Records from 1985 to 1993. Most recent: inspection, 21 April 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
21 April 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1151226
20 April 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 692587
18 April 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 167886
16 December 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1262202
23 April 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 922931
14 February 1991
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 911523
22 January 1991
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 903860
8 March 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1214916
12 February 1990
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 912210
8 January 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 911893
12 December 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 929073
5 January 1989
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1352990
14 December 1988
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1201936
28 January 1988
Hull Examination · Deficiency Check · COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1012097
28 January 1987
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1009332
15 December 1986
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1028048
26 December 1985
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 993391
12 December 1985
Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1298017
30 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1289279
5 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1286244
Construction/Loadline
Issued 16 December 1991
Resolved
ENSURE ALL HATCHES ON MAIN DECK COMPLY WITH 46CFR171.24. (WATER TIGHT INTEGRITY.)
Condition: Unknown
Due 24 January 1992
Resolved 24 January 1992
Construction/Loadline
Issued 16 December 1991
Resolved
REMOVE ROTTED FRAME FROM STBD QUARTER, 5TH FRAME FWD OF STERN.
Condition: Unknown
Due 24 January 1992
Resolved 24 January 1992
Construction/Loadline
Issued 16 December 1991
Resolved
REMOVE ROT FROM PROT RUB RAIL.
Condition: Unknown
Due 24 January 1992
Resolved 24 January 1992
Construction/Loadline
Issued 16 December 1991
Resolved
REPLACE PLANK ON STABOARD SIDE AS DIRECTED BY THE ATTENDING MARINE INSPECTOR. NOTIFY THE MARINE INSPECTION OFFICE AFTER THE PLANK IS REMOVED BUT PRIOR TO REPLACING THE PLANK.
Condition: Unknown
Due 24 January 1992
Resolved 24 January 1992
Construction/Loadline
Issued 16 December 1991
Resolved
REPLACE ALL HULL FASTENINGS AS REQUIRED BY THE MARINE INSPECTOR.
Condition: Unknown
Due 24 January 1992
Resolved 24 January 1992
Electrical
Issued 12 February 1990
Resolved
INSTALL OVER CURRENT PROTECTION IN FEEDER CABLE BETWEEN BATTERY BOW AND BREAKER BOARD.
Condition: Unknown
Due 12 February 1990
Resolved 12 February 1990
Engineering
Issued 12 February 1990
Resolved
REPLACE FLAME SCREEN IN STARDBOARD FUEL TANK VENT.
Condition: Unknown
Due 12 February 1990
Resolved 12 February 1990
Accommodation/Occupational Safety
Issued 12 February 1990
Resolved
LOCK OR DISABLE OVERBOARD DISCHARGE VALVE FROM MSD HOLDING TANK. LABLE DISCHARGE PUMP SWITCH "DO NOT DISCHARGE IN U. S. WATERS".
Condition: Unknown
Due 12 February 1990
Resolved 12 February 1990
Engineering
Issued 12 February 1990
Resolved
INSTALL BELT GUARD ON POWER STEERING PUMP IN ENGINE ROOM.
Condition: Unknown
Due 12 February 1990
Resolved 12 February 1990
Navigation
Issued 12 February 1990
Resolved
PROVIDE DEVIATION CARD FOR MAGNETIC COMPASS
Condition: Unknown
Due 12 February 1990
Resolved 12 February 1990
Construction/Loadline
Issued 8 January 1990
Resolved
SCRAPE AND TREAT FURRING WOOD IN WAY OF ENGINE SPACE HATCH.
Condition: Unknown
Due 8 January 1990
Resolved 8 January 1990
Engineering
Issued 8 January 1990
Resolved
ENCLOSE FUEL SHUTOFFS SO AS TO BE OPERABLE FROM OUTSIDE THE SPACE.
Condition: Unknown
Due 8 January 1990
Resolved 8 January 1990
Electrical
Issued 8 January 1990
Resolved
PROPERLY SUPPORT AND SPLICE WIRE RUNS FWD OF MAIN ENGINE.
Condition: Unknown
Due 8 January 1990
Resolved 8 January 1990
Engineering
Issued 28 January 1988
Resolved
INSTALL FLAME SCREENS ON FUEL TANK VENTS.
Condition: Unknown
Due 28 January 1988
Resolved 28 January 1988
Engineering
Issued 28 January 1988
Resolved
REMOVE OR REPAIR TACHOMETER OUTSIDE ENGINE COMPARTMENT.
Condition: Unknown
Due 28 January 1988
Resolved 28 January 1988
Engineering
Issued 28 January 1988
Resolved
REMOVE OIL PRESSURE AND TEMPERATURE GAUGE FROM MAIN CABIN.
Condition: Unknown
Due 28 January 1988
Resolved 28 January 1988
Deck/Cargo
Issued 28 January 1988
Resolved
REPAIR WINDLASS AND PROVE OPERATION.
Condition: Unknown
Due 28 January 1988
Resolved 28 January 1988
Lifesaving
Issued 28 January 1988
Resolved
RE-RUN LINE THROUGH SPOOL ON B/A SO THAT IT WILL FLOAT FREE FROM VESSEL.
Condition: Unknown
Due 28 January 1988
Resolved 28 January 1988
Accommodation/Occupational Safety
Issued 12 December 1985
Resolved
REPLACE 1" INTAKE LINE TO MSD AND DOUBLE CLAMP BOTH ENDS OF LINE.
Condition: Unknown
Due 12 December 1985
Resolved 12 December 1985
Accommodation/Occupational Safety
Issued 12 December 1985
Resolved
DOUBLE CLAMP 2" DISCHARGE LINE FROM MSD AT VALVE.
Condition: Unknown
Due 12 December 1985
Resolved 12 December 1985
Accommodation/Occupational Safety
Issued 12 December 1985
Resolved
PROVE 'Y' VALVE ON MSD OPERATIONAL AND PROVIDE POSITIVE CLOSING DEVICE.
Condition: Unknown
Due 12 December 1985
Resolved 12 December 1985
Construction/Loadline
Issued 12 December 1985
Resolved
REPLACE UPPER CONNECTION ON BAIT TANK SEA SUCTION VALVE AND DOUBLE CLAMP HOSE.
Condition: Unknown
Due 12 December 1985
Resolved 12 December 1985
Lifesaving
Issued 5 January 1985
Resolved
PROVIDE 3 ADULT, 1 CHILD LIFE PRESERVER AND TAPE ON 3 OTHER (2A,1C)
Condition: Unknown
Due 5 January 1985
Resolved 5 January 1985
Documentation
Issued 5 January 1985
Resolved
1,CONDUCT A STIBILTY TEST FOR YOUR VESSEL PRIOR TO MARCH 02,1985
Condition: Unknown
Due 5 January 1985
Resolved 5 January 1985