← All vessels
EXCALIBUR
Passenger (Inspected) · Passenger Ship class · Built 1950s · USCG Southwest District (CGD-SW) · Other hulls named EXCALIBUR
EXCALIBUR is a 1953 passenger vessel (inspected). The Coast Guard has recorded 79 inspections since 1985, most recently in June 2012, along with 213 deficiencies and 2 operational controls.
Records from 1985 to 2012. Most recent: inspection, 11 June 2012.
- Built
- 1953
- Last inspected
- 11 June 2012
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 213 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
265363
WDD7239
42840
Flag
UNITED STATES
367183760 (licence lapsed)
Maury page id
psix-42840
Inspections, by type
…with no type recorded12
Years with a record
27 calendar years (1985–2012)
The 79 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it9 - Regulatory (Subpart C or D), Net Ton
14 - Regulatory (Subpart C or D), Gross Ton
14 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WDD7239MMSI 367183760 · expired · compulsorily equipped · granted 28 April 2007, cancelled 1 July 2017 · licensed under a name not among this hull’s recorded names (not shown)
WE7347MMSI not assigned · expired · voluntarily equipped · granted 9 December 1996, cancelled 3 June 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 79
11 June 2012
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4341293
18 July 2011
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4079043
22 January 2009
Plan Review "T" Boat
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3423279
12 March 2008
Hull Examination · COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3162542
23 July 2007
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3004798
31 May 2006
Annual Inspection · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2659916
15 July 2005
Periodic Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2427985
28 July 2004
Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2154014
28 April 2004
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2062003
18 June 2003
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1822384
23 April 2003
COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1778725
12 July 2002
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1645090
1 May 2002
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1617645
26 March 2002
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1496023
8 August 2001
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1069149
1 August 2001
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1069075
12 July 2001
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1418932
17 April 2001
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1405164
22 February 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1376489
9 June 2000
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1395466
24 January 2000
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1376029
16 December 1999
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1401147
7 April 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1469579
12 February 1999
Plan Review "T" Boat
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1472017
4 February 1999
Deficiency Check · Plan Review "T" Boat
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1437520
11 January 1999
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1426168
29 July 1998
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 798155
7 July 1998
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1463392
29 June 1998
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 796197
29 June 1998
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1462667
29 June 1998
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1468448
17 December 1997
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1406230
27 January 1997
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1106897
17 December 1996
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1434496
16 July 1996
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1394574
10 January 1996
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1461686
26 July 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 873059
21 June 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1190908
25 January 1995
Hull Examination · Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1355081
12 January 1994
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 857979
21 September 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1153738
27 April 1993
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 833801
25 March 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1142803
2 March 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 843300
18 December 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1132542
17 December 1992
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 830612
9 December 1992
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 827631
19 May 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 948938
23 April 1992
Damage Survey
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1264325
17 April 1992
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 126279
7 February 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 948606
31 January 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 946403
2 January 1992
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 949296
17 October 1991
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 942046
19 August 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 942907
17 July 1991
Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1353171
6 February 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 907000
2 January 1991
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1217182
12 December 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 913913
14 November 1990
Drydock Extension
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1244130
16 April 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 912805
5 January 1990
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1223291
6 June 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 899212
10 April 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 892863
21 March 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1207627
26 January 1989
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1030604
3 January 1989
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1042024
16 May 1988
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1040307
8 January 1988
Deficiency Check · COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1014711
8 June 1987
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1335876
13 April 1987
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1022496
23 February 1987
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1309966
21 January 1987
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1317376
9 June 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 991653
21 April 1986
Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1307010
18 March 1986
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1301089
5 February 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 978644
10 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 974441
10 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 978597
Deficiency record · 213
Engineering › Bilge Water Management System › Not Operational
Issued 18 July 2011
Resolved
Prove proper operation of bilge dewatering system. Prohibited from carrying passengers
Engineering › Bilge Water Management System › Manifold
Issued 18 July 2011
Resolved
Provide properly label bilge manifold
Engineering › Bilge Water Management System › Piping
Issued 18 July 2011
Resolved
Remove and replace pedro fitting/flex-hose in way of bilge piping in after bilge space
Fire Fighting › Remote Fuel Shutoff › General
Issued 18 July 2011
Resolved
Provide label for remote fuel shut offs
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 18 July 2011
Resolved
Provide label for fixed-fire extinguishment system.
Engineering › Bilge Water Management System › Not Installed
Issued 18 July 2011
Resolved
Provide visual indicator for high level bilge alarms in way of pilothouse/operating station.
Documentation › Markings/Placards › Lifejacket Placard
Issued 18 July 2011
Resolved
Provide lifejacket placard and post in a conspicuous place for all lifejacket types held aboard
Electrical › Electric Supply System (service) › Battery Installation
Issued 18 July 2011
Resolved
Provide approved vented/non-ferrous lid for battery stowage.
Electrical › Electric Supply System (service) › Cable
Issued 18 July 2011
Resolved
Properly mount all wiring in way of engine room
Electrical › Electric Supply System (service) › Cable
Issued 18 July 2011
Resolved
Remove all dead-end wiring in way of engine room.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 3 April 2008
Resolved
Replace fixed f/f system manual pull cable.
Communications › Radio Communications › EPIRB
Issued 3 April 2008
Resolved
Register EPIRB in name of current operator.
Navigation › Piloting/Steering › Marine Charts
Issued 3 April 2008
Resolved
Provide charts for area of operation, and updated Coast Pilot & Light List
Operations/Management › Drills/Instruction › Abandon Ship
Issued 3 April 2008
Resolved
Make crew/vsl available for drills.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 3 April 2008
Resolved
Prove compliance with chemical testing requirements.
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 3 April 2008
Resolved
Provide sound signaling device (horn)
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 April 2008
Resolved
Make wiring repairs on bridge.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 3 April 2008
Resolved
Install overcurrent protection protection for 12V system near source.
Stability › Watertight Integrity › General
Issued 3 April 2008
Resolved
Make bulkhead penetration of fwd E/R bulkhead as high as possible & plug discontinued hole.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 April 2008
Resolved
Replace raw water hose located on the supply side of radiator.
Stability › Unintentional Flooding › General
Issued 3 April 2008
Resolved
Replace Pedro hose (bait tank) located port side fwd in E/R.
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 April 2008
Resolved
Provide wiring diagram for 12V system and submit plans for system repairs/mods as necessary.
Construction/Loadline › Hull › Side Shell
Issued 28 March 2008
Resolved
Replace butt blocks and re-caulk seams as necessary to eliminate weeping / movement of following butt blocks in E/R: 1. Port side between frames 8 & 9 (counting from forward bulkhead). 2. Stbd side between frames 3 & 4.
Electrical › Electric Supply System (service) › Cable
Issued 12 March 2008
Resolved
Remove wiring in the ER; leading from fuel filter to alternator. Wiring damaged fro chafing and no in-line breaker protection. Provide diagram of the service.
Electrical › Electric Supply System (service) › Cable
Issued 12 March 2008
Resolved
Install junction box on the bridge where O GW is clamped to O6 GW leading to the fuse box.
Engineering › Diesel Engine (propulsion-reduction gear) › Valve Actuating Gear
Issued 23 July 2007
Resolved
Replace rusted throttle control cable sleeve.
Lifesaving › Visual Distress Signals (General) › Storage
Issued 23 July 2007
Resolved
Provide snap hook and 60" line for strobe light.
Operations/Management › Drills/Instruction › Not Conducted
Issued 31 May 2006
Resolved
Prior to getting U/W with passengers, conduct emergency drills w/ regular captain and crew.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 31 May 2006
Resolved
Vessel limited to 28 total persons pending addition of two lifejackets.
Engineering › Bilge Water Management System › Valve
Issued 31 May 2006
Resolved
Replace valve in bilge line aft of collision bulkhead.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 31 May 2006
Resolved
Secure top of ladder to pilot house.
Construction/Loadline › Hull › Transverse Frame
Issued 31 May 2006
Resolved
Replace thru-bolts between floor timbers and frames in #2 compartment as discussed.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 31 May 2006
Resolved
Provide documentation of compliant chemical testing program.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 21 July 2005
Resolved
Replace cracked port sidelight lens.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 21 July 2005
Resolved
Install rail course evenly spaced between bulwark and top rail.
Engineering › Steering Gear System › Rudder
Issued 15 July 2005
Resolved
Prove proper operation of emergency steering assembly.
Electrical › Lighting (service) › Lighting Fixture
Issued 15 July 2005
Resolved
Repair deck light (port side railing - pilothouse deck).
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 15 July 2005
Resolved
Prove proper operation of engine shut-down, and engine shutdown override.
Engineering › Steering Gear System › Ram
Issued 14 July 2005
Resolved
Secure hydraulic steering ram.
Engineering › Bilge Water Management System › Not Operational
Issued 14 July 2005
Resolved
Ensure all bilge high level alarms operable.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 July 2005
Resolved
Ensure all NAV lights are operational.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 14 July 2005
Resolved
Properly configure water light to the ring buoy.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 14 July 2005
Resolved
Register the EPIRB.
Personnel › Certificates/Documents/Licenses › Certificate, CPR Course Completion
Issued 14 July 2005
Resolved
Ensure 50% of crew has current first aid/CPR qualification.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 14 July 2005
Resolved
Provide updated/current NAV pubs; Coast Pilot [name withheld], Tide/Current table, and NAV rules.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 July 2005
Resolved
Repair railing/stanchion at ladder to pilot house.
Engineering › Bilge Water Management System › Hose
Issued 14 July 2005
Resolved
Replace bad bilge suction line connection IWO the engine room and the fwd compartment.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 14 July 2005
Resolved
Replace three type I lifejackets (adult).
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 14 July 2005
Resolved
Replace 10 non operable survival lights.
Electrical › Electric Supply System (service) › Cable
Issued 14 July 2005
Resolved
Repair the compromised hull bonding system IWO the engine room.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 14 July 2005
Resolved
Replace the expired first aid kit items and replace/repair kit container.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 14 July 2005
Resolved
Secure switches on the control console IWO the pilot house.
Construction/Loadline › Structures › Deck Plating
Issued 14 July 2005
Resolved
Make repair to the 01 deck aft of the pilot house.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 July 2005
Resolved
Make repairs as necessary to strengthen port side railing at rail break/embarkation area.
Lifesaving › Lifebuoys
Issued 28 April 2004
Resolved
Provide waterlight for ring buoy iaw 46 CFR 180.70(d). LEGACY COMPONENT DESC: Self-igniting Lights
Communications › Radio Communications
Issued 28 April 2004
Resolved
406 MHz EPIRB not onboard vessel due to new battery being installed. Issued rqmt to reinstall 406 MHz EPIRB. LEGACY COMPONENT DESC: EPIRB
Engineering › Bilge Water Management System › Valve
Issued 28 April 2004
Resolved
Repair or remove valve for bilge suction line serving anchor line compartment.
Engineering › Bilge Water Management System › Strainer
Issued 28 April 2004
Resolved
Install bilge strainer for fuel tank compartment iaw 46 CFR 182.510(b).
Engineering › Steering Gear System
Issued 28 April 2004
Resolved
Renew steering quadrant and aft port/stbd cable sheaves. Steering quadrant and sheaves for cable & chain steering fractured and severely wasted.
Engineering › Steering Gear System
Issued 28 April 2004
Resolved
Free-up or renew sheave for stbd steering cable directly below helm. Sheave was not turning during operational test.
Lifesaving › Lifejacket/PFD (Type I)
Issued 23 April 2003
Resolved
3 PFD shoulder lights inop, 1 PFD not labeled properly with vessel name and 1 PFD req'd renewal of retroreflective material. All items corrected prior to the completion of the inspection.
Engineering › Shafting/Propeller Arrangements
Issued 23 April 2003
Resolved
Install additional packing material and adjust packing gland to reduce water intrusion through shaft packing gland. LEGACY COMPONENT DESC: Stern Tube Bearing
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 23 April 2003
Resolved
Repair main propulsion engine muffler. LEGACY COMPONENT DESC: Piping (exhaust)
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 23 April 2003
Resolved
Clean and repair electrical connections for engine room fire extinguisher. LEGACY COMPONENT DESC: Control Valve
Pollution Prevention/Response › Prevention Equipment
Issued 12 December 2002
Resolved
Replace flex hose between MSD holding tank and overboard discharge valve. LEGACY COMPONENT DESC: Sewage System Piping
Engineering › Bilge Water Management System
Issued 12 December 2002
Resolved
Repair check valve in bilge suction line to forward compartment. LEGACY COMPONENT DESC: Valve
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 12 December 2002
Resolved
Repair or replace CO2 portable fire extinguisher in main salon.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 12 December 2002
Resolved
Conduct U/W check ride and U/W inspection
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 12 December 2002
Resolved
Make repairs to main engine transmission.
Construction/Loadline › Hull
Issued 12 July 2002
Resolved
Recaulk as necessary to reduce water intrusion into fore peak and engine room spaces.
Construction/Loadline › Hull
Issued 12 July 2002
Resolved
Recaulk seam between sheer plank and deck planks on both port and starboard sides. Seams open allowing light to enter vessel.
Engineering › Bilge Water Management System
Issued 12 July 2002
Resolved
Replace PVC pipe and improper hose in discharge line from bilge pump in engine room.
Construction/Loadline › Hull
Issued 12 July 2002
Resolved
Conduct U/W check ride upon returning vessel to water.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 26 March 2002
Resolved
Repair reach rod connection for emergency fuel shut-off valve for starboard fuel oil tank.
Engineering › Fuel Oil Storage/Transfer System
Issued 26 March 2002
Resolved
Install flame impingement bowl for RACOR fuel filter in engine room. LEGACY COMPONENT DESC: Filter/Strainer
Engineering › Steering Gear System
Issued 26 March 2002
Resolved
Tighten rudder packing gland to stop water intrusion into lazarette. LEGACY COMPONENT DESC: Rudder Bearing
Engineering › Shafting/Propeller Arrangements
Issued 26 March 2002
Resolved
Tighten shaft log packing to reduce water intrusion into engine room. LEGACY COMPONENT DESC: Stern Gland
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 26 March 2002
Resolved
Repair water leak on forward part of propulsion engine behind first pulley attach to crankshaft. Water leak initially appeared to be coming from engine, however, further investigation revealed water leak was coming from a pump located just below and to port of engine.
Electrical › Lighting (service)
Issued 26 March 2002
Resolved
Install globe for overhead light in galley. LEGACY COMPONENT DESC: Lighting Fixture
Documentation › Logs/Records
Issued 26 March 2002
Resolved
Provide documentation for monthly testing of 406 MHZ EPIRB. LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Electrical › Electric Supply System (service)
Issued 26 March 2002
Resolved
Provide cover for batteries in engine room. LEGACY COMPONENT DESC: Battery Installation
Electrical › Electric Supply System (service)
Issued 26 March 2002
Resolved
Clean corrosion from battery terminals in engine room. LEGACY COMPONENT DESC: Battery Conductor
Engineering › Bilge Water Management System
Issued 26 March 2002
Resolved
Remove PVC pipe in bilge pumping system in engine room and replace with metalic pipe. LEGACY COMPONENT DESC: Piping
Operations/Management › Navigation Safety
Issued 26 March 2002
Resolved
Update all navigational charts and publications in accordance with Local Notice to Mariners. LEGACY COMPONENT DESC: Carriage of Charts and Publications
Accommodation/Occupational Safety › Occupational Safety
Issued 26 March 2002
Resolved
Replace missing window on port side of pilot house.
Engineering › Steering Gear System › Chain
Issued 26 March 2002
Resolved
Clean and grease steering gear chain and pulleys.
Construction/Loadline › Hull
Issued 26 March 2002
Resolved
Recaulk seam between sheer strake and deck on port side of fuel space. LEGACY COMPONENT DESC: Sheerstrake
Construction/Loadline › Structures › Scuttle
Issued 26 March 2002
Resolved
Make entrance hatch into lazarette watertight.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 26 March 2002
Resolved
Remount B-II CO2 portable fire extinguishers in galley.
Navigation
Issued 17 April 2001
Resolved
Repair as new starboard running light. Vessel is restricted to daylight and non-restricted visibility conditions until corrected.
Documentation
Issued 17 April 2001
Resolved
Conduct and record test of EPIRB as per 46 CFR 185.728.
Fire Fighting
Issued 17 April 2001
Resolved
Renew bracket for the portable 15LB CO2 fire extinguisher.
Lifesaving
Issued 17 April 2001
Resolved
Install corrosion resistant clip on lifering buoy correctly.
Lifesaving
Issued 17 April 2001
Resolved
Renew port side glass in way of operating station.
Navigation
Issued 17 April 2001
Resolved
Install compass binnacle light. Vessel is restricted to daylight and non- restricted visibilty conditions until corrected.
Construction/Loadline
Issued 17 April 2001
Resolved
Renew pedro connection in way of forward compartment bilge suction pipe.
Construction/Loadline
Issued 17 April 2001
Resolved
Install 6" coaming at rear of accommodation space. Coaming to be watertight with main deck as required by 46 CFR 179.360.
Fire Fighting
Issued 17 April 2001
Resolved
Post fixed fire extinguishing instructions for engineroom fire extinguishing system as required by 46 CFR 185.612.
Lifesaving
Issued 17 April 2001
Resolved
Replace lifefloats with inflatable buoyant apparatus as required by 46 150.204(a)(1).
Navigation
Issued 17 April 2001
Resolved
Repair as new rudder stops and steering system foundations for pullys in way of lazarette.
Lifesaving
Issued 17 April 2001
Resolved
Renew hydrostatic release on 406 EPIRB.
Documentation
Issued 17 April 2001
Resolved
Update FCC station license to include 406 EPIRB.
Fire Fighting
Issued 17 April 2001
Resolved
Post fixed fire extinguishing instructions.
Electrical
Issued 17 April 2001
Resolved
Renew 110VAC junction box in way of head.
Lifesaving
Issued 17 April 2001
Resolved
Conduct drills, crew training and log as required by 46 CFR 185.520.
Engineering
Issued 17 April 2001
Resolved
Renew fuel supply line to the main diesel engine with material as per 46 CFR 182.720.
Construction/Loadline
Issued 17 April 2001
Resolved
Install bilge alarm in engine room
Lifesaving
Issued 17 April 2001
Resolved
Segregate adult and child PFD's and re-label per 46 CFR 180.78(a)(5)
Navigation
Issued 17 April 2001
Resolved
Update lightlist, coastpilot, and nautical charts for area.
Construction/Loadline
Issued 17 April 2001
Resolved
Repair as new bilge alarm in forward compartment bilge.
Electrical
Issued 17 April 2001
Resolved
Install blank in DC electrical panel in starboard head.
Lifesaving
Issued 17 April 2001
Resolved
Update first aid kit.
Electrical
Issued 17 April 2001
Resolved
Tidy up and support DC wiring throughout vessel as required by 46 CFR 183.340 (a)(4).
Construction/Loadline
Issued 9 June 2000
Resolved
IN THE PRESENCE OF THE ATTENDING MARINE INSPECTOR CONDUCT AN UNDERWAY CHECKRIDE.
Construction/Loadline
Issued 16 December 1999
Resolved
INSTALL WEATHERTIGHT COVER OVER HAWSEPIPE LEADING TO FOREPEAK.
Construction/Loadline
Issued 16 December 1999
Resolved
INSTALL HIGH LEVEL BILGE ALARMS IN FUEL TANK COMPARTMENT, FORE PEAK, AND FORWARD PASSENGER COMPARTMENT IN ACCORDANCE WITH 46 CFR 182.530.
Construction/Loadline
Issued 16 December 1999
Resolved
PROVIDE A FIXED MEANS OF DEWATERING THE FUEL TANK COMPARTMENT.
Navigation
Issued 7 April 1999
Resolved
Remove 121Mhz EPIRB from vessel
Fire Fighting
Issued 7 April 1999
Resolved
Install vent closures for vents servicing engineroom
Fire Fighting
Issued 7 April 1999
Resolved
Install manual pull station for fixed gas fire extinguishing system
Electrical
Issued 7 April 1999
Resolved
Bracket wires at 24" intervals
Fire Fighting
Issued 7 April 1999
Resolved
Make fwd and aft bulkheads fume tight
Fire Fighting
Issued 7 April 1999
Resolved
post operating instructions per 46 CFR 185.612
Navigation
Issued 11 January 1999
Resolved
Reduce route to Coast Wise no more than 20 nm until a Single Side Band radio is installed.
Engineering
Issued 11 January 1999
Resolved
Repair propulsion engine tachometer on bridge.
Construction/Loadline
Issued 11 January 1999
Resolved
Install suction hose on hand bilge pump.
Electrical
Issued 11 January 1999
Resolved
Place electrical switch port side in pilot house in a approved junction box.
Engineering
Issued 11 January 1999
Resolved
Replace lube oil hoses for propulsion engine with Coast Guard approved type.
Lifesaving
Issued 11 January 1999
Resolved
Provide Coast Guard approved or equivilant first aid kit.
Engineering
Issued 11 January 1999
Resolved
Securly mount main engine to keel cooler piping and install Coast Guard approved hoses for intended service.
Construction/Loadline
Issued 11 January 1999
Resolved
Replace installed PVC piping in vessel bilge piping system with approved mettalic piping.
Electrical
Issued 11 January 1999
Resolved
Remount/tighten alternator bracket.
Construction/Loadline
Issued 11 January 1999
Resolved
Submit proposal to repair/replace rotted deck beams #1-5 starboard side in fuel tank compartment.
Engineering
Issued 11 January 1999
Resolved
Replace propulsion engine jacket water hoses with Coast Guard approved hosefor intended service.
Lifesaving
Issued 11 January 1999
Resolved
Install Coast Guard approved 406 MHZ EPIRB.
Documentation
Issued 11 January 1999
Resolved
Provide current copy of 46 CFR 166-199 T-Boat regulations.
Navigation
Issued 11 January 1999
Resolved
Make permanent repairs to steering system. Reinstall cable sheeve.
Electrical
Issued 11 January 1999
Resolved
Make repairs to vessels grounding system.
Electrical
Issued 11 January 1999
Resolved
Permanently mount battery selector switch in engine room.
Construction/Loadline
Issued 29 June 1998
Resolved
SCRAPE OFF WOOD ROT ON BLKHDS AND OVERHEAD OF ENGINEROOM
Construction/Loadline
Issued 29 June 1998
Resolved
PROVIDE REPAIR PROPOSAL TO REPAIR/RENEW PLANKS AND CHINE IN WAY OF ROT AS MARKED AND DISCOVERED DURING REPAIRS. THE ABOVE REPAIRS SHALL BE CORRECTEDTO THE SATISFACTION OF THE ATTENDING [name withheld] CREDIT FOR DRYDOCK AND TAKING ANY PASSENGERS FOR HIRE
Engineering
Issued 29 June 1998
Resolved
TIGHTEN ENGINE FOUNDATION BOLTS
Engineering
Issued 29 June 1998
Resolved
RENEW F/O SUPPLY LINE FROM F/O TANK TO FUEL FILTER
Engineering
Issued 29 June 1998
Resolved
RENEW F/O RETURN LINE
Construction/Loadline
Issued 29 June 1998
Resolved
RENEW PEDRO CONNECTIONS ON THE MAIN SUCTION VALVE TO BAIT/FIRE PUMP, AND SUCTION AND DISCHARGE PEDRO CONNECTIONS ON BILGE AND BAIT PUMPS.
Construction/Loadline
Issued 29 June 1998
Resolved
RECAULK SEAMS AS INDICATED
Construction/Loadline
Issued 29 June 1998
Resolved
TIGHTEN OR RE-FASTEN FLOORS AND CHINE BOLTS IN FWD COMPARTMENT.
Unknown
Issued 17 December 1997
Resolved
Make aft hatch watertight.
Unknown
Issued 17 December 1997
Resolved
Provide 2 adult type I coast Guard approved lifejackets prior to carring more than 28 adults, total.
Unknown
Issued 17 December 1997
Resolved
Provide up-date charts and nautical publications as per 46 CFR 184.420
Unknown
Issued 17 December 1997
Resolved
Provide better ventlation to the aft compartment.
Engineering
Issued 17 December 1996
Resolved
Remove and replace the cowling for the engine exhaust system, when the cowling is off inspect the lagging.
Navigation
Issued 10 January 1996
Resolved
Replace the energency steering arm.
Lifesaving
Issued 10 January 1996
Resolved
Provide 13 additional Coast Guard approved typy 1 adult lifejackets prior to carring more than 24 adults.
Navigation
Issued 12 January 1994
Resolved
PROVIDE AND MAINTAIN CURRENT EDITIONS OF LIGHT LIST, COAST PILOT, AND 46 CFR SUBCHAPTER "T" REGULATIONS.
Navigation
Issued 12 January 1994
Resolved
PROVE PROPER OPERATION OF PORT SIDE RUNNING LIGHT.
Electrical
Issued 12 January 1994
Resolved
REMOVE UNUSED DEAD ENDED WIRE FROM CONTROL PANEL IN WHEEL HOUSE.
Lifesaving
Issued 12 January 1994
Resolved
PROVIDE EIGHT (8) ADDITIONAL CG APPROVED TYPE 1 ADULT LIFE JACKETS PRIOR TOCARRYING MORE THAN TWENTY NINE (29) PERSONS ON BOARD VESSEL.
Construction/Loadline
Issued 12 January 1994
Resolved
REMOVE STANDING WATER FROM BILGES.
Construction/Loadline
Issued 27 April 1993
Resolved
REFASTEN BOTTOM OF FRAM IN WAY OF PACKING GLAND IN ENGINE ROOM.
Navigation
Issued 27 April 1993
Resolved
REPAIR WORM DAMAGE TO RUDDER IN WAY OF THE UPPER RUDDER POST.
Engineering
Issued 27 April 1993
Resolved
REPLACE CUTLASS BEARING.
Construction/Loadline
Issued 27 April 1993
Resolved
SCRAPE AND TREAT ROT ON THE UNDER DECKS, FRAMES AND KNEES ON THE STBD SIDE OF THE ENGINE ROOM.
Construction/Loadline
Issued 9 December 1992
Resolved
CLEAN AND TREAT FURRING IN ENGINE ROOM IN WAY OF OUTBOARD UPPER CORNERS ANDIN FUEL TANK COMPARTMENT ON FORWARD BULKHEAD.
Construction/Loadline
Issued 9 December 1992
Resolved
SUBMIT PROPOSED PLANS/DRAWINGS TO PROVIDE HOUSE WITH 6 INCH COAMING OR WATERTIGHT HATCHES FOR MAIN DECK IN ACCORDANCE WITH 46CFR171.124
Lifesaving
Issued 9 December 1992
Resolved
PROVIDE WEAKLINK FOR LIFEFLOAT.
Documentation
Issued 9 December 1992
Resolved
PROVIDE PROOF OF APPROVED DRUG TESTING PROGRAM.
Construction/Loadline
Issued 9 December 1992
Resolved
SUBMIT PROPOSED PLANS/DRAWINGS TO PROVIDE SUFFICIENT AMOUNT OF FREEING- PORTS IN ACCORDANCE WITH 46CFR171.155
Unknown
Issued 23 April 1992
Resolved
PROVIDE MEANS FOR SECURING BAIT TANK VALVE OPEN, ALLOWING ONLY VESSEL'S CREW THE OPPORTUNITY TO OPEN.
Construction/Loadline
Issued 23 April 1992
Resolved
INSTALL A SERRATED FERREL PIPE INWAY OF RAW WATER DISCHARGE SIDE OF PUMP ATFLEX HOSE PVC PIPE CONNECTION.
Construction/Loadline
Issued 23 April 1992
Resolved
INSTALL HEAD FLUSH VALVES AT TOILET BOWLS.
Lifesaving
Issued 2 January 1992
Resolved
PROVIDE PHYSICAL BARRIER SEPARATING ADULT FROM CHILDREN'S LIFE PRESERVERS IN STORAGE LOCKER.
Construction/Loadline
Issued 2 January 1992
Resolved
MAKE WATERTIGHT THE WEATHERTIGHT VENTS LOCATED IN THE ACCESS AHCTCH COMBINGTO THE FORWARD COMPARTMENT. VENTS ARE PRESENTLY WITHIN 12 INCHES OF THE DECK.
Lifesaving
Issued 2 January 1992
Resolved
PROVIDE TWO FOUR FOOT PADDLES FOR LIFE FLOAT.
Navigation
Issued 2 January 1992
Resolved
PROVIDE BELL TO COMPLY WITH RULES OF THE ROAD.
Electrical
Issued 2 January 1992
Resolved
LABEL FUSE CIRCUITS IN FUSE BOX.
Lifesaving
Issued 2 January 1992
Resolved
PROVIDE 6 ORANGE SMOKE AND 6 RED FLARES.
Construction/Loadline
Issued 17 July 1991
Resolved
REPLACE CAULKING SEAM, GARBER STRAKE TO KEEL AND ELSEWHERE AS NEEDED._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 17 July 1991
Resolved
CONTACT THIS OFFICE TO SCHEDULE CHECK OF WATERTIGHT INTEGRITY._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 17 July 1991
Resolved
TREAT AREAS DETAILED ITEM 1 THIS CASE TO BE TREATED WITH APPROPRIATE SOLUTION._x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 17 July 1991
Resolved
SUBMIT REPAIR PROPOSAL FOR 7TH FRAME AFT OF FORWARD BULKHEAD PORT SIDE 3RD COMPARTMENT AFT OF BOW. THIS PROPOSAL SHALL INCLUDE REPLACEMENT OF FRAME, KNUCKLE, DECK BEAM AND REPAIR AND OR REPLACEMENT OF ADJACENT PLANKS AS NEEDED, TO THIS OFFICE._x001C_
Construction/Loadline
Issued 17 July 1991
Resolved
COMPETE SATISFACTORILY ALL REPAIRS DETAILED IN ITEM 1 THIS CASE._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 2 January 1991
Resolved
PROPERLY MOUNT THROTTLE CABLE THROUGHOUT VESSEL._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 January 1991
Resolved
PROVIDE TWO PADDLES PER LIFE FLOAT APPROPRIATELY STENCILLED WITH VESSEL NAME._x001C_ _x001C_ _x001C_
Documentation
Issued 2 January 1991
Resolved
PROVIDE CURRENT DOCUMENTATION OF VESSEL._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 January 1991
Resolved
RELOCATE WATERLIGHTS FOR LIFE FLOATS TO AN AREA THEY CAN FLOAT FREELY._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 2 January 1991
Resolved
INSTALL SECURING MECHANISMS ON THE TWO FLUSH-DECK HATCHES ON THE WEATHERDECK._x001C_ _x001C_ THIS ITEM IS REISSUED FROM CASE # MI90039161._x001C_
Construction/Loadline
Issued 2 January 1991
Resolved
SCRAPE AND TREAT AREA OF FRAME WHERE DRILLING FOR BOLTS TO SECURE BAIT BOX HAS ALLOWED ROT TO START._x001C_ _x001C_ _x001C_
Navigation
Issued 2 January 1991
Resolved
PROVIDE CURRENT COMPASS DEVIATION CARD._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 January 1991
Resolved
REPLACE FOUR ADULT LIFE JACKETS._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 2 January 1991
Resolved
SECURE BOLTS UPPER PORT PLATE FOR STEERING PULLEY BUSHING._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 14 November 1990
Resolved
INSTALL SECURING MECHANISMS ON THE TWO FLUCH-DECK HATCHES ON THE WEATHERDECK.
Construction/Loadline
Issued 5 January 1990
Resolved
REPAIR AND SECURE HATCH FOR COMPARTMENT AFT OF COLLISION BULKHEAD.
Construction/Loadline
Issued 5 January 1990
Resolved
CLEAN AND TREAT FURRING DECK PLANKING AND BEAMS IN THE ENGINE ROOM WHERE THE DECK MEETS THE SIDESHELL.
Construction/Loadline
Issued 5 January 1990
Resolved
PROPERLY INSTALL PERMANENT VENTS (ONE PORT AND ONE STBD) FOR THE LAZERETTE.
Construction/Loadline
Issued 5 January 1990
Resolved
MAKE HATCH TO LAZERETTE WATER TIGHT.
Accommodation/Occupational Safety
Issued 5 January 1990
Resolved
REPLACE/MODIFY OVERBOARD DISCHARGE VALVE TO MSD SO VALVE CAN BE LOCKED SHUTIN U.S. WATERS.
Construction/Loadline
Issued 5 January 1990
Resolved
CLEAN AND TREAT SOFT OR MOLDY FRAMES AND PLANKING IN LAZERETTE.
Lifesaving
Issued 26 January 1989
Resolved
PROVIDE 11 ADULT AND 1 CHILD PFD. VSL RESTRICTED TO 35 TOTAL PERSONS UNTIL CORRECTED.
Lifesaving
Issued 3 January 1989
Resolved
PROVIDE 11 ADULT AND 1 CHILD PFD.VSL RESTRICTED TO 35 TOAL PERSONS UNTIL CORRECTED.
Navigation
Issued 3 January 1989
Resolved
REPACK RUDDER POST .
Construction/Loadline
Issued 3 January 1989
Resolved
HARD PIPE KEEL COOLER BETWEEN ISOLATION VALVES AND HULL PLANKING.
Engineering
Issued 8 January 1988
Resolved
INSTALL USING SOUND MARINE PRACTICE KEEL COOLER ISOLATION VALVES.
Accommodation/Occupational Safety
Issued 21 January 1987
Resolved
REPAIR OR REMOVE MECHANICAL VENTILATION IN ENGINEROOM.
Electrical
Issued 21 January 1987
Resolved
INSTALL LEAD LINED OR FIBERLAS BATTERY STORAGE BOX
Documentation
Issued 21 January 1987
Resolved
PROVIDE CURRENT RADIOTELEPHONY CERTIFICATE.
Fire Fighting
Issued 21 January 1987
Resolved
INSTALL PROPER NOZZLE TO FIRE HOSE
Lifesaving
Issued 21 January 1987
Resolved
VESSEL IS RESTRICTED TO CARRYING 30 ADULT PASSENGERS UNTIL ADDITIONAL 14 PFDS ARE PROVIDED
Lifesaving
Issued 21 January 1987
Resolved
PROPERLY CONNECT WATERLIGHT TO RINGBUOY AND LIFEFLOATS.
Lifesaving
Issued 18 March 1986
Resolved
PROVIDE ONE ADDITIONAL ADULT PFD.UNTIL PROVIDED,VSL RESTRICTED TO MAX OF 45PERSONS,43PAX.
Construction/Loadline
Issued 10 January 1985
Resolved
RENEW ALL UNDER DECK FRAMING IN THE ENGINE ROOM.THIS ITEM MAY BE COMPLETED WHILE THE VESSEL IS IN THE WATER.THIS ITEM TO BE COMPLETED BEFORE CARRYING PASSENGERS BUT NO LATER THAN 30 NOV 84.
Unknown
Issued 10 January 1985
Resolved
NOTIFY [name withheld] SHAFT,BEARINGS,SCREW,RUDDER,AND DECKING AND DECK FITTINGS ARE BACK IN PLACE.THIS ITEM TO BE COMPLETED BEFORE THE VESSELIS PLACED IN THE WATER BUT NO LATER THAN 30 NOV 84.
Construction/Loadline
Issued 10 January 1985
Resolved
RENEW WORM DAMAGED SECTION OF PLANKING(MINIMUM THREE FRAMES LONG)ON STBD SIDE CHINE.NOTIFY [name withheld] SECTION IS REMOVED AND BEFORE PUTTING IN NEW SECTION.THIS ITEM TO BE COMPLETED PRIOR TO VESSEL BEING PLACED IN WATER BUT NO LATER THAN 30 NOV 84.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.