Records from 1995 to 2016. Most recent: inspection, 6 December 2016.
Inspection history · 66
6 December 2016
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6052829
27 September 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6010347
9 May 2016
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5869766
6 March 2016
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5827714
17 December 2015
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5783860
12 October 2015
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5739347
10 June 2014
Examination of Repairs · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 4892849
24 July 2012
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4392295
8 May 2012
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4306054
6 September 2011
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4137870
1 August 2011
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4104261
7 February 2011
Damage Survey · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3954291
4 January 2011
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4020978
8 December 2010
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 3907046
20 September 2010
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3866309
23 March 2010
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 3702404
28 December 2009
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3644946
18 March 2009
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3431691
9 January 2009
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3391584
1 January 2009
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3387380
6 December 2008
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3375555
29 August 2008
Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3311988
27 August 2008
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3316924
21 July 2008
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3271913
16 June 2008
Damage Survey · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3246450
9 June 2008
Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 3231049
26 May 2008
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 3233542
23 May 2008
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3269672
12 May 2008
Damage Survey · Deficiency Check · In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3182110
28 February 2008
Hull Examination · Internal Structural Exam · Annual Inspection · Deficiency Check · Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 3163389
30 January 2008
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3138702
22 December 2007
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3117257
17 November 2007
Examination of Repairs · Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3100320
2 July 2007
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2980694
29 May 2007
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2992530
15 March 2007
Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2888387
4 January 2007
MTSA/ISPS Verification · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2844365
27 October 2006
Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2809498
24 October 2006
Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2808541
11 October 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2798176
19 September 2006
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2781934
18 September 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2781396
14 December 2005
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2551158
2 August 2005
Hull Examination · Examination of Repairs · Cargo Tank Internal · Internal Structural Exam
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 2486826
14 December 2004
Administrative Inspection
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2256313
22 November 2004
MTSA/ISPS Verification · Reflagging & Initial Certification
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2244405
11 November 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2239348
19 October 2004
ISPS III Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2224274
9 September 2004
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2191775
15 July 2004
NPV Safety Exam · Ballast Water Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2134640
15 July 2004
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2135099
2 July 2004
PII Safety Exam · ISPS II Exam
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2118988
21 May 2004
Annual Inspection · Ballast Water Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2073996
29 January 2004
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1996983
14 April 2003
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1773320
23 October 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1694897
22 May 2000
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 278135
9 November 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 434565
30 April 1999
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 428296
19 September 1998
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 420590
2 October 1997
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 408471
16 December 1996
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 398260
26 October 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 396808
14 April 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 390133
12 December 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 53666
13 November 1995
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 384869
Operations/Management › Ballast Water Managment › Sediments
Issued 12 October 2015
Resolved
9900. Rinse anchors and anchor chains when the anchor is retrieved to remove organisms and sediments at their places of origin. Vessel's anchor has large portion of sediment between the fluke and shank. Vessel last dropped anchor in China.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 December 2015
Resolution: Received documention to clear def.
Construction/Loadline › Hull › Longitudinal Frame
Issued 1 August 2011
Resolved
Found several cracks along the edges of web framing in both port and starboard #5 ballast tanks. Some cracks were adjacent to old repairs and some were new cracks. Found some fractures in both port and starboard side as well.
Action required: 705 - Other - as specified
Due 2 October 2011
Resolved 6 September 2011
Resolution: Checked finale weld repairs on the P&S # 5 Ballast Water tanks, all SAT.
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 1 August 2011
Resolved
Amend automation test procedures to align with shipboard automation test procedures. Vessel's Approved Automation test procedures do not aligh with the procedures the crew is using.
Action required: 705 - Other - as specified
Due 2 October 2011
Resolved 22 September 2011
Resolution: Vessel will use approved procedure.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 February 2011
Resolved
Crew is to inspect crack to transverse web-frame number 1, were it connects to the rudder horn (port side) at least every 35 days for further damage. Repairs should be made at next port call at Los Angeles/Long Beach.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2011
Resolved 21 April 2011
Resolution: Repairs complete NDT conducted.
Navigation › Collision/Grounding Avoidance › Radar
Issued 6 December 2008
Resolved
Vessel issued LOD for inoperable 3CM radar for inbound transit to LA/LB. Vessel is to repair prior to departure and submit sat tech report. 17c
Action required: 17 - Rectify deficiencies prior to departure
Due 9 December 2008
Resolved 9 December 2008
Resolution: Received service report
Lifesaving › Lifeboat › Hull
Issued 29 August 2008
Resolved
Complete repairs to damaged fiberglass on starboard lifeboat.
Action required: 705 - Other - as specified
Due 1 October 2008
Resolved 9 September 2008
Resolution: Contacted Vincent Nguyen of ABS San Francisco. Verified satisfactory completion of repairs on lifeboat.
Lifesaving › Launching Appliances › Winch Brake
Issued 29 August 2008
Resolved
Complete repairs to davit brake and prove proper operation.
Action required: 705 - Other - as specified
Due 1 October 2008
Resolved 9 September 2008
Resolution: Contacted Vincent Nguyen of ABS San Francisco. Verified proper repairs of davit brake completed as well as witnessed satisfactory operation of davit and brake assembly.
Lifesaving › Lifeboat › Hull
Issued 29 August 2008
Resolved
Install and maintain additional 20 man liferaft. To be kept on board until lifeboat and davit repairs have been completed and tested.
Due 29 August 2008
Resolved 29 August 2008
Resolution: Corrected on the spot.
Construction/Loadline › Hull › Girder
Issued 17 June 2008
Resolved
Make Port and Stbd 3/4 LWBT available and gas free for an internal inspection by attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 1 August 2008
Resolved 21 July 2008
Resolution: Inspected 3/4/ LWBT, no new fractures.
Construction/Loadline › Hull › Girder
Issued 16 June 2008
Resolved
Provide a written repair proposal for permanent repairs to hull fracture in port 3/4 LWBT IWO girder L15A at frame 107. Proposal to take into account recent modifications to 3/4 LBWT and past structural analysis performed on the vessel. Proposal shall also look at this as a fleet wide issue and address situation with all similar vessels in the fleet. Proposal to be submitted NLT 16 July 2008.
Action required: 705 - Other - as specified
Due 16 October 2008
Resolved 1 January 2009
Resolution: Received results of analysis and repairs have been successfully completed.
Construction/Loadline › Hull › Girder
Issued 23 May 2008
Resolved
Vessel to conduct internal inspections of the port and starboard 3/4 LWBTs once every 120 days. Report all findings to [email withheld]. Examinations to continue until permanent repairs are completed or otherwise specified.
Action required: 705 - Other - as specified
Due 23 May 2009
Resolved 1 June 2009
Resolution: No new fractures observed.
Construction/Loadline › Hull › Girder
Issued 12 May 2008
Resolved
Conduct internal exam of both port and stbd 3&4 double bottom ballast tanks and report findings to Sector LA/LB at [email withheld].
Action required: 705 - Other - as specified
Due 14 July 2008
Resolved 16 June 2008
Resolution: Vessel conducted internal exam with no additional fractures noted and no changes observed to past repairs.
Construction/Loadline › Structures › Ventilators
Issued 19 March 2008
Resolved
Many vent covers had dogs stolen by yard workers in drydock. Required vsl crew to ensure all replacements put in station prior to departure for US from Asia cargo runs.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 12 May 2008
Resolution: Vessel personnel replaced all missing dogs. Conducted deck walk and observed numerous new dogs in various vent covers throughout the vessel.
Lifesaving › Embarkation Appliances/Stations › Side Ropes
Issued 19 March 2008
Resolved
Replace embarkation ladders at port and & stbd and fwd liferaft stations with same make and model or new CG approved models due to wastage of ropes.
Condition: Improper/Lack of Maintenance
Due 19 April 2008
Resolved 12 May 2008
Resolution: Vessel installed new embarkation ladders at port & stbd lifeboat stations. Ladders CG approved (approval #160.117).
Construction/Loadline › Hull › Girder
Issued 19 March 2008
Resolved
Monitor c/l deck girder fracture at Hatch 11, advise USCG Activities Far East if it propagates into Deck plate. Repair in accordance with existing procedure or submit alternate repair proposal. If no propagation into deck plate, repair within 45 days.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 3 May 2008
Resolved 16 June 2008
Lifesaving › Launching Appliances › Davit
Issued 19 March 2008
Resolved
Replace lifeboat davit chocks (fore and aft) on both port and stbd davits within 60 days. Provide condition report on lifeboat hull in contact areas to attending CG inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2008
Resolved 12 May 2008
Resolution: Lifeboat davit chocks replaced and covered with canvas to prevent impact damage to lifeboat.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 19 March 2008
Resolved
Provide for permanent repair to bulkhead penetrations in accomodation spaces that were improperly made (15 locations). Complete no later than Annual ABS Safe Construction Survey for 2008. (See SAFENET Outstanding Recommendation #242)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2008
Resolved 21 July 2008
Resolution: Completed.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 19 March 2008
Resolved
Provide approved plans for Low-Sulfur Fuel Oil (LSFO) related structural modifications completed and any further intended work within 30 days (ABS or USCG review).
Condition: Improper Installation
Due 19 April 2008
Resolved 11 April 2008
Resolution: MLL submitted and received plan approval for as-built tank mod drawings (with one amendment for additional stiffeners), ABS Houston Ltr Dtd 11-Apr-08, Ref 332248.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 19 March 2008
Resolved
Complete identified deck gratings and manhole repairs by annual loadline survey by ABS.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 July 2008
Resolution: Completed.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Repair crack in STBD 3/4 double bottom ballast tank located at girder L-13 IWA frame 113.
Action required: 705 - Other - as specified
Due 24 December 2007
Resolved 24 December 2007
Resolution: Vsl repaired crack and NDT sat.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Repair crack in Port 3/4 double bottom ballast tank located at girder L-13 IWA frame 113.
Action required: 705 - Other - as specified
Due 24 December 2007
Resolved 24 December 2007
Resolution: Vsl repaired crack and NDT sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 December 2007
Resolved
Repair crack in STBD 3/4 double bottom ballast tank located on longitudinal 13 between frames 117 & 118.
Action required: 705 - Other - as specified
Due 24 December 2007
Resolved 24 December 2007
Resolution: Vsl repaired crack and NDT sat.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Make permanent repairs to # 3/4 port & stbd double bottom ballast tanks in all areas identified in attached list. (see vessel documents).
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 19 March 2008
Resolution: Repairs completed to the satisfaction of ABS/CG attending inspectors.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Conduct internal examination of both port & stbd double bottom ballast tanks monthly until permanent repairs are made.
Due 29 February 2008
Resolved 23 December 2007
Resolution: Cleared 835 due to modified inspection requirements as noted in deficiency number 07 and as listed in the narrative.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Provide detailed rpt of all cracks identified in 3/4 starboard DB tank and 3/4 port DB tank. Rpt details must include exact measrmnts to 1 mm accuracy of each crack, cracks must be marked with scribe marks at the beginning and end of each crack for measrmnt and insp purposes. Photos must also be taken of each crack and labeled with the location. In addition provide a copy of the ABS survey rpt.
Action required: 705 - Other - as specified
Due 24 December 2007
Resolved 24 December 2007
Resolution: Received report and pictures from vsl.
Construction/Loadline › Hull › Girder
Issued 22 December 2007
Resolved
Conduct internal exams of both port and stbd double bottom tanks once every two weeks, not to exceed twice in any 35 day period. Exam will include monitoring of all identified cracks and measuring to the 1 mm. All measurements will need to be recorded and provided to Sector LA/LB via email at [email withheld] upon completion. Must be completed to the satisfaction of the cognizant OCMI.
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 14 May 2008
Resolution: CG 835 Amended and reissued on 14 May 08 by Sector LA/LB.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Repair crack in STBD lower ballast tank located between frames 107 and 108 and longitudinals 15A and 16
Action required: 17 - Rectify deficiencies prior to departure
Due 2 December 2007
Resolved 21 November 2007
Resolution: Temporary repaired.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Repair crack in port lower ballast tank located between frames 107 and 108 and longitudinals 15A and 16
Action required: 17 - Rectify deficiencies prior to departure
Due 2 December 2007
Resolved 21 November 2007
Resolution: Temporary repaired.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Submit repair proposal for cracks in STBD and port lower ballast tanks for approval by USCG and ABS concurrently. Repair proposal has to be approved by USCG and ABS prior to commencing any repair work.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 December 2007
Resolved 21 November 2007
Resolution: Provided.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Make permanant repairs to #3/4 P/S lower BTs in way of frames 107/108 and longs 15a/16 prior to departure of next dry-dock February 2008.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 19 March 2008
Resolution: Permanent repairs completed to the satisfaction of ABS and Attening CG inspector.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 17 November 2007
Resolved
Report structural failures of P/S ballast tanks through SMS.
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 December 2007
Resolved 3 December 2007
Resolution: Report as non-comformaties thru SMS. CAR submitted.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Make available for examination to P/S lower ballast tanks upon return to port of LA.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 15 January 2008
Resolved 30 January 2008
Resolution: [name withheld] and [name withheld] examined temporary repairs to both #4 P/S lower ballast tanks in way of frames 107/108 and Longs 15A/16.
Stability › Watertight Integrity › General
Issued 17 November 2007
Resolved
Conduct internal examination of both P/S lower ballst tanks monthly until permanent repiars are made.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 24 December 2007
Resolution: Replaced by new CG-835 requiring internal exam once every two weeks not to exceed twice in any 35 day period.
Deck/Cargo › Cargo Stowage › General
Issued 17 November 2007
Resolved
Conduct a review of cargo loading procedures.
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 December 2007
Resolved 3 December 2007
Resolution: Cargo Securing manual and Loadstar user guide reviewed with crew. Five load conditions were installed into loadstar with no deficiencies.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 4 January 2007
Resolved
Repair or renew HFO vent pipe in portside tunnel forward. Pipe has excessive wastage underneath and is leaking water onto deck below.
Due 4 April 2007
Resolved 14 March 2007
Lifesaving › Launching Appliances › Release Mechanism
Issued 24 October 2006
Resolved
Repair or provide operable the port lifeboat to the satisfaction of an attending marine inspector prior to an overseas voyage. The vessel may transit on a coastwise voyage to LA-LB to the San Francisco Bay area provided inflatable liferafts equal to the capacity of the port lifeboat are installed on the port side in a suitable float-free manner.
Action required: 705 - Other - as specified
Due 15 November 2006
Resolved 26 October 2006
Resolution: Port lifeboat fall release cables were renewed and tested satisfactory. Vessel was allowed to depart San Francisco Bay.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 21 May 2004
Resolved
Abandon Ship Drill could not be preformed due to Cargo Operations and Repair work being done to vessel. Drills to be preformed at next U.S. Port. LEGACY COMPONENT DESC: Abandon Ship
Action required: 15 - Rectify deficiencies by next port
Resolved 15 July 2004
Resolution: Crew conducted a satisfactory abandon ship drill.
Operations/Management › Drills/Instruction › Fire
Issued 21 May 2004
Resolved
Fire Drill could not be preformed due to Cargo Operations and Repair work being done to vessel. Drills to be preformed at next U.S. Port. LEGACY COMPONENT DESC: Fire
Action required: 15 - Rectify deficiencies by next port
Resolved 2 July 2004
Resolution: ran drill
Lifesaving
Issued 9 November 1999
Resolved
AIR FLOW INDICATORS (FILAMENTS)SMOKE CABINET IN FIRE LOCKER MISSING IN SEVERAL HOLD SAMPLE. MAKE REPAIRS TO AIR FLOW INDICATORS TO THE SATISFACTION OF CLASS PRIOR TO 30DEC99.
Condition: Unknown
Due 23 May 2000
Resolved 23 May 2000