← All vessels
DENISE D
Passenger Barge (Inspected) · Barge class · Built 1950s · USCG Heartland District (CGD-H) · Other hulls named DENISE D
DENISE D is a 1956 passenger barge (inspected). The Coast Guard has recorded 52 inspections since 1984, most recently in February 2010, along with 54 deficiencies.
Records from 1984 to 2010. Most recent: inspection, 3 February 2010.
- Built
- 1956
- Last inspected
- 3 February 2010
- Documentation
- Expired · documentation file of 10 September 2026
- Deficiencies
- 54 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
272646
WH5225
43242
Flag
UNITED STATES
—
Maury page id
psix-43242
Inspections, by type
…with no type recorded13
Years with a record
25 calendar years (1984–2010)
The 52 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Registered dimensions (L × B × D)144.1 ft × 35.1 ft × 8.6 ft
Registered tonnagegross 433 / net 433
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLEVINGSTONE SHIPBLDG CO · ORANGE, TX, UNITED STATES · built 1956
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHENDERSON, KY
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger Barge (Inspected)
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it433 - Regulatory (Subpart C or D), Net Ton
433 - Regulatory (Subpart C or D), Gross Ton
433 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 52
3 February 2010
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3689089
25 February 2009
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3423497
3 July 2008
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3255693
13 June 2008
Periodic Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3235995
10 May 2007
Annual Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2927656
15 March 2007
Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2890697
1 December 2005
Annual Inspection · Cargo Tank Internal · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2544217
3 February 2005
COI Inspection · MTSA Verification
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2285755
9 February 2004
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2003324
3 February 2004
Periodic Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2000210
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1997487
23 January 2001
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1444448
16 November 2000
Hull Examination
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1405076
7 February 2000
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1465535
16 August 1999
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1113499
28 July 1999
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 769124
23 July 1999
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 195749
23 July 1999
Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1402912
30 June 1999
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1092115
25 February 1999
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1410042
25 February 1998
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1436056
27 February 1997
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1450006
24 December 1996
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 752843
21 December 1996
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1095613
17 December 1996
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 195748
17 December 1996
Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1092811
28 February 1996
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 885172
2 November 1995
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1183502
7 March 1995
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1171584
3 March 1994
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 853131
9 December 1993
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 172424
22 April 1993
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1454005
11 May 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 951802
16 April 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 957010
5 March 1992
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1317954
13 March 1991
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 907663
12 March 1991
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 907849
24 September 1990
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 904632
20 March 1990
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1220621
9 March 1990
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 904804
4 May 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 891772
23 March 1989
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1041088
8 March 1989
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1201001
14 February 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 440033
10 March 1988
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1296092
23 December 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 526112
12 March 1987
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1321297
10 March 1986
COI Inspection · Credit Drydock
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1298734
10 February 1986
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 997715
18 November 1985
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 985253
7 December 1984
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 976108
4 December 1984
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1286072
Deficiency record · 54
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 February 2010
Resolved
Owner/Operator did not submit written application for inspection for certification to cognizant OCMI within 30 day time period as per 46CFR 31.01-159(a).
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 3 February 2010
Resolved
Fixed containment did not meet requirements of 33CFR 155.310 due to having rainwater and product within containment.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 3 February 2010
Resolved
Oil transfer hose has significant wear/tear/kinks; oil transfer hose also had a coupling that was not approved as per 33 CFR 154.500 using a non-approved coupling and wire banding.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 3 February 2010
Resolved
Oil transfer procedures were not current with owner/operator procedures.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 3 February 2010
Resolved
DOI's were not filled out completely; several DOI's were missing times/dates.
Deck/Cargo › Vapor Control Systems › Flame Screens
Issued 3 February 2010
Resolved
Flame Screen on STBD #3 tank torn.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 3 February 2010
Resolved
Exhaust piping in pump room not lagged IAW with NFPA 302 4-1.2 as required by 46CFR 58.10-5
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 3 February 2010
Resolved
Breather for diesel engine in the pump room saturated with oil and dust.
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 3 February 2010
Resolved
Excessive leaks on pump engines and hosing.
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 3 February 2010
Resolved
Flexible fuel lines do not meet SAE-J-1942 standard; length greater than 30 inches.
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (hydraulic)
Issued 25 February 2009
Resolved
Remove no longer used hydraulic starter accumulator and associated components.
Engineering › Fuel Oil Service System › Hose
Issued 25 February 2009
Resolved
Replace all leaking fuel oil hoses for cargo pump prime mover.
Engineering › Freshwater System (jacketwater cooling) › Fitting
Issued 25 February 2009
Resolved
Repair leaking jacket water fitting on water cooled exhaust manifold.
Engineering › Lubricating Oil Service System › Hose
Issued 25 February 2009
Resolved
Repair/ Replace leaking lube oil gage line.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 25 February 2009
Resolved
Replace flame screen on # 3 port cargo tank pressure vacuum valve.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 25 February 2009
Resolved
Remove standing water from cargo pump room.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 25 February 2009
Resolved
Repair/ replace leaking packing on cargo transfer pump.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 25 February 2009
Resolved
Properly mark all draft readings with contrasting colors for clear visibility on barge.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 25 February 2009
Resolved
Replace two (2) worn transfer hoses.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 25 February 2009
Resolved
Properly identify all transfer hoses to match transfer hose test log book.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 25 February 2009
Resolved
Place a copy of the piping diagram on vessel and in transfer procedures.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 February 2009
Resolved
Find original Certificate Of Inspection (COI) and place on board vessel, if original can not be found request another original COI from cognizant Officer in Charge of Marine Inspections.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 June 2008
Resolved
Failed to maintain valid COI. Annual inspection was scheduled outside the period(s) specified in 46CFR31.10-17 and therfore endorsed by the CG MI approximately 40 days late.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 10 May 2007
Resolved
Replace/repair fuel hose on cargo pump engine in way of fuel oil leak.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 15 March 2007
Resolved
Vessel shall conduct NO cargo operations until permanant repairs are made to leak in #2S cargo tank. Repairs to be made to the satisfaction of attending CG marine inspector.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 3 February 2005
Resolved
Found Certificate of Financial Responsibility expired (25NOV04).
Deck/Cargo › Holds/Tanks
Issued 3 February 2004
Resolved
Replace flame screen, aft port stern slop tank ullage opening. LEGACY COMPONENT DESC: Flame Arrester
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 February 2004
Resolved
Owners of the barge failed to have the annual inspection conducted for the previous two years.
Construction/Loadline
Issued 23 July 1999
Resolved
Effect permanent repairs to the approximate 1.5 inch fracture in the side shell plating of #2 cargo tank to the satisfaction of the attending marine inspector. Temporary repairs shall be maintained and no further cargo may be loaded until permanent repairs have been completed.
Deck/Cargo
Issued 25 February 1999
Resolved
REPLACE MISSING HOLD DOWN (WING NUT) ON #3 PORT CARGO TANK ULLAGE OPENING.
Deck/Cargo
Issued 25 February 1999
Resolved
PROPERLY LABEL ALL CARGO TANKS.
Deck/Cargo
Issued 25 February 1999
Resolved
PLUG CARGO PUMP VENT LINE.(DISCHARGE SIDE)
Deck/Cargo
Issued 25 February 1999
Resolved
Replace torn flame screen on stern void lube oil tank P/V valve.
Deck/Cargo
Issued 25 February 1999
Resolved
PROPERLY PACK ALL CARGO TANK REMOTE OPERATED VALVES.
Deck/Cargo
Issued 25 February 1999
Resolved
PLUG EXPOSED GATE OPENING ON MOBIL 477 DECK LUBE OIL TANK DRAIN VALVE.
Construction/Loadline
Issued 17 December 1996
Resolved
Make permanent repairs to leaking side shell plating in way of no. 3 starboard cargo tank to the satisfaction of the attending USCG Marine Inspector prior to the loading of cargo but no later than 17 January 1997.
Deck/Cargo
Issued 5 March 1992
Resolved
Replace missing bolts and nuts, and tighten all loose bolts and nuts on allbutterworth openings as required by 33CFR155.815(a)(5) prior to compliance date.
Documentation
Issued 5 March 1992
Resolved
Provide oil transfer procedures as required by 33CFR155.720 prior to compliance date.
Construction/Loadline
Issued 5 March 1992
Resolved
Replace gasket on hatch cover to stern void prior to compliance date.
Deck/Cargo
Issued 5 March 1992
Resolved
Replace flame screens in pressure-vacuum relief valves with fire resistant screen as required by 46CFR30.10-25 prior to compliance date.
Deck/Cargo
Issued 5 March 1992
Resolved
Replace missing bolts in each hole of each permanently connected flange on the cargo piping as required by 33CFR156.130(a)(4) prior to compliance date.
Deck/Cargo
Issued 5 March 1992
Resolved
Remove two oil transfer hoses that show deterioration of the outer cover through to the wire reinforcement as required by 33CFR156.170(c)(1)(i) prior to compliance date.
Deck/Cargo
Issued 5 March 1992
Resolved
Secure small discharge containment to deck under manifold of independent lube oil tank located on bow as required by 33CFR155.310(a)(1)(i) prior to compliance date.
Documentation
Issued 5 March 1992
Resolved
Provide a valid Certificate of Financial Responsibility (COFR) as required by 33CFR130.3(a) prior to moving the vessel, or transferring oil to, from, or within the vessel.
Deck/Cargo
Issued 5 March 1992
Resolved
Mark all oil transfer hoses with the maximum allowable working pressure (MAWP) and the words "OIL SERVICE" as required by 33CFR155.800 prior to compliance date.
Engineering
Issued 5 March 1992
Resolved
Install a flame screen in the opening of the gooseneck vent to the fuel tank as required by 46CFR56.50-85(a)(8) prior to compliance date.
Construction/Loadline
Issued 5 March 1992
Resolved
Repair cracks in the weldment attaching the stern "tow knees" to the sideshell plating on the transom prior to the compliance date.
Deck/Cargo
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE CRACK BETWEEN #1 CARGO TANKS AND THE FORWARD RAKE AT THE NEXT GAS FREEING BUT NO LATER THAN THE COMPLIANCE DATE. THE #1 CARGO TANKS SHALL NOT BE USED UNTIL PERMANENT REPAIRS HAVE BEEN COMPLETED.
Deck/Cargo
Issued 9 March 1990
Resolved
PROVIDE PROPER VENTS WITH P/V VALVES FOR THE FORWARD AND AFT SLOP TANKS AT THE NEXT GAS FREEING OR DRYDOCKING BUT NO LATER THAN THE COMPLIANCE DATE.
Engineering
Issued 9 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE DIESEL PUMP ENGINE FUEL RETURN LINE PRIOR TO THE COMPLIANCE DATE.
Construction/Loadline
Issued 9 March 1990
Resolved
REMOVE FUEL FROM THE FORWARD RAKE PRIOR TO THE COMPLIANCE DATE.
Deck/Cargo
Issued 9 March 1990
Resolved
PERMANENTLY MOUNT THE LUBE OIL PUMP MOTOR AT THE NEXT GAS FREEING OR DRYDOCKING BUT NO LATER THAN THE COMPLIANCE DATE.
Deck/Cargo
Issued 8 March 1989
Resolved
PERMANENTLY MOUNT TWO DECK LUBE OIL TANKS AT THE NEXT DRYDOCKING OR NEXT GAS FREEING BUT NO LATER THAN THE COMPLIANCE DATE.
Electrical
Issued 8 March 1989
Resolved
MAKE ALL ELECTRICAL SWITCHES, MOTORS AND CABLE RUNS EXPLOSION PROOF USING U.L. APPROVED EQUIPMENT PRIOR TO THE COMPLIANCE DATE.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.