replace all gaskets to Watertight Doors (WTD) located at frames 8, 38 & 59. 46CFR171.114(a)(2)
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 September 2010
Resolved
There are numerous dead end wires throughout the vessel. Go through the vessel and remove wiring or store in a junction box. 46CFR183.01-5(a)
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 29 September 2010
Resolved
Vessel has two fuel tanks located on the port & starboard sides. Both tank fill lines have three flexible hose connections. The fuel transfer line between tanks is also a flexible line (in bilge). I do not believe that this arrangement meets the intent of 46CFR182.40-5(a) and must be replaced with rigid metallic line.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 29 September 2010
Resolved
Vessel must provide a FCC Bridge to Bridge certificate. Vessel is restricted to no more than 1000 feet from shore.
Lifesaving › Lifebuoys › Serviceable
Issued 29 September 2010
Resolved
Vessel has two life buoys that are no longer serviceable. Vessel must replace and properly mark the ring buoy located at the operating station, as well as the port side life buoy. 46CFR180.30-1(a)
Documentation › Certificates/Documents › FCC SSL
Issued 28 July 2009
Resolved
Provide current FCC Safety Certificate IAW 47 CFR 80.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 28 July 2009
Resolved
Provide documentation of drug testing program enrollment.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 28 July 2009
Resolved
Provide 2009 edition of tides and currents.
Engineering › Bilge Water Management System › Interface Detector
Issued 28 July 2009
Resolved
Ensure bilge high level alarm is operational in galley space void.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 28 July 2009
Resolved
Ensure contents of first aid kit are current and meet the requirements of 46 CFR 160.041.
Engineering › Bilge Water Management System › Not Operational
Issued 28 July 2009
Resolved
Properly demonstrate operation of fixed bilge pumping system.
Documentation › Certificates/Documents › FCC SSL
Issued 28 February 2008
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 28 February 2008
Resolved
Provide proof of crew enrollement in marine employers drug testing program.
Communications › Radio Communications › EPIRB
Issued 28 February 2008
Resolved
Provide NOAA registration for 406MHz EPIRB.
Stability › Weathertight Integrity › General
Issued 28 February 2008
Resolved
Replace gasket in way of galley deck hatch.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 28 February 2008
Resolved
Provide platform at the bottom of rescue platform capable of supporting a deckhand and victim.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 28 February 2008
Resolved
Provide one additional child type I PFD.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 28 February 2008
Resolved
Provide clear operating instructions for local discharge of fixed fire extinguishing system.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 28 February 2008
Resolved
Make permanent repairs to wasted exhaust pipe, port main diesel engine.
Engineering › Steering Gear System › Pin
Issued 28 February 2008
Resolved
Properly secure clevis pins in way of steering gear system.
Engineering › Diesel Engine (propulsion-direct drive) › Waste Heat Recovery
Issued 28 February 2008
Resolved
Make repairs to water pump in way of port main diesel engine.
Communications › Alarms/Indicators › High Water Alarm
Issued 28 February 2008
Resolved
Prove proper operation of high level bilge alarms throughout.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 28 February 2008
Resolved
Remove oil/water mix from engine compartment bilge and properly dispose of the same.
Engineering › Diesel Engine (propulsion-direct drive) › Connecting Rod
Issued 28 February 2008
Resolved
Replace shift cable starboard main diesel engine.
Fire Fighting › Firemans Outfit › Axe
Issued 4 October 2007
Resolved
Mark fire axe with vessel name
Communications › Radio Communications › VHF Radiotelephone
Issued 4 October 2007
Resolved
Provide radio operators permit for master.
Navigation › Piloting/Steering › US Coast Pilot
Issued 4 October 2007
Resolved
Provide coast pilot publication onboard vessel.
Communications › Radio Communications › VHF Radiotelephone
Issued 4 October 2007
Resolved
Provide emergency broadcast placard onboard vessel.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (air intake)
Issued 4 October 2007
Resolved
Double clamp flex hose IWO all vital systems as defined in 46CFR182.710.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 4 October 2007
Resolved
Provide/post lifejacket donning placard.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 4 October 2007
Resolved
Provide 60ft lifeline IWO stbd ring life buoy.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 October 2007
Resolved
Provide anchor light.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 October 2007
Resolved
Prove proper operation of port running light.
Navigation › Piloting/Steering › Gyro Compass
Issued 4 October 2007
Resolved
Prove proper operation of light IWO magnetic compass. Vessel is restricted to daylight operations until requirement satisfied.
Lifesaving › Lifebuoys › Serviceable
Issued 4 October 2007
Resolved
Provide retro reflective materials IWO ring life buoys.
Engineering › Bilge Water Management System › Not Installed
Issued 4 October 2007
Resolved
Replace gauges IWO bilge/fire engine driven pumps (port and stbd…frozen)
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 4 October 2007
Resolved
Provide cages IWO fixed lighting in engine space and fuel tank space.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 October 2007
Resolved
Remove dead end wires IWO submersible bilge pump in lazarette space.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 4 October 2007
Resolved
Replace flex hose connection IWO fuel tank cross-connection at next Dry Dock.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 4 October 2007
Resolved
Provide seals IWO portable fire extinguishers.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 4 October 2007
Resolved
Provide portable lights at operating station and entrance to engine compartment.
Stability › Watertight Integrity › General
Issued 4 October 2007
Resolved
Replace gaskets in WTD’s between engine compartment and fuel tank space/galley.
Stability › Watertight Integrity › General
Issued 4 October 2007
Resolved
Make WTD in engine compartment water tight (has what appears to be hose port, that is not water tight).
Stability › Watertight Integrity › General
Issued 4 October 2007
Resolved
Mark all WTD’s with “Watertight Door – Close in Emergency”.
Electrical › Electric Generation Source (service) › Generator
Issued 4 October 2007
Resolved
Properly line battery boxes in engine space with material not affected by electrolyte.
Electrical › Lighting (service) › Lighting Fixture
Issued 4 October 2007
Resolved
Properly mount starboard aft light fixture in engine space.
Engineering › Bilge Water Management System › Not Operational
Issued 4 October 2007
Resolved
Provide indicator light at operator station, indicating operation of electric submersible bilge pump for accommodation space.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 October 2007
Resolved
Properly support electrical wires in fuel tank space.
Fire Fighting › Fire Hoses › Condition
Issued 4 October 2007
Resolved
Replace wasted main deck fire hose.
Operations/Management › Pollution › Control of Discharge of Oil
Issued 4 October 2007
Resolved
Provide/mount oil pollution placard.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 4 October 2007
Resolved
Provide original Certificate of Documentation onboard vessel.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 8 September 2006
Resolved
Prior to departing North Cove Marina for Kingston, NY, provide proof excess oily bilge water has been properly removed.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 8 September 2006
Resolved
Prior to carrying passengers for hire, provide proof of crew enrollement in valid drug testing program and proof of pre-employment drug tests as required by 46 CFR Part 16.
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 8 September 2006
Resolved
Prior to carrying passengers in the Sector NY zone, submit a written request to Sector NY detailing vessels intentions with regards to vessels operation, route and approximate length of time vessel will operate in the area.
Navigation › Piloting/Steering › US Coast Pilot
Issued 23 July 2006
Resolved
Provide coastal pilots on board for the voyage intended.
Engineering › Bilge Water Management System › Strainer
Issued 23 July 2006
Resolved
Install a strainer on the engine room bilge suction.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 July 2006
Resolved
Replace cracked and wasted deck longitudinal engine room overhead in-way of the starboard engine.
Stability › Watertight Integrity › General
Issued 8 July 2006
Resolved
Renew engine room and lazarette deck hatch gaskets.
Lifesaving › Visual Distress Signals (General) › Expired
Issued 8 July 2006
Resolved
EPIRB registration is expired. Provided documentary proof of registration prior to the carriage of passenger on an Oceans route.
Navigation › Piloting/Steering › Marine Charts
Issued 29 June 2006
Resolved
Provide Up to date charts & pubs for the proposed area of operation to the satisfaction of the attending Marine Inspector
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 29 June 2006
Resolved
Prior to carrying passengers contact the local OCMI to request permission to operate in the intended area
Documentation › Certificates/Documents › Stability Letter
Issued 18 October 2005
Resolved
Post Stability Letter IAW 46 CFR 176.306.
Documentation › Markings/Placards › Warning Signs
Issued 18 October 2005
Resolved
Post Emergency Instruction IAW 46 CFR 185.510(a).
Navigation › Piloting/Steering › US Coast Pilot
Issued 18 October 2005
Resolved
Provide Coast Pilot or the equivalent.
Navigation › Piloting/Steering › Magnetic Compass
Issued 18 October 2005
Resolved
Prove proper operation of illumination of magnetic compass IAW 184.402(c). Vessel is restricted to daylight operations until complete.
Communications › Radio Communications › EPIRB
Issued 18 October 2005
Resolved
Replace expired HRU in way of 406MHz EPIRB.
Communications › Radio Communications › EPIRB
Issued 18 October 2005
Resolved
Replace worn antenna in way of 406MHz EPIRB.
Lifesaving › Lifebuoys › Serviceable
Issued 18 October 2005
Resolved
Replace worn ring lifebuoys. Provide (1) with 60ft of U/V resistant line and (1) buoy with floating waterlight.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 October 2005
Resolved
Provide proper mounting bracket for floating waterlight.
Communications › Alarms/Indicators › General Alarm
Issued 18 October 2005
Resolved
Provide Public Address System IAW 46 CFR 184.610.
Construction/Loadline › Structures › Scuttle
Issued 18 October 2005
Resolved
Provide captive chain in way of engine room deck hatch in accordance with 46 CFR 179.360(b)(2).
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 18 October 2005
Resolved
Provide "No Passenger Access" chains forward of operating station.
Engineering › Bilge Water Management System › Piping
Issued 18 October 2005
Resolved
Install a positive shutoff valve in way of all submersible electric bilge pumps IAW 46 CFR 182.520(e)(7).
Fire Fighting › Fire Pumps › Arrangement
Issued 18 October 2005
Resolved
Install appropriate fire pump engaging rod.
Lifesaving › Hand Flares › Quantity
Issued 18 October 2005
Resolved
Provide six USCG approved orange day smoke signaling devices.
Fire Fighting › Fire Pumps › Arrangement
Issued 18 October 2005
Resolved
Provide double clamp on port MDE fire pump raw water intake hose.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 October 2005
Resolved
Properly remove or secure in junction boxes all loose wiring and splices throughout vessel.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 October 2005
Resolved
Prove 22 AWG wiring used for only High Level [name withheld] indicating system IAW 46 CFR 183.340(c)
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 18 October 2005
Resolved
Properly mount port and starboard starter solenoids.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 18 October 2005
Resolved
Replace wasted rubber hose on top side of starboard MDE heat exchanger piping.
Communications › Alarms/Indicators › High Water Alarm
Issued 18 October 2005
Resolved
Remove inoperative High Water Alarm float switch and associated equipment in tank compartment.
Construction/Loadline › Hull › Keel
Issued 24 August 2004
Resolved
Grind back to good material and make proper repairs to area of water intusion noted on starboard side of keel.
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 1 June 2004
Resolved
Install captive chains on all deck hatches.
Electrical › Electrical Distribution System (service)
Issued 3 September 2003
Resolved
Mount electrical wiring in engine room in accordance with 46 CFR 183.340(b)(4). LEGACY COMPONENT DESC: Wiring
Engineering › Sea-water System (primary cooling)
Issued 3 September 2003
Resolved
Prior to completion of next vessel drydock, properly cap or remove raw water intake valve for obsolete generator system. LEGACY COMPONENT DESC: Valve
Lifesaving › Lifebuoys
Issued 3 September 2003
Resolved
Properly install strobe light on ring life buoy prior to getting underway with passengers. LEGACY COMPONENT DESC: Floating water light
Documentation › Markings/Placards
Issued 3 September 2003
Resolved
Properly mount Oil Pollution Placard. LEGACY COMPONENT DESC: Oil Discharge Placard
Documentation › Certificates/Documents
Issued 3 September 2003
Resolved
Prior to carrying passengers for hire vessel owner must employ Master with a license of proper tonnage or provide documentation from Marine Surveyor and/or Marine Architect stating the vessel is under 50 gross tons. (See activity narrative) LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 3 September 2003
Resolved
Properly mount portable lighting at entrance to engine room.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 September 2003
Resolved
Install machinery guards main diesel engine alternator belt and flywheel. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Lifesaving › Lifebuoys › Quantity
Issued 3 July 2002
Resolved
Install 2 additional ringbuoys near the stern.
Fire Fighting › Ventilation Systems › Ducts
Issued 3 July 2002
Resolved
Provide proper vent closure devices for engineroom vents.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 3 July 2002
Resolved
Perform installation pressure test on fixed CO2 system piping in the presence of a uscg Marine Inspector.
Communications › Radio Communications › VHF Radiotelephone
Issued 3 July 2002
Resolved
Provide a valid FCC Radio Safety Certificate.
Casualty record · 1
18 May 2001Routine · role: Involved in a Marine Casualty · activity 85299
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.