Records from 1985 to 2010. Most recent: inspection, 5 November 2010.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
5 November 2010
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3894212
4 December 2007
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3109110
6 June 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2671835
20 May 2002
Administrative Inspection
Administrative · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1630479
10 May 2002
Examination of Repairs · Deficiency Check · Hull Examination
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 1616509
1 October 2001
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1451734
30 June 2000
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1051551
26 April 2000
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1049333
7 April 2000
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1404939
8 October 1999
Examination of Repairs
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1436268
2 April 1999
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1432081
11 January 1999
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 788837
22 September 1998
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 212676
14 August 1998
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 110472
9 March 1998
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1459378
7 July 1997
Damage Survey
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1371899
20 May 1997
Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1402457
9 May 1997
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 151610
28 March 1997
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1428770
6 April 1994
Hull Examination · COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 857676
22 March 1993
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 835976
11 March 1992
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 944525
28 February 1991
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 995252
28 February 1990
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 911434
14 April 1989
Re-Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1344218
29 February 1988
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1029505
26 February 1987
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1325308
4 March 1986
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 988628
8 March 1985
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1286950
Construction/Loadline › Hull › Bottom Plating
Issued 10 May 2002
Resolved
Conduct gauging of the forward/aft rakes and at least two belts in the midships section.
Condition: Improper/Lack of Maintenance
Due 20 May 2002
Resolved 10 May 2002
Construction/Loadline › Penetrations › Bottom Plug Packing
Issued 10 May 2002
Resolved
Remove the starboard propulsion shaft. Conduct inspection of stern tube bearing and install new shaft sleeve.
Condition: Improper/Lack of Maintenance
Due 21 May 2002
Resolved 10 May 2002
Construction/Loadline › Hull › Hull Plating
Issued 10 May 2002
Resolved
Remove standing water in the engineroom, gas free, and clean space for inspection.
Due 21 May 2002
Resolved 10 May 2002
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 1 October 2001
Resolved
CO2 fire extinguisher in aft port main deck area must be provided with an approved bracket prior to 14 August 2001._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 1 October 2001
Resolved
Life ring on main deck needs line attached IAW 46 CFR 160.050-4(c) prior to14 August 2001._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Electrical
Issued 1 October 2001
Resolved
Install covers on bare lights on main deck prior to 14 August 2001._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Penetrations › Valve Flange
Issued 1 October 2001
Resolved
Prior to carrying passengers but not later than 14 August 2001, install valves on through hull fittings for raw water intakes in way of both the port and starboard main engines.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline
Issued 1 October 2001
Resolved
Clean after steering to make hull available for inspection by 16 July 2001._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 1 October 2001
Resolved
Complete annual reinspection (RIN) prior to carrying passengers; all internal spaces must be clean and available for inspection.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 1 October 2001
Resolved
Prior to operating starboard main engine but not later than 14 August 2001,remove overboard discharge breather line to crank case._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Engineering › Freshwater System (cylinder head cooling) › Piping
Issued 1 October 2001
Resolved
Replace flex hose on raw water lines on port main engine (4 total) prior to14 August 2001._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder
Issued 1 October 2001
Resolved
Prior to carrying passengers but not later than 14 August 2001, prove proper operation of starboard main diesel engine.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Hull › Hull Plating
Issued 1 October 2001
Resolved
Prior to carrying passengers provide gauging report of aft bulkhead (transom) in after steering and submit repair proposal to MSO Memphis. Gaugings must be taken 2" from the bottom deck plating, than at 6" and 18" from the bottom and one taken 2" from the overhead.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 1 October 2001
Resolved
Prior to carrying passengers provide gauging report of aft bulkhead in engine room and submit repair proposal to MSO Memphis. Gaugings must be taken at 2" and 5" above the hull plating at 3 equally spaced intervals between each frame.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 1 October 2001
Resolved
Marine sanitation device overboard discharge pipe must be kept in the locked position when underway._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Penetrations › Pipe Flange
Issued 1 October 2001
Resolved
Replace bilge piping where worn and pitted from valve to bulkhead in the #4and #5 compartments prior to 14 August 2001._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Structures › Superstructure
Issued 1 October 2001
Resolved
Make weather tight the superstructure around the main deck in way of bulkheads (including transom behind paddle wheel), and exterior deck spacesprior to 14 August 2001._x001C_ _x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline › Hull › Bottom Plating
Issued 1 October 2001
Resolved
Prior to carrying passengers but not later than 14 August 2001 make proper permanent repairs to holed deck in female head.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline
Issued 1 October 2001
Resolved
Prior to carrying passengers but not later than 14 August 2001 prove properoperation of the #1 bilge pump._x001C_
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 1 October 2001
Resolved
Prior to carrying passengers but not later than 14 August 2001, make properpermanent repairs to the port main engine exhaust manifold in way of holes.
Condition: Unknown
Due 1 October 2001
Resolved 1 October 2001
Construction/Loadline
Issued 7 April 2000
Resolved
INSTALL ROSEBOX ON BILGE SUCTION IN ENGINE ROOM PORT SIDE.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Engineering
Issued 7 April 2000
Resolved
REPAIR/REPLACE FLEXIBLE COOLING WATER LINES ON MDE EXHAUST LINES.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Construction/Loadline
Issued 7 April 2000
Resolved
PROPERLY REPAIR TWO SMALL HOLES IN UPPER PART OF BOW RAKE.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Construction/Loadline
Issued 7 April 2000
Resolved
PROPERLY PACK BULKHEAD PENETRATIONS FOR BILGE HIGH LEVEL ALARMS.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Construction/Loadline
Issued 7 April 2000
Resolved
INSTALL STOP VALVES ON BILGE PIPE ON AFT SIDE OF COLLISION BULKHEAD.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Electrical
Issued 7 April 2000
Resolved
ENSURE EMERGENCY LIGHTS ACTUATE AUTOMATICALLY ON LOSS OF ELECTRICAL POWER.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Electrical
Issued 7 April 2000
Resolved
REPLACE EMERGENCY BATTERIES AND BATTERY CHARGER.
Condition: Unknown
Due 7 April 2000
Resolved 7 April 2000
Construction/Loadline
Issued 8 October 1999
Resolved
DRYDOCK OR RAISE STERN OF VESSEL OUT OF WATER FOR SURVEY & REPAIRS TO SIDE & BTM PLATE IWO VOID ON PORT STERN. MAKE PERM & PROPER REPAIRS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 14 October 1999
Resolved 14 October 1999
Lifesaving
Issued 9 March 1998
Resolved
Provide a first aid kit.
Condition: Unknown
Due 9 March 1998
Resolved 9 March 1998