Records from 1985 to 2020. Most recent: inspection, 22 January 2020.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 57
22 January 2020
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6893732
19 April 2019
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6665413
22 March 2019
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6648390
29 June 2018
Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6459735
25 May 2018
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6422075
6 April 2017
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6119133
24 March 2017
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6111961
19 May 2016
Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5880957
29 May 2014
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4872934
22 June 2012
Plan Review "T" Boat · Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 4356297
12 December 2011
Plan Review "T" Boat
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4206497
15 July 2011
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 4082437
18 January 2011
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3928454
1 December 2008
Internal Structural Exam · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3366562
18 June 2008
Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 3205503
12 December 2007
In-Service Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3110645
15 June 2007
Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 3144255
29 March 2007
Hull Examination · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2897346
24 January 2007
Construction Oversight
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2867400
21 June 2006
Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 2646748
28 April 2005
COI Inspection · Hull Examination
Physical examination · MSFO CAPE COD · USCG Northeast District (CGD-NE) · Activity 2343143
23 June 2004
Re-Inspection
Physical examination · MSFO CAPE COD · USCG Northeast District (CGD-NE) · Activity 2107299
23 June 2003
Hull Examination · Re-Inspection
Physical examination · MSFO CAPE COD · USCG Northeast District (CGD-NE) · Activity 1822450
24 June 2002
Re-Inspection
Physical examination · MSFO CAPE COD · USCG Northeast District (CGD-NE) · Activity 1635631
11 May 2001
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1064292
4 May 2001
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1366534
22 February 2001
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1059619
29 June 2000
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1458779
22 June 2000
Hull Examination · Damage Survey
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1412144
30 April 2000
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 88558
4 June 1999
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1089724
22 May 1998
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 799091
22 April 1998
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1124770
27 June 1997
Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 777988
16 May 1997
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 773585
17 May 1996
Re-Inspection · Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1146775
16 April 1996
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1081123
11 December 1995
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 877226
12 May 1995
Re-Inspection · Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 871647
13 May 1994
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1353617
20 April 1994
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1353616
30 June 1993
Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1160219
17 May 1993
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1463045
19 April 1993
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1379782
1 July 1992
Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 957005
15 May 1992
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1267684
17 May 1991
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1223374
15 April 1991
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 909738
2 June 1990
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 901443
22 May 1989
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 896742
19 April 1989
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1348403
4 May 1988
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1039396
15 June 1987
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1310555
23 April 1987
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1317531
2 June 1986
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1300498
11 June 1985
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 985869
16 April 1985
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 982455
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 23 April 2019
Resolved
A weathertight door with permanent watertight coamings that comply with the height requirements in Table 171.124 [6" for Partially Protected; 3" for Protected] must be provided for each opening located in a deck house that gives access into the hull and is located in a well. Access doors into passenger cabin/deck house do not have watertight coamings as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2019
Resolved 2 May 2019
Resolution: Sector Boston determined that vessel need not install coaming due to applicability factors for regulations in force when vessel was built.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 19 April 2019
Resolved
At each subsequent inspection for certification, the marine inspector may require abandon ship or man overboard drills be held. Drills not conducted due to weather. Must complete drills prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 April 2019
Resolution: Drills conducted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 19 April 2019
Resolved
Each hatch exposed to the weather must be watertight. Hatches for forepeak, lazarette, and steering space not watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 17 May 2019
Resolution: Satisfactory closure devices installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 19 April 2019
Resolved
Each hatch cover must have captive chain or other device to prevent its loss. Hatch covers for Laz and Steering space do not have retaining device.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 23 April 2019
Resolution: Retaining devices installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 19 April 2019
Resolved
Each collision bulkhead must have means to make watertight. Wires penetrating collision bulkhead do not have proper watertight penetrations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 14 May 2019
Resolution: Wiring penetration was made properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 April 2019
Resolved
A submersible electrical bilge pump may be used provided that a positive shutoff valve is installed at the hull penetration. Overboards in E/R do not have valves.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 14 May 2019
Resolution: Valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 April 2019
Resolved
On a vessel of at least 26 ft. in length, a visual and audible alarm must be provided at the operating station to indicate high water level. Fuel tank space high level alarm is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 23 April 2019
Resolution: High level alarm tested satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 April 2019
Resolved
Life floats, when stowed in tiers, the separate units must be kept apart by spacers. No spacers are present between life float tiers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2019
Resolved 23 April 2019
Resolution: Spacers placed between tiers.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 31 May 2018
Resolved
Deck rails on a vessel engaged in excursion trips must be at least 39.5" high. Gunwale on the vessel is at 36". Make/provide rails or equivalent protection to increase height to 39.5".
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2018
Resolved 31 May 2018
Resolution: CID Boston accepted vsl request for reconsideration. See narrative/special note for additional info.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 May 2018
Resolved
Make aft engine room bulkhead watertight, port side of keel.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2018
Resolved 4 June 2018
Resolution: Repaired and sealed aft engine room bulkhead to make watertight.
Construction/Loadline › Hull › Side Shell
Issued 25 May 2018
Resolved
Make seam at butt block on starboard side, aft frame space in engine room watertight.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2018
Resolved 4 June 2018
Resolution: Sealed seam as specified to make watertight.
Engineering › Bilge Water Management System › Valve
Issued 25 May 2018
Resolved
Prove proper operation of screw down valve forward of collision bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2018
Resolved 4 June 2018
Resolution: Repaired insert gate on valve to make operational.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 25 May 2018
Resolved
Replace grab line on ring life buoy.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 June 2018
Resolved 25 May 2018
Resolution: Replaced grab line; corrected on the spot.
Lifesaving › Lifefloat › Pendant
Issued 25 May 2018
Resolved
Replace grab line on 02 life floats as specified; reduced POB to 48.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2018
Resolved 4 June 2018
Resolution: Replaced grab line on 02 life floats.
Lifesaving › Lifefloat › Paddle
Issued 7 April 2017
Resolved
Label life float paddels with vessel name.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 14 April 2017
Resolution: All life float paddles labeled.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 19 May 2016
Resolved
Renew EPIRB registration, battery, and hydrostatic release. Do not operate beyond 3 miles from shore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 May 2016
Resolution: Vessel rep requested to change the vessel's routes and conditions to within three miles from shore, en lieu of correcting EPIRB deficiencies.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 19 May 2016
Resolved
Provide vessel with valid FCC Safety Radiotelephony Certificate (47 CFR 13).
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 June 2016
Resolved 24 May 2016
Resolution: Vessel rep provided valid FCC safety certificate.
Fire Fighting › Fixed Steam Fire Extinguishing System › Alarm
Issued 19 May 2016
Resolved
Vessel's pre-engineered fire extinguishing system did not secure the main engines when tested. Issued CG-835 requirement to prove proper operation.
Action required: 705 - Other - as specified
Resolved 20 May 2016
Resolution: Vessel rep discovered a loose wire and refastened it. Completed operational test of engine shutdown, test sat.
Engineering › Bilge Water Management System › Not Operational
Issued 29 May 2014
Resolved
Bilge system in forepeak is inoperable. Prove proper operation of entire bilge system before carrying passengers. 46 CFR 182.520
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 June 2014
Resolution: Bilge pumps were tested SAT.
Engineering › Bilge Water Management System › Valve
Issued 29 May 2014
Resolved
No stop/check valves installed throughout the bilge system. Provide required valves. 46 CFR 182.25-5(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 June 2014
Resolution: After pulling the strainers the piping had rising foot valves but many were seized. Valves were greased and brought back to working condition and reinstalled SAT.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 29 May 2014
Resolved
MSD overboard discharge valve is locked in the open position. Valve must be locked in the closed position. 46 CFR 184.704
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 June 2014
Resolution: Valve has been closed and locked in the closed position.
Engineering › Bilge Water Management System › Pump
Issued 29 May 2014
Resolved
Starboard engine room electric bilge pump is inoperable. All bilge pumping systems on board must be operable. 46 CFR 185.520
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 June 2014
Resolution: New electric bilge pumps were installed and tested SAT.
Electrical › Electric Supply System (service) › Battery Installation
Issued 29 May 2014
Resolved
Starboard battery box is not secure. Secure battery box. 46 CFR 111.15-5(b)
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Battery box is secure for sea.
Engineering › Bilge Water Management System › Piping
Issued 29 May 2014
Resolved
No diagram provided for operation of bilge system. Provide diagram to allow ease of operation.
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 29 May 2014
Resolution: Owner supplied operating instructions and diagram for bilge system on site.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 29 May 2014
Resolved
No flame screens installed. Install proper screens. 46 CFR 182.20-35(d)
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Hoses were re-attached to prior vents and these vents were found to be SAT.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 29 May 2014
Resolved
Water supply valve to toilet is missing handle creating undue risk of water intrusion. Repair valve and handle. 46 CFR 182.40-1(a)(1)
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Valve was installed to prevent future water intrusion.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 29 May 2014
Resolved
Waterlight for lifefloat is inoperable. Prove proper operation. 46 CFR 180.175(f)(4)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 June 2014
Resolution: All water lights were tested with attending marine inspector. SAT.
Documentation › Certificates/Documents › FCC SSL
Issued 29 May 2014
Resolved
Missing FCC Station license. Provide current documentation. 47 CFR 80
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: FCC license was on board with new license number.
Documentation › Safety/Response Plans/Programs › Waste Management Plan
Issued 29 May 2014
Resolved
Missing Waste Management Plan documentation. Provide plan. 46 CFR 33 CFR 151.57
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Waste manegement plan has been added and posted.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 29 May 2014
Resolved
Missing proof of Drug and Alcohol Program. Provide proof of enrollment. 33 CFR 16
Action required: 705 - Other - as specified
Due 12 June 2014
Resolved 19 June 2014
Resolution: Provided proof of DAPI program.
Communications › Radio Communications
Issued 23 June 2003
Resolved
REPLACE HYDROSTATIC RELEASE FOR THE EPIRB. VESSEL IS RESTRICTED TO NOT MORE THAN 3 MILES FROM SHORE UNTIL REPLACED. LEGACY COMPONENT DESC: EPIRB
Action required: 705 - Other - as specified
Due 27 June 2003
Resolved 23 June 2003
Resolution: RELEASE REPLACED.
Documentation › Certificates/Documents › FCC SSL
Issued 23 June 2003
Resolved
PROVIDE PROOF OF CURRENT SAFETY RADIO TELEPHONE CERTIFICATE.
Action required: 705 - Other - as specified
Due 23 July 2003
Resolved 23 June 2003
Resolution: VESSEL SCHEDULED FOR RADIO INSPECTION.
Lifesaving
Issued 16 May 1997
Resolved
CONDUCT FIRE AND MAN OVERBOARD DRILLS IN THE PRESENCE OF AN COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 July 1997
Resolved 7 July 1997
Navigation
Issued 17 May 1996
Resolved
PROVIDE FCC RADIO BROADCAST PLACARD.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Lifesaving
Issued 17 May 1996
Resolved
PROVIDE BRIGHT COLORED WATER PROOF FLARE CONTAINER MARKED DISTRESS SIGNALS.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Navigation
Issued 17 May 1996
Resolved
PROVIDE CURRENT COAST PILOT, NAV RULES, AND UPDATED CHARTS.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Lifesaving
Issued 17 May 1996
Resolved
CONDUCT UNDERWAY DRILLS.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Lifesaving
Issued 17 May 1996
Resolved
PROVIDE 15 ADULT AND 1 CHILD LIFE PERSERVERS. VESSEL IS RESTRICTED TO 65 PERSONS UNTIL ADDITIONAL PERSERVERS ARE ON BOARD.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Lifesaving
Issued 17 May 1996
Resolved
POST LIFE PRESERVER DONNING PLACARD.
Condition: Unknown
Due 28 June 1996
Resolved 3 October 1996
Lifesaving
Issued 12 May 1995
Resolved
CONDUCT FIRE AND BOAT DRILLS IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 22 June 1995
Resolved 15 September 1995
Lifesaving
Issued 17 May 1993
Resolved
MAKE FORWARD P.A. SPEAKER OPERATIONAL.
Condition: Unknown
Due 17 May 1993
Resolved 17 May 1993
Lifesaving
Issued 17 May 1993
Resolved
CONDUCT U/W DRILLS IN PRESENCE OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 17 May 1993
Resolved 17 May 1993
Lifesaving
Issued 15 May 1992
Resolved
CONDUCT UNDERWAY DRILLS IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 15 May 1992
Resolved 15 May 1992
Engineering
Issued 15 May 1992
Resolved
INSTALL PROTECTIVE GUARD FOR BELT DRIVEN FIRE PUMP AND ALTERNATOR.
Condition: Unknown
Due 15 May 1992
Resolved 15 May 1992