Records from 1995 to 2012. Most recent: inspection, 28 May 2012.
Inspection history · 49
28 May 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4325919
14 May 2012
ISPS II Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4311814
11 January 2011
ISPS II Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3925738
24 March 2009
STCW 95 Exam · MARPOL Annex I Examination · ISPS III Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3438496
24 March 2009
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3438648
13 March 2009
Type not recorded
No type recorded · USCGC ALLIGATOR (WPB 87372) · USCG Heartland District (CGD-H) · Activity 3434004
2 February 2009
Random ISPS/MTSA-No PSC
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3403770
25 August 2008
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3308868
1 August 2008
COC-CHEM Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 3270360
22 April 2008
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3189556
10 April 2008
NPV Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3181113
9 April 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3178925
27 July 2006
Ballast Water Examination · COC-CHEM Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2726769
11 October 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2512508
30 September 2005
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2504545
26 September 2005
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2502400
24 September 2005
ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2499982
26 July 2005
COC-CHEM Annual
Type not classified · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2440959
19 July 2005
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2432809
23 April 2005
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2341368
5 November 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2235826
26 October 2004
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2228373
24 August 2004
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2174356
16 August 2004
Ballast Water Examination · COC-CHEM Annual
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2167297
8 June 2004
MTSA/ISPS Verification · Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2092595
31 October 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1940301
20 October 2003
MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1933171
25 April 2003
Administrative Inspection
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1780436
3 March 2003
Ballast Water Examination · Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1752124
10 October 2002
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1687648
20 July 2002
Ballast Water Examination · Letter of Compliance (Initial/Renewal)
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1649329
31 January 2002
Letter of Compliance (Initial/Renewal)
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1483145
30 July 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 292416
30 July 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1069328
20 April 2001
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 289486
3 July 2000
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 279808
3 July 2000
Letter of Compliance (Initial/Renewal)
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1365846
23 March 2000
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2228337
4 October 1999
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 433318
4 October 1999
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 793057
1 December 1998
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 423255
9 May 1998
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 415725
9 May 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 792466
26 February 1997
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 400687
10 June 1996
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 392160
10 June 1996
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 877515
23 October 1995
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 467973
28 July 1995
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 380979
28 July 1995
Letter of Compliance (Initial/Renewal)
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 873248
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Combustible Gas Indicator
Issued 14 May 2012
Resolved
Portable vapor detector was missing drager tubes for: Ammonia and Metylacrylate. IBC Code 13.2 . 50ac
Due 14 June 2012
Resolved 28 May 2012
Resolution: Vessel submitted documentation and photos attesting to the reciept of drager tubes.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 14 May 2012
Resolved
Clutch mechanism for rescue boat is inoperable from console, but can be operated locally on outboard. Solas (97) III/19 50ac
Due 14 June 2012
Resolved 28 May 2012
Resolution: Vessel submitted documentation and photos attesting to the proper repair of the rescue boat.
Lifesaving › Lifeboat Equipment › Hand Flare
Issued 12 January 2011
Resolved
The normal equipment of every lifeboat shall consist of four rocket parachute flares, six hand flares, and two bouyant smoke signals. Vessel's lifeboat was missing all required pyrotechnics. 74 Solas (97ed) CH III/ 41.8.13-15
Action required: 705 - Other - as specified
Resolved 12 January 2011
Resolution: All required Pyrotechnics were replaced.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 12 January 2011
Resolved
The machinery shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. The emergency fire pump packing gland was leaking excessively causing flooding within the space it was contained. 74 Solas (97ed) II-1/26.1
Action required: 705 - Other - as specified
Resolved 12 January 2011
Resolution: Emergency Fire Pump packing gland was repaired. The vessel''s class society surveyed the repair and pressurized pump to 60psi with minimal leakage.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 12 January 2011
Resolved
Vessel is required to demonstrate the proper operation of the ODME. Vessel was unable to demonstrate proper operation of the ODME to Coast Guard Inspectors. 78 Marpol ANNEX 1 Part B Reg 31.2
Must be rectified prior to discharging Slops.
Action required: 705 - Other - as specified
Due 19 January 2011
Resolved 12 January 2011
Resolution: Valve Solenoids were replaced for the overboard and slop recirculation lines. System was surveyed by attending class surveyor and found to be working properly.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 12 January 2011
Resolved
Vessel is required to have a functioning low pressure vapor alarm for it's vapor control system. Vessel's low pressure vapor alarm is not functioning. 46 CFR 39.20-13
Action required: 705 - Other - as specified
Due 19 January 2011
Resolved 12 January 2011
Resolution: Vapor pressure alarm has been shown to be working properly to the satisfaction of the Coast Guard Inspector.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 12 January 2011
Resolved
Vessel is required to have a 95% alarm labeled as High Level Alarm. Vessel's 95% alarm on the cargo deck is labeled as HIGH-HIGH Alarm. 46 CFR 39.20-7(c)(2)
Action required: 705 - Other - as specified
Due 19 January 2011
Resolved 12 January 2011
Resolution: Vessels labling for the High Level Alarm has been repainted and found by the Coast Guard Inspector to be satisfactory.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 12 January 2011
Resolved
The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The P/V valves for cargo tanks 2P and 5P are missing bonding straps.
Action required: 705 - Other - as specified
Due 12 February 2011
Resolved 12 January 2011
Resolution: New bonding straps have been affixed to the P/V system and were found to be satisfactory by the Attending coast guard inspectors.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 12 January 2011
Resolved
Every ship of 400 GT and above shall be provided with a tank or tanks with adequate capacity for sludge and oil residues. Vessel's IOPP Form B lists duplicate tanks with seperate names of 0.56m^3 capacity. 78 Marpol Annex I Ch3/12.1
Action required: 705 - Other - as specified
Due 12 February 2011
Resolved 12 January 2011
Resolution: IOPP form B was reviewed and corrected.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Combustible Gas Indicator
Issued 12 January 2011
Resolved
Suitable portable instruments for measuring oxygen and flammable vapor concentrations shall be provided. Vessel's portable instruments are not properly calibrated. Vessel is using expired calibration gas because new calibration gas will not allow for proper calibration. 74 Solas (97ed) II-2/59.4.4.1
Action required: 705 - Other - as specified
Due 12 January 2011
Resolved 27 April 2011
Resolution: Received Flag State report and receipts attesting to proper repair.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 12 January 2011
Resolved
The last meter of piping before the vapor connection point must be painted RED/YELLOW/RED with each red band being 0.1 meter wide. The word vapor must be labled on pipe in black letters at least 50mm high. Vessel does not have the correct paint scheme and labling. 46 CFR 39.20(d)
Action required: 15 - Rectify deficiencies by next port
Resolved 12 January 2011
Resolution: Vapor pressure lines have been painted according the the color scheme described in 46 CFR 39.20(d) and were found to be satisfactory to the attending Coast Guard inspectors.
Pollution Prevention/Response › Prevention Equipment › Portable Containment
Issued 12 January 2011
Resolved
The condition of the ship and it's equipment shall be maintained to ensure that the ship will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Oil boom clips are exceedingly wasted in SOPEP locker causing risk to the environment if used in an emergency. Marpol 73/78 Annex 1 Reg 6.4.1
Action required: 705 - Other - as specified
Due 28 January 2011
Resolved 12 January 2011
Resolution: Oil Booms were replaced and found satisfactory by Attending Class Surveyor.
Fire Fighting › Fire Main › Condition
Issued 2 April 2009
Resolved
There is a 1'-2' wasted section of the fire main about 6 feet aft of the forward bulkhead (paint locker). Repair prior to loading cargo to the satisfaction of the attending USCG inspector and flag or class. Solas 74 Chapter II-2, Reg. 5.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 January 2011
Resolution: Vessel examined for COC renewal, fire main found in good order.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 23 March 2009
Resolved
PSCO's found a fabricated pipe that was designed to allow for the direct discharge of oily water from the sludge pump to the boiler blowdown skin valve. Additionally PSCO's were shown procedures used to by-pass the MARPOL seals on the emergency bilge suction. Crew members provided information that these discharges were conducted without being logged in the Oil Record Book.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2009
Resolution: Pipe was confiscated by PSCOs and is being held as evidence for the APPS Violation case against the Company.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 23 March 2009
Resolved
Vessel's Marine Sanitation Device (MSD) is inoperable . The MSD's fresh air blower has been disconnected and is not operational. MSD is approved as an TYpe II. MSD has several holes on the top of the tank. MSD is now being used as a Type III/Holding Tank. The overboard discharge for the MSD is in the open position and the vessel is discharging untreated sewage into the navigable waters of the US.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2009
Resolution: COTP Order 09-019 has been rescinded. Appropriate repairs and training over crew has bee completed to the satisfaction of Coast Guard, Flag, and Class.
Documentation › Safety Management System › Safety/Environmental Protection Policy
Issued 23 March 2009
Resolved
Upon review of the vessel's Safety Management System and observations made by the PSCO's, it is evident that the vessel's crew has engaged in practices not in compliance with set environmental protection procedures for the disposal of oily waste. It is recommended that the vessel's Recognized Organization conduct an external audit of these non-conformities and proved USCG with a report.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2009
Resolution: Vessel underwent an ISM audit by the RSO and a Flag inspection by Marshall Islands. Report submitted to the local COTP.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 23 March 2009
Resolved
Chief Engineer was unable to perform an operational test of the incinerator. The refractory for the incinerator door became lodged and prevented the door on the incinerator from closing. Due to the door malfunctioning, the Chief Engineer was unable to perform an operational test of the vessel's incinerator. Class to attest to the proper operation of the vessel's incinerator
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2009
Resolution: Chief Engineer performed an operational test of the incinerator to the satisfaction of Coast Guard and Flag.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 1 August 2008
Resolved
Repair and calibrate as needed the Draeger 3000 and Draeger 2000 multi gas meters. Provide calidbration certificate within 60 days.
Action required: 705 - Other - as specified
Resolved 25 August 2008
Resolution: Recieved calibration certificates for the meters.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 1 August 2008
Resolved
Provide span gas for all gas meter on board. Provide within 60 days.
Action required: 705 - Other - as specified
Resolved 25 August 2008
Resolution: Recieved invoice for span for all meters on board.
Engineering › Steam Boiler (auxiliary/waste heat) › Pump
Issued 10 April 2008
Resolved
Boiler circulation pump is leaking steam and has been temporarily repaired. Make permanent repairs to the satisfaction of class.
Action required: 705 - Other - as specified
Due 17 April 2008
Resolved 22 April 2008
Resolution: Received class report from Det Norske Veritas satisfying requirement.
Engineering › Steam System (auxiliary) › Piping
Issued 10 April 2008
Resolved
Steam line to bunker tank IWO fresh water generator is leaking steam. Make permanent repairs.
Action required: 705 - Other - as specified
Due 17 April 2008
Resolved 22 April 2008
Resolution: Received class report from Det Norske Veritas satisfying requirement.
Engineering › Fuel Oil Service System › Pump
Issued 27 July 2006
Resolved
Fuel oil viscosity meter pump is leaking and needs to be replaced. SOLAS 74/78 II-2/15
Action required: 705 - Other - as specified
Resolved 27 July 2006
Resolution: The pump seal was replaced. Repaird prior to depature.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 27 July 2006
Resolved
Emergency fire pump has materials attached to it established for volume on pump which due to heat will be rendered ineffective. Replace to comply with. SOLAS 74/78 II-2/4.6.1.
Action required: 705 - Other - as specified
Resolved 27 July 2006
Resolution: Replaced attached materials to comply with regulations. Replaced prior to departure.
Navigation › Collision/Grounding Avoidance › Automatic Radar Plotting Aid (ARPA)
Issued 25 October 2004
Resolved
MSO Philadelphia issued LOD 44 - 04 to M/T KERIM for inop ARPA, only for TRANIST THROUGH MSO Philadelphia COTP ZONE
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 October 2004
Resolved 26 October 2004
Resolution: LOD 44 - 04 Rescinded M/T KERIM departed MSO Philadelphia COTP ZONE
Construction/Loadline › Markings › Load Line Mark
Issued 16 August 2004
Resolved
Load Line improperly marked with "A B" on port side and "N V" on starboard side.
Action required: 705 - Other - as specified
Due 16 September 2004
Resolved 26 October 2004
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 16 August 2004
Resolved
Vessel has no span gas to calibrate explosive meeter vessel may not load any combustible or flammable cargoes in U.S. waters until span gas is received.
Action required: 15 - Rectify deficiencies by next port
Due 16 August 2004
Resolved 24 August 2004
Resolution: Received proper documentation from vessel stating that the span gas was received to calibrate meter.
Deck/Cargo › Ballast › Special Ballast Arrangements
Issued 16 August 2004
Resolved
Provide Marine Chemist Certificate and make aft ballast pump room available for inspection.
Action required: 15 - Rectify deficiencies by next port
Due 16 August 2004
Resolved 24 August 2004
Resolution: Received Marine [name withheld] stating that the ballast pump room is gas-free.
Deck/Cargo › Holds/Tanks
Issued 20 October 2003
Resolved
Repair and prove proper operation of cargo tank gauging system for the #5 starboard and #8 port cargo tanks NLT 20NOV03 and prior to reloading tanks. LEGACY COMPONENT DESC: Liquid Level Gaging
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 November 2003
Resolved 8 June 2004
Resolution: Witnessed proper operation of tank gauging systems.
Engineering › Fuel Oil Service System
Issued 31 January 2002
Resolved
NEED TO INSTALL A REMOTE OPERATED VALVE ON EMERGENCY GENERATOR FUEL OIL TANK.
IAW SOLAS 74 83 AMEND II-2 15.5 BY NEXT DRYDOCK. LEGACY COMPONENT DESC: Valve, Control
Condition: Design Flaw
Due 28 November 2002
Resolved 12 February 2002
Resolution: IAW IMO resolution fuel tank does not hold enough fuel to meet this requirement
Documentation
Issued 28 July 1995
Resolved
Provide evidence as required by part III of NVIC 10-94 that vessel is builtin compliance with 33 CFR 157.24. Complete prior to return to a U. S. port.
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995
Fire Fighting
Issued 28 July 1995
Resolved
Remove all hold back devices on fire doors throughout the vessel prior to departure from the port per SOLAS Chpt II-2 Reg 45(3).
Condition: Unknown
Due 1 August 1995
Resolved 1 August 1995