Records from 1985 to 2026. Most recent: inspection, 6 May 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 55
6 May 2026
Administrative Inspection · Vessel Attendance · Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8314691
7 May 2025
Annual Inspection · Administrative Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8119825
8 May 2024
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7889583
23 August 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7776102
3 May 2023
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7680625
7 June 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7469946
22 September 2021
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7312429
23 April 2021
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7332041
7 May 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6678871
8 May 2017
COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6139805
13 October 2016
Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6015255
9 May 2016
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5885975
12 May 2014
Deficiency Check · Annual Inspection · DAPI Audit · MTSA Verification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4860176
10 May 2012
DAPI Audit · COI Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4301495
27 September 2011
Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4163462
12 May 2009
Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3475909
7 May 2008
MTSA Verification · DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3205843
8 May 2007
Deficiency Check · MTSA Verification · Administrative Inspection · MARPOL Annex V Examination · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2919759
18 April 2007
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2913824
27 September 2006
Internal Structural Exam · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2792676
9 May 2006
Annual Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2680057
14 February 2006
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2584902
11 May 2005
MTSA Verification · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2357146
2 August 2004
MTSA Verification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2161393
11 May 2004
Annual Inspection · Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2102055
5 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1962259
13 May 2003
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1814176
8 May 2002
Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1637126
10 May 2001
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1410640
18 July 2000
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1430892
12 July 2000
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 820617
22 June 1999
COI Inspection · Plan Review "T" Boat · Deadweight Survey · Construction Oversight
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1397325
6 May 1997
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1439883
26 August 1996
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1247438
1 August 1996
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1398508
13 June 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 878376
23 August 1994
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1172263
22 July 1993
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1415863
20 November 1992
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 956145
3 June 1992
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 945889
14 May 1992
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 961150
23 September 1991
Drydock Extension
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1268631
23 September 1991
Drydock Extension
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1309782
4 June 1991
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1230461
14 May 1991
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 903869
17 May 1990
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1238465
15 May 1989
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1349641
26 April 1989
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1037448
18 May 1988
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1352069
14 May 1987
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1023780
23 September 1986
Credit Drydock
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1313116
15 May 1986
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1307553
12 August 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1293324
25 June 1985
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1287398
23 May 1985
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1291067
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 6 May 2026
Resolved
Conduct underway man over board drills with Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2026
Resolved 7 May 2026
Resolution: all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 May 2026
Resolved
Proplery stow adult and children's life jackets. Adult life jackets were found in the children's mark locations on the main deck
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2026
Resolved 20 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 May 2026
Resolved
Properly mark stowage location of life jackets with size and number stored on aft texas deck both sides
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2026
Resolved 5 June 2026
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 6 May 2026
Resolved
Make aft bulkhead starboard side engine room vapor tight to prevent CO2 from expecting
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2026
Resolved 5 June 2026
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 May 2026
Resolved
Prove proper operation of emergency lights on main deck forward and starboard side aft
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2026
Resolved 5 June 2026
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 May 2026
Resolved
Provide a properly working flashlight for the bridge
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2026
Resolved 20 May 2026
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 6 May 2026
Resolved
Replace all expried items in the first aid kit
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2026
Resolved 20 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 May 2026
Resolved
Remove all expired flares and labeling form the bridge
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2026
Resolved 20 May 2026
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 8 May 2025
Resolved
Conducted underway man overboard drill with CG inspector before carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2025
Resolved 5 June 2025
Resolution: all sat
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 8 May 2025
Resolved
Install guard on front of the generator to prevent anyone from coming into contact with the flywheeel
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2025
Resolved 5 June 2025
Resolution: All sat
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 9 May 2024
Resolved
Prove proper operation of fire pump to produce 50 PSI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2024
Resolved 10 June 2024
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 May 2024
Resolved
Replace broken/ hanging stern light prior to night operations.
Action required: 705 - Other - as specified
Due 9 May 2024
Resolved 10 June 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 May 2024
Resolved
Replace leaking fire hose on Starboard side are 2nd deck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 May 2024
Resolved 10 June 2024
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 May 2024
Resolved
Prove proper operation of Emergency lighting on the boiler deck starboard side aft and both exit signs on the boiler deck aft
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2024
Resolved 10 June 2024
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 June 2023
Resolved
Prove proper operation of Emergency light on port side engine room and in wheelhouse.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 3 July 2023
Resolution: all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 June 2023
Resolved
Secure both battery boxes in engine room to prevent shifting during vessel operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 3 July 2023
Resolution: all sat.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 5 May 2023
Resolved
replaced worn/wasted Max Capacity sign on starboard side going to the top deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 30 May 2023
Resolution: all sat
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2023
Resolved
Remark vessel’s name on all faded Life ring bouys
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 30 May 2023
Resolution: all sat
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 5 May 2023
Resolved
replace all combustible plastic trash cans with non-combustible ones with no openings in the sides or bottom.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 31 July 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2023
Resolved
Prove proper operation of life ring buoy light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 30 May 2023
Resolution: all sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 8 June 2022
Resolved
Window is broken. Glass and other glazing material used in windows must be of material that will not break into dangerous fagments if fractured.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 June 2022
Resolved 22 June 2022
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 8 June 2022
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Engine room supply vent does not close when fixed fire system is activated.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2022
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 8 June 2022
Resolved
Vessel name is not properly stenciled on life ring (faded). Remark 2 life rings with vessels name.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 June 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 June 2022
Resolved
Life jackets must be in servicable condition. 6 life jackets were found sun rotted and with water damage to reflective material. Passengers reduced to 393 total until new life jackets are procured.
Action required: 705 - Other - as specified
Resolved 3 May 2023
Resolution: vessel has replaced Life jackets
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 8 June 2022
Resolved
Life jackets are required to be marked with the vessel name. Restencil child life jackets with vessels name.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 June 2022
Engineering › Electric Propulsion System › Feeder Circuitry
Issued 11 May 2016
Resolved
Properly tape exposed leads on the bow thruster motor.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2016
Resolved 19 May 2016
Resolution: Received pictures showing properly taped wires.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 11 May 2016
Resolved
Secure CO2 beverage bottle below galley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 May 2016
Resolution: Bottle secured.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 11 May 2016
Resolved
Double clamp hose aft of M/E stbd side.
Due 19 May 2016
Resolved 11 May 2016
Resolution: Hose was double clamped.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 11 May 2016
Resolved
Properly secure outlet cover top deck galley stbd side fwd.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 May 2016
Resolution: Outlet cover properly secured.
Lifesaving › Lifebuoys › Serviceable
Issued 11 May 2016
Resolved
Replace wire w/proper uv resistant lanyard on stbd bridge wing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 May 2016
Resolution: Wire replaced with nylon lanyard.
Engineering › Fuel Oil Service System › Valve, Control
Issued 11 May 2016
Resolved
Install remote fuel shutoff on generator day tank in the Engine Room Port side.
Due 31 January 2017
Resolved 13 October 2016
Resolution: remote fuel shutoff installed.
Lifesaving › Hand Flares › Not on Board
Issued 13 May 2014
Resolved
PROVIDE 3 RED HAND FLARES AND 3 ORANGE SMOKE FLARES OR 6 ROCKET PARACHUTE FLARES. RESTRICTED TO VOYAGES OF 30 MINS OR LESS.
Action required: 705 - Other - as specified
Due 26 May 2014
Resolved 13 May 2014
Resolution: VESSEL OBTAINED 3 RED HAND FLARES AND 3 ORANGE SMOKE FLARES.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 May 2014
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 26 May 2014
Resolved 12 May 2014
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Engineering › Fuel Oil Service System › Hose
Issued 11 May 2012
Resolved
replace all flexible fuel hose with SAE J 1942 hose.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 July 2012
Resolution: Replaced fuel hose with approved SAE J 1942.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 11 May 2012
Resolved
Provide metal or non-combustible trash cans in passenger areas.
Action required: 705 - Other - as specified
Due 10 June 2012
Resolved 15 July 2012
Resolution: Provided non-combustible trash cans.
Construction/Loadline › Hull › Hull Plating
Issued 28 September 2011
Resolved
Provide hull gauging report for the entire length of the vessel from the chime to two feet outboard as discussed with attending marine inspectors in one foot increments.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Resolution: After several discussions with vsl rep and after reinspection, it was determined that the hull would be left as is at this time as the coating that is on the hull is effectively arresting any hull wastage.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 28 September 2011
Resolved
Install meshing or additional cabling as required by 46 CFR 116.900(f)(1)(ii) on all rails prior to carrying passengers.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Resolution: Installed an additional wire cable course, which will make the rail courses 5" versus the 4" required by the regs. local OCMI allowance for the 5" courses is granted.. Special note entered into MISLE.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 28 September 2011
Resolved
Property bond fuel tank to the hull.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Resolution: Tank properly bonded to hull.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 28 September 2011
Resolved
Attach hatch cover to the hatch frame or coaming as per regulation.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Engineering › Steering Gear System › Rudder Stock
Issued 28 September 2011
Resolved
Properly pack or replace bushings on port aft and inboard centerline rudder posts that are loose, prior to returning vessel to the water.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Stability › Watertight Integrity › General
Issued 28 September 2011
Resolved
Properly adjust and or replace all cable through puts to provide watertight integrity in all holds as discussed.
Action required: 705 - Other - as specified
Resolved 10 May 2012
Electrical › Electric Supply System (service) › Cable
Issued 12 May 2009
Resolved
Properly support and dead-end electrical cables in sewage void.
Action required: 705 - Other - as specified
Resolved 12 May 2009
Stability › Watertight Integrity › General
Issued 28 September 2006
Resolved
Clean & re-surface watertight hatches matting surfaces, prove by water test.
Action required: 705 - Other - as specified
Due 30 April 2007
Resolved 8 May 2007
Stability › Unintentional Flooding › General
Issued 28 September 2006
Resolved
Provide weeping / drain holes in unused port & starboard portable water tanks in compartment #3
Action required: 705 - Other - as specified
Due 30 April 2007
Resolved 8 May 2007
Engineering › Sea-water System (primary cooling) › Valve
Issued 28 September 2006
Resolved
Install shut-off valves on aft keel cooler thru-hull intake & discharge lines.
Action required: 705 - Other - as specified
Due 30 April 2007
Resolved 8 May 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 12 May 2005
Resolved
Repair emergency light on weather deck.
Due 9 June 2005
Resolved 15 May 2005
Resolution: The hose was replaced.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 12 May 2005
Resolved
Repair or replace 4 plug receptacle located at the gift shop counter.
Due 9 June 2005
Resolved 13 May 2005
Resolution: The plug was removed.
Electrical › Electric Generation Source (service) › Generator
Issued 12 May 2005
Resolved
Replace dry rotten fuel hose at forward generator with materials that meet 46 CFR 182.455
Due 9 June 2005
Resolved 16 May 2005
Resolution: The hose was replaced.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 12 May 2005
Resolved
Attach line to gangway that is used to recover man overboard.
Due 9 June 2005
Resolved 12 May 2005
Resolution: A line and caribeener was installed.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 12 May 2005
Resolved
Replace window that is broken on the 01 deck salon with a window that meets the requirements found in 46 CFR 177.1010
Due 9 June 2005
Resolved 15 May 2005
Resolution: The window was replaced.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 10 May 2005
Resolved
Provide 24" of working space around the main switchboard as required by 46 CFR 183.330(e).
Due 9 June 2005
Resolved 21 May 2005
Resolution: The area was cleared ivo the main switch board.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 10 May 2005
Resolved
Provide a non-conducting mat or grate in front of the switchboard as required by 46 CFR 183.330(f).
Due 9 June 2005
Resolved 21 May 2005
Resolution: A noncunductive mat was placed in front of the switch board.
Engineering › Diesel Engine (propulsion-direct drive) › Waste Heat Recovery
Issued 10 May 2005
Resolved
Replace red water hose on main diesel engine with hose of non metallic piping that meets SAE J-1942 as required by 46 CFR 182.720.
Due 9 June 2005
Resolved 15 May 2005
Resolution: The hose was replaced.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 12 May 2004
Resolved
Replace 60 ft floating line on bow ring bouy
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 12 May 2004
Resolved
Reconnect hatch retainer wire on thruster & FO tank space
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 12 May 2004
Resolved
Post COI & stability letters
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 12 May 2004
Resolved
Issue Senior Deckhand qualification letters with copy on board vessel
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Documentation › Markings/Placards
Issued 12 May 2004
Resolved
Revise and post missing emergency instructions LEGACY COMPONENT DESC: Emergency Instructions
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Accommodation/Occupational Safety › Medical/First Aid
Issued 12 May 2004
Resolved
Label first aid kit location LEGACY COMPONENT DESC: Medicine Chest
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 12 May 2004
Resolved
Correct CO2 operating procedures LEGACY COMPONENT DESC: Operating Controls
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Navigation › Collision/Grounding Avoidance
Issued 12 May 2004
Resolved
Repair/relamp stern light LEGACY COMPONENT DESC: Navigation Lights
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 12 May 2004
Resolved
Repair fwd & stbd exit lights to lamp under normal & emergency conditions LEGACY COMPONENT DESC: Open Deck Space
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Deck/Cargo › Holds/Tanks
Issued 12 May 2004
Resolved
Relabel watertight hatch-keep closed LEGACY COMPONENT DESC: Hatch Cover
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Operations/Management › Drills/Instruction
Issued 12 May 2004
Resolved
Locate emergency evacuation plan w/ copy on vessel LEGACY COMPONENT DESC: Emergency Evacuation Plan
Due 11 June 2004
Resolved 17 June 2004
Resolution: Administratively cleared per Ops Mgr fax.
Stability › Weathertight Integrity
Issued 14 May 2003
Resolved
REPLACE 2 MISSING WINDOWS ON P/S BOILER DECK AFT.
Due 13 June 2003
Resolved 11 May 2004
Electrical › Electrical Distribution System (service)
Issued 14 May 2003
Resolved
PROVIDE COVER FOR OPEN BREAKER SPACE IN GALLEY PANEL LEGACY COMPONENT DESC: Circuit Breaker
Due 13 June 2003
Resolved 11 May 2004
Lifesaving › Lifejacket/PFD (Type I)
Issued 14 May 2003
Resolved
PROVIDE REFLECTIVE TAPE ON CHILD LIFE PRESERVERS LEGACY COMPONENT DESC: Retroreflective Material
Due 13 June 2003
Resolved 11 May 2004
Engineering › Fuel Oil Service System
Issued 14 May 2003
Resolved
REPLACE FUEL OIL VENT FLAME SCREEN WITH 30 X 30 MESH LEGACY COMPONENT DESC: Vent Pipe
Due 13 June 2003
Resolved 11 May 2004
Operations/Management › Other Criminal/Civil Violations
Issued 14 May 2003
Resolved
PROVE PAYMENT OF 2002 USER FEES
Due 13 June 2003
Resolved 11 May 2004
Engineering › Bilge Water Management System
Issued 9 May 2002
Resolved
CLEAN OUT ALL BILGES OF STANDING WATER
Due 9 June 2002
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Stability › Watertight Integrity
Issued 9 May 2002
Resolved
ADJUST WATERTIGHT DOORS AS NEEDED
Due 9 June 2002
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Engineering › Bilge Water Management System
Issued 9 May 2002
Resolved
TEST RUN SME AUXILIARY BILGE PUMP. UNIT NOT AVAILABLE DUE TO LACK OF POTABLE WATER PRIME. LEGACY COMPONENT DESC: Pump
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Engineering › Bilge Water Management System › Piping
Issued 9 May 2002
Resolved
REMOVE BUCKET UNDER BILGE SUCTION LINE
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Engineering › Bilge Water Management System › Strainer
Issued 9 May 2002
Resolved
INSTALL SCREEN STARINER OVER LAZARETTE BILGE SUCTION LINE
Due 9 June 2002
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 9 May 2002
Resolved
REPAINT DRAFT MARKS
Due 9 June 2002
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 May 2002
Resolved
UPDATE/INVENTORY FIRST AID KIT
Due 9 June 2002
Resolved 10 June 2002
Resolution: CLEARED VIA FAX SIGNED BY MASTER
Documentation
Issued 19 July 2000
Resolved
POST COI IN PASSENGER AREA.
Condition: Unknown
Due 31 July 2000
Resolved 27 July 2000
Documentation
Issued 19 July 2000
Resolved
POST STABILTY LETTER IN PILOT HOUSE
Condition: Unknown
Due 31 July 2000
Resolved 27 July 2000
Documentation
Issued 19 July 2000
Resolved
POST OIL POLLUTION PLACARD AT ENGINEROOM PUMP SWITCH AND PILOTHOUSE.
Condition: Unknown
Due 31 July 2000
Resolved 27 July 2000
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 18 July 2000
Resolved
PAINT DRAFT MARKS IN ACCORDANCE WITH CURRENT STABILITY LETTER.
Condition: Unknown
Due 18 July 2000
Resolved 18 July 2000
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2000
Resolved
FABRICATE STORAGE LOCKER FOR ADDITIONAL LIFEJACKETS ON UPPER DECK
Condition: Unknown
Due 18 July 2000
Resolved 18 July 2000
Fire Fighting
Issued 23 June 1999
Resolved
COMPLETE INSTALLATION OF FIXED CO2 SYSTEM
Condition: Unknown
Due 11 January 2000
Resolved 11 January 2000
Construction/Loadline
Issued 23 June 1999
Resolved
MARK PASSENGER LOADING OR DRAFT MARKS AND MAXIMUM PASSENGERS ALLOWED FOR UPPER DECKS BASED ON G-MSC STABILITY LETTER
Condition: Unknown
Due 11 January 2000
Resolved 11 January 2000
Documentation
Issued 23 June 1999
Resolved
OBTAIN STABILITY LETTER BASED ON DEADWEIGHT SURVEY FROM G-MSC
Condition: Unknown
Due 11 January 2000
Resolved 11 January 2000
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 August 1996
Resolved
PROVIDE ON BOARD ONE MISSING B II PORTABLE FIRE EXTINGUISHER (FOR SERVICE SPACE) TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 August 1996
Resolved
PROVIDE THE MISSING LOWER MOUNTING STRAP FOR THE ENGINE ROOM B II PORTABLE FIRE EXTINGUISHER MOUNTING BRACKET TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 1996
Resolved
MARK THE EMERGENCY FUEL OIL SHUT OFF VALVE AT THE LOCATION OF THE VALVE ITSELF WITH THE NAME OF THE VALVE AND THE DIRECTION FOR SHUT OFF TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 1 August 1996
Resolved
MARK THE 220 VOLT AND 110 VOLT POWER DISTRIBUTION PANELS, IN THE ENGINE ROOM, WITH THE VOLTAGE ON THE OUTSIDE OF THE PANEL TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 August 1996
Resolved
PROPERLY MARK FOUR CHILDREN'S AND FIVE ADULT'S LIFE PRESERVERS WITH THE VESSEL'S NAME TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 August 1996
Resolved
LABEL THE CIRCUIT BREAKER PANELS, ONE LOCATED FORWARD OF THE MAIN ENGINE AND THE OTHER LOCATED IN THE DOG HOUSE, ON THE INSIDE WITH THE COMPONENT THAT EACH CIRCUIT BREAKER IN THE PANEL PROVIDES POWER TO. THIS TO BE ACCOMPLISHED TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 1 August 1996
Resolved
POST THE OIL POLLUTION PLACARD TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 August 1994
Resolved
PROVIDE PROPER NAVIGATION LIGHTS IN ACCORDANCE WITH THE NAVIGATION RULES.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 August 1994
Resolved
REPAIR FIREMAIN LEAK AT ELBOW ON FORWARD MAIN DECK.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 August 1994
Resolved
MODIFY BILGE SYSTEM TO PROVIDE SUCTION FORWARD OF COLLISION BULKHEAD. SUBMIT PLANS FOR INSTALLATION PRIOR TO MODIFICATION OF SYSTEM.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 24 August 1994
Resolved
PROVIDE VALID STABILITY LETTER.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 24 August 1994
Resolved
OBTAIN FCC LICENSE.
Condition: Unknown
Due 24 August 1994
Resolved 24 August 1994
01 - Certificates & Documentation › 011 - Ships Certificates › Tonnage certificate
Issued 24 May 1985
Resolved
HAVE VESSEL ADMEASURED AND PROPERLY DOCUMENTED PRIOR TO 1 OCTOBER, 1985. NOTIFY OFFICER IN CHARGE MARINE INSPECTION UPON COMPLETION.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 May 1985
Resolved
HAVE ALL FIRE EXTINGUISHERS SERVICED PRIOR TO 1 JUNE, 1985.
Condition: Unknown
Due 24 May 1985
Resolved 24 May 1985