MAURY USCG vessel records Sign in
← All vessels

EMITA II

EMITA II is a 1953 passenger vessel (inspected). The Coast Guard has recorded 73 inspections since 1985, most recently in June 2026, along with 130 deficiencies, 1 operational control and 2 casualty investigations between 2022 and 2023.

Records from 1985 to 2026. Most recent: inspection, 1 June 2026.

Built
1953
Last inspected
1 June 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDK2366
Flag
UNITED STATES
368034840
Maury page id
psix-42866

Inspections, by type

…with no type recorded6
Years with a record 37 calendar years (1985–2026)
The 73 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)60.8 ft × 21.1 ft × 6.5 ft
Registered tonnagegross 13 / net 8
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORPORATION · WARREN, RI, UNITED STATES · built 1953
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMICHIGAN CITY, IN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 May 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Regulatory (Subpart C or D), Gross Ton
8 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDK2366MMSI 368034840 · active · compulsorily equipped · granted 1 May 2018, expires 1 May 2028
WDI8010MMSI 367734420 · expired · compulsorily equipped · granted 17 May 2016, cancelled 27 June 2026
WDD2251MMSI 367112930 · expired · compulsorily equipped · granted 10 May 2006, cancelled 16 July 2016
WJ5277MMSI not assigned · expired · compulsorily equipped · granted 5 June 1995, cancelled 27 August 2005
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 73

1 June 2026 Hull Examination
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 8385234
13 May 2026 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8373563
25 April 2026 Administrative Inspection
Administrative · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 8355802
12 September 2025 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8234554
21 July 2025 Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8193039
3 December 2024 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8042563
17 September 2024 In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8006192
3 September 2024 COI Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7991793
8 September 2023 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7787445
22 June 2023 Type not recorded
No type recorded · Station Michigan City · USCG Great Lakes District (CGD-GL) · Activity 7721017
21 June 2023 Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7720271
21 June 2023 Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7764016
31 May 2023 In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7710536
15 November 2022 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7601195
31 October 2022 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7586593
8 September 2022 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7553784
10 July 2022 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7502788
10 July 2022 Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7516777
5 October 2021 Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7327026
8 September 2021 Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7307119
19 May 2021 Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Grand Haven · USCG Great Lakes District (CGD-GL) · Activity 7200977
17 May 2021 Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7199128
12 August 2020 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7032211
11 September 2019 COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6809131
30 May 2018 Annual Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6434254
23 May 2018 COI Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6421713
12 April 2018 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6399334
15 May 2017 Deficiency Check · COI Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6146236
25 May 2016 Administrative Inspection · Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5937735
14 March 2016 Drydock Exam · Internal Structural Exam · Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5833004
23 May 2012 Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4319639
7 May 2012 DAPI Audit · COI Inspection · Simplified Stability Test
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4304908
9 December 2011 Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4204902
8 May 2009 Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3472652
6 May 2008 Periodic Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3201027
5 May 2006 Annual Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2641243
6 June 2005 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2441648
25 April 2005 Damage Survey
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2340366
13 May 2004 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2066321
27 May 2003 Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1799684
1 October 2002 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1682761
3 July 2002 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1640495
22 April 2002 COI Inspection · Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1607579
22 May 2001 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1370203
18 May 2000 Deficiency Check · Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1420325
27 April 1999 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 795275
27 April 1999 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1360944
11 March 1999 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 811199
5 May 1998 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1427507
3 June 1997 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 786900
23 May 1997 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1371823
2 May 1997 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1383526
17 April 1997 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1406027
1 May 1996 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1359098
8 January 1996 Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1427152
10 May 1995 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1436988
17 June 1994 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1407350
23 May 1994 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1356651
7 August 1993 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 844568
13 July 1993 Plan Review "T" Boat
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1354391
26 May 1993 Plan Review "T" Boat · COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1354339
9 July 1992 Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1258098
29 April 1992 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1379687
6 May 1991 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 928460
28 November 1990 Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1221975
7 May 1990 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1223983
4 May 1989 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1199685
3 May 1988 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1037508
5 May 1987 COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1026335
9 May 1986 Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1302743
10 April 1986 Credit Drydock · Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 988214
10 April 1986 Credit Drydock
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1301841
7 May 1985 Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 979484

Deficiency record · 130

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 April 2026 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel lost all propulsion while underway due to mechancial failure.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2026
Resolved 13 May 2026
Resolution: flood light dropped from overhead and tripped air dampener.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 September 2024 Resolved
Where flexible non metallic hoses are is used it must meet SAE J-1942. The newly installed flex hoses in the fuel system does not meet SAE J-1942. Remove all Pirtek hose and replace with hose meeting SAE J-1942.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 3 December 2024
Resolution: Proof of proper hoses installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 September 2024 Resolved
An adult lifejacket must be carried for each person onboard. One adult lifejacket is missing. Provide one adult type I jacket for a total of 152 adult jackets.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 September 2024 Resolved
A vessel must provide a number of child size like jackets equaling 10% of the total passengers permitted onboard. The vessel is short 3 child size jackets. Provide 3 additional child jackets for a total or 16
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 September 2024 Resolved
The number and identification of their sizes must be marked in legible letters on each container for lifejackets. Mark the PORT side door with the number and size of lifejackets stowed inside.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 3 December 2024
Resolution: Placard placed on ordered
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 3 September 2024 Resolved
Protection must be provided at such locations where persons might come in contact with the exhaust pipe. There is a large area of missing lagging on the main engine exhaust pipe in the engine room. Replace missing exhaust.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 3 December 2024
Resolution: Lagging placed on order
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 3 September 2024 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 3 September 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2024 Resolved
Electrical equipment on a vessel must be installed to protect passengers and other persons from electrical shock. Mount the surge trap behind the bar.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 3 December 2024
Resolution: Surge protector mounted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 3 September 2024 Resolved
Bulwarks installed around the periphery of the deck must provide adequate strength. There is a bow bulwark. Repair the same.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2024
Resolved 3 December 2024
Resolution: Weld repair is complete.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2023 Resolved
01-Vessel life ring needs SOLAS reflective tape type II installed.
Action required: 10 - Deficiency Rectified
Resolved 8 September 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 September 2023 Resolved
Electrical outlet outdoor behind pilot house needs new cover.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2023
Resolved 23 October 2023
Resolution: Outlet replaced
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2023 Resolved
Vessel power driven fire pump is inoperable. Repair and test to the satisfaction of the attending Marine Inspector prior to operating with passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 September 2023
Resolution: Attended op test, all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 September 2023 Resolved
Vessel is missing 04 child sized lifejackets to be compliant with the 16 on the COI. Provide 4 additional child lifejackets. Total persons onboard is reduced to 120 (177 pax and 3 crew) until life jackets are provided
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2023
Resolved 23 October 2023
Resolution: Life jackets have been added.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 June 2023 Resolved
Vessel lost propulsion while underway with passengers and could not restart main engine. Determine cause and effect repairs to the satisfaction of an attending Coast Guard Marine Inspector prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2023
Resolved 22 June 2023
Resolution: Main engine fuel injector pump was replaced. Cleared outstanding requirement.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 8 September 2022 Resolved
The vessel's stability letter issued on 11Jun12 requires the concrete ballast in compartments 2, 4, & 5 to be coated to prevent absorbtion of water. Re-coat the concrete ballast in compartments 2, 4, & 5.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2022
Resolved 15 November 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 8 September 2022 Resolved
Replace the gaskets on all hatches to ensure watertight/weathertight integrity.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2022
Resolved 31 October 2022
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 September 2022 Resolved
Provide valid first-aid cards for deckhands [name withheld] & [name withheld].
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2022
Resolved 31 October 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 September 2022 Resolved
Provide an anchor light that provides 360 degree visibility.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2022
Resolved 31 October 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 July 2022 Resolved
While vessel was underway with passengers, it experienced a loss of propulsion and needed tow back to pier. Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel must make repairs/perform maintenance to propulsion plant to determine casualty cause and perform testing to the satisfaction of local OCMI prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 July 2022
Resolution: Maintenace performed, correction action completed, tested SAT.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 September 2021 Resolved
Fire/Bilge pump overboard discharge spool piece found wasted. Renew and prove proper operation prior to carrying passengers.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 14 September 2021
Resolved 10 September 2021
Resolution: All wasted piping was replaced with new, Test all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 September 2021 Resolved
Ring Buoy grab line is dry rotted. renew Ring Buoy.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 September 2021
Resolved 5 October 2021
Resolution: Proof of replacement provided.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 8 September 2021 Resolved
Random DAPI pool does not cover all employees. Provide accurate list.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2021
Resolved 5 October 2021
Resolution: Revised DAPI random pool list provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 May 2021 Resolved
Vessels Drydock exam and Internal Structural Exam was found past due. Due date was 30APR2021 as noted on the Certificate Of Inspection(COI). Prior to carrying passengers make vessel available for above inspections.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2021
Resolved 20 May 2021
Resolution: Completed satisfactory drydock and ISE
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 August 2020 Resolved
FWD void bilge suction valve reach rod not installed permanently. Provide permeant installation for rod. 46 CFR 182.510 (d)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 August 2020
Resolution: Provided proof that reach rod is permenatly installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 August 2020 Resolved
Vessel is restricted to operate with only 55 total persons, 05 children until 97 adult/extended size life jackets and 11 child jackets are added to vessel. 46 CFR 180.71
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 August 2020
Resolution: Vessel provided proof of newly purchased lifejackets and properly placed into service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 12 August 2020 Resolved
Two 12 volt battery chargers in engine room need amp meters installed on charging circuit. 46 CFR 183.350 (f)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 September 2020
Resolution: Operator provided proof of meters installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 August 2020 Resolved
Remove the polystyrene in engine space vestibule. 46 CFR177.405 (a)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2020
Resolution: All foam was removed from Vestibule
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 August 2020 Resolved
Properly label life jacket stowage cabinet on upper deck 2" block letters 46 CFR 185.604 (f)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 September 2020
Resolution: Operated provided proof of proper labeling.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 August 2020 Resolved
Provide onboard noncombustible waste receptacles. 46 CFR 177.405 (f)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 September 2020
Resolution: Proof of metal waste recepticle provided.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 12 August 2020 Resolved
Provide great lakes radio inspection, provide FCC radio operator permits for masters, and radio station log book. 47 CFR 80
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 September 2020
Resolution: Operator provided copy of the issued GL agreement
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 August 2020 Resolved
Remove excess stores from all void spaces. 46 CFR 178.330 (a) (4)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 August 2020
Resolution: Vessel has removed all non-used items from void spaces.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 12 August 2020 Resolved
Properly renew with good metal STBD side area in galley at main deck. 46 CFR 176.802
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2020
Resolution: All metal was cropped and renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 August 2020 Resolved
Properly mark ring buoys with vessel name in block letters. 46 CFR 185.604 (b)
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2020
Resolution: Ring buoy was properly labeled.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 12 September 2019 Resolved
Missing annual fire extinguisher servicing report. Provide proof of annual servicing prior to carrying passengers. 46 CFR 176.810(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 September 2019
Resolved 13 September 2019
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 12 September 2019 Resolved
Missing Nav chart and all required Nav publications. Provide all required Nav pubs and charts on board prior to carrying passengers. 46 CFR 184.420
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 12 September 2019
Resolved 13 September 2019
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 May 2018 Resolved
Place port and stbd running lights to ensure proper are of visibility.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2018
Resolved 12 September 2019
Navigation › Piloting/Steering › Magnetic Compass
Issued 30 May 2018 Resolved
Ensure compass is illuminated
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2018
Resolved 12 September 2019
Documentation › Logs/Records › Garbage Recordkeeping
Issued 30 May 2018 Resolved
Post waste management plan
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2018
Resolved 12 September 2019
Documentation › Logs/Records › Logbook (official)
Issued 30 May 2018 Resolved
Post station bill
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2018
Resolved 12 September 2019
Electrical › Electric Supply System (service) › Cable
Issued 15 May 2017 Resolved
Secure starter cables laying in engine room bilge.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Engineering › Fuel Oil Service System › Hose
Issued 15 May 2017 Resolved
Secure fuel lines laying in engine room bilge.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Engineering › Generator (propulsion/auxiliary-electric) › Equipment Grounding Circuitry
Issued 15 May 2017 Resolved
Properly secure starboard side generator.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 15 May 2017 Resolved
Both port and startboard topside lifejacket boxes need to be properly labeled with contents and count.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 15 May 2017 Resolved
Batter in lifering water light needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Fire Fighting › Fire Pumps › Capacity
Issued 15 May 2017 Resolved
Repair leaking fire pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 15 May 2017 Resolved
Repair leaking transmission control lever.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 15 May 2017 Resolved
Secure loose freezer on main deck.
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 15 May 2017 Resolved
Conduct emergency drills prior to operation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Engineering › Steering Gear System › Cable
Issued 15 May 2017 Resolved
Replace broken section of steering cable in void # 2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2017
Resolved 23 May 2017
Resolution: Cleared to the satisfaction of the attending marine inspector.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 May 2016 Resolved
Replace 30 adult life jackets due to failed coverings. Passenger count is reduced to 122 until additional type I life jackets are provided.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2016
Resolved 15 May 2017
Resolution: Vessel's life jackets were verified during the COI inspection.
Lifesaving › Lifebuoys › Serviceable
Issued 25 May 2016 Resolved
Replace ring buoy or grab line for buoy as it was found deteriorated.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 May 2016
Resolved 25 May 2016
Resolution: New Ring buoy provided prior to MI's departure.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 25 May 2016 Resolved
Install chaffing gear at contact points of flexible hose in engine room.
Action required: 705 - Other - as specified
Due 23 June 2016
Resolved 23 June 2016
Resolution: Received notification from o/o installation corrected.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 May 2016 Resolved
Remove all portable work lighting from void spaces and install approved installations IAW provided cite.
Action required: 705 - Other - as specified
Due 29 July 2016
Resolved 21 July 2016
Resolution: Portable lights removed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 May 2016 Resolved
Provide exhaust fan guard.
Action required: 705 - Other - as specified
Due 23 June 2016
Resolved 23 June 2016
Resolution: Received notification from o/o that guard has been installed. To be verified during def check.
Engineering › Bilge Water Management System › Valve
Issued 25 May 2016 Resolved
Provide operable reach rod for forepeak bilge suction valve.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 25 May 2016
Resolution: Valve removed thus securing the bilge line. O/o intends to install new reach rod during op season. Arrangement meet regs w/o valve.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 May 2016 Resolved
Remove extension cords and provide appropriate branch hard wired lines with outlets for galley equipment.
Action required: 705 - Other - as specified
Due 23 June 2016
Resolved 23 June 2016
Resolution: Received notification from o/o that branch lines have been extended with appropriate outlets provided in the vicinity of galley equipment.
Engineering › Diesel Engine (propulsion-direct drive) › Gear, Timing
Issued 7 May 2012 Resolved
Repair main engine pulley guard bracket.
Due 25 May 2012
Resolved 9 May 2013
Resolution: Witnessed satisfactory repair of bracket.
Stability › Watertight Integrity › General
Issued 7 May 2012 Resolved
Complete deck repairs prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2012
Resolved 23 May 2012
Resolution: Deck Repaired
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 8 May 2009 Resolved
Vessel is limited to no more than 146 persons until 6 Adult pfd's are provided.
Action required: 705 - Other - as specified
Due 22 May 2009
Resolved 27 May 2009
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 8 May 2009 Resolved
Provide proof of accurate MIS report showing total pool numbers and breakdown of company personel.
Action required: 705 - Other - as specified
Due 22 May 2009
Resolved 13 May 2009
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 May 2009 Resolved
Make permanent repairs or replace engine belt guard prior to 2010 season.
Action required: 705 - Other - as specified
Due 31 May 2010
Resolved 10 May 2010
Stability › Watertight Integrity › General
Issued 8 May 2009 Resolved
Prior to operating in 2010 season install gasket material on all deck hatches and ensure dogging devices are operable.
Action required: 705 - Other - as specified
Due 31 May 2010
Resolved 10 May 2010
Lifesaving › Lifebuoys › Serviceable
Issued 6 May 2008 Resolved
Replace ring buoy or replace grab line with uv resistant line of sufficient length.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2008
Resolved 13 May 2008
Resolution: New ring buoy placed into service with the appropriate markings, line and quick disconnect with lanyard for light.
Fire Fighting › Ventilation Systems › Ducts
Issued 6 May 2008 Resolved
Correct routing of engine room ventilation system at funnels on upper deck and in the galley.
Action required: 705 - Other - as specified
Due 8 June 2008
Resolved 8 May 2009
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 6 May 2008 Resolved
Replace 3 adult life jackets, until replacement vessel is limited to 146 passengers.
Action required: 705 - Other - as specified
Due 6 May 2008
Resolved 13 May 2008
Resolution: New jacket placed into service with appropriate markings.
Stability › Incline Test › General
Issued 6 May 2008 Resolved
Replace concrete fixed ballast in voids 4 - 2100 lbs and 5 - 800 lbs removed for inspection of hull.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2008
Resolved 13 May 2008
Resolution: Concrete replaced and verified this date.
Operations/Management › Drug and Alcohol Testing › Testing, Serious Marine Incident
Issued 5 May 2006 Resolved
Prior to operating provide required documentation for annual DAPI Audit.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2006
Resolved 5 May 2006
Resolution: Cleared requirement with discussion with o/o identifying general intent of reg covered by company policy. This office is working with o/o to modify company policy to substantially meet all items from DAPI audit.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 5 May 2006 Resolved
Vessel is limited to carry no more than 133 adult passengers until 19 Type I PFD's are provided with appropriate retrorelflective material.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: Reflective tape and name affixed to all jackets with an additional 7 jackets on board.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 5 May 2006 Resolved
Vessel is limited to daytime operations until properly operating watertight for ring lifebuoy is provided.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: New watertight installed with lanyard and clip.
Documentation › Certificates/Documents › FCC SSL
Issued 5 May 2006 Resolved
Vessel is limited to operating no more than 1,000 feet from the shoreline until valid FCC Station License is provided.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: New station license provide and posted in pilot house.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 5 May 2006 Resolved
Segregate child-sized lifejackets from adult and properly label their stowage location.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: Adequate segregation provide for lifejackets.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 May 2006 Resolved
Remove all extension cords and properly hardwire as appropriate.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: Two additional electrical lines ran in MSD space with adequate support and protection.
Electrical › Electric Generation Source (service) › Generator
Issued 5 May 2006 Resolved
Repair port generator returning cooling line.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: Hose replaced due to entire line brittle. Tested system with sat results.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 5 May 2006 Resolved
Replace crimp connection on negative conductor for starter solenoid.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: New crimp connector installed with shrink wrap coating.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 5 May 2006 Resolved
Tailor recommended emergency instructions listed in 46CFR185.512 and post in accordance with 46CFR185.510.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 7 June 2006
Resolution: Procedures aligned to company policy and meet needs for vessel emergencies.
Construction/Loadline › Structures › Deck Plating
Issued 5 May 2006 Resolved
V/W longitudinal deck supports in way of compartment forward of collision bulkhead. Two supports either side of center line found with cracked welds at union to aft transverse bulkhead. Deferred required repair to be completed prior to 2007 operating season.
Action required: 705 - Other - as specified
Due 4 May 2007
Resolved 14 May 2007
Resolution: Viewed repairs finding all satisfactory completed.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear, Timing
Issued 13 May 2004 Resolved
repair inoperative main engine tachometer on bridge
Due 13 June 2004
Resolved 6 June 2005
Resolution: Witnessed satisfactory operation of engine monitoring gauges.
Operations/Management › Drills/Instruction
Issued 22 April 2002 Resolved
Conduct drills in presence of marine inspector.
Due 26 May 2002
Resolved 2 July 2002
Construction/Loadline › Structures
Issued 22 April 2002 Resolved
Replace or repair wasted area of stem. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 26 May 2002
Resolved 2 July 2002
Electrical › Electric Generation Source (service)
Issued 22 April 2002 Resolved
Repair wiring to cooler unit in galey. LEGACY COMPONENT DESC: Conductor
Due 26 May 2002
Resolved 2 July 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 22 April 2002 Resolved
Replace / repair leaking raw water pump on main engine. LEGACY COMPONENT DESC: Pump, Positive Displacement
Due 26 May 2002
Resolved 2 July 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 22 April 2002 Resolved
Replace retro-reflective material on 20 PFDs noted. LEGACY COMPONENT DESC: Retroreflective Material
Due 26 May 2002
Resolved 2 July 2002
Lifesaving › Lifebuoys
Issued 22 April 2002 Resolved
Replace life ring buoy.
Due 3 May 2002
Resolved 7 May 2002
Engineering
Issued 22 May 2001 Resolved
Replace 2 hydraulic hoses from main engine reduction gear to engine mountedheat exchanger.
Condition: Unknown
Due 22 June 2001
Resolved 4 December 2001
Engineering
Issued 22 May 2001 Resolved
Inspect all hoses and cables in engine room for chaffing. Install chaffinggear and secure against damage prior to 22June01
Condition: Unknown
Due 22 June 2001
Resolved 4 December 2001
Construction/Loadline
Issued 22 May 2001 Resolved
Install strainers which comply with 46 CFR 182.510 to the bilge piping system in compartments 2,4 and 5, prior to 22 Jun. 01
Condition: Unknown
Due 22 June 2001
Resolved 4 December 2002
Engineering
Issued 22 May 2001 Resolved
Repair and prove operation of fire main system prior to 29 May 01. Provide3 fire buckets in accordance with 46 CFR 181.610, in lieu of fire pump until repairs are made.
Condition: Unknown
Due 29 May 2001
Resolved 4 December 2002
Lifesaving
Issued 18 May 2000 Resolved
place distress signals in bright colored container as per 185.614
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Lifesaving
Issued 18 May 2000 Resolved
conduct fire, emergency drills
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Documentation
Issued 18 May 2000 Resolved
present crew list for dapi audit
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Accommodation/Occupational Safety
Issued 18 May 2000 Resolved
mark sewage holding tank -3/4 full level
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Lifesaving
Issued 18 May 2000 Resolved
present ship's log book describing training and drills performed.
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Navigation
Issued 18 May 2000 Resolved
install emergency broadcast placard as per 184.506
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Lifesaving
Issued 18 May 2000 Resolved
install retroreflective material on ring bouy
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Electrical
Issued 18 May 2000 Resolved
protect wiring in forward cabin under pilot house from damage and chaffing
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Electrical
Issued 18 May 2000 Resolved
repair conduit in 110 vdc circuit in forward hold
Condition: Unknown
Due 18 May 2000
Resolved 31 May 2000
Construction/Loadline
Issued 11 March 1999 Resolved
VESSEL CAN NOT OPERATE WITH PASSENGERS UNTIL IT IS IN COMPLIANCE WITH THE NEW BILGE SYSTEM REGULATIONS.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 5 May 1998 Resolved
BILGE SUCTIONS STRAINERS WERE CLOGGED WITH CORROSION. CLEAN CORROSION FROM STRAINERS TO ENSURE PROPER AREA FOR SUCTION IS MAINTAINED.
Condition: Unknown
Due 5 May 1998
Resolved 11 May 1998
Lifesaving
Issued 5 May 1998 Resolved
SEVERAL PFDS WERE MISSING PIECES OF RETROREFLECTIVE MATERIAL AND/OR REQUIRED MARKING OF VESSEL NAME.
Condition: Unknown
Due 5 May 1998
Resolved 11 May 1998
Lifesaving
Issued 2 May 1997 Resolved
Renew retroreflective material on seven adult PFDs to the satisfaction of the attending USCG Marine Inspector not later than 30MAY97.
Condition: Unknown
Due 2 May 1997
Resolved 2 May 1997
Documentation
Issued 2 May 1997 Resolved
Demonstrate compliance with the drug testing and employee assistance program requirements of 46 CFR 16 to the satisfaction of the attending USCGMarine Inspector not later than 30MAY97.
Condition: Unknown
Due 2 May 1997
Resolved 2 May 1997
Lifesaving
Issued 2 May 1997 Resolved
Conduct to the satisfaction of the attending USCG Marine Inspector a fire drill and a person overboard drill not later than 30MAY97.
Condition: Unknown
Due 2 May 1997
Resolved 2 May 1997
Fire Fighting
Issued 1 May 1996 Resolved
Install mounting brackets for B-II fire extinguishers in galley, passenger accommadation space, and engineroom to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 1 May 1996 Resolved
Revise existing Emergency Instructions and post at operating station iaw 46CFR 185.510/.512 to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 1 May 1996 Resolved
Ensure crew is provided instruction and becomes familiar with the newly revised Emergency Instructions iaw 46 CFR 185.510 to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 1 May 1996 Resolved
Obtain and post PFD donning instructions for Gladding Corporation Kapok Nylon Shell PFDs iaw 46 CFR 185.516 to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 1 May 1996 Resolved
Permanently stencil PFD stowage boxes on second deck to the satisfaction ofthe attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 1 May 1996 Resolved
Secure ovens to prevent movement iaw the provisions of 46 CFR 184.220 to the satisfaction of the attending USCG marine inspector.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Lifesaving
Issued 10 May 1995 Resolved
Replace retro tape on 1 child-size and 10 adult PFDs. Until new retro is installed PFDs are to be removed from vessel and no more than 144 passengers may be carried onboard.
Condition: Unknown
Due 10 May 1995
Resolved 10 May 1995
Engineering
Issued 23 May 1994 Resolved
INSTALL PROPER FLAME SCREEN IN DIESEL TANK FUEL VENT TO THE SATISFACTION OFTHE COGNIZANT OCMI.
Condition: Unknown
Due 23 May 1994
Resolved 23 May 1994
Fire Fighting
Issued 23 May 1994 Resolved
HAVE WEIGHED BY ATTENDENT MARINE INSPECTOR HAND PORTABLE EXTINGUISHERS IAW_x001C_46 CFR 176.25-25(A)(2).
Condition: Unknown
Due 23 May 1994
Resolved 23 May 1994
Unknown
Issued 23 May 1994 Resolved
SUBMIT SKETCHES OR WRITTEN SPECIFICATIONS DESCRIBING SOUND BOX INSTALLATIONIN E/R PER 46 CFR 176.20 TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 23 May 1994
Resolved 23 May 1994
Electrical
Issued 26 May 1993 Resolved
SUBMIT AN AS BUILT DRAWING OF MODIFICATIONS TO THE ELECTRICAL SYSTEM TO THEOCMI FOR APPROVAL.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Electrical
Issued 26 May 1993 Resolved
PROVIDE GUARDS ON THE FLOURESCENT BULBS IN TWO FIXTURES, ONE IN ENGINEROOM AND THE OTHER IN THE LAZZARETTE.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Fire Fighting
Issued 26 May 1993 Resolved
PROVIDE AND INSTALL SUITABLE BRACKETS FOR THE FIRE EXTINGUISHERS.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Lifesaving
Issued 26 May 1993 Resolved
CONDUCT FIRE AND MAN OVERBOARD DRILLS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Documentation
Issued 26 May 1993 Resolved
POST THE EMERGENCY CHECKOFF LIST, GARBAGE PLACARD AND COI IN A LOCATION ACCESSIBLE TO PASSENGERS.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Documentation
Issued 26 May 1993 Resolved
POST THE NEW STABILITY LETER UNDER GLASS IN THE PILOTHOUSE UPON RECEIPT FROM THE OCMI.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Engineering
Issued 26 May 1993 Resolved
PROVIDE A 30X30 MESH FLAME SCREEN IN THE FUEL OIL TANK VENT, PRESENTLY MISSING.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Construction/Loadline
Issued 26 May 1993 Resolved
PROVIDE A CAPTIVE CHAIN OR LINE ON THE FORE PEAK HATCH, WHICH IS NOW EXPOSED TO THE WEATHER DUE TO ALTERATIONS.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Navigation
Issued 26 May 1993 Resolved
MOVE THE MASTHEAD LIGHT TO COMPLY WITH THE VERTICAL POSITIONING REQUIREMENTS OF ANNEX I OF THE INLAND RULES (33 CFR 84.03) OR APPLY FOR A CERTIFICATE OF ALTERNATIVE COMPLIANCE IAW 33 CFR PART 89.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Navigation
Issued 26 May 1993 Resolved
PROVIDE AN ANCHOR LIGHT.
Condition: Unknown
Due 26 May 1993
Resolved 26 May 1993
Lifesaving
Issued 29 April 1992 Resolved
Renew grab line on ring bouy._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Electrical
Issued 29 April 1992 Resolved
Provide overcurrent protection as pointed out by inspector. (1ea. alternator,and 3ea. water pumps,) and demonstrate the operation of the frequency meterfor the #1 S/S generator.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Lifesaving
Issued 6 May 1991 Resolved
PROVIDE ADDITIONAL 23 ADULT PFD'S _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Navigation
Issued 6 May 1991 Resolved
PROVIDE ANCHORING DAYSHAPE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Engineering
Issued 6 May 1991 Resolved
PROVIDE ADEQUATE BILGE SUCTION STRAINERS ON ALL BILGE SUCTION LINES, PRESENT SCREEN IS TOO SMALL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Electrical
Issued 6 May 1991 Resolved
REPLACE WIRE NUTS WITH PROPER COMPRESSION SLEEVE CONNECTIONS AS POINTED OUTBY MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Engineering
Issued 6 May 1991 Resolved
PROVIDE FLAME DEFLECTOR SHIELD ON RACOR FUEL FILTERS AS POINTED OUT BY MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1991
Resolved 6 May 1991
Lifesaving
Issued 5 May 1987 Resolved
PROVIDE ON BOARD 31 ADDITIONAL ADULT TYPE I LIFE PRESERVERS BRINGING TOTAL ABOARD TO 214, AND 2 ADDITIONAL CHILDRENS TYPE I LIFE PRESERVERS BRINGING TOTAL TO 22.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987

Casualty record · 2

10 July 2022Routine · role: Subject of Search and Rescue · activity 7516777
21 June 2023Routine · role: Involved in a Marine Casualty · activity 7764016
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.